{{#Wiki_filter:July 14, 2011   David A. Repka, Esq.
{{#Wiki_filter:July 14, 2011 David A. Repka, Esq.                                  Diane Curran, Esq.
Tyson Smith, Esq.
Tyson Smith, Esq.                                     Harmon, Curran, Spielberg, and Eisenberg Carlos Sisco                                           1726 M Street NW Winston & Strawn LLP                                   Washington, DC 20036 101 California Street                                 Suite 600 San Francisco, CA 94111-5802                           E-mail: dcurran@harmoncurran.com E-mail: drepka@winston.com trsmith@winston.com CSisco@winston.com Jill ZamEk, Esq.
Carlos Sisco Winston & Strawn LLP 101 California Street San Francisco, CA 94111
San Luis Obispo Mothers for Peace 1123 Flora Road Arroyo Grande, CA 93420 E-mail: jzk@charter.net In the Matter of Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 and 2)
-5802 E-mail: drepka@winston.com trsmith@winston.com CSisco@winston.com Jill ZamEk, Esq.
Docket Nos. 50-275-LR and 50-323-LR
San Luis Obispo Mothers for Peace 1123 Flora Road Arroyo Grande, CA 93420 E-mail: jzk@charter.net Diane Curran, Esq.
Harmon, Curran, Spielberg, and Eisenberg


1726 M Street NW Washington, DC 20036 Suite 600 E-mail: dcurran@harmoncurran.com In the Matter of Pacific Gas and Electric Company (Diablo Canyo n Nuclear Power Plant, Units 1 and 2
==Dear Parties:==
) Docket Nos. 5 0-275-LR and 5 0-323-LR 


==Dear Parties:==
Pursuant to the Licensing Board's Memorandum and Order dated September 15, 2010, the Staff will monthly provide the parties an index identifying the hearing file and mandatory disclosures in accordance with 10 C.F.R. §§ 2.1203 and 2.336. For purposes of producing the mandatory disclosures and hearing file, and considering any document as privileged or protected, the Staff treated documents created by agents and contractors of the NRC the same as if those documents were created by the Staff. Accordingly, the Staff did not produce any documents to be disclosed since the last mandatory disclosure and therefore there is no index.
Pursuant to the Licensing Board's Memorandum and Order dated September 15, 20 10, the Staff will monthly provid e the parties an index identifying the hearing file and mandatory disclosures in accordance with 10 C.F.R. §§ 2.1203 and 2.336
Attached is the Affidavit of Nathaniel B. Ferrer, as required by 10 C.F.R. § 2.336(c).
. For purposes of producing the mandatory disclosures and hearing file, and considering any document as privileged or protected, the Staff treated documents created by agents and contractors of the NRC the same as if those documents were created by the Staff.
Respectfully submitted,
Accordingly, the Staff did not produce any documents to be disclosed since the last mandatory disclosure and therefore there is no index. Attac hed is the Affidavit of Nathaniel B.
                                                              /signed (electronically) by/
Ferrer, as required by 10 C.F.R. § 2.336(c).                 Respectfully submitted,           /signed (electronically) by/
Lloyd B. Subin Counsel for the NRC Staff : Affidavit of Nathaniel B. Ferrer
Lloyd B. Subin Counsel for the NRC Staff
:
Affidavit of Nathaniel B. Ferrer


In the Matter of PACIFIC GAS & ELECTRIC COMPANY (Diablo Canyon Nuclear Power Plant, Units 1 and 2)
In the Matter of PACIFIC GAS & ELECTRIC COMPANY (Diablo Canyon Nuclear Power Plant, Units 1 and 2)
Docket Nos. 50
Docket Nos. 50-275-LR and 50-323-LR NRC Staff Transmittal Letter dated July 14, 2011 Attachment 1 Affidavit of Nathaniel B. Ferrer
-2 75-LR and 50-3 23-LR   NRC Staff Transmittal Letter dated July 14 , 2011 Attachment 1 Affidavit of Nathaniel B. Ferrer


July 14, 2011 UNITED STATES OF NUCLEAR REGULATORY BEFORE THE ATOMIC SAFETY AND LICENSING In the Matter of ) ) PACIFIC GAS & ELECTRIC COMPANY ) Docket Nos. ) (Diablo Canyon Nuclear Power Plant ) Units 1 and 2) AFFIDAVIT OF NATHANIEL B. FERRER CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(b) I, Nathaniel B. Ferrer, do hereby state as follows: 1. I am employed as a Project Manager in the Division of License Renewal in the U.S. Nuclear Regulatory Commission's
July 14, 2011 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of                                       )
("NRC") Office of Nuclear Reactor Regulation.
                                                        )
I serve as a project manager for the Diablo Canyon Nuclear Power Plant, Units 1 and 2 license renewal application
PACIFIC GAS & ELECTRIC COMPANY                         )       Docket Nos. 50~275~LRI 50~323*LR
("LRA"). Among other things, I am managing the preparation of the hearing file and mandatory disclosures in connection with the LRA at issue in this proceeding.
                                                        )
: 2. I hereby certify that all relevant materials related to the issues in connection with the LRA that are required to be disclosed pursuant to 10 C.F.R. § 2.336 (b) and (c) in the captioned proceeding have been disclosed, and that the disclosures are accurate and complete for documents identified by the Staff as of July 14, 2011. 3. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief. / Nathaniel B. Ferrer Executed in Rockville, Maryland this 14th day of July, 2011}}
(Diablo Canyon Nuclear Power Plant                     )
Units 1 and 2)
AFFIDAVIT OF NATHANIEL B. FERRER CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(b)
I, Nathaniel B. Ferrer, do hereby state as follows:
: 1.     I am employed as a Project Manager in the Division of License Renewal in the U.S. Nuclear Regulatory Commission's ("NRC") Office of Nuclear Reactor Regulation. I serve as a project manager for the Diablo Canyon Nuclear Power Plant, Units 1 and 2 license renewal application ("LRA"). Among other things, I am managing the preparation of the hearing file and mandatory disclosures in connection with the LRA at issue in this proceeding.
: 2.     I hereby certify that all relevant materials related to the issues in connection with the LRA that are required to be disclosed pursuant to 10 C.F.R. § 2.336 (b) and (c) in the captioned proceeding have been disclosed, and that the disclosures are accurate and complete for documents identified by the Staff as of July 14, 2011.
: 3.     I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.
                                                      / Nathaniel B. Ferrer Executed in Rockville, Maryland this 14th day of July, 2011}}

Revision as of 17:19, 12 November 2019

2011/07/14 - Diablo Canyon - July Hearing File Update.Pdf
ML11199A057
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 07/14/2011
From: Subin L
NRC/OGC
To: Curran D, Repka D, Zamek J
Atomic Safety and Licensing Board Panel, San Luis Obispo Mothers for Peace
Subin L
References
50-275-LR, 50-323-LR
Download: ML11199A057 (3)


Text

July 14, 2011 David A. Repka, Esq. Diane Curran, Esq.

Tyson Smith, Esq. Harmon, Curran, Spielberg, and Eisenberg Carlos Sisco 1726 M Street NW Winston & Strawn LLP Washington, DC 20036 101 California Street Suite 600 San Francisco, CA 94111-5802 E-mail: dcurran@harmoncurran.com E-mail: drepka@winston.com trsmith@winston.com CSisco@winston.com Jill ZamEk, Esq.

San Luis Obispo Mothers for Peace 1123 Flora Road Arroyo Grande, CA 93420 E-mail: jzk@charter.net In the Matter of Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 and 2)

Docket Nos. 50-275-LR and 50-323-LR

Dear Parties:

Pursuant to the Licensing Board's Memorandum and Order dated September 15, 2010, the Staff will monthly provide the parties an index identifying the hearing file and mandatory disclosures in accordance with 10 C.F.R. §§ 2.1203 and 2.336. For purposes of producing the mandatory disclosures and hearing file, and considering any document as privileged or protected, the Staff treated documents created by agents and contractors of the NRC the same as if those documents were created by the Staff. Accordingly, the Staff did not produce any documents to be disclosed since the last mandatory disclosure and therefore there is no index.

Attached is the Affidavit of Nathaniel B. Ferrer, as required by 10 C.F.R. § 2.336(c).

Respectfully submitted,

/signed (electronically) by/

Lloyd B. Subin Counsel for the NRC Staff : Affidavit of Nathaniel B. Ferrer

In the Matter of PACIFIC GAS & ELECTRIC COMPANY (Diablo Canyon Nuclear Power Plant, Units 1 and 2)

Docket Nos. 50-275-LR and 50-323-LR NRC Staff Transmittal Letter dated July 14, 2011 Attachment 1 Affidavit of Nathaniel B. Ferrer

July 14, 2011 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

PACIFIC GAS & ELECTRIC COMPANY ) Docket Nos. 50~275~LRI 50~323*LR

)

(Diablo Canyon Nuclear Power Plant )

Units 1 and 2)

AFFIDAVIT OF NATHANIEL B. FERRER CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(b)

I, Nathaniel B. Ferrer, do hereby state as follows:

1. I am employed as a Project Manager in the Division of License Renewal in the U.S. Nuclear Regulatory Commission's ("NRC") Office of Nuclear Reactor Regulation. I serve as a project manager for the Diablo Canyon Nuclear Power Plant, Units 1 and 2 license renewal application ("LRA"). Among other things, I am managing the preparation of the hearing file and mandatory disclosures in connection with the LRA at issue in this proceeding.
2. I hereby certify that all relevant materials related to the issues in connection with the LRA that are required to be disclosed pursuant to 10 C.F.R. § 2.336 (b) and (c) in the captioned proceeding have been disclosed, and that the disclosures are accurate and complete for documents identified by the Staff as of July 14, 2011.
3. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.

/ Nathaniel B. Ferrer Executed in Rockville, Maryland this 14th day of July, 2011