{{#Wiki_filter:Grand Gulf Nuclear Station Drill Date - September 28, 2010 Radiological Emergency Preparedness (REP) Program | {{#Wiki_filter:Grand Gulf Nuclear Station After Action Report/ | ||
Improvement Plan Drill Date - September 28, 2010 Radiological Emergency Preparedness (REP) Program Published October 20, 2010 | |||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | |||
Unclassified Radiological Emergency Preparedness Program (REP) | |||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | |||
_____________________________________________________________________ | _____________________________________________________________________ | ||
This page is intentionally blank. | This page is intentionally blank. | ||
Grand Gulf Nuclear Station After Action Report/Improvement Plan Published | |||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | Unclassified Radiological Emergency Preparedness Program (REP) | ||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | |||
_____________________________________________________________________ | |||
Grand Gulf Nuclear Station After Action Report/Improvement Plan Published October 20, 2010 Contents Executive Summary 3 Section 1: Exercise Overview 4 1.1 Exercise Details 4 1.2 Exercise Planning Team Leadership 4 1.3 Participating Organizations 5 Section 2: Exercise Design Summary 6 2.1 Exercise Purpose and Design 6 2.2 Exercise Objectives, Capabilities and Activities 6 2.3 Scenario Summary 6 Section 3: Analysis of Capabilities 7 3.1 Drill Evaluation and Results 7 3.2 Summary Results of Drill Evaluation 7 3.3 Criteria Evaluation Summaries 9 3.3.1 Support Jurisdictions 9 3.3.1.1 Riverland Medical Center 9 3.3.2 Private Organizations 12 3.3.2.1 Northeast Louisiana Ambulance Service 12 Section 4: Conclusion 14 Appendix A: Improvement Plan 15 Appendix B: Drill Evaluators and Team Leaders 17 Appendix C: Acronyms and Abbreviations 18 Appendix D: Exercise Plan 19 1 | |||
Unclassified Radiological Emergency Preparedness Program (REP) | |||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | |||
_____________________________________________________________________ | _____________________________________________________________________ | ||
This page is intentionally blank. | This page is intentionally blank. | ||
2 Unclassified Radiological Emergency Preparedness Program (REP) | 2 | ||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | |||
Unclassified Radiological Emergency Preparedness Program (REP) | |||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | |||
_____________________________________________________________________ | _____________________________________________________________________ | ||
EXECUTIVE | EXECUTIVE | ||
Line 35: | Line 45: | ||
Personnel from the State of Louisiana, Riverland Medical Center, Northeast Louisiana Ambulance Service, and Grand Gulf Nuclear Station participated in the drill. Cooperation and teamwork of all the participants was evident during the drill and DHS/FEMA wishes to acknowledge these efforts. | Personnel from the State of Louisiana, Riverland Medical Center, Northeast Louisiana Ambulance Service, and Grand Gulf Nuclear Station participated in the drill. Cooperation and teamwork of all the participants was evident during the drill and DHS/FEMA wishes to acknowledge these efforts. | ||
This report contains the final evaluation of the out-of-sequence drill. The participants demonstrated knowledge of their emergency response plans and procedures. There was one Deficiency and three Areas Requiring Corrective Action (ARCA) identified during the drill. One ARCA was corrected during the drill and no Plan Issues were identified. | This report contains the final evaluation of the out-of-sequence drill. The participants demonstrated knowledge of their emergency response plans and procedures. There was one Deficiency and three Areas Requiring Corrective Action (ARCA) identified during the drill. One ARCA was corrected during the drill and no Plan Issues were identified. | ||
3 Unclassified Radiological Emergency Preparedness Program (REP) | 3 | ||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | |||
Unclassified Radiological Emergency Preparedness Program (REP) | |||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | |||
_____________________________________________________________________ | _____________________________________________________________________ | ||
SECTION 1: EXERCISE OVERVIEW 1.1 Exercise Details Exercise Name Grand Gulf Nuclear Station Type of Exercise Drill Exercise Date September 28, 2010 Program Department of Homeland Security/FEMA Radiological Emergency Preparedness Program Scenario Type Radiological Emergency 1.2 Exercise Planning Team Leadership Lisa | SECTION 1: EXERCISE OVERVIEW 1.1 Exercise Details Exercise Name Grand Gulf Nuclear Station Type of Exercise Drill Exercise Date September 28, 2010 Program Department of Homeland Security/FEMA Radiological Emergency Preparedness Program Scenario Type Radiological Emergency 1.2 Exercise Planning Team Leadership Lisa Hammond RAC Chair FEMA Region VI Technological Hazards Branch Chief 800 N. Loop 288 Denton, Texas, 76209 940-898-5199 lisa.hammond@dhs.gov Bill Bischof Federal Planning Team Lead FEMA Region VI Technological Hazards Specialist 800 N. Loop 288 4 | ||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | |||
Unclassified Radiological Emergency Preparedness Program (REP) | |||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | |||
_____________________________________________________________________ | _____________________________________________________________________ | ||
Denton, Texas, 76209 940-898-5562 bill.bischof@dhs.gov Greg | Denton, Texas, 76209 940-898-5562 bill.bischof@dhs.gov Greg Gothard State Planner Louisiana Department of Environmental Quality Environmental Scientist 602 N. Fifth St. | ||
Baton Rouge, Louisiana, 70802 225-219-3627 greg.gothard@la.gov 1.3 Participating Organizations Agencies and organizations of the following jurisdictions participated in the Grand Gulf Nuclear Station drill: | Baton Rouge, Louisiana, 70802 225-219-3627 greg.gothard@la.gov 1.3 Participating Organizations Agencies and organizations of the following jurisdictions participated in the Grand Gulf Nuclear Station drill: | ||
Risk Jurisdictions Tensas Parish Office of Emergency Preparedness Support Jurisdictions Riverland Medical Center Northeast Louisiana Ambulance Service Private Organizations Grand Gulf Nuclear Station 5 Unclassified Radiological Emergency Preparedness Program (REP) | Risk Jurisdictions Tensas Parish Office of Emergency Preparedness Support Jurisdictions Riverland Medical Center Northeast Louisiana Ambulance Service Private Organizations Grand Gulf Nuclear Station 5 | ||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | |||
Unclassified Radiological Emergency Preparedness Program (REP) | |||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | |||
_____________________________________________________________________ | _____________________________________________________________________ | ||
SECTION 2: EXERCISE DESIGN | SECTION 2: EXERCISE DESIGN | ||
Line 53: | Line 69: | ||
2.2 Exercise Objectives, Capabilities and Activities Exercise objectives and identified Capabilities/REP Criteria selected to be exercised are discussed in the Exercise Plan (EXPLAN), Appendix D. | 2.2 Exercise Objectives, Capabilities and Activities Exercise objectives and identified Capabilities/REP Criteria selected to be exercised are discussed in the Exercise Plan (EXPLAN), Appendix D. | ||
2.3 Scenario Summary The drill scenario was developed to evaluate the response of drill participants to an incident requiring evacuation of the public from the Louisiana portion of the 10-mile Emergency Planning Zone surrounding the Grand Gulf Nuclear Station. The drill scenario provided for the evaluation of the Riverland Medical Center and Northeast Louisiana Ambulance Service's ability to transport and treat a radiologically contaminated injured individual. | 2.3 Scenario Summary The drill scenario was developed to evaluate the response of drill participants to an incident requiring evacuation of the public from the Louisiana portion of the 10-mile Emergency Planning Zone surrounding the Grand Gulf Nuclear Station. The drill scenario provided for the evaluation of the Riverland Medical Center and Northeast Louisiana Ambulance Service's ability to transport and treat a radiologically contaminated injured individual. | ||
6 Unclassified Radiological Emergency Preparedness Program (REP) | 6 | ||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | |||
Unclassified Radiological Emergency Preparedness Program (REP) | |||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | |||
_____________________________________________________________________ | _____________________________________________________________________ | ||
SECTION 3: ANALYSIS OF CAPABILITIES 3.1 Drill | SECTION 3: ANALYSIS OF CAPABILITIES 3.1 Drill Evaluation and Results Contained in this section are the results and findings of the evaluation of all jurisdictions and functional entities that participated in the September 28, 2010, drill evaluation to test the offsite emergency response capabilities of Riverland Medical Center and Northeast Louisiana Ambulance Service to transport and treat a contaminated injured individual. | ||
Each jurisdiction and functional entity was evaluated on the basis of its demonstration of criteria delineated in the exercise evaluation areas as outlined in the April 25, 2002, Federal Register, Radiological Emergency Preparedness: | Each jurisdiction and functional entity was evaluated on the basis of its demonstration of criteria delineated in the exercise evaluation areas as outlined in the April 25, 2002, Federal Register, Radiological Emergency Preparedness: Evaluation Methodology. Detailed information on the exercise evaluation area criteria and the extent of play agreement used in this drill are found in Appendix D of this report. | ||
3.2 Summary Results of Drill Evaluation The matrix presented in Table 3.1 on the following page, presents the status of all drill evaluation area criteria that were scheduled for demonstration during this drill by all participating jurisdictions and functional entities. Exercise criteria are listed by number and the demonstration status is indicated by the use of the following letters: | 3.2 Summary Results of Drill Evaluation The matrix presented in Table 3.1 on the following page, presents the status of all drill evaluation area criteria that were scheduled for demonstration during this drill by all participating jurisdictions and functional entities. Exercise criteria are listed by number and the demonstration status is indicated by the use of the following letters: | ||
M - Met (No Deficiency or ARCAs assessed and no unresolved ARCAs from prior exercise) | M - Met (No Deficiency or ARCAs assessed and no unresolved ARCAs from prior exercise) | ||
D - Deficiency assessed A - ARCAs assessed or unresolved ARCAs from previous exercises P - Plan Issue N - Not Demonstrated 7 Unclassified Radiological Emergency Preparedness Program (REP) | D - Deficiency assessed A - ARCAs assessed or unresolved ARCAs from previous exercises P - Plan Issue N - Not Demonstrated 7 | ||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | |||
Unclassified Radiological Emergency Preparedness Program (REP) | |||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | |||
_____________________________________________________________________ | _____________________________________________________________________ | ||
Table 3.1 - | Table 3.1 - Summary of Drill Evaluation DATE: 2010-09-28 SITE: Grand Gulf Nuclear Station, MS NELA RMC M: Met, A: ARCA, D: Deficiency, P: Plan Issue, N: Not Demonstrated Emergency Operations Management Mobilization 1a1 Facilities 1b1 Direction and Control 1c1 Communications Equipment 1d1 Equip & Supplies to support operations 1e1 M A Protective Action Decision Making Emergency Worker Exposure Control 2a1 Radiological Assessment and PARs 2b1 Decisions for the Plume Phase -PADs 2b2 PADs for protection of special populations 2c1 Rad Assessment and Decision making for the Ingestion Exposure Pathway 2d1 Rad Assessment and Decision making concerning Relocation, Reentry, and Return 2e1 Protective Action Implementation Implementation of emergency worker exposure control 3a1 M A Implementation of KI decision 3b1 Implementation of protective actions for special populations - EOCs 3c1 Implementation of protective actions for Schools 3c2 Implementation of traffic and access control 3d1 Impediments to evacuation are identified and resolved 3d2 Implementation of ingestion pathway decisions - availability/use of info 3e1 Materials for Ingestion Pathway PADs are available 3e2 Implementation of relocation, re-entry, and return decisions. 3f1 Field Measurement and Analysis Adequate Equipment for Plume Phase Field Measurements 4a1 Field Teams obtain sufficient information 4a2 Field Teams Manage Sample Collection Appropriately 4a3 Post plume phase field measurements and sampling 4b1 Laboratory operations 4c1 Emergency Notification and Public Info Activation of the prompt alert and notification system 5a1 Activation of the prompt alert and notification system - Fast Breaker 5a2 Activation of the prompt alert and notification system - Exception areas 5a3 Emergency information and instructions for the public and the media 5b1 Support Operations/Facilities Mon / decon of evacuees and emergency workers, and registration of evacuees 6a1 Mon / decon of emergency worker equipment 6b1 Temporary care of evacuees 6c1 Transportation and treatment of contaminated injured individuals 6d1 M D 8 | ||
3f1 Field Measurement and Analysis Adequate Equipment for Plume Phase Field Measurements 4a1 Field Teams obtain sufficient information 4a2 Field Teams Manage Sample Collection Appropriately 4a3 Post plume phase field measurements and sampling 4b1 Laboratory operations 4c1 Emergency Notification and Public Info Activation of the prompt alert and notification system 5a1 Activation of the prompt alert and notification system - Fast Breaker 5a2 Activation of the prompt alert and notification system - Exception areas 5a3 Emergency information and instructions for the public and the media 5b1 Support Operations/Facilities Mon / decon of evacuees and emergency workers, and registration of evacuees 6a1 Mon / decon of emergency worker equipment 6b1 Temporary care of evacuees 6c1 Transportation and treatment of contaminated injured individuals 6d1 M D 8 Unclassified Radiological Emergency Preparedness Program (REP) | |||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | Unclassified Radiological Emergency Preparedness Program (REP) | ||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | |||
_____________________________________________________________________ | _____________________________________________________________________ | ||
3.3 Criteria Evaluation Summaries 3.3.1 Support Jurisdictions 3.3.1.1 Riverland Medical Center | |||
: a. MET: None | |||
: b. AREAS REQUIRING CORRECTIVE ACTION: 1.e.1, 3.a.1. | |||
ISSUE NO.: 28-10-1e1-A-01 CRITERION: Equipment, maps, displays, dosimetry, potassium iodide (KI), and other supplies are sufficient to support emergency operations. | ISSUE NO.: 28-10-1e1-A-01 CRITERION: Equipment, maps, displays, dosimetry, potassium iodide (KI), and other supplies are sufficient to support emergency operations. | ||
CONDITION: The Ludlum 12 Survey Meters did not have a Range of Reading sticker affixed. | CONDITION: The Ludlum 12 Survey Meters did not have a Range of Reading sticker affixed. | ||
Line 73: | Line 96: | ||
==REFERENCE:== | ==REFERENCE:== | ||
Interim REP Program Manual under Criterion 1.e.1 - Equipment, page III-111. NUREG-0654, H.7,10; J.10.a,b,e, J.11; K.3.a EFFECT: The emergency worker is not able to ensure the equipment is measuring properly. RECOMMENDATION: Affix a Range of Readings sticker to the Ludlum 12 survey meter. Provide training on the proper use of the Range of Readings sticker and operations of the equipment. | Interim REP Program Manual under Criterion 1.e.1 - Equipment, page III-111. NUREG-0654, H.7,10; J.10.a,b,e, J.11; K.3.a EFFECT: The emergency worker is not able to ensure the equipment is measuring properly. | ||
ISSUE NO.: 28-10-3a1-A-02 CRITERION: OROs issue appropriate dosimetry and procedures, and manage radiological exposure to emergency workers IAW plans and procedures. Emergency workers periodically and at the end of each mission read and record dosimeter reading. | RECOMMENDATION: Affix a Range of Readings sticker to the Ludlum 12 survey meter. Provide training on the proper use of the Range of Readings sticker and operations of the equipment. | ||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | ISSUE NO.: 28-10-3a1-A-02 CRITERION: OROs issue appropriate dosimetry and procedures, and manage radiological exposure to emergency workers IAW plans and procedures. Emergency workers periodically and at the end of each mission read and record dosimeter reading. (NUREG-0654, K.3) 9 | ||
Unclassified Radiological Emergency Preparedness Program (REP) | |||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | |||
_____________________________________________________________________ | _____________________________________________________________________ | ||
CONDITION: Administrative exposure limits and background levels were not identified to medical personnel at the hospital during the drill. | |||
POSSIBLE CAUSE: Medical center personnel have not been adequately trained on dosimetry. | POSSIBLE CAUSE: Medical center personnel have not been adequately trained on dosimetry. | ||
Line 83: | Line 109: | ||
NUREG 0654 K.3.a, b EFFECT: Medical center personnel would not have known when administrivative exposure levels were exceeded. | NUREG 0654 K.3.a, b EFFECT: Medical center personnel would not have known when administrivative exposure levels were exceeded. | ||
RECOMMENDATION: Additional training on dosimetry should be provided. | RECOMMENDATION: Additional training on dosimetry should be provided. | ||
DEFICIENCY: | : c. DEFICIENCY: 6.d.1. | ||
ISSUE NO.: 28-10-6d1-D-03 CRITERION: Facility/ORO has the appropriate space, adequate resources, and trained personnel to provide transport, monitoring, decontamination, and medical services to contaminated injured individuals. | ISSUE NO.: 28-10-6d1-D-03 CRITERION: Facility/ORO has the appropriate space, adequate resources, and trained personnel to provide transport, monitoring, decontamination, and medical services to contaminated injured individuals. (NUREG-0654, F.2., H.10., K.5.a.b., | ||
L.1., 4) | |||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | CONDITION: Minimal or no contamination control; no radiological briefing for Emergency Workers (EWs); emergency workers assigned as Monitors were unsure of how to use or read the survey meters; and no range of readings stickers on survey meters. The following discrepancies were observed: | ||
- Emergency workers were not provided a radiological briefing. EWs were not aware of the exposure limits or background levels. No contamination threshold limits were identified. | |||
- The Monitor assigned to assist with transfer of patient from ambulance to hospital staff did not frisk the patient or gurney upon transfer from the ambulance to the hospital staff. | |||
- During the ambulance survey, the monitor was not sure of what steps to take if 10 | |||
Unclassified Radiological Emergency Preparedness Program (REP) | |||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | |||
_____________________________________________________________________ | _____________________________________________________________________ | ||
contamination was found.- The REA Monitor was unaware of how to use swipes and unclear of the procedures for disposal of contaminated waste.- Monitors were not knowledgeable on how to use or read the survey meters when surveying the patient. The controller provided (simulated) reading that the meter was off scale, the monitor did not understand she needed to adjust the meter dial to the next higher scale and coaching was consistently provided throughout the drill.- The REA Monitor did not conduct an initial patient contamination survey until after the first time out was called by the GGNS representative and conducted training on how and why contamination controls are important.- After training, the REA Monitor continued to demonstrate poor surveying techniques and required continued coaching.- The REA medical staff used poor technique in removing potentially contaminated sheets, clothing and medical equipment (neck brace, backboard, etc).- REA nurse may have cross contaminated medical equipment and supplies, prior to changing gloves, by accessing sealed cabinets and following the procedures to request supplies from Buffer Zone staff.- REA staff did not perform glove changes until after time out and training was provided.- Throughout the drill the REA Monitor did not survey the REA staff hands or potentially contaminated areas.- A basin of contaminated saline used to irrigate the wound was left at the | contamination was found. | ||
11 Unclassified Radiological Emergency Preparedness Program (REP) | - The REA Monitor was unaware of how to use swipes and unclear of the procedures for disposal of contaminated waste. | ||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | - Monitors were not knowledgeable on how to use or read the survey meters when surveying the patient. The controller provided (simulated) reading that the meter was off scale, the monitor did not understand she needed to adjust the meter dial to the next higher scale and coaching was consistently provided throughout the drill. | ||
- The REA Monitor did not conduct an initial patient contamination survey until after the first time out was called by the GGNS representative and conducted training on how and why contamination controls are important. | |||
- After training, the REA Monitor continued to demonstrate poor surveying techniques and required continued coaching. | |||
- The REA medical staff used poor technique in removing potentially contaminated sheets, clothing and medical equipment (neck brace, backboard, etc). | |||
- REA nurse may have cross contaminated medical equipment and supplies, prior to changing gloves, by accessing sealed cabinets and following the procedures to request supplies from Buffer Zone staff. | |||
- REA staff did not perform glove changes until after time out and training was provided. | |||
- Throughout the drill the REA Monitor did not survey the REA staff hands or potentially contaminated areas. | |||
- A basin of contaminated saline used to irrigate the wound was left at the patients feet on the gurney and later on the counter without regard of proper disposal. | |||
- The REA Monitor was the first EW to demonstrate the doffing of PPE and exit procedures from the REA. She left the still-running survey meter on the counter and proceeded to step on the step off pad without removing the booties or being surveyed by the Buffer Zone nurse. The monitor did not demonstrate the proper procedure to remove the PPE even though the procedures were posted on the wall. | |||
- The Buffer Zone nurses surveying technique was too fast and the distance was inconsistent, at times too far (greater that 1/2 -1) and at times the meter came in contact with the EW being surveyed. | |||
- Maintenance staff were tasked with completing the closeout of the REA and Buffer Zone area and had no knowledge or training of proper procedures. | |||
- Majority of Emergency Workers departed the area prior to the drill being terminated. | |||
11 | |||
Unclassified Radiological Emergency Preparedness Program (REP) | |||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | |||
_____________________________________________________________________ | _____________________________________________________________________ | ||
POSSIBLE CAUSE: Inadequate training and failure to follow procedures. | |||
==REFERENCE:== | ==REFERENCE:== | ||
Line 98: | Line 145: | ||
EFFECT: The patient would not have been appropriately decontaminated, and the staff could have received contamination by the poor techniques that would result in a spread of contamination to the workers in the area. | EFFECT: The patient would not have been appropriately decontaminated, and the staff could have received contamination by the poor techniques that would result in a spread of contamination to the workers in the area. | ||
RECOMMENDATION: Conduct and reinforce training as needed. Update procedures. | RECOMMENDATION: Conduct and reinforce training as needed. Update procedures. | ||
PLAN ISSUES: None NOT DEMONSTRATED: None PRIOR ISSUES - RESOLVED: None PRIOR ISSUES - UNRESOLVED: None 3.3.2 Private Organizations 3.3.2.1 Northeast Louisiana Ambulance Service MET: | : d. PLAN ISSUES: None | ||
AREAS REQUIRING CORRECTIVE ACTION: | : e. NOT DEMONSTRATED: None | ||
ISSUE NO.: 28-10-6d1-A-01 CRITERION: Facility/ORO has the appropriate space, adequate resources, and trained personnel to provide transport, monitoring, decontamination, and medical services to contaminated injured individuals. | : f. PRIOR ISSUES - RESOLVED: None | ||
: g. PRIOR ISSUES - UNRESOLVED: None 3.3.2 Private Organizations 3.3.2.1 Northeast Louisiana Ambulance Service | |||
: a. MET: 1.e.1, 3.a.1, 6.d.1. | |||
: b. AREAS REQUIRING CORRECTIVE ACTION: 6.d.1. | |||
ISSUE NO.: 28-10-6d1-A-01 CRITERION: Facility/ORO has the appropriate space, adequate resources, and trained personnel to provide transport, monitoring, decontamination, and medical services to contaminated injured individuals. (NUREG-0654, F.2., H.10., K.5.a.b., | |||
L.1., 4) | |||
CONDITION: The ambulance technician didnt demonstrate a glove change while assessing the victim. | |||
POSSIBLE CAUSE: The checklist referenced by the ambulance technicians should include glove changes. | POSSIBLE CAUSE: The checklist referenced by the ambulance technicians should include glove changes. | ||
12 Unclassified Radiological Emergency Preparedness Program (REP) | 12 | ||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | |||
Unclassified Radiological Emergency Preparedness Program (REP) | |||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | |||
_____________________________________________________________________ | _____________________________________________________________________ | ||
==REFERENCE:== | ==REFERENCE:== | ||
NUREG-0654, K.3.a., 3.b; Tensas Parish Office of Emergency Preparedness, Emergency Medical Services (EMS)/Ambulance Procedure for Response to Radiological Emergencies, Revision 3: September 24, 2010. | NUREG-0654, K.3.a., 3.b; Tensas Parish Office of Emergency Preparedness, Emergency Medical Services (EMS)/Ambulance Procedure for Response to Radiological Emergencies, Revision 3: September 24, 2010. | ||
EFFECT: Contamination from the victim could have remained on the ambulance | EFFECT: Contamination from the victim could have remained on the ambulance technicians gloves transferring contamination to the ambulance and other equipment. | ||
CORRECTIVE ACTION DEMONSTRATED: Training was conducted and several glove changes were subsequently demonstrated throughout the drill. | CORRECTIVE ACTION DEMONSTRATED: Training was conducted and several glove changes were subsequently demonstrated throughout the drill. | ||
DEFICIENCY: None PLAN ISSUES: None NOT DEMONSTRATED: None PRIOR ISSUES - RESOLVED: None PRIOR ISSUES - UNRESOLVED: None 13 Unclassified Radiological Emergency Preparedness Program (REP) | : c. DEFICIENCY: None | ||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | : d. PLAN ISSUES: None | ||
: e. NOT DEMONSTRATED: None | |||
: f. PRIOR ISSUES - RESOLVED: None | |||
: g. PRIOR ISSUES - UNRESOLVED: None 13 | |||
Unclassified Radiological Emergency Preparedness Program (REP) | |||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | |||
_____________________________________________________________________ | _____________________________________________________________________ | ||
SECTION 4: CONCLUSION Based on the results of the drill, and the assessment of a deficiency against Riverland Medical Center, the Medical Center will be required to redemonstrate and correct the issues identified within this report. The Northeast Louisiana Ambulance Service satisfactorily demonstrated their required criteria and no additional demonstration is necessary until the next regularly scheduled drill/exercise at this location. | SECTION 4: CONCLUSION Based on the results of the drill, and the assessment of a deficiency against Riverland Medical Center, the Medical Center will be required to redemonstrate and correct the issues identified within this report. The Northeast Louisiana Ambulance Service satisfactorily demonstrated their required criteria and no additional demonstration is necessary until the next regularly scheduled drill/exercise at this location. | ||
14 Unclassified Radiological Emergency Preparedness Program (REP) | 14 | ||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | |||
Unclassified Radiological Emergency Preparedness Program (REP) | |||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | |||
_____________________________________________________________________ | _____________________________________________________________________ | ||
APPENDIX A: IMPROVEMENT PLAN Issue Number: 28-10-1e1-A-01 Criterion: 1e1 ISSUE: The Ludlum 12 Survey Meters did not have a Range of Reading sticker affixed. | APPENDIX A: IMPROVEMENT PLAN Issue Number: 28-10-1e1-A-01 Criterion: 1e1 ISSUE: The Ludlum 12 Survey Meters did not have a Range of Reading sticker affixed. | ||
RECOMMENDATION: | RECOMMENDATION: Affix a Range of Readings sticker to the Ludlum 12 survey meter. Provide training on the proper use of the Range of Readings sticker and operations of the equipment. | ||
Affix a Range of Readings sticker to the Ludlum 12 survey meter. Provide training on the proper use of the Range of Readings sticker and operations of the equipment. | |||
CORRECTIVE ACTION DESCRIPTION: | CORRECTIVE ACTION DESCRIPTION: | ||
CAPABILITY: | CAPABILITY: PRIMARY RESPONSIBLE AGENCY: | ||
PRIMARY RESPONSIBLE AGENCY: | CAPABILITY ELEMENT: START DATE: | ||
CAPABILITY ELEMENT: | AGENCY POC: ESTIMATED COMPLETION DATE: | ||
START DATE: | Issue Number: 28-10-3a1-A-02 Criterion: 3a1 ISSUE: Administrative exposure limits and background levels were not identified to medical personnel at the hospital during the drill. | ||
AGENCY POC: | RECOMMENDATION: Additional training on dosimetry should be provided. | ||
ESTIMATED COMPLETION DATE: | |||
Issue Number: 28-10-3a1-A-02 Criterion: 3a1 ISSUE: Administrative exposure limits and background levels were not identified to medical personnel at the hospital during the drill. | |||
RECOMMENDATION: | |||
Additional training on dosimetry should be provided. | |||
CORRECTIVE ACTION DESCRIPTION: | CORRECTIVE ACTION DESCRIPTION: | ||
CAPABILITY: | CAPABILITY: PRIMARY RESPONSIBLE AGENCY: | ||
PRIMARY RESPONSIBLE AGENCY: | CAPABILITY ELEMENT: START DATE: | ||
CAPABILITY ELEMENT: | AGENCY POC: ESTIMATED COMPLETION DATE: | ||
START DATE: | 15 | ||
AGENCY POC: | |||
ESTIMATED COMPLETION DATE: | Unclassified Radiological Emergency Preparedness Program (REP) | ||
15 Unclassified Radiological Emergency Preparedness Program (REP) | After Action Report/Improvement Plan Grand Gulf Nuclear Station | ||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | |||
_____________________________________________________________________ | _____________________________________________________________________ | ||
Issue Number: 28-10-6d1-D-03 Criterion: 6d1 ISSUE: Minimal or no contamination control; no radiological briefing for Emergency Workers (EWs); | Issue Number: 28-10-6d1-D-03 Criterion: 6d1 ISSUE: Minimal or no contamination control; no radiological briefing for Emergency Workers (EWs); | ||
emergency workers assigned as Monitors were unsure of how to use or read the survey meters; and no range of readings stickers on survey meters. The following discrepancies were observed: | emergency workers assigned as Monitors were unsure of how to use or read the survey meters; and no range of readings stickers on survey meters. The following discrepancies were observed: | ||
- Emergency workers were not provided a radiological briefing. EWs were not aware of the exposure limits or background levels. No contamination threshold limits were identified.- The Monitor assigned to assist with transfer of patient from ambulance to hospital staff did not frisk the patient or gurney upon transfer from the ambulance to the hospital staff.- During the ambulance survey, the monitor was not sure of what steps to take if contamination was found.- The REA Monitor was unaware of how to use swipes and unclear of the procedures for disposal of contaminated waste.- Monitors were not knowledgeable on how to use or read the survey meters when surveying the patient. The controller provided (simulated) reading that the meter was off scale, the monitor did not understand she needed to adjust the meter dial to the next higher scale and coaching was consistently provided throughout the drill.- The REA Monitor did not conduct an initial patient contamination survey until after the first time out was called by the GGNS representative and conducted training on how and why contamination controls are important.- After training, the REA Monitor continued to demonstrate poor surveying techniques and required continued coaching.- The REA medical staff used poor technique in removing potentially contaminated sheets, clothing and medical equipment (neck brace, backboard, etc).- REA nurse may have cross contaminated medical equipment and supplies, prior to changing gloves, by accessing sealed cabinets and following the procedures to request supplies from Buffer Zone staff.- REA staff did not perform glove changes until after time out and training was provided.- Throughout the drill the REA Monitor did not survey the REA staff hands or potentially contaminated areas.- A basin of contaminated saline used to irrigate the wound was left at the | - Emergency workers were not provided a radiological briefing. EWs were not aware of the exposure limits or background levels. No contamination threshold limits were identified. | ||
RECOMMENDATION: | - The Monitor assigned to assist with transfer of patient from ambulance to hospital staff did not frisk the patient or gurney upon transfer from the ambulance to the hospital staff. | ||
Conduct and reinforce training as needed. Update procedures. | - During the ambulance survey, the monitor was not sure of what steps to take if contamination was found. | ||
- The REA Monitor was unaware of how to use swipes and unclear of the procedures for disposal of contaminated waste. | |||
- Monitors were not knowledgeable on how to use or read the survey meters when surveying the patient. The controller provided (simulated) reading that the meter was off scale, the monitor did not understand she needed to adjust the meter dial to the next higher scale and coaching was consistently provided throughout the drill. | |||
- The REA Monitor did not conduct an initial patient contamination survey until after the first time out was called by the GGNS representative and conducted training on how and why contamination controls are important. | |||
- After training, the REA Monitor continued to demonstrate poor surveying techniques and required continued coaching. | |||
- The REA medical staff used poor technique in removing potentially contaminated sheets, clothing and medical equipment (neck brace, backboard, etc). | |||
- REA nurse may have cross contaminated medical equipment and supplies, prior to changing gloves, by accessing sealed cabinets and following the procedures to request supplies from Buffer Zone staff. | |||
- REA staff did not perform glove changes until after time out and training was provided. | |||
- Throughout the drill the REA Monitor did not survey the REA staff hands or potentially contaminated areas. | |||
- A basin of contaminated saline used to irrigate the wound was left at the patients feet on the gurney and later on the counter without regard of proper disposal. | |||
- The REA Monitor was the first EW to demonstrate the doffing of PPE and exit procedures from the REA. She left the still-running survey meter on the counter and proceeded to step on the step off pad without removing the booties or being surveyed by the Buffer Zone nurse. The monitor did not demonstrate the proper procedure to remove the PPE even though the procedures were posted on the wall. | |||
- The Buffer Zone nurses surveying technique was too fast and the distance was inconsistent, at times too far (greater that 1/2 -1) and at times the meter came in contact with the EW being surveyed. | |||
- Maintenance staff were tasked with completing the closeout of the REA and Buffer Zone area and had no knowledge or training of proper procedures. | |||
- Majority of Emergency Workers departed the area prior to the drill being terminated. | |||
RECOMMENDATION: Conduct and reinforce training as needed. Update procedures. | |||
CORRECTIVE ACTION DESCRIPTION: | CORRECTIVE ACTION DESCRIPTION: | ||
CAPABILITY: | CAPABILITY: PRIMARY RESPONSIBLE AGENCY: | ||
PRIMARY RESPONSIBLE AGENCY: | CAPABILITY ELEMENT: START DATE: | ||
CAPABILITY ELEMENT: | AGENCY POC: ESTIMATED COMPLETION DATE: | ||
START DATE: | 16 | ||
AGENCY POC: | |||
ESTIMATED COMPLETION DATE: | Unclassified Radiological Emergency Preparedness Program (REP) | ||
16 Unclassified Radiological Emergency Preparedness Program (REP) | After Action Report/Improvement Plan Grand Gulf Nuclear Station | ||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | |||
_____________________________________________________________________ | _____________________________________________________________________ | ||
APPENDIX B: DRILL | APPENDIX B: DRILL EVALUATORS AND TEAM LEADERS DATE: 2010-09-28, SITE: Grand Gulf Nuclear Station, MS LOCATION EVALUATOR AGENCY Riverland Medical Center *Bill Bischof DHS/FEMA Brad DeKorte DHS/FEMA Elsa Lopez DHS/FEMA Northeast Louisiana Ambulance Service *Linda Gee DHS/FEMA | ||
*Bill Bischof | * Team Leader 17 | ||
*Linda Gee DHS/FEMA* Team Leader 17 Unclassified Radiological Emergency Preparedness Program (REP) | |||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | Unclassified Radiological Emergency Preparedness Program (REP) | ||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | |||
_____________________________________________________________________ | _____________________________________________________________________ | ||
APPENDIX C: ACRONYMS AND ABBREVIATIONS Acronym Meaning ARCA Areas Requiring Corrective Action BZ Buffer Zone DRD Direct Reading Dosimeter EMD Emergency Management Director EMS Emergency Medical Services EMT Emergency Medical Technician ER Emergency Room EW Emergency Worker GE General Emergency GGNS Grand Gulf Nuclear Station NELA Northeast Louisiana Ambulance Service NP Nurse Practitioner PPE Personal Protective Equipment REA Radiation Emergency Area RMC Riverland Medical Center TLD Thermoluminescent Dosimeter 18 Unclassified Radiological Emergency Preparedness Program (REP) | APPENDIX C: ACRONYMS AND ABBREVIATIONS Acronym Meaning ARCA Areas Requiring Corrective Action BZ Buffer Zone DRD Direct Reading Dosimeter EMD Emergency Management Director EMS Emergency Medical Services EMT Emergency Medical Technician ER Emergency Room EW Emergency Worker GE General Emergency GGNS Grand Gulf Nuclear Station NELA Northeast Louisiana Ambulance Service NP Nurse Practitioner PPE Personal Protective Equipment REA Radiation Emergency Area RMC Riverland Medical Center TLD Thermoluminescent Dosimeter 18 | ||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | |||
Unclassified Radiological Emergency Preparedness Program (REP) | |||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | |||
_____________________________________________________________________ | _____________________________________________________________________ | ||
APPENDIX D: EXERCISE PLAN 19 Unclassified Radiological Emergency Preparedness Program (REP) | APPENDIX D: EXERCISE PLAN 19 | ||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | |||
Unclassified Radiological Emergency Preparedness Program (REP) | |||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | |||
_____________________________________________________________________ | _____________________________________________________________________ | ||
20 Unclassified Radiological Emergency Preparedness Program (REP) | RADIOLOGICAL EMERGENCY MEDICAL DRILL SCENARIO (MS-1) | ||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | FOR GRAND GULF NUCLEAR STATION September 28, 2010 Participants Riverland Medical Center Northeast Ambulance Service 20 | ||
Unclassified Radiological Emergency Preparedness Program (REP) | |||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | |||
_____________________________________________________________________ | _____________________________________________________________________ | ||
21 Unclassified Radiological Emergency Preparedness Program (REP) | I. PURPOSE This simulated radiation medical emergency is being conducted in order to exercise the emergency medical response for Grand Gulf Nuclear Station (GGNS) at Riverland Medical Center and Northeast Ambulance Service. The basic objective is to assess the ability of the hospital and ambulance emergency service to handle contaminated and injured patients. | ||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | II. PROPOSED SCHEDULE DATE: September 28, 2010 TIME: 8:30 am Drill Starts (GGNS General Emergency) 9:00 am Accident Reported 9:30 am Patient Arrives at Hospital (Approximate) 12:00 pm Drill Terminates (Approximate) 12:00 pm Player Critique 12:30 pm Evaluator Comments LOCATIONS: Riverland Medical Center INJURY/ILLNESS: Blow to the forehead with minor bleeding and bruising, left shoulder injury with possible dislocation, open puncture wound to left hand with possible fracture III. DISCLAIMER Real life emergencies take precedence over this demonstration. In case of an emergency, the demonstration will be cancelled and rescheduled for a later date. | ||
21 | |||
Unclassified Radiological Emergency Preparedness Program (REP) | |||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | |||
_____________________________________________________________________ | _____________________________________________________________________ | ||
22 Unclassified Radiological Emergency Preparedness Program (REP) | IV. EVALUATION AREAS AND EXTENT-OF-PLAY-OFFSITE EVALUATION AREA 1: EMERGENCY OPERATIONS MANAGEMENT Sub-element 1.e - Equipment and Supplies to Support Operations Criterion 1.e.1: Equipment, maps, displays, dosimetry, potassium iodide (KI), and other supplies are sufficient to support emergency operation. (NUREG-0654, H.7, 10; J.10.a, b, e J.11; K.3.a) | ||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | Locations Riverland Medical Center and Northeast Ambulance Service Extent of Play The ambulance crew should be knowledgeable on how to acquire dosimetry kits and potassium iodide (KI) during a declared emergency. The ambulance crew will discuss the method of obtaining dosimetry kits and KI from the parish when an emergency has been declared. The discussion can be accomplished by interview with the evaluator. In accordance with the scenario for this evaluation, the utility will provide necessary dosimetry to the ambulance crew. | ||
Correction-on-the-spot will be applicable for this demonstration. | |||
EVALUATION AREA 3: PROTECTIVE ACTION IMPLEMENTATION Sub-element 3.a - Implementation of Emergency Worker Exposure Control Criterion 3.a.1: The OROs issue appropriate dosimetry and procedures, and manage radiological exposure to emergency workers in accordance with the plans and procedures. | |||
Emergency workers periodically and at the end of each mission read their dosimeters and record the readings on the appropriate exposure record or chart. (NUREG-0654, K.3.a, b) | |||
Locations Riverland Medical Center and Northeast Ambulance Service Extent of Play Correction-on-the-spot will be applicable for this demonstration. | |||
22 | |||
Unclassified Radiological Emergency Preparedness Program (REP) | |||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | |||
_____________________________________________________________________ | _____________________________________________________________________ | ||
23 Unclassified Radiological Emergency Preparedness Program (REP) | EVALUATION AREA 6: SUPPORT OPERATION/FACILITIES Sub-element 6.d--Transportation and Treatment of Contaminated Injured individuals Criterion 6.d.1: The facility/ORO has the appropriate space, adequate resources, and trained personnel to provide transport, monitoring, decontamination, and medical services to contaminated injured individuals. (NUREG-0654, F.2; H.10; K.5.a, b; L.1, 4) | ||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | Locations Riverland Medical Center and Northeast Ambulance Service Extent of Play The initial call(s) will be simulated by cell phone from the Tensas Emergency Director who will be on location at Riverland Medical Center. | ||
No actual surgical procedures, X-ray, blood samples, starting of IVs etc. will be demonstrated. No actual transportation to Highway 604 to pickup the victim/patient. To avoid taking the ambulance out of service for an extended time, the area behind the hospital will be used to simulate the accident scene. The ambulance will be staged at the hospital to start the demonstration. | |||
Once the patient is loaded on the ambulance, play will pause for approximately 15 minutes to simulate the travel time between the accident scene on Highway 65 and Ferriday. | |||
Correction-on-the-spot will be applicable for this demonstration. | |||
GENERAL EXTENT-OF-PLAY (EOP): | |||
: 1. With regard to last minute additions or changes to any previously approved Extent-of-Play, all suggested changes must be forwarded to the RAC Chair for approval. | |||
: 2. The goal of all offsite response organizations (ORO) is to protect the health and safety of the public. | |||
This goal is achieved through the execution of appropriate plans and procedures. It is recognized that situations may arise that could limit the organizations in the exact execution of these plans and procedures. | |||
: 3. In the event of an unanticipated situation, OROs are permitted to exercise flexibility in the implementation of their plans and procedures in order to successfully achieve the objective of protection of public health and safety and protection of the environment. | |||
: 4. As a statement of fact, no ORO will deliberately deviate from its plans and procedures with the intent of avoiding responsibility. | |||
==References:== | |||
As indicated in the Extent-of-Play Agreement, the State of Louisiana requests the option to correct issues immediately as defined in FEMA Policy Paper, Strategic Review Steering Committee, Initiative 1.5, Correct Issues Immediately, effective March 31, 2000, signed by Kay C. Goss, CEM, Associate Director for Preparedness, Training and Exercises. Acceptable locations/activities for on-the-spot-correction are clearly indicated in the extent of play portion under each criterion. | |||
23 | |||
Unclassified Radiological Emergency Preparedness Program (REP) | |||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | |||
_____________________________________________________________________ | _____________________________________________________________________ | ||
24 Unclassified Radiological Emergency Preparedness Program (REP) | NARRATIVE SCENARIO INITIAL CONDITIONS Grand Gulf Station has declared a General Emergency based on Offsite Radiation Monitoring Team reports. An evacuation of all people within five miles of Grand Gulf has commenced. Since the wind direction is from 90 degrees (blowing into the West) zone 12 is being evacuated to Tallulah and Ferriday, and many areas within five miles of the plant are expected to be contaminated. (Refer to Attachment A.) | ||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | A man fishing at Dishroon Lake (approximately 3 miles from Grand Gulf) was in the plume when he heard the evacuation sirens. It took him about 25 minutes to get his boat out of the lake, and get in his car to evacuate. He travelled west on Highway 604 around the North Edge of Lake Bruin, and got to Highway 65 when his car stalled. He opened the hood of his car to try to get the engine running and the hood latch failed and he was struck in the head, left shoulder and left hand by the falling hood. He suffered the following injuries: | ||
Blow to the forehead with minor bleeding and bruising Left shoulder injury, possible dislocation Open puncture wound to left hand, possible broken hand, swelling, bruising and moderate bleeding The fisherman wrapped his hand with a pressure dressing to stop the bleeding and is sitting on the ground in front of his car. An evacuee travelling North on Highway 65 called 911 to report the accident. The passerby did not stop but continued North toward Tallulah. | |||
NOTE: The accident scene will be set up in the back of Riverland Medical Center to prevent the ambulance from leaving its service area. Once the patient is loaded on the ambulance, play will pause for approximately 15 minutes to simulate the travel time between the accident scene on Highway 65 and Ferriday. | |||
24 | |||
Unclassified Radiological Emergency Preparedness Program (REP) | |||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | |||
_____________________________________________________________________ | _____________________________________________________________________ | ||
25 Unclassified Radiological Emergency Preparedness Program (REP) | CONTROLLER MESSAGE Cue Card: # 1 Time: 0830 THIS IS A DRILL Controller The controller will simulate a call from the Tensas Parish 911 Center to report the General Emergency. | ||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | Message: Grand Gulf Nuclear Station has declared a General Emergency. | ||
Anticipated Response: Northeast Ambulance Service will contact Riverland Medical Center. | |||
Due to events in progress, the ambulance crew and hospital should begin preparations for the transport/treatment of the contaminated individual according to their procedures. | |||
THIS IS A DRILL 25 | |||
Unclassified Radiological Emergency Preparedness Program (REP) | |||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | |||
_____________________________________________________________________ | _____________________________________________________________________ | ||
26 Unclassified Radiological Emergency Preparedness Program (REP) | CONTROLLER MESSAGE Cue Card: # 2 Time: 0900 THIS IS A DRILL Controller: The controller will simulate from the Tensas Parish 911 Center relaying a call from a passerby of the accident. | ||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | Message: There is a guy on Highway 65 at the intersection of Highway 604 sitting by his car. His hood is up and it looks like hes bleeding. | ||
Anticipated Response: As soon as EMS receives the call, it will immediately notify the hospital. | |||
The ambulance will proceed (simulated) to where the patient is, while the hospital finalizes the setup for a contaminated injured patient. | |||
THIS IS A DRILL 26 | |||
Unclassified Radiological Emergency Preparedness Program (REP) | |||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | |||
_____________________________________________________________________ | _____________________________________________________________________ | ||
27 Unclassified Radiological Emergency Preparedness Program (REP) | CONTROLLER MESSAGE Cue Card: # 3 THIS IS A DRILL Controller: The controller will provide the ambulance crew any information required for them to make a diagnosis. | ||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | Message: Injury: Blow to forehead with minor bleeding and bruising. | ||
Blow to the left shoulder with possible dislocation Open puncture wound to left hand, possibly broken with swelling, bruising, and moderate bleeding. | |||
Vitals: Initial - Use actual vitals. | |||
During transport - Use actual vitals. | |||
Anticipated Response: Vital signs should be taken, the wound should be bandaged, the shoulder should be splinted and/or stabilized as necessary. The patient should be removed from the area. | |||
During transport to the hospital the patient should be observed and vital signs retaken. All information should be relayed to the hospital. | |||
THIS IS A DRILL 27 | |||
Unclassified Radiological Emergency Preparedness Program (REP) | |||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | |||
_____________________________________________________________________ | _____________________________________________________________________ | ||
28 Unclassified Radiological Emergency Preparedness Program (REP) | CONTROLLER MESSAGE Cue Card: # 4 THIS IS A DRILL Controller: The controller will provide the REA team additional information required to make a diagnosis and treat the patient, when requested. | ||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | Message: Injury: 3 long. x 1/2 deep cut (contaminated area 1 around wound) | ||
Survey Readings: Use Cue Card # 4A to provide survey readings for three areas. | |||
X-Rays: X-Ray are to be simulated. | |||
Use Cue Card # 4B to provide shoulder x-ray. | |||
Anticipated Response: The REA team should have the patients wounds surveyed for contamination. Once determined that only the head wound is contaminated, the REA staff should decon the area. An x-ray of the shoulder should be ordered and simulated. | |||
Blood or other samples, IVs, and surgical procedures will be simulated, if required. | |||
Note: The hospital staff will use both mR/hr and cpm for radiation measurements. (Monitoring of the patient will be in mR/hr, while contamination surveys will be in cpm.) | |||
THIS IS A DRILL 28 | |||
Unclassified Radiological Emergency Preparedness Program (REP) | |||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | |||
_____________________________________________________________________ | _____________________________________________________________________ | ||
29 Unclassified Radiological Emergency Preparedness Program (REP) | Cue Card: # 4A 29 | ||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | |||
Unclassified Radiological Emergency Preparedness Program (REP) | |||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | |||
_____________________________________________________________________ | _____________________________________________________________________ | ||
30 Unclassified Radiological Emergency Preparedness Program (REP) | Cue Card: # 4B 30 | ||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | |||
Unclassified Radiological Emergency Preparedness Program (REP) | |||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | |||
_____________________________________________________________________ | _____________________________________________________________________ | ||
31 Unclassified Radiological Emergency Preparedness Program (REP) | CONTROLLER MESSAGE Cue Card: # 5 THIS IS A DRILL Controller: The controller will provide a the ambulance crew with contamination information. | ||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | Message: Survey Readings: All readings are at background for both the ambulance and the two ambulance technicians. | ||
Anticipated Response: The ambulance crew can return to duty. | |||
THIS IS A DRILL 31 | |||
Unclassified Radiological Emergency Preparedness Program (REP) | |||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | |||
_____________________________________________________________________ | _____________________________________________________________________ | ||
32 Unclassified Radiological Emergency Preparedness Program (REP) | CONTROLLER MESSAGE Cue Card: # 6 THIS IS A DRILL Controller: The controller will provide a final background reading once the patient has been decontaminated and will terminate the drill. | ||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | Message: Survey Readings: All readings are at background. | ||
Termination: The drill is terminated, please have one team member demonstrate exiting the room and removing protective equipment. | |||
Anticipated Response: The REA team will prepare the patient for transport, transferred to a clean gurney, and removed from the room for more medical procedures or admission. | |||
One team member will demonstrate how to exit the contaminated room and remove their personal protective equipment. | |||
The area will be returned to normal by the hospital staff. | |||
THIS IS A DRILL 32 | |||
Unclassified Radiological Emergency Preparedness Program (REP) | |||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | |||
_____________________________________________________________________ | _____________________________________________________________________ | ||
33 Unclassified Radiological Emergency Preparedness Program (REP) | ATTACHMENT A 33 | ||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | |||
Unclassified Radiological Emergency Preparedness Program (REP) | |||
After Action Report/Improvement Plan Grand Gulf Nuclear Station | |||
_____________________________________________________________________ | _____________________________________________________________________ | ||
This page is intentionally blank. | This page is intentionally blank. | ||
34 | 34}} | ||
Revision as of 06:56, 13 November 2019
ML103020544 | |
Person / Time | |
---|---|
Site: | Grand Gulf |
Issue date: | 10/20/2010 |
From: | US Dept of Homeland Security, Federal Emergency Management Agency |
To: | Region 2 Administrator |
Cecere, Bethanny NSIR/DPR 415-6754 | |
References | |
Download: ML103020544 (36) | |
Text
Grand Gulf Nuclear Station After Action Report/
Improvement Plan Drill Date - September 28, 2010 Radiological Emergency Preparedness (REP) Program Published October 20, 2010
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Grand Gulf Nuclear Station
_____________________________________________________________________
This page is intentionally blank.
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Grand Gulf Nuclear Station
_____________________________________________________________________
Grand Gulf Nuclear Station After Action Report/Improvement Plan Published October 20, 2010 Contents Executive Summary 3 Section 1: Exercise Overview 4 1.1 Exercise Details 4 1.2 Exercise Planning Team Leadership 4 1.3 Participating Organizations 5 Section 2: Exercise Design Summary 6 2.1 Exercise Purpose and Design 6 2.2 Exercise Objectives, Capabilities and Activities 6 2.3 Scenario Summary 6 Section 3: Analysis of Capabilities 7 3.1 Drill Evaluation and Results 7 3.2 Summary Results of Drill Evaluation 7 3.3 Criteria Evaluation Summaries 9 3.3.1 Support Jurisdictions 9 3.3.1.1 Riverland Medical Center 9 3.3.2 Private Organizations 12 3.3.2.1 Northeast Louisiana Ambulance Service 12 Section 4: Conclusion 14 Appendix A: Improvement Plan 15 Appendix B: Drill Evaluators and Team Leaders 17 Appendix C: Acronyms and Abbreviations 18 Appendix D: Exercise Plan 19 1
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Grand Gulf Nuclear Station
_____________________________________________________________________
This page is intentionally blank.
2
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Grand Gulf Nuclear Station
_____________________________________________________________________
EXECUTIVE
SUMMARY
On September 28, 2010 an out-of-sequence Medical Services drill was conducted for the Grand Gulf Nuclear Station (GGNS), located in Port Gibson, Claiborne County, Mississippi. Personnel from the U.S. Department of Homeland Security/Federal Emergency Management Agency (DHS/FEMA) Region VI evaluated all activities. The purpose of the drill was to assess the level of preparedness of local responders to react to a simulated radiological emergency at GGNS.
The previous plume exercise was conducted on September 9, 2009.
Personnel from the State of Louisiana, Riverland Medical Center, Northeast Louisiana Ambulance Service, and Grand Gulf Nuclear Station participated in the drill. Cooperation and teamwork of all the participants was evident during the drill and DHS/FEMA wishes to acknowledge these efforts.
This report contains the final evaluation of the out-of-sequence drill. The participants demonstrated knowledge of their emergency response plans and procedures. There was one Deficiency and three Areas Requiring Corrective Action (ARCA) identified during the drill. One ARCA was corrected during the drill and no Plan Issues were identified.
3
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Grand Gulf Nuclear Station
_____________________________________________________________________
SECTION 1: EXERCISE OVERVIEW 1.1 Exercise Details Exercise Name Grand Gulf Nuclear Station Type of Exercise Drill Exercise Date September 28, 2010 Program Department of Homeland Security/FEMA Radiological Emergency Preparedness Program Scenario Type Radiological Emergency 1.2 Exercise Planning Team Leadership Lisa Hammond RAC Chair FEMA Region VI Technological Hazards Branch Chief 800 N. Loop 288 Denton, Texas, 76209 940-898-5199 lisa.hammond@dhs.gov Bill Bischof Federal Planning Team Lead FEMA Region VI Technological Hazards Specialist 800 N. Loop 288 4
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Grand Gulf Nuclear Station
_____________________________________________________________________
Denton, Texas, 76209 940-898-5562 bill.bischof@dhs.gov Greg Gothard State Planner Louisiana Department of Environmental Quality Environmental Scientist 602 N. Fifth St.
Baton Rouge, Louisiana, 70802 225-219-3627 greg.gothard@la.gov 1.3 Participating Organizations Agencies and organizations of the following jurisdictions participated in the Grand Gulf Nuclear Station drill:
Risk Jurisdictions Tensas Parish Office of Emergency Preparedness Support Jurisdictions Riverland Medical Center Northeast Louisiana Ambulance Service Private Organizations Grand Gulf Nuclear Station 5
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Grand Gulf Nuclear Station
_____________________________________________________________________
SECTION 2: EXERCISE DESIGN
SUMMARY
2.1 Exercise Purpose and Design The DHS/FEMA Region VI Office evaluated the drill on September 28, 2010 to assess the capabilities of local emergency preparedness organizations in implementing their Radiological Emergency Response Plans and procedures to protect the public health and safety during a radiological emergency involving Grand Gulf Nuclear Station (GGNS). The purpose of this report is to present the results and findings on the performance of the offsite response organizations during a simulated radiological emergency.
2.2 Exercise Objectives, Capabilities and Activities Exercise objectives and identified Capabilities/REP Criteria selected to be exercised are discussed in the Exercise Plan (EXPLAN), Appendix D.
2.3 Scenario Summary The drill scenario was developed to evaluate the response of drill participants to an incident requiring evacuation of the public from the Louisiana portion of the 10-mile Emergency Planning Zone surrounding the Grand Gulf Nuclear Station. The drill scenario provided for the evaluation of the Riverland Medical Center and Northeast Louisiana Ambulance Service's ability to transport and treat a radiologically contaminated injured individual.
6
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Grand Gulf Nuclear Station
_____________________________________________________________________
SECTION 3: ANALYSIS OF CAPABILITIES 3.1 Drill Evaluation and Results Contained in this section are the results and findings of the evaluation of all jurisdictions and functional entities that participated in the September 28, 2010, drill evaluation to test the offsite emergency response capabilities of Riverland Medical Center and Northeast Louisiana Ambulance Service to transport and treat a contaminated injured individual.
Each jurisdiction and functional entity was evaluated on the basis of its demonstration of criteria delineated in the exercise evaluation areas as outlined in the April 25, 2002, Federal Register, Radiological Emergency Preparedness: Evaluation Methodology. Detailed information on the exercise evaluation area criteria and the extent of play agreement used in this drill are found in Appendix D of this report.
3.2 Summary Results of Drill Evaluation The matrix presented in Table 3.1 on the following page, presents the status of all drill evaluation area criteria that were scheduled for demonstration during this drill by all participating jurisdictions and functional entities. Exercise criteria are listed by number and the demonstration status is indicated by the use of the following letters:
M - Met (No Deficiency or ARCAs assessed and no unresolved ARCAs from prior exercise)
D - Deficiency assessed A - ARCAs assessed or unresolved ARCAs from previous exercises P - Plan Issue N - Not Demonstrated 7
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Grand Gulf Nuclear Station
_____________________________________________________________________
Table 3.1 - Summary of Drill Evaluation DATE: 2010-09-28 SITE: Grand Gulf Nuclear Station, MS NELA RMC M: Met, A: ARCA, D: Deficiency, P: Plan Issue, N: Not Demonstrated Emergency Operations Management Mobilization 1a1 Facilities 1b1 Direction and Control 1c1 Communications Equipment 1d1 Equip & Supplies to support operations 1e1 M A Protective Action Decision Making Emergency Worker Exposure Control 2a1 Radiological Assessment and PARs 2b1 Decisions for the Plume Phase -PADs 2b2 PADs for protection of special populations 2c1 Rad Assessment and Decision making for the Ingestion Exposure Pathway 2d1 Rad Assessment and Decision making concerning Relocation, Reentry, and Return 2e1 Protective Action Implementation Implementation of emergency worker exposure control 3a1 M A Implementation of KI decision 3b1 Implementation of protective actions for special populations - EOCs 3c1 Implementation of protective actions for Schools 3c2 Implementation of traffic and access control 3d1 Impediments to evacuation are identified and resolved 3d2 Implementation of ingestion pathway decisions - availability/use of info 3e1 Materials for Ingestion Pathway PADs are available 3e2 Implementation of relocation, re-entry, and return decisions. 3f1 Field Measurement and Analysis Adequate Equipment for Plume Phase Field Measurements 4a1 Field Teams obtain sufficient information 4a2 Field Teams Manage Sample Collection Appropriately 4a3 Post plume phase field measurements and sampling 4b1 Laboratory operations 4c1 Emergency Notification and Public Info Activation of the prompt alert and notification system 5a1 Activation of the prompt alert and notification system - Fast Breaker 5a2 Activation of the prompt alert and notification system - Exception areas 5a3 Emergency information and instructions for the public and the media 5b1 Support Operations/Facilities Mon / decon of evacuees and emergency workers, and registration of evacuees 6a1 Mon / decon of emergency worker equipment 6b1 Temporary care of evacuees 6c1 Transportation and treatment of contaminated injured individuals 6d1 M D 8
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Grand Gulf Nuclear Station
_____________________________________________________________________
3.3 Criteria Evaluation Summaries 3.3.1 Support Jurisdictions 3.3.1.1 Riverland Medical Center
- a. MET: None
- b. AREAS REQUIRING CORRECTIVE ACTION: 1.e.1, 3.a.1.
ISSUE NO.: 28-10-1e1-A-01 CRITERION: Equipment, maps, displays, dosimetry, potassium iodide (KI), and other supplies are sufficient to support emergency operations.
CONDITION: The Ludlum 12 Survey Meters did not have a Range of Reading sticker affixed.
POSSIBLE CAUSE: Lack of training or oversight. Unaware of requirements.
REFERENCE:
Interim REP Program Manual under Criterion 1.e.1 - Equipment, page III-111. NUREG-0654, H.7,10; J.10.a,b,e, J.11; K.3.a EFFECT: The emergency worker is not able to ensure the equipment is measuring properly.
RECOMMENDATION: Affix a Range of Readings sticker to the Ludlum 12 survey meter. Provide training on the proper use of the Range of Readings sticker and operations of the equipment.
ISSUE NO.: 28-10-3a1-A-02 CRITERION: OROs issue appropriate dosimetry and procedures, and manage radiological exposure to emergency workers IAW plans and procedures. Emergency workers periodically and at the end of each mission read and record dosimeter reading. (NUREG-0654, K.3) 9
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Grand Gulf Nuclear Station
_____________________________________________________________________
CONDITION: Administrative exposure limits and background levels were not identified to medical personnel at the hospital during the drill.
POSSIBLE CAUSE: Medical center personnel have not been adequately trained on dosimetry.
REFERENCE:
NUREG 0654 K.3.a, b EFFECT: Medical center personnel would not have known when administrivative exposure levels were exceeded.
RECOMMENDATION: Additional training on dosimetry should be provided.
- c. DEFICIENCY: 6.d.1.
ISSUE NO.: 28-10-6d1-D-03 CRITERION: Facility/ORO has the appropriate space, adequate resources, and trained personnel to provide transport, monitoring, decontamination, and medical services to contaminated injured individuals. (NUREG-0654, F.2., H.10., K.5.a.b.,
L.1., 4)
CONDITION: Minimal or no contamination control; no radiological briefing for Emergency Workers (EWs); emergency workers assigned as Monitors were unsure of how to use or read the survey meters; and no range of readings stickers on survey meters. The following discrepancies were observed:
- Emergency workers were not provided a radiological briefing. EWs were not aware of the exposure limits or background levels. No contamination threshold limits were identified.
- The Monitor assigned to assist with transfer of patient from ambulance to hospital staff did not frisk the patient or gurney upon transfer from the ambulance to the hospital staff.
- During the ambulance survey, the monitor was not sure of what steps to take if 10
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Grand Gulf Nuclear Station
_____________________________________________________________________
contamination was found.
- The REA Monitor was unaware of how to use swipes and unclear of the procedures for disposal of contaminated waste.
- Monitors were not knowledgeable on how to use or read the survey meters when surveying the patient. The controller provided (simulated) reading that the meter was off scale, the monitor did not understand she needed to adjust the meter dial to the next higher scale and coaching was consistently provided throughout the drill.
- The REA Monitor did not conduct an initial patient contamination survey until after the first time out was called by the GGNS representative and conducted training on how and why contamination controls are important.
- After training, the REA Monitor continued to demonstrate poor surveying techniques and required continued coaching.
- The REA medical staff used poor technique in removing potentially contaminated sheets, clothing and medical equipment (neck brace, backboard, etc).
- REA nurse may have cross contaminated medical equipment and supplies, prior to changing gloves, by accessing sealed cabinets and following the procedures to request supplies from Buffer Zone staff.
- REA staff did not perform glove changes until after time out and training was provided.
- Throughout the drill the REA Monitor did not survey the REA staff hands or potentially contaminated areas.
- A basin of contaminated saline used to irrigate the wound was left at the patients feet on the gurney and later on the counter without regard of proper disposal.
- The REA Monitor was the first EW to demonstrate the doffing of PPE and exit procedures from the REA. She left the still-running survey meter on the counter and proceeded to step on the step off pad without removing the booties or being surveyed by the Buffer Zone nurse. The monitor did not demonstrate the proper procedure to remove the PPE even though the procedures were posted on the wall.
- The Buffer Zone nurses surveying technique was too fast and the distance was inconsistent, at times too far (greater that 1/2 -1) and at times the meter came in contact with the EW being surveyed.
- Maintenance staff were tasked with completing the closeout of the REA and Buffer Zone area and had no knowledge or training of proper procedures.
- Majority of Emergency Workers departed the area prior to the drill being terminated.
11
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Grand Gulf Nuclear Station
_____________________________________________________________________
POSSIBLE CAUSE: Inadequate training and failure to follow procedures.
REFERENCE:
NUREG-0654, F.2; H.10; K.5.a, b: L.1, 4 and Hospital Emergency Department Management of Accidents Procedures for Riverland Medical Center.
EFFECT: The patient would not have been appropriately decontaminated, and the staff could have received contamination by the poor techniques that would result in a spread of contamination to the workers in the area.
RECOMMENDATION: Conduct and reinforce training as needed. Update procedures.
- d. PLAN ISSUES: None
- e. NOT DEMONSTRATED: None
- f. PRIOR ISSUES - RESOLVED: None
- g. PRIOR ISSUES - UNRESOLVED: None 3.3.2 Private Organizations 3.3.2.1 Northeast Louisiana Ambulance Service
- a. MET: 1.e.1, 3.a.1, 6.d.1.
- b. AREAS REQUIRING CORRECTIVE ACTION: 6.d.1.
ISSUE NO.: 28-10-6d1-A-01 CRITERION: Facility/ORO has the appropriate space, adequate resources, and trained personnel to provide transport, monitoring, decontamination, and medical services to contaminated injured individuals. (NUREG-0654, F.2., H.10., K.5.a.b.,
L.1., 4)
CONDITION: The ambulance technician didnt demonstrate a glove change while assessing the victim.
POSSIBLE CAUSE: The checklist referenced by the ambulance technicians should include glove changes.
12
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Grand Gulf Nuclear Station
_____________________________________________________________________
REFERENCE:
NUREG-0654, K.3.a., 3.b; Tensas Parish Office of Emergency Preparedness, Emergency Medical Services (EMS)/Ambulance Procedure for Response to Radiological Emergencies, Revision 3: September 24, 2010.
EFFECT: Contamination from the victim could have remained on the ambulance technicians gloves transferring contamination to the ambulance and other equipment.
CORRECTIVE ACTION DEMONSTRATED: Training was conducted and several glove changes were subsequently demonstrated throughout the drill.
- c. DEFICIENCY: None
- d. PLAN ISSUES: None
- e. NOT DEMONSTRATED: None
- f. PRIOR ISSUES - RESOLVED: None
- g. PRIOR ISSUES - UNRESOLVED: None 13
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Grand Gulf Nuclear Station
_____________________________________________________________________
SECTION 4: CONCLUSION Based on the results of the drill, and the assessment of a deficiency against Riverland Medical Center, the Medical Center will be required to redemonstrate and correct the issues identified within this report. The Northeast Louisiana Ambulance Service satisfactorily demonstrated their required criteria and no additional demonstration is necessary until the next regularly scheduled drill/exercise at this location.
14
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Grand Gulf Nuclear Station
_____________________________________________________________________
APPENDIX A: IMPROVEMENT PLAN Issue Number: 28-10-1e1-A-01 Criterion: 1e1 ISSUE: The Ludlum 12 Survey Meters did not have a Range of Reading sticker affixed.
RECOMMENDATION: Affix a Range of Readings sticker to the Ludlum 12 survey meter. Provide training on the proper use of the Range of Readings sticker and operations of the equipment.
CORRECTIVE ACTION DESCRIPTION:
CAPABILITY: PRIMARY RESPONSIBLE AGENCY:
CAPABILITY ELEMENT: START DATE:
AGENCY POC: ESTIMATED COMPLETION DATE:
Issue Number: 28-10-3a1-A-02 Criterion: 3a1 ISSUE: Administrative exposure limits and background levels were not identified to medical personnel at the hospital during the drill.
RECOMMENDATION: Additional training on dosimetry should be provided.
CORRECTIVE ACTION DESCRIPTION:
CAPABILITY: PRIMARY RESPONSIBLE AGENCY:
CAPABILITY ELEMENT: START DATE:
AGENCY POC: ESTIMATED COMPLETION DATE:
15
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Grand Gulf Nuclear Station
_____________________________________________________________________
Issue Number: 28-10-6d1-D-03 Criterion: 6d1 ISSUE: Minimal or no contamination control; no radiological briefing for Emergency Workers (EWs);
emergency workers assigned as Monitors were unsure of how to use or read the survey meters; and no range of readings stickers on survey meters. The following discrepancies were observed:
- Emergency workers were not provided a radiological briefing. EWs were not aware of the exposure limits or background levels. No contamination threshold limits were identified.
- The Monitor assigned to assist with transfer of patient from ambulance to hospital staff did not frisk the patient or gurney upon transfer from the ambulance to the hospital staff.
- During the ambulance survey, the monitor was not sure of what steps to take if contamination was found.
- The REA Monitor was unaware of how to use swipes and unclear of the procedures for disposal of contaminated waste.
- Monitors were not knowledgeable on how to use or read the survey meters when surveying the patient. The controller provided (simulated) reading that the meter was off scale, the monitor did not understand she needed to adjust the meter dial to the next higher scale and coaching was consistently provided throughout the drill.
- The REA Monitor did not conduct an initial patient contamination survey until after the first time out was called by the GGNS representative and conducted training on how and why contamination controls are important.
- After training, the REA Monitor continued to demonstrate poor surveying techniques and required continued coaching.
- The REA medical staff used poor technique in removing potentially contaminated sheets, clothing and medical equipment (neck brace, backboard, etc).
- REA nurse may have cross contaminated medical equipment and supplies, prior to changing gloves, by accessing sealed cabinets and following the procedures to request supplies from Buffer Zone staff.
- REA staff did not perform glove changes until after time out and training was provided.
- Throughout the drill the REA Monitor did not survey the REA staff hands or potentially contaminated areas.
- A basin of contaminated saline used to irrigate the wound was left at the patients feet on the gurney and later on the counter without regard of proper disposal.
- The REA Monitor was the first EW to demonstrate the doffing of PPE and exit procedures from the REA. She left the still-running survey meter on the counter and proceeded to step on the step off pad without removing the booties or being surveyed by the Buffer Zone nurse. The monitor did not demonstrate the proper procedure to remove the PPE even though the procedures were posted on the wall.
- The Buffer Zone nurses surveying technique was too fast and the distance was inconsistent, at times too far (greater that 1/2 -1) and at times the meter came in contact with the EW being surveyed.
- Maintenance staff were tasked with completing the closeout of the REA and Buffer Zone area and had no knowledge or training of proper procedures.
- Majority of Emergency Workers departed the area prior to the drill being terminated.
RECOMMENDATION: Conduct and reinforce training as needed. Update procedures.
CORRECTIVE ACTION DESCRIPTION:
CAPABILITY: PRIMARY RESPONSIBLE AGENCY:
CAPABILITY ELEMENT: START DATE:
AGENCY POC: ESTIMATED COMPLETION DATE:
16
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Grand Gulf Nuclear Station
_____________________________________________________________________
APPENDIX B: DRILL EVALUATORS AND TEAM LEADERS DATE: 2010-09-28, SITE: Grand Gulf Nuclear Station, MS LOCATION EVALUATOR AGENCY Riverland Medical Center *Bill Bischof DHS/FEMA Brad DeKorte DHS/FEMA Elsa Lopez DHS/FEMA Northeast Louisiana Ambulance Service *Linda Gee DHS/FEMA
- Team Leader 17
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Grand Gulf Nuclear Station
_____________________________________________________________________
APPENDIX C: ACRONYMS AND ABBREVIATIONS Acronym Meaning ARCA Areas Requiring Corrective Action BZ Buffer Zone DRD Direct Reading Dosimeter EMD Emergency Management Director EMS Emergency Medical Services EMT Emergency Medical Technician ER Emergency Room EW Emergency Worker GE General Emergency GGNS Grand Gulf Nuclear Station NELA Northeast Louisiana Ambulance Service NP Nurse Practitioner PPE Personal Protective Equipment REA Radiation Emergency Area RMC Riverland Medical Center TLD Thermoluminescent Dosimeter 18
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Grand Gulf Nuclear Station
_____________________________________________________________________
APPENDIX D: EXERCISE PLAN 19
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Grand Gulf Nuclear Station
_____________________________________________________________________
RADIOLOGICAL EMERGENCY MEDICAL DRILL SCENARIO (MS-1)
FOR GRAND GULF NUCLEAR STATION September 28, 2010 Participants Riverland Medical Center Northeast Ambulance Service 20
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Grand Gulf Nuclear Station
_____________________________________________________________________
I. PURPOSE This simulated radiation medical emergency is being conducted in order to exercise the emergency medical response for Grand Gulf Nuclear Station (GGNS) at Riverland Medical Center and Northeast Ambulance Service. The basic objective is to assess the ability of the hospital and ambulance emergency service to handle contaminated and injured patients.
II. PROPOSED SCHEDULE DATE: September 28, 2010 TIME: 8:30 am Drill Starts (GGNS General Emergency) 9:00 am Accident Reported 9:30 am Patient Arrives at Hospital (Approximate) 12:00 pm Drill Terminates (Approximate) 12:00 pm Player Critique 12:30 pm Evaluator Comments LOCATIONS: Riverland Medical Center INJURY/ILLNESS: Blow to the forehead with minor bleeding and bruising, left shoulder injury with possible dislocation, open puncture wound to left hand with possible fracture III. DISCLAIMER Real life emergencies take precedence over this demonstration. In case of an emergency, the demonstration will be cancelled and rescheduled for a later date.
21
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Grand Gulf Nuclear Station
_____________________________________________________________________
IV. EVALUATION AREAS AND EXTENT-OF-PLAY-OFFSITE EVALUATION AREA 1: EMERGENCY OPERATIONS MANAGEMENT Sub-element 1.e - Equipment and Supplies to Support Operations Criterion 1.e.1: Equipment, maps, displays, dosimetry, potassium iodide (KI), and other supplies are sufficient to support emergency operation. (NUREG-0654, H.7, 10; J.10.a, b, e J.11; K.3.a)
Locations Riverland Medical Center and Northeast Ambulance Service Extent of Play The ambulance crew should be knowledgeable on how to acquire dosimetry kits and potassium iodide (KI) during a declared emergency. The ambulance crew will discuss the method of obtaining dosimetry kits and KI from the parish when an emergency has been declared. The discussion can be accomplished by interview with the evaluator. In accordance with the scenario for this evaluation, the utility will provide necessary dosimetry to the ambulance crew.
Correction-on-the-spot will be applicable for this demonstration.
EVALUATION AREA 3: PROTECTIVE ACTION IMPLEMENTATION Sub-element 3.a - Implementation of Emergency Worker Exposure Control Criterion 3.a.1: The OROs issue appropriate dosimetry and procedures, and manage radiological exposure to emergency workers in accordance with the plans and procedures.
Emergency workers periodically and at the end of each mission read their dosimeters and record the readings on the appropriate exposure record or chart. (NUREG-0654, K.3.a, b)
Locations Riverland Medical Center and Northeast Ambulance Service Extent of Play Correction-on-the-spot will be applicable for this demonstration.
22
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Grand Gulf Nuclear Station
_____________________________________________________________________
EVALUATION AREA 6: SUPPORT OPERATION/FACILITIES Sub-element 6.d--Transportation and Treatment of Contaminated Injured individuals Criterion 6.d.1: The facility/ORO has the appropriate space, adequate resources, and trained personnel to provide transport, monitoring, decontamination, and medical services to contaminated injured individuals. (NUREG-0654, F.2; H.10; K.5.a, b; L.1, 4)
Locations Riverland Medical Center and Northeast Ambulance Service Extent of Play The initial call(s) will be simulated by cell phone from the Tensas Emergency Director who will be on location at Riverland Medical Center.
No actual surgical procedures, X-ray, blood samples, starting of IVs etc. will be demonstrated. No actual transportation to Highway 604 to pickup the victim/patient. To avoid taking the ambulance out of service for an extended time, the area behind the hospital will be used to simulate the accident scene. The ambulance will be staged at the hospital to start the demonstration.
Once the patient is loaded on the ambulance, play will pause for approximately 15 minutes to simulate the travel time between the accident scene on Highway 65 and Ferriday.
Correction-on-the-spot will be applicable for this demonstration.
GENERAL EXTENT-OF-PLAY (EOP):
- 1. With regard to last minute additions or changes to any previously approved Extent-of-Play, all suggested changes must be forwarded to the RAC Chair for approval.
- 2. The goal of all offsite response organizations (ORO) is to protect the health and safety of the public.
This goal is achieved through the execution of appropriate plans and procedures. It is recognized that situations may arise that could limit the organizations in the exact execution of these plans and procedures.
- 3. In the event of an unanticipated situation, OROs are permitted to exercise flexibility in the implementation of their plans and procedures in order to successfully achieve the objective of protection of public health and safety and protection of the environment.
- 4. As a statement of fact, no ORO will deliberately deviate from its plans and procedures with the intent of avoiding responsibility.
References:
As indicated in the Extent-of-Play Agreement, the State of Louisiana requests the option to correct issues immediately as defined in FEMA Policy Paper, Strategic Review Steering Committee, Initiative 1.5, Correct Issues Immediately, effective March 31, 2000, signed by Kay C. Goss, CEM, Associate Director for Preparedness, Training and Exercises. Acceptable locations/activities for on-the-spot-correction are clearly indicated in the extent of play portion under each criterion.
23
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Grand Gulf Nuclear Station
_____________________________________________________________________
NARRATIVE SCENARIO INITIAL CONDITIONS Grand Gulf Station has declared a General Emergency based on Offsite Radiation Monitoring Team reports. An evacuation of all people within five miles of Grand Gulf has commenced. Since the wind direction is from 90 degrees (blowing into the West) zone 12 is being evacuated to Tallulah and Ferriday, and many areas within five miles of the plant are expected to be contaminated. (Refer to Attachment A.)
A man fishing at Dishroon Lake (approximately 3 miles from Grand Gulf) was in the plume when he heard the evacuation sirens. It took him about 25 minutes to get his boat out of the lake, and get in his car to evacuate. He travelled west on Highway 604 around the North Edge of Lake Bruin, and got to Highway 65 when his car stalled. He opened the hood of his car to try to get the engine running and the hood latch failed and he was struck in the head, left shoulder and left hand by the falling hood. He suffered the following injuries:
Blow to the forehead with minor bleeding and bruising Left shoulder injury, possible dislocation Open puncture wound to left hand, possible broken hand, swelling, bruising and moderate bleeding The fisherman wrapped his hand with a pressure dressing to stop the bleeding and is sitting on the ground in front of his car. An evacuee travelling North on Highway 65 called 911 to report the accident. The passerby did not stop but continued North toward Tallulah.
NOTE: The accident scene will be set up in the back of Riverland Medical Center to prevent the ambulance from leaving its service area. Once the patient is loaded on the ambulance, play will pause for approximately 15 minutes to simulate the travel time between the accident scene on Highway 65 and Ferriday.
24
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Grand Gulf Nuclear Station
_____________________________________________________________________
CONTROLLER MESSAGE Cue Card: # 1 Time: 0830 THIS IS A DRILL Controller The controller will simulate a call from the Tensas Parish 911 Center to report the General Emergency.
Message: Grand Gulf Nuclear Station has declared a General Emergency.
Anticipated Response: Northeast Ambulance Service will contact Riverland Medical Center.
Due to events in progress, the ambulance crew and hospital should begin preparations for the transport/treatment of the contaminated individual according to their procedures.
THIS IS A DRILL 25
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Grand Gulf Nuclear Station
_____________________________________________________________________
CONTROLLER MESSAGE Cue Card: # 2 Time: 0900 THIS IS A DRILL Controller: The controller will simulate from the Tensas Parish 911 Center relaying a call from a passerby of the accident.
Message: There is a guy on Highway 65 at the intersection of Highway 604 sitting by his car. His hood is up and it looks like hes bleeding.
Anticipated Response: As soon as EMS receives the call, it will immediately notify the hospital.
The ambulance will proceed (simulated) to where the patient is, while the hospital finalizes the setup for a contaminated injured patient.
THIS IS A DRILL 26
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Grand Gulf Nuclear Station
_____________________________________________________________________
CONTROLLER MESSAGE Cue Card: # 3 THIS IS A DRILL Controller: The controller will provide the ambulance crew any information required for them to make a diagnosis.
Message: Injury: Blow to forehead with minor bleeding and bruising.
Blow to the left shoulder with possible dislocation Open puncture wound to left hand, possibly broken with swelling, bruising, and moderate bleeding.
Vitals: Initial - Use actual vitals.
During transport - Use actual vitals.
Anticipated Response: Vital signs should be taken, the wound should be bandaged, the shoulder should be splinted and/or stabilized as necessary. The patient should be removed from the area.
During transport to the hospital the patient should be observed and vital signs retaken. All information should be relayed to the hospital.
THIS IS A DRILL 27
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Grand Gulf Nuclear Station
_____________________________________________________________________
CONTROLLER MESSAGE Cue Card: # 4 THIS IS A DRILL Controller: The controller will provide the REA team additional information required to make a diagnosis and treat the patient, when requested.
Message: Injury: 3 long. x 1/2 deep cut (contaminated area 1 around wound)
Survey Readings: Use Cue Card # 4A to provide survey readings for three areas.
X-Rays: X-Ray are to be simulated.
Use Cue Card # 4B to provide shoulder x-ray.
Anticipated Response: The REA team should have the patients wounds surveyed for contamination. Once determined that only the head wound is contaminated, the REA staff should decon the area. An x-ray of the shoulder should be ordered and simulated.
Blood or other samples, IVs, and surgical procedures will be simulated, if required.
Note: The hospital staff will use both mR/hr and cpm for radiation measurements. (Monitoring of the patient will be in mR/hr, while contamination surveys will be in cpm.)
THIS IS A DRILL 28
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Grand Gulf Nuclear Station
_____________________________________________________________________
Cue Card: # 4A 29
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Grand Gulf Nuclear Station
_____________________________________________________________________
Cue Card: # 4B 30
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Grand Gulf Nuclear Station
_____________________________________________________________________
CONTROLLER MESSAGE Cue Card: # 5 THIS IS A DRILL Controller: The controller will provide a the ambulance crew with contamination information.
Message: Survey Readings: All readings are at background for both the ambulance and the two ambulance technicians.
Anticipated Response: The ambulance crew can return to duty.
THIS IS A DRILL 31
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Grand Gulf Nuclear Station
_____________________________________________________________________
CONTROLLER MESSAGE Cue Card: # 6 THIS IS A DRILL Controller: The controller will provide a final background reading once the patient has been decontaminated and will terminate the drill.
Message: Survey Readings: All readings are at background.
Termination: The drill is terminated, please have one team member demonstrate exiting the room and removing protective equipment.
Anticipated Response: The REA team will prepare the patient for transport, transferred to a clean gurney, and removed from the room for more medical procedures or admission.
One team member will demonstrate how to exit the contaminated room and remove their personal protective equipment.
The area will be returned to normal by the hospital staff.
THIS IS A DRILL 32
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Grand Gulf Nuclear Station
_____________________________________________________________________
ATTACHMENT A 33
Unclassified Radiological Emergency Preparedness Program (REP)
After Action Report/Improvement Plan Grand Gulf Nuclear Station
_____________________________________________________________________
This page is intentionally blank.
34