ML110040413: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Modify Plant Issue.4 Page 1 of 2 plant status dally enter daily plant status sat archives in Oconee Information for 08124/2009 (Modify/Update)
{{#Wiki_filter:Modify Plant Issue                                                                                                 Page 1 of 2
Outside of Scope Significant TS/ Issues: The licensee performed a boroscope inspection of the internal portions of the pipe and identified at least one location that is leaking. The guided wave UT was unsuccessful at obtaining meaningful results. The licensee is attempting.
  .4 plant status dally       enter daily plant status   sat archives                                         in Oconee Information for 08124/2009 (Modify/Update)
to perform a different  
Outside of Scope Significant TS/ Issues:
'type 'of' UT in order to characterize the flaw as input into their PDO (prompt determination of operability)
The licensee performed a boroscope inspection of the internal portions of the pipe and identified at least one location that is leaking.                     The guided at obtaining   meaningful   results.       The   licensee       is wave UT was unsuccessful attempting. to perform a different 'type 'of' UT in order to characterize the flaw as input into their     PDO (prompt determination of operability)                     The licensee is not planning on     performing   a weld   repair     of the   flaw,     rather     a modification is being planned to install         a new discharge line for the U2
The licensee is not planning on performing a weld repair of the flaw, rather a modification is being planned to install a new discharge line for the U2-portion of piping.. This mod-will consume most (if not all) of the 45-day maintenance AOT. SSF is currently inop:for all three units for siesmic whtn the discharge line was 'cut'.O-utside of Scope I St~fi~~1114120 10 3 hIttn /r 1 r. nrc, Qnv/webanrs/tDita/Modifvlssue.cfm?iid 14715 &sname=Oconee L ....................' T ':i Modify Plant Issue Page 2of 2 Outside of Scope ,0i A:1'4 httw I//O nrc.,.aov/weba~nns/n~ita/ModifvIssue.cfnm?iid=1471 5&sname=Ocoflee 11/4/2010}}
            -portion   of piping.. This mod-will consume most (if         not all)       of the 45-day maintenance   AOT. SSF is currently   inop:for all   three     units   for siesmic whtn the discharge line was 'cut'.
O-utside of Scope I                                                                                                                                 St~fi~~
1 hIttn /rr. nrc, Qnv/webanrs/tDita/Modifvlssue.cfm?iid 14715 &sname=Oconee                                         1114120 10    3
 
                    **      ,*'* *:'" ' T * ':i *.;*  ,**        *:,*
* r*.      L           I**
                                                                                              ....................
Modify Plant Issue                                                             Page 2of 2 Outside of Scope A
                        ,0i
:1
'4 11/4/2010 httw I//O nrc.,.aov/weba~nns/n~ita/ModifvIssue.cfnm?iid=1471 5&sname=Ocoflee}}

Revision as of 05:53, 13 November 2019

Plant Issue Tracking Application; Plant Status Daily - Oconee Information for 08/2/2009
ML110040413
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 08/24/2009
From:
NRC/RGN-II
To:
References
FOIA/PA-2011-0021
Download: ML110040413 (2)


Text

Modify Plant Issue Page 1 of 2

.4 plant status dally enter daily plant status sat archives in Oconee Information for 08124/2009 (Modify/Update)

Outside of Scope Significant TS/ Issues:

The licensee performed a boroscope inspection of the internal portions of the pipe and identified at least one location that is leaking. The guided at obtaining meaningful results. The licensee is wave UT was unsuccessful attempting. to perform a different 'type 'of' UT in order to characterize the flaw as input into their PDO (prompt determination of operability) The licensee is not planning on performing a weld repair of the flaw, rather a modification is being planned to install a new discharge line for the U2

-portion of piping.. This mod-will consume most (if not all) of the 45-day maintenance AOT. SSF is currently inop:for all three units for siesmic whtn the discharge line was 'cut'.

O-utside of Scope I St~fi~~

1 hIttn /rr. nrc, Qnv/webanrs/tDita/Modifvlssue.cfm?iid 14715 &sname=Oconee 1114120 10 3

    • ,*'* *:'" ' T * ':i *.;* ,** *:,*
  • r*. L I**

....................

Modify Plant Issue Page 2of 2 Outside of Scope A

,0i

1

'4 11/4/2010 httw I//O nrc.,.aov/weba~nns/n~ita/ModifvIssue.cfnm?iid=1471 5&sname=Ocoflee