{{#Wiki_filter:UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125           December 29, 2010  
{{#Wiki_filter:UNITED STATES
  Brad Berryman, Vice President, Operations  
                                NUC LE AR RE G ULATO RY C O M M I S S I O N
Arkansas Nuclear One Entergy Operations, Inc. 1448 S.R. 333 Russellville, AR 72802  
                                                    R E GI ON I V
                                        612 EAST LAMAR BLVD , SU I TE 400
SUBJECT: ARKANSAS NUCLEAR ONE, UNIT 2 - NOTIFICATION OF INSPECTION (NRC INSPECTION REPORT 050-368/2011002) AND REQUEST FOR INFORMATION  
                                          AR LI N GTON , TEXAS 76011-4125
Dear Mr. Berryman:  
                                            December 29, 2010
Brad Berryman, Vice President, Operations
Arkansas Nuclear One
Entergy Operations, Inc.
1448 S.R. 333
Russellville, AR 72802
SUBJECT:       ARKANSAS NUCLEAR ONE, UNIT 2 - NOTIFICATION OF INSPECTION (NRC
                INSPECTION REPORT 050-368/2011002) AND REQUEST FOR
                INFORMATION
Dear Mr. Berryman:
From February 22 to March 5, 2011, reactor inspectors from the Nuclear Regulatory
Commissions (NRC) Region IV office will perform the baseline inservice inspection at Arkansas
Nuclear One, Unit 2, using NRC Inspection Procedure 71111.08, Inservice Inspection
Activities. Experience has shown that this inspection is a resource intensive inspection both for
the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and
to ensure a productive inspection, we have enclosed a request for documents needed for this
inspection. These documents have been divided into two groups. The first group (Section A of
the enclosure), due by February 1, 2011, identifies information to be provided prior to the
inspection to ensure that the inspectors are adequately prepared. The second group (Section B
of the enclosure), identifies the information the inspectors will need upon arrival at the site. It is
important that all of these documents are up to date and complete in order to minimize the
number of additional documents requested during the preparation and/or the onsite portions of
the inspection.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Ms. Stephanie Pyle of your licensing
organization. Our inspection dates are subject to change based on your updated schedule of
outage activities. If there are any questions about this inspection or the material requested,
please contact Jim Melfi, lead inspector, at (817) 276-6523 (jim.melfi@nrc.gov) or Dustin
Reinert at (817) 860-8244 (dustin.reinert@nrc.gov).
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, Control
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget control
number.


From February 22 to March 5, 2011, reactor inspectors from the Nuclear Regulatory Commission's (NRC) Region IV office will perform the baseline inservice inspection at Arkansas Nuclear One, Unit 2, using NRC Inspection Procedure 71111.08, "Inservice Inspection Activities."  Experience has shown that this inspection is a resource intensive inspection both for
Entergy Operations, Inc.                       -2-
the NRC inspectors and your staff.  In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection.  These documents have been divided into two groups.  The first group (Section A of the enclosure), due by February 1, 2011, identifies information to be provided prior to the inspection to ensure that the inspectors are adequately prepared.  The second group (Section B of the enclosure), identifies the information the inspectors will need upon arrival at the site.  It is important that all of these documents are up to date and complete in order to minimize the
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
number of additional documents requested during the preparation and/or the onsite portions of the inspection.
enclosure will be available electronically for public inspection in the NRC Public Document
We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Ms. Stephanie Pyle of your licensing
Room or from the Publicly Available Records (PARS) component of NRCs document
organization.  Our inspection dates are subject to change based on your updated schedule of outage activities.  If there are any questions about this inspection or the material requested, please contact Jim Melfi, lead inspector, at (817) 276-6523 (jim.melfi@nrc.gov) or Dustin Reinert at (817) 860-8244 (dustin.reinert@nrc.gov).
system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011.  The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the
                                                        Sincerely,
requesting document displays a currently valid Office of Management and Budget control number. 
                                                        /RA/
Entergy Operations, Inc.   - 2 -  
                                                        Gregory E. Werner, Chief
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  
                                                        Plant Support Branch 2
  Sincerely,                                                                                     /RA/
                                                        Division of Reactor Safety
Gregory E. Werner, Chief Plant Support Branch 2 Division of Reactor Safety  
Docket: 50-368
Docket:   50-368 License: NPF-06  
License: NPF-06
Enclosure:
Senior Vice President
  & Chief Operating Officer
Entergy Operations, Inc.
P.O. Box 31995
Jackson, MS 39286-1995
Thomas Palmisano
Vice President, Oversight
Entergy Operations, Inc.
P.O. Box 31995
Jackson, MS 39286-1995
Mark Giles
Acting Manager, Licensing
Arkansas Nuclear One
1448 SR 333
Russellville, AR 72802
Joseph A. Aluise
Associate General Counsel - Nuclear
Entergy Services, Inc
639 Loyola Avenue
New Orleans, LA 70113
Senior Manager, Nuclear Safety & Licensing
Entergy Nuclear Operations
P.O. Box 31995
Jackson, MS 39286-1995


Enclosure:  Senior Vice President  & Chief Operating Officer Entergy Operations, Inc.  
Entergy Operations, Inc.         -3-
P.O. Box 31995 Jackson, MS  39286-1995
Chief, Radiation Control Section
Thomas Palmisano Vice President, Oversight
Arkansas Department of Health
Entergy Operations, Inc. P.O. Box 31995 Jackson, MS  39286-1995
4815 West Markham Street, Slot 30
Mark Giles
Little Rock, AR 72205-3867
Acting Manager, Licensing Arkansas Nuclear One 1448 SR 333 Russellville, AR 72802
Jim E. Gibson
County Judge of Pope County
Joseph A. Aluise Associate General Counsel - Nuclear Entergy Services, Inc 639 Loyola Avenue New Orleans, LA  70113
100 West Main Street
Senior Manager, Nuclear Safety & Licensing
Russellville, AR 72801
Entergy Nuclear Operations P.O. Box 31995 Jackson, MS  39286-1995
Arkansas Department of Health
 
Radiation Control Section
Entergy Operations, Inc.  - 3 -
4815 West Markham Street, Slot 30
Chief, Radiation Control Section Arkansas Department of Health 4815 West Markham Street, Slot 30 Little Rock, AR 72205-3867  
Little Rock, AR 72205-3867
David E. Maxwell, Director
Arkansas Department of Emergency
Management, Bldg. 9501
Camp Joseph T. Robinson
North Little Rock, AR 72199
Chief, Technological Hazards
  Branch
FEMA Region VI
800 North Loop 288
Federal Regional Center
Denton, TX 76209


Jim E. Gibson County Judge of Pope County 100 West Main Street Russellville, AR 72801
Entergy Operations, Inc.                    -4-
Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Art.Howell@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
DRP Deputy Director (Troy.Pruett@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
Senior Resident Inspector (Alfred.Sanchez@nrc.gov)
Resident Inspector (Jeff.Rotton@nrc.gov)
Branch Chief, DRP/E (Jeff.Clark@nrc.gov)
Senior Project Engineer, DRP/E (Ray.Azua@nrc.gov)
Project Engineer (Jim.Melfi@nrc.gov)
Project Engineer (William.Schaup@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Kaly.Kalyanam@nrc.gov)
Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OEMail Resource
File located: S:/DRS/REPORTS/reports final/ANO 2011002 RFI-JFM      ML 103630579
SUNSI Rev Compl. 7 Yes No ADAMS                  7 Yes No      Reviewer Initials  DRR
  Publicly Avail          7 Yes No Sensitive        Yes 7No    Sens. Type Initials DRR
EB 1                    TSB                                              C:PSB 2
D. Reinert              J. Melfi                                        G. Werner
/RA/                    /RA/                                            /RA/
12/20/2010              12/23/2010                                        12/29/2010
OFFICIAL RECORD COPY                                T=Telephone      E=E-mail      F=Fax


Arkansas Department of Health Radiation Control Section 4815 West Markham Street, Slot 30 Little Rock, AR  72205-3867
                        INSERVICE INSPECTION DOCUMENT REQUEST
David E. Maxwell, Director
Inspection Dates:             February 22 through March 5, 2011
Arkansas Department of Emergency  Management, Bldg. 9501 Camp Joseph T. Robinson North Little Rock, AR 72199
Inspection Procedures:       IP 71111.08 Inservice Inspection (ISI) Activities
Inspectors:                   Jim Melfi, Project Engineer (Lead Inspector - ISI)
Chief, Technological Hazards    Branch FEMA Region VI 800 North Loop 288 Federal Regional Center
                              Dustin Reinert, Reactor Inspector
Denton, TX  76209
A.     Information Requested for the In-Office Preparation Week
   
      The following information should be sent to the Region IV office in hard copy or
   
      electronic format (ims.certrec.com preferred), in care of Jim Melfi, by February 1, 2011,
Entergy Operations, Inc.  - 4 -
      to facilitate the selection of specific items that will be reviewed during the onsite
Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Art.Howell@nrc.gov) DRP Director (Kriss.Kennedy@nrc.gov)
      inspection week. The inspectors will select specific items from the information requested
DRP Deputy Director (Troy.Pruett@nrc.gov) DRS Director (Anton.Vegel@nrc.gov) Senior Resident Inspector (Alfred.Sanchez@nrc.gov) Resident Inspector (Jeff.Rotton@nrc.gov) Branch Chief, DRP/E (Jeff.Clark@nrc.gov)
      below and then request from your staff additional documents needed during the onsite
Senior Project Engineer, DRP/E (Ray.Azua@nrc.gov) Project Engineer (Jim.Melfi@nrc.gov) Project Engineer (William.Schaup@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov) Project Manager (Kaly.Kalyanam@nrc.gov) Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)
      inspection week (Section B of this enclosure). We ask that the specific items selected
RITS Coordinator (Marisa.Herrera@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) OEMail Resource
      from the lists be available and ready for review on the first day of inspection. Please
      provide requested documentation electronically, if possible. If requested documents are
   
      large and only hard copy formats are available, please inform the inspectors and provide
   
      subject documentation during the first day of the onsite inspection. If you have any
File located:  S:/DRS/REPORTS/reports final/ANO 2011002 RFI-JFM      ML 103630579 SUNSI Rev Compl.  Yes  No ADAMS  Yes  No Reviewer Initials DRRPublicly Avail  Yes  No Sensitive  Yes No Sens. Type Initials DRR
      questions regarding this information request, please call the inspectors as soon as
EB 1 TSB  C:PSB 2 D. Reinert J. Melfi  G. Werner
      possible.
/RA/ /RA/ /RA/ 12/20/2010 12/23/2010  12/29/2010 OFFICIAL RECORD COPY  T=Telephone          E=E-mail        F=Fax
A.1   ISI/Welding Programs and Schedule Information
 
      a)       A detailed schedule (including preliminary dates) of:
  - 1 - Enclosure INSERVICE INSPECTION DOCUMENT REQUEST  
                i)     Nondestructive examinations planned for Class 1 and 2 systems and
  Inspection Dates: February 22 through March 5, 2011  
                        containment, performed as part of your ASME, Section XI, risk informed
                        (if applicable), and augmented inservice inspection programs during the
Inspection Procedures: IP 71111.08 "Inservice Inspection (ISI) Activities"
                        upcoming outage
Inspectors: Jim Melfi, Project Engineer (Lead Inspector - ISI) Dustin Reinert, Reactor Inspector  
                        Provide a status summary of the nondestructive examination inspection
                        activities versus the required inspection period percentages for this
A. Information Requested for the In-Office Preparation Week
                        interval by category per ASME, Section XI, IWX-2400. Do not provide
  The following information should be sent to the Region IV office in hard copy or electronic format (ims.certrec.com preferred), in care of Jim Melfi, by February 1, 2011, to facilitate the selection of specific items that will be reviewed during the onsite inspection week. The inspectors will select specific items from the information requested below and then request from your staff additional documents needed during the onsite  
                        separately if other documentation requested contains this information.
inspection week (Section B of this enclosure). We ask that the specific items selected from the lists be available and ready for review on the first day of inspection. Please provide requested documentation electronically, if possible. If requested documents are large and only hard copy formats are available, please inform the inspectors and provide subject documentation during the first day of the onsite inspection. If you have any questions regarding this information request, please call the inspectors as soon as possible.  
                ii)     Reactor pressure vessel head examinations planned for the upcoming
A.1 ISI/Welding Programs and Schedule Information
                        outage
  a) A detailed schedule (including preliminary dates) of:  
                iii)   Examinations planned for Alloy 82/182/600 components that are not
i) Nondestructive examinations planned for Class 1 and 2 systems and containment, performed as part of your ASME, Section XI, risk informed (if applicable), and augmented inservice inspection programs during the  
                        included in the Section XI scope, if applicable
upcoming outage  
                iv)     Examinations planned as part of your boric acid corrosion control
Provide a status summary of the nondestructive examination inspection activities versus the required inspection period percentages for this interval by category per ASME, Section XI, IWX-2400. Do not provide separately if other documentation requested contains this information. ii) Reactor pressure vessel head examinations planned for the upcoming outage iii) Examinations planned for Alloy 82/182/600 components that are not included in the Section XI scope, if applicable  
                        program (Mode 3 walkdowns, bolted connection walkdowns, etc.)
iv) Examinations planned as part of your boric acid corrosion control program (Mode 3 walkdowns, bolted connection walkdowns, etc.)
                                              -1-                                       Enclosure
  - 2 - Enclosure v) Welding activities that are scheduled to be completed during the upcoming outage (ASME, Class 1, 2, or 3 structures, systems, or components)  
 
b) A copy of ASME, Section XI, code relief requests and associated NRC safety evaluations applicable to the examinations identified above.
          v)       Welding activities that are scheduled to be completed during the
  c) A list of nondestructive examination reports (ultrasonic, radiography, magnetic particle, dye penetrate, Visual VT-1, VT-2, and VT-3), which have identified relevant conditions on Code Class 1 and 2 systems since the beginning of the  
                  upcoming outage (ASME, Class 1, 2, or 3 structures, systems, or
last refueling outage. This should include the previous Section XI pressure test(s) conducted during startup and any evaluations associated with the results of the pressure tests. Also, include in the list the nondestructive examination reports with relevant conditions in the reactor pressure vessel head penetration nozzles that have been accepted for continued service. The list of nondestructive examination reports should include a brief description of the structures, systems, or components where the relevant condition was identified.  
                  components)
d) A list with a brief description (e.g., system, material, pipe size, weld number, and nondestructive examinations performed) of the welds in Code Class 1 and 2 systems which have been fabricated due to component repair/replacement activities since the beginning of the last refueling outage, or are planned to be  
    b)   A copy of ASME, Section XI, code relief requests and associated NRC safety
fabricated this refueling outage.  
          evaluations applicable to the examinations identified above.
e) If reactor vessel weld examinations required by the ASME Code are scheduled to occur during the upcoming outage, provide a detailed description of the welds to be examined and the extent of the planned examination. Please also provide reference numbers for applicable procedures that will be used to conduct these examinations.  
    c)   A list of nondestructive examination reports (ultrasonic, radiography, magnetic
f) Copy of any 10 CFR Part 21 reports applicable to your structures, systems, or components within the scope of Section XI of the ASME Code that have been  
          particle, dye penetrate, Visual VT-1, VT-2, and VT-3), which have identified
identified since the beginning of the last refueling outage.  
          relevant conditions on Code Class 1 and 2 systems since the beginning of the
g) A list of any temporary noncode repairs in service (e.g., pinhole leaks).  
          last refueling outage. This should include the previous Section XI pressure
h) Please provide copies of the most recent self-assessments for the inservice inspection, welding, and Alloy 600 programs.
          test(s) conducted during startup and any evaluations associated with the results
A.2 Reactor Pressure Vessel Head  
          of the pressure tests. Also, include in the list the nondestructive examination
  a) Provide the detailed scope of the planned nondestructive examinations of the reactor vessel head which identifies the types of nondestructive examination methods to be used on each specific part of the vessel head to fulfill  
          reports with relevant conditions in the reactor pressure vessel head penetration
commitments made in response to NRC Bulletin 2002-02 and NRC Order EA-03-009. Also, include examination scope expansion criteria and planned expansion sample sizes if relevant conditions are identified, if applicable.  
          nozzles that have been accepted for continued service. The list of
 
          nondestructive examination reports should include a brief description of the
  - 3 - Enclosure b) A list of the standards and/or requirements that will be used to evaluate indications identified during nondestructive examination of the reactor vessel head. (e.g., the specific industry or procedural standards which will be used to evaluate potential leakage and/or flaw indications).  
          structures, systems, or components where the relevant condition was identified.
    d)   A list with a brief description (e.g., system, material, pipe size, weld number, and
          nondestructive examinations performed) of the welds in Code Class 1 and 2
          systems which have been fabricated due to component repair/replacement
          activities since the beginning of the last refueling outage, or are planned to be
          fabricated this refueling outage.
    e)   If reactor vessel weld examinations required by the ASME Code are scheduled to
          occur during the upcoming outage, provide a detailed description of the welds to
          be examined and the extent of the planned examination. Please also provide
          reference numbers for applicable procedures that will be used to conduct these
          examinations.
    f)   Copy of any 10 CFR Part 21 reports applicable to your structures, systems, or
          components within the scope of Section XI of the ASME Code that have been
          identified since the beginning of the last refueling outage.
    g)   A list of any temporary noncode repairs in service (e.g., pinhole leaks).
    h)   Please provide copies of the most recent self-assessments for the inservice
          inspection, welding, and Alloy 600 programs.
A.2 Reactor Pressure Vessel Head
    a)   Provide the detailed scope of the planned nondestructive examinations of the
          reactor vessel head which identifies the types of nondestructive examination
          methods to be used on each specific part of the vessel head to fulfill
          commitments made in response to NRC Bulletin 2002-02 and
          NRC Order EA-03-009. Also, include examination scope expansion criteria and
          planned expansion sample sizes if relevant conditions are identified, if applicable.
                                        -2-                                       Enclosure
 
    b)     A list of the standards and/or requirements that will be used to evaluate
          indications identified during nondestructive examination of the reactor vessel
          head. (e.g., the specific industry or procedural standards which will be used to
          evaluate potential leakage and/or flaw indications).
A.3 Boric Acid Corrosion Control Program
A.3 Boric Acid Corrosion Control Program
  a) Copy of the procedures that govern the scope, equipment and implementation of the inspections required to identify boric acid leakage and the procedures for boric acid leakage/corrosion evaluation.  
    a)     Copy of the procedures that govern the scope, equipment and implementation of
b) Please provide a list of leaks (including code class of the components) that have been identified since the last refueling outage and associated corrective action documentation. If during the last cycle, the unit was shutdown, please provide documentation of containment walkdown inspections performed as part of the boric acid corrosion control program.  
          the inspections required to identify boric acid leakage and the procedures for
c) Please provide a copy of the most recent self-assessment performed for the boric acid corrosion control program.  
          boric acid leakage/corrosion evaluation.
A.4 Additional Information Related to all Inservice Inspection Activities
    b)     Please provide a list of leaks (including code class of the components) that have
  a) A list with a brief description of inservice inspection, boric acid corrosion control program, and steam generator tube inspection related issues (e.g., condition reports) entered into your corrective action program since the beginning of the last Unit 2 refueling outage. For example, a list based upon data base searches using key words related to piping or steam generator tube degradation such as:  
          been identified since the last refueling outage and associated corrective action
inservice inspection, ASME Code, Section XI, NDE, cracks, wear, thinning, leakage, rust, corrosion, boric acid, or errors in piping/steam generator tube examinations.  
          documentation. If during the last cycle, the unit was shutdown, please provide
b) Please provide names and phone numbers for the following program leads:  
          documentation of containment walkdown inspections performed as part of the
Inservice inspection contacts (examination, planning) Containment exams Reactor pressure vessel head exams Snubbers and supports  
          boric acid corrosion control program.
Repair and replacement program manager Licensing contact Site welding engineer Boric acid corrosion control program  
    c)     Please provide a copy of the most recent self-assessment performed for the
 
          boric acid corrosion control program.
  - 4 - Enclosure B. Information to be Provided Onsite to the Inspectors at the Entrance Meeting February 22, 2011
A.4 Additional Information Related to all Inservice Inspection Activities
B.1 Inservice Inspection/Welding Programs and Schedule Information
    a)     A list with a brief description of inservice inspection, boric acid corrosion control
a) Updated schedules for inservice inspection/nondestructive examination activities, including steam generator tube inspections, planned welding activities, and schedule showing contingency repair plans, if available.  
          program, and steam generator tube inspection related issues (e.g., condition
b) For ASME Code Class 1 and 2 welds selected by the inspectors from the lists provided from Section A of this enclosure, please provide copies of the following  
          reports) entered into your corrective action program since the beginning of the
documentation for each subject weld:  
          last Unit 2 refueling outage. For example, a list based upon data base searches
i) Weld data sheet (traveler) ii) Weld configuration and system location  
          using key words related to piping or steam generator tube degradation such as:
iii) Applicable code edition and addenda for weldment  
          inservice inspection, ASME Code, Section XI, NDE, cracks, wear, thinning,
iv) Applicable code edition and addenda for welding procedures v) Applicable weld procedures used to fabricate the welds vi) Copies of procedure qualification records supporting the weld procedures from B.1.b.v  
          leakage, rust, corrosion, boric acid, or errors in piping/steam generator tube
vii) Copies of mechanical test reports identified in the procedure qualification records above  
          examinations.
viii) Copies of the nonconformance reports for the selected welds, if applicable  
    b)     Please provide names and phone numbers for the following program leads:
ix) Radiographs of the selected welds and access to equipment to allow viewing radiographs (if radiographic testing was performed)  
          Inservice inspection contacts (examination, planning)
x) Copies of the preservice examination records for the selected welds xi) Copies of welder performance qualifications records applicable to the selected welds, including documentation that welder maintained proficiency in the applicable welding processes specified in the weld procedures (at least 6 months prior to the date of subject work)  
          Containment exams
xii) Copies of nondestructive examination personnel qualifications (visual inspection, penetrant testing, ultrasonic testing, radiographic testing), as applicable  
          Reactor pressure vessel head exams
 
          Snubbers and supports
  - 5 - Enclosure c) For the inservice inspection related corrective action issues selected by the inspectors from Section A of this enclosure, provide a copy of the corrective actions and supporting documentation.  
          Repair and replacement program manager
d) For the nondestructive examination reports with relevant conditions on Code Class 1 and 2 systems selected by the inspectors from Section A above, provide a copy of the examination records, examiner qualification records and associated corrective action documents.  
          Licensing contact
e) A copy of (or ready access to) most current revision of the inservice inspection program manual and plan for the current Interval.
          Site welding engineer
f) For the nondestructive examinations selected by the inspectors from Section A of this enclosure, provide a copy of the nondestructive examination procedures used to perform the examinations (including calibration and flaw characterization/sizing procedures). For ultrasonic examination procedures qualified in accordance with ASME, Code, Section XI, Appendix VIII, provide  
          Boric acid corrosion control program
documentation supporting the procedure qualification (e.g., the EPRI performance demonstration qualification summary sheets). Also, include qualification documentation of the specific equipment to be used (e.g., ultrasonic unit, cables, and transducers including serial numbers) and nondestructive examination personnel qualification records.  
                                          -3-                                         Enclosure
B.2 Reactor Pressure Vessel Head  
 
  a) Provide the nondestructive personnel qualification records for the examiners who will perform examinations of the reactor pressure vessel head.
B. Information to be Provided Onsite to the Inspectors at the Entrance Meeting
b) If a visual examination is planned for the upcoming refueling outage, provide drawings showing the following:
    February 22, 2011
i) Reactor pressure vessel head and control rod drive mechanism nozzle configurations ii) Reactor pressure vessel head insulation configuration  
B.1 Inservice Inspection/Welding Programs and Schedule Information
The drawings listed above should include fabrication drawings for the nozzle attachment welds as applicable.
    a)     Updated schedules for inservice inspection/nondestructive examination activities,
c) Copy of nondestructive examination reports from the last reactor pressure vessel head examination.  
            including steam generator tube inspections, planned welding activities, and
d) If a visual examination is planned for the upcoming refueling outage provide a copy of the evaluation or calculation demonstrating that the scope of the visual examination of the upper head will meet the 95 percent minimum coverage required by NRC Order EA-03-009.  
            schedule showing contingency repair plans, if available.
 
    b)     For ASME Code Class 1 and 2 welds selected by the inspectors from the lists
  - 6 - Enclosure e) Provide a copy of the procedures that will be used to identify the source of any boric acid deposits identified on the reactor pressure vessel head. If no explicit procedures exist which govern this activity, provide a description of the process to be followed including personnel responsibilities, and expectations.
            provided from Section A of this enclosure, please provide copies of the following
            documentation for each subject weld:
f) Provide a copy of the updated calculation of effective degradation years for the reactor pressure vessel head susceptibility ranking.  
            i)     Weld data sheet (traveler)
g) Provide a copy of the vendor qualification report(s) that demonstrates the detection capability of the nondestructive examination equipment used for the  
            ii)     Weld configuration and system location
reactor pressure vessel head examinations. Also, identify any changes in equipment configurations used for the reactor pressure vessel head examinations which differ from that used in the vendor qualification report(s).  
            iii)   Applicable code edition and addenda for weldment
B.3 Boric Acid Corrosion Control Program  
            iv)     Applicable code edition and addenda for welding procedures
  a) Provide boric acid walkdown inspection results, an updated list of boric acid leaks identified so far this outage, associated corrective action documentation, and overall status of planned boric acid inspections.  
            v)     Applicable weld procedures used to fabricate the welds
b) Provide any engineering evaluations completed for boric acid leaks identified since the end of the last refueling outage. Please include a status of corrective  
            vi)     Copies of procedure qualification records supporting the weld procedures
actions to repair and/or clean these boric acid leaks. Please identify specifically which known leaks, if any, have remained in service or will remain in service as active leaks.
                    from B.1.b.v
B.4 Codes and Standards
            vii)   Copies of mechanical test reports identified in the procedure qualification
a) Ready access to (i.e., copies provided to the inspectors for use during the inspection at the onsite inspection location or room number and location where available):  
                    records above
i) Applicable editions of the ASME Code (Sections V, IX, and XI) for the inservice inspection program and the repair/replacement program.
            viii)   Copies of the nonconformance reports for the selected welds, if
ii) EPRI and industry standards referenced in the procedures used to perform the steam generator tube eddy current examination.  
                    applicable
Inspector Contact Information:  
            ix)     Radiographs of the selected welds and access to equipment to allow
Jim Melfi   Dustin Reinert    
                    viewing radiographs (if radiographic testing was performed)
Project Engineer Reactor Inspector   817-276-6523   817-860-8244     Jim.Melfi@nrc.gov             Dustin.Reinert@nrc.gov  
            x)     Copies of the preservice examination records for the selected welds
 
            xi)     Copies of welder performance qualifications records applicable to the
  - 7 - Enclosure Mailing Address: US NRC, Region IV Attn: Jim Melfi 612 E. Lamar Blvd, Suite 400 Arlington, TX 76011
                    selected welds, including documentation that welder maintained
                    proficiency in the applicable welding processes specified in the weld
                    procedures (at least 6 months prior to the date of subject work)
            xii)   Copies of nondestructive examination personnel qualifications (visual
                    inspection, penetrant testing, ultrasonic testing, radiographic testing), as
                    applicable
                                        -4-                                         Enclosure
 
    c)   For the inservice inspection related corrective action issues selected by the
          inspectors from Section A of this enclosure, provide a copy of the corrective
          actions and supporting documentation.
    d)   For the nondestructive examination reports with relevant conditions on Code
          Class 1 and 2 systems selected by the inspectors from Section A above, provide
          a copy of the examination records, examiner qualification records and associated
          corrective action documents.
    e)   A copy of (or ready access to) most current revision of the inservice inspection
          program manual and plan for the current Interval.
    f)   For the nondestructive examinations selected by the inspectors from Section A of
          this enclosure, provide a copy of the nondestructive examination procedures
          used to perform the examinations (including calibration and flaw
          characterization/sizing procedures). For ultrasonic examination procedures
          qualified in accordance with ASME, Code, Section XI, Appendix VIII, provide
          documentation supporting the procedure qualification (e.g., the EPRI
          performance demonstration qualification summary sheets). Also, include
          qualification documentation of the specific equipment to be used (e.g., ultrasonic
          unit, cables, and transducers including serial numbers) and nondestructive
          examination personnel qualification records.
B.2 Reactor Pressure Vessel Head
    a)   Provide the nondestructive personnel qualification records for the examiners who
          will perform examinations of the reactor pressure vessel head.
    b)   If a visual examination is planned for the upcoming refueling outage, provide
          drawings showing the following:
          i)       Reactor pressure vessel head and control rod drive mechanism nozzle
                  configurations
          ii)     Reactor pressure vessel head insulation configuration
          The drawings listed above should include fabrication drawings for the nozzle
          attachment welds as applicable.
    c)   Copy of nondestructive examination reports from the last reactor pressure vessel
          head examination.
    d)   If a visual examination is planned for the upcoming refueling outage provide a
          copy of the evaluation or calculation demonstrating that the scope of the visual
          examination of the upper head will meet the 95 percent minimum coverage
          required by NRC Order EA-03-009.
                                      -5-                                       Enclosure
 
        e)     Provide a copy of the procedures that will be used to identify the source of any
              boric acid deposits identified on the reactor pressure vessel head. If no explicit
              procedures exist which govern this activity, provide a description of the process
              to be followed including personnel responsibilities, and expectations.
        f)     Provide a copy of the updated calculation of effective degradation years for the
              reactor pressure vessel head susceptibility ranking.
        g)     Provide a copy of the vendor qualification report(s) that demonstrates the
              detection capability of the nondestructive examination equipment used for the
              reactor pressure vessel head examinations. Also, identify any changes in
              equipment configurations used for the reactor pressure vessel head
              examinations which differ from that used in the vendor qualification report(s).
B.3     Boric Acid Corrosion Control Program
        a)     Provide boric acid walkdown inspection results, an updated list of boric acid leaks
              identified so far this outage, associated corrective action documentation, and
              overall status of planned boric acid inspections.
        b)     Provide any engineering evaluations completed for boric acid leaks identified
              since the end of the last refueling outage. Please include a status of corrective
              actions to repair and/or clean these boric acid leaks. Please identify specifically
              which known leaks, if any, have remained in service or will remain in service as
              active leaks.
B.4     Codes and Standards
        a)     Ready access to (i.e., copies provided to the inspectors for use during the
              inspection at the onsite inspection location or room number and location where
              available):
              i)       Applicable editions of the ASME Code (Sections V, IX, and XI) for the
                        inservice inspection program and the repair/replacement program.
              ii)     EPRI and industry standards referenced in the procedures used to
                        perform the steam generator tube eddy current examination.
Inspector Contact Information:
Jim Melfi                       Dustin Reinert
Project Engineer               Reactor Inspector
817-276-6523                   817-860-8244
Jim.Melfi@nrc.gov               Dustin.Reinert@nrc.gov
                                            -6-                                       Enclosure
 
Mailing Address:
US NRC, Region IV
Attn: Jim Melfi
612 E. Lamar Blvd, Suite 400
Arlington, TX 76011
                            -7- Enclosure
}}
}}

Revision as of 05:01, 13 November 2019

Notification of Inspection (NRC Inspection Report 050-368/2011002) and Request for Information
ML103630579
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 12/29/2010
From: Greg Werner
NRC/RGN-I/DRS/PSB2
To: Berryman B
Entergy Operations
References
IP 71111.08
Download: ML103630579 (11)


See also: IR 05000368/2011002

Text

UNITED STATES

NUC LE AR RE G ULATO RY C O M M I S S I O N

R E GI ON I V

612 EAST LAMAR BLVD , SU I TE 400

AR LI N GTON , TEXAS 76011-4125

December 29, 2010

Brad Berryman, Vice President, Operations

Arkansas Nuclear One

Entergy Operations, Inc.

1448 S.R. 333

Russellville, AR 72802

SUBJECT: ARKANSAS NUCLEAR ONE, UNIT 2 - NOTIFICATION OF INSPECTION (NRC

INSPECTION REPORT 050-368/2011002) AND REQUEST FOR

INFORMATION

Dear Mr. Berryman:

From February 22 to March 5, 2011, reactor inspectors from the Nuclear Regulatory

Commissions (NRC) Region IV office will perform the baseline inservice inspection at Arkansas

Nuclear One, Unit 2, using NRC Inspection Procedure 71111.08, Inservice Inspection

Activities. Experience has shown that this inspection is a resource intensive inspection both for

the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and

to ensure a productive inspection, we have enclosed a request for documents needed for this

inspection. These documents have been divided into two groups. The first group (Section A of

the enclosure), due by February 1, 2011, identifies information to be provided prior to the

inspection to ensure that the inspectors are adequately prepared. The second group (Section B

of the enclosure), identifies the information the inspectors will need upon arrival at the site. It is

important that all of these documents are up to date and complete in order to minimize the

number of additional documents requested during the preparation and/or the onsite portions of

the inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Ms. Stephanie Pyle of your licensing

organization. Our inspection dates are subject to change based on your updated schedule of

outage activities. If there are any questions about this inspection or the material requested,

please contact Jim Melfi, lead inspector, at (817) 276-6523 (jim.melfi@nrc.gov) or Dustin

Reinert at (817) 860-8244 (dustin.reinert@nrc.gov).

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, Control

Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget control

number.

Entergy Operations, Inc. -2-

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRCs document

system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Gregory E. Werner, Chief

Plant Support Branch 2

Division of Reactor Safety

Docket: 50-368

License: NPF-06

Enclosure:

Senior Vice President

& Chief Operating Officer

Entergy Operations, Inc.

P.O. Box 31995

Jackson, MS 39286-1995

Thomas Palmisano

Vice President, Oversight

Entergy Operations, Inc.

P.O. Box 31995

Jackson, MS 39286-1995

Mark Giles

Acting Manager, Licensing

Arkansas Nuclear One

1448 SR 333

Russellville, AR 72802

Joseph A. Aluise

Associate General Counsel - Nuclear

Entergy Services, Inc

639 Loyola Avenue

New Orleans, LA 70113

Senior Manager, Nuclear Safety & Licensing

Entergy Nuclear Operations

P.O. Box 31995

Jackson, MS 39286-1995

Entergy Operations, Inc. -3-

Chief, Radiation Control Section

Arkansas Department of Health

4815 West Markham Street, Slot 30

Little Rock, AR 72205-3867

Jim E. Gibson

County Judge of Pope County

100 West Main Street

Russellville, AR 72801

Arkansas Department of Health

Radiation Control Section

4815 West Markham Street, Slot 30

Little Rock, AR 72205-3867

David E. Maxwell, Director

Arkansas Department of Emergency

Management, Bldg. 9501

Camp Joseph T. Robinson

North Little Rock, AR 72199

Chief, Technological Hazards

Branch

FEMA Region VI

800 North Loop 288

Federal Regional Center

Denton, TX 76209

Entergy Operations, Inc. -4-

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Art.Howell@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

DRP Deputy Director (Troy.Pruett@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

Senior Resident Inspector (Alfred.Sanchez@nrc.gov)

Resident Inspector (Jeff.Rotton@nrc.gov)

Branch Chief, DRP/E (Jeff.Clark@nrc.gov)

Senior Project Engineer, DRP/E (Ray.Azua@nrc.gov)

Project Engineer (Jim.Melfi@nrc.gov)

Project Engineer (William.Schaup@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Kaly.Kalyanam@nrc.gov)

Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource

File located: S:/DRS/REPORTS/reports final/ANO 2011002 RFI-JFM ML 103630579

SUNSI Rev Compl. 7 Yes No ADAMS 7 Yes No Reviewer Initials DRR

Publicly Avail 7 Yes No Sensitive Yes 7No Sens. Type Initials DRR

EB 1 TSB C:PSB 2

D. Reinert J. Melfi G. Werner

/RA/ /RA/ /RA/

12/20/2010 12/23/2010 12/29/2010

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

INSERVICE INSPECTION DOCUMENT REQUEST

Inspection Dates: February 22 through March 5, 2011

Inspection Procedures: IP 71111.08 Inservice Inspection (ISI) Activities

Inspectors: Jim Melfi, Project Engineer (Lead Inspector - ISI)

Dustin Reinert, Reactor Inspector

A. Information Requested for the In-Office Preparation Week

The following information should be sent to the Region IV office in hard copy or

electronic format (ims.certrec.com preferred), in care of Jim Melfi, by February 1, 2011,

to facilitate the selection of specific items that will be reviewed during the onsite

inspection week. The inspectors will select specific items from the information requested

below and then request from your staff additional documents needed during the onsite

inspection week (Section B of this enclosure). We ask that the specific items selected

from the lists be available and ready for review on the first day of inspection. Please

provide requested documentation electronically, if possible. If requested documents are

large and only hard copy formats are available, please inform the inspectors and provide

subject documentation during the first day of the onsite inspection. If you have any

questions regarding this information request, please call the inspectors as soon as

possible.

A.1 ISI/Welding Programs and Schedule Information

a) A detailed schedule (including preliminary dates) of:

i) Nondestructive examinations planned for Class 1 and 2 systems and

containment, performed as part of your ASME,Section XI, risk informed

(if applicable), and augmented inservice inspection programs during the

upcoming outage

Provide a status summary of the nondestructive examination inspection

activities versus the required inspection period percentages for this

interval by category per ASME,Section XI, IWX-2400. Do not provide

separately if other documentation requested contains this information.

ii) Reactor pressure vessel head examinations planned for the upcoming

outage

iii) Examinations planned for Alloy 82/182/600 components that are not

included in the Section XI scope, if applicable

iv) Examinations planned as part of your boric acid corrosion control

program (Mode 3 walkdowns, bolted connection walkdowns, etc.)

-1- Enclosure

v) Welding activities that are scheduled to be completed during the

upcoming outage (ASME, Class 1, 2, or 3 structures, systems, or

components)

b) A copy of ASME,Section XI, code relief requests and associated NRC safety

evaluations applicable to the examinations identified above.

c) A list of nondestructive examination reports (ultrasonic, radiography, magnetic

particle, dye penetrate, Visual VT-1, VT-2, and VT-3), which have identified

relevant conditions on Code Class 1 and 2 systems since the beginning of the

last refueling outage. This should include the previousSection XI pressure

test(s) conducted during startup and any evaluations associated with the results

of the pressure tests. Also, include in the list the nondestructive examination

reports with relevant conditions in the reactor pressure vessel head penetration

nozzles that have been accepted for continued service. The list of

nondestructive examination reports should include a brief description of the

structures, systems, or components where the relevant condition was identified.

d) A list with a brief description (e.g., system, material, pipe size, weld number, and

nondestructive examinations performed) of the welds in Code Class 1 and 2

systems which have been fabricated due to component repair/replacement

activities since the beginning of the last refueling outage, or are planned to be

fabricated this refueling outage.

e) If reactor vessel weld examinations required by the ASME Code are scheduled to

occur during the upcoming outage, provide a detailed description of the welds to

be examined and the extent of the planned examination. Please also provide

reference numbers for applicable procedures that will be used to conduct these

examinations.

f) Copy of any 10 CFR Part 21 reports applicable to your structures, systems, or

components within the scope of Section XI of the ASME Code that have been

identified since the beginning of the last refueling outage.

g) A list of any temporary noncode repairs in service (e.g., pinhole leaks).

h) Please provide copies of the most recent self-assessments for the inservice

inspection, welding, and Alloy 600 programs.

A.2 Reactor Pressure Vessel Head

a) Provide the detailed scope of the planned nondestructive examinations of the

reactor vessel head which identifies the types of nondestructive examination

methods to be used on each specific part of the vessel head to fulfill

commitments made in response to NRC Bulletin 2002-02 and

NRC Order EA-03-009. Also, include examination scope expansion criteria and

planned expansion sample sizes if relevant conditions are identified, if applicable.

-2- Enclosure

b) A list of the standards and/or requirements that will be used to evaluate

indications identified during nondestructive examination of the reactor vessel

head. (e.g., the specific industry or procedural standards which will be used to

evaluate potential leakage and/or flaw indications).

A.3 Boric Acid Corrosion Control Program

a) Copy of the procedures that govern the scope, equipment and implementation of

the inspections required to identify boric acid leakage and the procedures for

boric acid leakage/corrosion evaluation.

b) Please provide a list of leaks (including code class of the components) that have

been identified since the last refueling outage and associated corrective action

documentation. If during the last cycle, the unit was shutdown, please provide

documentation of containment walkdown inspections performed as part of the

boric acid corrosion control program.

c) Please provide a copy of the most recent self-assessment performed for the

boric acid corrosion control program.

A.4 Additional Information Related to all Inservice Inspection Activities

a) A list with a brief description of inservice inspection, boric acid corrosion control

program, and steam generator tube inspection related issues (e.g., condition

reports) entered into your corrective action program since the beginning of the

last Unit 2 refueling outage. For example, a list based upon data base searches

using key words related to piping or steam generator tube degradation such as:

inservice inspection, ASME Code,Section XI, NDE, cracks, wear, thinning,

leakage, rust, corrosion, boric acid, or errors in piping/steam generator tube

examinations.

b) Please provide names and phone numbers for the following program leads:

Inservice inspection contacts (examination, planning)

Containment exams

Reactor pressure vessel head exams

Snubbers and supports

Repair and replacement program manager

Licensing contact

Site welding engineer

Boric acid corrosion control program

-3- Enclosure

B. Information to be Provided Onsite to the Inspectors at the Entrance Meeting

February 22, 2011

B.1 Inservice Inspection/Welding Programs and Schedule Information

a) Updated schedules for inservice inspection/nondestructive examination activities,

including steam generator tube inspections, planned welding activities, and

schedule showing contingency repair plans, if available.

b) For ASME Code Class 1 and 2 welds selected by the inspectors from the lists

provided from Section A of this enclosure, please provide copies of the following

documentation for each subject weld:

i) Weld data sheet (traveler)

ii) Weld configuration and system location

iii) Applicable code edition and addenda for weldment

iv) Applicable code edition and addenda for welding procedures

v) Applicable weld procedures used to fabricate the welds

vi) Copies of procedure qualification records supporting the weld procedures

from B.1.b.v

vii) Copies of mechanical test reports identified in the procedure qualification

records above

viii) Copies of the nonconformance reports for the selected welds, if

applicable

ix) Radiographs of the selected welds and access to equipment to allow

viewing radiographs (if radiographic testing was performed)

x) Copies of the preservice examination records for the selected welds

xi) Copies of welder performance qualifications records applicable to the

selected welds, including documentation that welder maintained

proficiency in the applicable welding processes specified in the weld

procedures (at least 6 months prior to the date of subject work)

xii) Copies of nondestructive examination personnel qualifications (visual

inspection, penetrant testing, ultrasonic testing, radiographic testing), as

applicable

-4- Enclosure

c) For the inservice inspection related corrective action issues selected by the

inspectors from Section A of this enclosure, provide a copy of the corrective

actions and supporting documentation.

d) For the nondestructive examination reports with relevant conditions on Code

Class 1 and 2 systems selected by the inspectors from Section A above, provide

a copy of the examination records, examiner qualification records and associated

corrective action documents.

e) A copy of (or ready access to) most current revision of the inservice inspection

program manual and plan for the current Interval.

f) For the nondestructive examinations selected by the inspectors from Section A of

this enclosure, provide a copy of the nondestructive examination procedures

used to perform the examinations (including calibration and flaw

characterization/sizing procedures). For ultrasonic examination procedures

qualified in accordance with ASME, Code,Section XI, Appendix VIII, provide

documentation supporting the procedure qualification (e.g., the EPRI

performance demonstration qualification summary sheets). Also, include

qualification documentation of the specific equipment to be used (e.g., ultrasonic

unit, cables, and transducers including serial numbers) and nondestructive

examination personnel qualification records.

B.2 Reactor Pressure Vessel Head

a) Provide the nondestructive personnel qualification records for the examiners who

will perform examinations of the reactor pressure vessel head.

b) If a visual examination is planned for the upcoming refueling outage, provide

drawings showing the following:

i) Reactor pressure vessel head and control rod drive mechanism nozzle

configurations

ii) Reactor pressure vessel head insulation configuration

The drawings listed above should include fabrication drawings for the nozzle

attachment welds as applicable.

c) Copy of nondestructive examination reports from the last reactor pressure vessel

head examination.

d) If a visual examination is planned for the upcoming refueling outage provide a

copy of the evaluation or calculation demonstrating that the scope of the visual

examination of the upper head will meet the 95 percent minimum coverage

required by NRC Order EA-03-009.

-5- Enclosure

e) Provide a copy of the procedures that will be used to identify the source of any

boric acid deposits identified on the reactor pressure vessel head. If no explicit

procedures exist which govern this activity, provide a description of the process

to be followed including personnel responsibilities, and expectations.

f) Provide a copy of the updated calculation of effective degradation years for the

reactor pressure vessel head susceptibility ranking.

g) Provide a copy of the vendor qualification report(s) that demonstrates the

detection capability of the nondestructive examination equipment used for the

reactor pressure vessel head examinations. Also, identify any changes in

equipment configurations used for the reactor pressure vessel head

examinations which differ from that used in the vendor qualification report(s).

B.3 Boric Acid Corrosion Control Program

a) Provide boric acid walkdown inspection results, an updated list of boric acid leaks

identified so far this outage, associated corrective action documentation, and

overall status of planned boric acid inspections.

b) Provide any engineering evaluations completed for boric acid leaks identified

since the end of the last refueling outage. Please include a status of corrective

actions to repair and/or clean these boric acid leaks. Please identify specifically

which known leaks, if any, have remained in service or will remain in service as

active leaks.

B.4 Codes and Standards

a) Ready access to (i.e., copies provided to the inspectors for use during the

inspection at the onsite inspection location or room number and location where

available):

i) Applicable editions of the ASME Code (Sections V, IX, and XI) for the

inservice inspection program and the repair/replacement program.

ii) EPRI and industry standards referenced in the procedures used to

perform the steam generator tube eddy current examination.

Inspector Contact Information:

Jim Melfi Dustin Reinert

Project Engineer Reactor Inspector

817-276-6523 817-860-8244

Jim.Melfi@nrc.gov Dustin.Reinert@nrc.gov

-6- Enclosure

Mailing Address:

US NRC, Region IV

Attn: Jim Melfi

612 E. Lamar Blvd, Suite 400

Arlington, TX 76011

-7- Enclosure