ML12031A252: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 01/31/2012
| issue date = 01/31/2012
| title = Second Update to Mandatory Disclosures Pursuant to 10 C.F.R. Section 2.336 in the Matter of Davis-Besse License Renewal
| title = Second Update to Mandatory Disclosures Pursuant to 10 C.F.R. Section 2.336 in the Matter of Davis-Besse License Renewal
| author name = Matthews T P
| author name = Matthews T
| author affiliation = FirstEnergy Nuclear Operating Co, Morgan, Lewis & Bockius, LLP
| author affiliation = FirstEnergy Nuclear Operating Co, Morgan, Lewis & Bockius, LLP
| addressee name = Lodge T J, Harris B G
| addressee name = Lodge T, Harris B
| addressee affiliation = - No Known Affiliation, NRC/OGC
| addressee affiliation = - No Known Affiliation, NRC/OGC
| docket = 05000346
| docket = 05000346
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:Morgan, Le w1111 Penns y Washington, Tel: 202-73 9Fax: 202-73 9 www.morga n  Timothy P202.739.55 2tmatthews@ January 3 Via Ele c Terry J. L 316 N. M Toledo, O Brian G.
{{#Wiki_filter:Morgan, Lew wis & Bockius LLP 1111 Pennsyylvania Avenue, NW W
Office o f U.S. Nu c Washin g RE: S N D Dear Co u Pursuant Boards O Nuclear O Contenti o FENOC
Washington, DC 20004 Tel: 202-7399-3000 Fax: 202-7399-3001 www.morgannlewis.com Timothy P. P Matthews 202.739.552 27 tmatthews@@morganlewis.com  m January 31, 3 2012 Via Elecctronic Inforrmation Exchange Terry J. Lodge, L         Esq.
* Encl o who smay r opin i will u* Encl o com p b e re l wis & Bockius LLP ylvania Avenue, N WDC  20004 9-3000 9-3001 nlewis.com P. Matthews 2 7 @morganlewis.co m 3 1, 2012 ctronic Info r L odge, Esq.
316 N. Michigan M             St.,, Suite 520 Toledo, OH  O 43604 Brian G. Harris, Esq..
M ichigan St.
Office off the Generall Counsel U.S. Nucclear Regulattory Commiission Washinggton, DC 205        555-0001 RE:      Second Updaate to Mandaatory Disclossures Pursuaant to 10 C.F         F.R. § 2.336; FirstEnergyy Nuclear Operrating Co., License N                            L         Reneewal for Davvis-Besse Nuuclear Powerr Station, D
, O H 43604 Harris, Esq
Docket    No. 50-346
.f the Genera l c lear Regula t gton, DC 20 5 econd Upd a N uclear Ope r D ocket No.
5 u nsel: to 10 C.F.
R Order modi f O perating C o ns 1 and 4 s disclosure o sure 1 is re s s e opinion F E r ely as witn e ions. FENO u pdate Encl o o sure 2 pro v pilations, an d l evant to th e W m rmation Ex , Suite 520
. l Counsel tory Comm i 5 55-0001 a te to Mand a r ating Co., L 0-346 R. § 2.336, t h f ying the Ini t Company (F E as restated as consist of served for t h E NOC will b e sses, and a C has not y e o sure 1 whe n vides a descr i d tangible t h e admitted c o chan g e i ssion a tory Disclo s L icense Ren e h e Boards I n t ial Schedul i E NOC) is pr o and admitte dthe followi n he names, a d b ase its posi copy of the e t identified n it has iden t i ption, by c a h ings in the p o ntentions.
P s ures Pursu a e wal for Da v n itial Sched u i ng Order d a o viding the e d by the Boa r n g: d dresses, an dtions on the analyses an d witnesses f o t ified its wit n a tegory and l possession, c P er the Sch e a nt to 10 C.
F v is-Besse N u u ling Order d ated Novem b e nclosed di s r d on April 2 d telephone n contentions d authorities o r any heari n n esses. l ocation, of t c ustody, or c e duling Ord e F.R. § 2.336; u clear Powe r dated June 1 b er 2, 2011, s closures fo r 2 6, 2011 (L B numbers of t and upon w upon whic h n g on the co n the docume n c ontrol of F E er and our a g FirstEnerg y r Station, 1 5, 2011, an d FirstEnerg y r Intervenor s B P-11-13).
t he persons u whom FENO h they base t h n tentions, a n n ts, data E NOC that m greement, th y d the y s u pon C h eir n d m ay ese Terry J. Lodge, Esq.
Brian G. Harris, Esq.  


January 31, 2012
==Dear Couunsel:==


Page Two
Pursuant to 10 C.F.R      R. § 2.336, thhe Boards Innitial Scheduuling Order dated d    June 15, 1 2011, andd the Boards Order O        modiffying the Inittial Scheduliing Order daated Novembber 2, 2011, FirstEnergyy Nuclear Operating O            Company C          (FEENOC) is prooviding the enclosed e        dissclosures forr Intervenorss Contentioons 1 and 4 as restated and    a admittedd by the Boarrd on April 26,  2 2011 (LB  BP-11-13).
FENOCs disclosures consist of the followinng:
* Encloosure 1 is resserved for thhe names, adddresses, andd telephone numbersn        of the t persons upon u
whosse opinion FE      ENOC will baseb    its positions on the contentions and upon whomw      FENOC may relyr as witneesses, and a copy of the analyses andd authorities upon whichh they base thheir opiniions. FENOC has not yeet identified witnesses foor any hearinng on the conntentions, annd will update u        Enclo  osure 1 whenn it has identtified its witnnesses.
* Encloosure 2 prov    vides a descriiption, by caategory and location, l        of the t documennts, data comppilations, and    d tangible thhings in the possession, p            c custody,  or control c      of FEENOC that maym be rellevant to thee admitted coontentions. Per  P the Scheeduling Ordeer and our aggreement, these


DB1/ 68343838.5 disclosures do not include privileged documents, or publicly-available documents unless FirstEnergy expects to rely on them at hearing. If you determine that you would like a copy of any of these documents, please inform me of which documents you would like, and I will  
Terry J. Lodge, Esq.
Brian G. Harris, Esq.
January 31, 2012 Page Two disclosures do not include privileged documents, or publicly-available documents unless FirstEnergy expects to rely on them at hearing. If you determine that you would like a copy of any of these documents, please inform me of which documents you would like, and I will provide a copy to you.
* Enclosure 3 provides an index of documents, data compilations, or tangible things that may be relevant to the contentions but that contain proprietary information, Sensitive Unclassified Non-Safeguards Information (SUNSI), or otherwise protected information. Upon request, FENOC will provide a copy under the terms of a Protective Order issued by the Board.
In order to compile Enclosures 2 and 3, a search was conducted of documents in FENOCs possession, custody, or control. The attached affidavit attests that all relevant materials identified by this search that are required to be disclosed under the Scheduling Order have been disclosed.
When FENOC identifies additional relevant documents or the witnesses for any hearing on the contentions, FENOC will update these disclosures as required by the Boards Scheduling Order.
FENOC has been conservative in identifying documents for inclusion in Enclosures 2 and 3. By identifying documents in those Enclosures, FENOC does not necessarily concede that the documents are in fact relevant or material to the admitted contentions.
Sincerely, Executed in Accord with 10 C.F.R. § 2.304(d)
Signed (electronically) by Timothy P. Matthews Timothy P. Matthews Counsel for FirstEnergy Nuclear Operating Co.
Enclosures DB1/ 68343838.5


provide a copy to you.
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD
* Enclosure 3 provides an index of documents, data compilations, or tangible things that may be relevant to the contentions but that contain proprietary information, Sensitive Unclassified Non-Safeguards Information (SUNSI), or otherwise protected information. Upon request, FENOC will provide a copy under the terms of a Protective Order issued by the Board. In order to compile Enclosures 2 and 3, a search was conducted of documents in FENOCs possession, custody, or control. The attached affidavit attests that all relevant materials
                                                                  )
In the Matter of                                                  )
                                                                  )    Docket No. 50-346-LR FIRSTENERGY NUCLEAR OPERATING COMPANY                            )
                                                                  )
(Davis-Besse Nuclear Power Station, Unit 1)                      )
                                                                  )
AFFIDAVIT OF CLIFF CUSTER
: 1.        My name is Cliff Custer. I am the Project Manager, License Renewal, at FirstEnergy Nuclear Operating Company (FENOC). Working with the attorneys for FENOC, I have been responsible for managing the collection of documents, data compilations, and tangible things to comply with the mandatory disclosure requirements in 10 C.F.R. § 2.336 and the Atomic Safety and Licensing Boards Initial Scheduling Order dated June 15, 2011 (Scheduling Order) in this proceeding, and the Licensing Boards Order Granting Motion for Modification of Initial Scheduling Order dated November 2, 2011 in this proceeding.
: 2.        FENOC conducted a search of documents, data compilations, and tangible things in its possession, custody, and control for information relevant to the admitted contentions, and in the possession, custody, and control of its affiliated companies, as specified in 10 C.F.R. § 2.336(a). As provided in 10 C.F.R. § 2.336(c), this search encompassed information and documents reasonably available to FENOC and its affiliated companies, including:
: a.      Both electronic and paper documents; DB1/ 68936769.1
: b.      Corporate records, Davis-Besse license renewal project files, and documents in the possession and control of individuals who have worked on the Davis-Besse license renewal project or on matters potentially relevant to the admitted contentions; and
: c.      Documents, data compilations, and tangible things in the possession and control of AREVA, Inc. (AREVA), which assisted FENOC in preparing portions of the Davis-Besse Environmental Report.
: 3.      Consistent with the Boards Scheduling Order, Enclosure 2 to this Affidavit provides an index of relevant, non-privileged, non-protected documents, data compilations, and tangible things that were located as a result of this search.
: 4.      Consistent with the Boards Scheduling Order, Enclosure 3 to this Affidavit provides the index of relevant documents, data compilations, and tangible things containing information that FENOC believes are proprietary to FENOC or its affiliated companies or third parties, or falls within the category of Sensitive Unclassified, Non-Safeguards Information (SUNSI).
: 5.      FENOC has been conservative in identifying documents for inclusion in the Enclosures.
Accordingly, FENOC is not suggesting that just because a document is listed on the Enclosure that it is indeed relevant to one of the admitted contentions.
: 6.      These disclosures are reasonably accurate and complete as of December 31, 2011.
DB1/ 68936769.1 2


identified by this search that are required to be disclosed under the Scheduling Order have been
Enclosure 1 (Reserved)
DB1/ 68936769.1


disclosed.
Enclosure 2 DB1/ 68936769.1


When FENOC identifies additional relevant documents or the witnesses for any hearing on the contentions, FENOC will update these disclosures as required by the Boards Scheduling Order.  
First Energy-Davis-Besse License Renewal Proceeding Mandatory Disclosure Log Second Update, January 31, 2012 Log No.              Category            Location*                  Document Title                  Date    Contentions Standard file;Standard  Morgan, Lewis &
FEDB-00000685 file without attachment      Bockius        CS_Photovoltaics_20090421.pdf              4/21/2009 Contention 1 Standard file;Standard  Morgan, Lewis & Second Generation of CAES Technology- Perf FEDB-00000686 file without attachment      Bockius        Operat -Energy Storage ESP PG 2009.pdf      1/25/2010 Contention 1 Standard file;Standard  Morgan, Lewis &
FEDB-00000687 file without attachment      Bockius        AA-CAES Diagram_EPRI.bmp                    1/21/2010 Contention 1 Standard file;Standard  Morgan, Lewis &
FEDB-00000688 file without attachment      Bockius        AA-CAES Diagram_EPRI_2.bmp                  1/21/2010 Contention 1 Mason_CoupledWind-CAESPowerPlants_ComparativeBaseLoadPo Standard file;Standard  Morgan, Lewis & werPlantAnalysis__RERI_13August2009[1].pd FEDB-00000689 file without attachment      Bockius        f                                          1/18/2010 Contention 1 Standard file;Standard  Morgan, Lewis &
FEDB-00000690 file without attachment      Bockius        Compressed Air Energy Storage (CAES).htm    1/14/2010 Contention 1 Standard file;Standard  Morgan, Lewis &
FEDB-00000691 file without attachment      Bockius        EESAT%202005%20presentation.pdf            1/12/2010 Contention 1 Standard file;Standard  Morgan, Lewis & ESPC_Presentation_at_EESAT_May_2007.pd FEDB-00000692 file without attachment      Bockius        f                                          1/21/2010 Contention 1 Standard file;Standard  Morgan, Lewis &
FEDB-00000693 file without attachment      Bockius        ESPC CT Caes AI.bmp                        2/11/2010 Contention 1 Standard file;Standard  Morgan, Lewis &
FEDB-00000694 file without attachment      Bockius        ESPC CT Caes AI_Expand.bmp                  2/11/2010 Contention 1 Standard file;Standard  Morgan, Lewis &
FEDB-00000695 file without attachment      Bockius        PP Training_05_Storage 060110.ppt          8/31/2010 Contention 1 Standard file;Standard  Morgan, Lewis &
FEDB-00000696 file without attachment      Bockius        EWEC_Paper_Final_2004.pdf                  1/13/2010 Contention 1 Standard file;Standard  Morgan, Lewis &
FEDB-00000697 file without attachment      Bockius        projekt_0507_engl_internetx.pdf            1/13/2010 Contention 1 Standard file;Standard  Morgan, Lewis &
FEDB-00000698 file without attachment      Bockius        MAAP input.pdf                            12/30/2011 Contention 4 Standard file;Standard  Morgan, Lewis &
FEDB-00000699 file without attachment      Bockius        Caes1 vs CAES2 R1.pdf                      1/25/2010 Contention 1 Standard file;Standard  Morgan, Lewis &
FEDB-00000700 file without attachment      Bockius        Compressed Air Energy Storage (CAES).txt    1/13/2010 Contention 1 Standard file;Standard  Morgan, Lewis &
FEDB-00000701 file without attachment      Bockius        Dr_Paul_Denholm.pdf                        1/14/2010 Contention 1 Standard file;Standard  Morgan, Lewis &
FEDB-00000702 file without attachment      Bockius        Mechanical Energy Storage.ppt              1/18/2010 Contention 1
*Morgan Lewis is located at 1111 Pennsylvania Avenue, NW Washington, DC 20004                                                1


FENOC has been conservative in identifying documents for inclusion in Enclosures 2 and 3. By identifying documents in those Enclosures, FENOC does not necessarily concede that the documents are in fact relevant or material to the admitted contentions.
First Energy-Davis-Besse License Renewal Proceeding Mandatory Disclosure Log Second Update, January 31, 2012 Log No.                Category            Location*                  Document Title                  Date    Contentions eMail;eMail without        Morgan, Lewis & Fw: [Prism 2.0 Project] Follow-up to Energy FEDB-00000703 attachment                    Bockius        Storage Webcast                            12/22/2011 Contention 1 Scanned Document;Standard file;Standard file without Morgan, Lewis & OVERALL DESIGN PHILOSOPHY RIV 1 2 FEDB-00000704 attachment                    Bockius        08                                          2/15/2008 Contention 1
*Morgan Lewis is located at 1111 Pennsylvania Avenue, NW Washington, DC 20004                                                    2


Sincerely,
Enclosure 3 DB1/ 68936769.1


Executed in Accord with 10 C.F.R. § 2.304(d)  
First Energy-Davis-Besse License Renewal Proceeding Proprietary Log Second Update, January 31, 2012 Log No.                      Category                Location*                            Document Title                              Date            Confidentiality                    Contentions Standard file;Standard file  Morgan, Lewis &    Chapter 18 Impacts of Fossil Fuel Quality - PowerPoint Slides -            FE Proprietary - 10 C.F.R. § FEDBPROP-00003596        with attachment              Bockius            rev2a.ppt                                                        9/4/2008 2.390(a)(4)                            Contention 1 Standard file;Standard file  Morgan, Lewis &                                                                                FE Proprietary - 10 C.F.R. § FEDBPROP-00003597        without attachment          Bockius            20090302090812-Gellings,%20EPRI.pdf                              1/14/2010 2.390(a)(4)                            Contention 1 Standard file;Standard file  Morgan, Lewis &                                                                                FE Proprietary - 10 C.F.R. § FEDBPROP-00003598        without attachment          Bockius            AA-CAES_011510_RWC.ppt                                          2/12/2010 2.390(a)(4)                            Contention 1 Standard file;Standard file  Morgan, Lewis &                                                                                FE Proprietary - 10 C.F.R. § FEDBPROP-00003599        without attachment          Bockius            CAES Systems_011510_RWC.ppt                                      2/22/2010 2.390(a)(4)                            Contention 1 Morgan, Lewis &    RE: [Prism 2.0 Project] Reminder on Energy Storage                        Third-Party Proprietary - 10 C.F.R.
FEDBPROP-00003600        eMail;eMail with attachment  Bockius            Webcast, Friday, Dec 16 from 12 to 1:30 pm ET.                  12/16/2011 § 2.390(a)(4)                          Contention 1 Morgan, Lewis &                                                                                Third-Party Proprietary - 10 C.F.R.
FEDBPROP-00003601        Attachment                  Bockius            Prism 2_Energy Storage Webcast_Final.pdf                        12/16/2011 § 2.390(a)(4)                          Contention 1 Morgan, Lewis &                                                                                FE Proprietary - 10 C.F.R. § FEDBPROP-00003602        eMail;eMail with attachment  Bockius            Re: Norton Data for PowerGEM                                    12/6/2011 2.390(a)(4)                            Contention 1 Standard file;Standard file  Morgan, Lewis &                                                                                Third-Party Proprietary - 10 C.F.R.
FEDBPROP-00003603        without attachment          Bockius            000000000001016004[1].pdf                                        1/25/2010 § 2.390(a)(4)                          Contention 1 5.91+Haddington+-
Standard file;Standard file  Morgan, Lewis &    +Norton+267+MW+2+Unit+Comp+Air+Detail+Cost+10.20.09.                      FE Proprietary - 10 C.F.R. § FEDBPROP-00003604        without attachment          Bockius            pdf                                                              1/18/2010 2.390(a)(4)                            Contention 1 Standard file;Standard file  Morgan, Lewis &                                                                                FE Proprietary - 10 C.F.R. § FEDBPROP-00003605        without attachment          Bockius            14.29 NES Updated Model 090629shp.ppt                            2/10/2010 2.390(a)(4)                            Contention 1 Scanned Document;Standard                                                                                                  FE Proprietary - 10 C.F.R. § file;Standard file without  Morgan, Lewis &    NORTON CAES MARKET SIMULATIONS FULL MODELING                              2.390(a)(4); Third-Party Proprietary -
FEDBPROP-00003606        attachment                  Bockius            RESULTS                                                        11/28/2011 10 C.F.R. § 2.390(a)(4)                Contention 1 Standard file;Standard file  Morgan, Lewis &                                                                                FE Proprietary - 10 C.F.R. § FEDBPROP-00003607        without attachment          Bockius            PDF 01.pdf                                                        1/5/2012 2.390(a)(4)                            Contention 1 Standard file;Standard file  Morgan, Lewis &    ! 0_3%20EPRI%20-%20Energy%20Storage%20Overview%20-                        Third-Party Proprietary - 10 C.F.R.
FEDBPROP-00003608        without attachment          Bockius            %20Dan%20Rastler.pdf                                            1/14/2010 § 2.390(a)(4)                          Contention 1 5.92+Haddington+-
Standard file;Standard file  Morgan, Lewis &    +Norton+267+MW+2+Unit+Comp+Air+Sum+Cost+10.20.09.p                        FE Proprietary - 10 C.F.R. § FEDBPROP-00003609        without attachment          Bockius            df                                                              1/18/2010 2.390(a)(4)                            Contention 1 EPRI CAES Demonstration Project Webcast Will Be Today, Morgan, Lewis &    December 15, 2011 (from 11am to 12noon, PST, which is                      Third-Party Proprietary - 10 C.F.R.
FEDBPROP-00003610        eMail;eMail with attachment  Bockius            2pm to 3pm, EST)                                                12/15/2011 § 2.390(a)(4)                          Contention 1 Morgan, Lewis &    Webcast EPRI CAES Demo Proj Webcast.Dec 15.                                Third-Party Proprietary - 10 C.F.R.
FEDBPROP-00003611        Attachment                  Bockius            2011.V3.pdf                                                    12/15/2011 § 2.390(a)(4)                          Contention 1 Standard file;Standard file  Morgan, Lewis &                                                                                Third-Party Proprietary - 10 C.F.R.
FEDBPROP-00003612        without attachment          Bockius            000000000001020444[1].pdf                                        1/25/2010 § 2.390(a)(4)                          Contention 1 FE Proprietary - 10 C.F.R. § Standard file;Standard file  Morgan, Lewis &                                                                                2.390(a)(4); Third-Party Proprietary -
FEDBPROP-00003613        without attachment          Bockius            5.20+Burns+and+Roe+Preliminary+Cost+Estimate.pdf                1/18/2010 10 C.F.R. § 2.390(a)(4)                Contention 1 Standard file;Standard file  Morgan, Lewis &                                                                                Third-Party Proprietary - 10 C.F.R.
FEDBPROP-00003614        without attachment          Bockius            EPRI_Paper_on_CAES_Technology.pdf                                1/21/2010 § 2.390(a)(4)                          Contention 1 FE Proprietary - 10 C.F.R. § Standard file;Standard file  Morgan, Lewis &    5.98+Haddington+Norton+267+MW+2+Unit+Rev+112409+Lvl                        2.390(a)(4); Third-Party Proprietary -
FEDBPROP-00003615        without attachment          Bockius            +II+Sum+Rept.pdf                                                1/18/2010 10 C.F.R. § 2.390(a)(4)               Contention 1
*Morgan Lewis is located at 1111 Pennsylvania Avenue, NW Washington, DC 20004                                                                                                                                1


Signed (electronically) by Timothy P. Matthews Timothy P. Matthews
First Energy-Davis-Besse License Renewal Proceeding Proprietary Log Second Update, January 31, 2012 Log No.                      Category                Location*                            Document Title                      Date            Confidentiality                    Contentions Standard file;Standard file  Morgan, Lewis &                                                                        Third-Party Proprietary - 10 C.F.R.
FEDBPROP-00003616        without attachment          Bockius            Power Generation Technologies.pdf                        5/24/2007 § 2.390(a)(4)                          Contention 1 Morgan, Lewis &                                                                        FE Proprietary - 10 C.F.R. § FEDBPROP-00003617        eMail;eMail with attachment  Bockius            FW: ISPD Project Listing / Status Update for October    11/17/2011 2.390(a)(4)                            Contention 1 Morgan, Lewis &                                                                        FE Proprietary - 10 C.F.R. § FEDBPROP-00003618        Attachment                  Bockius            ISPD Project Status Report October 2011_111611.doc      11/17/2011 2.390(a)(4)                            Contention 1 Morgan, Lewis &    low Mass values: HIGHLY PRIVILEGED AND CONFIDENTIAL                FE Proprietary - 10 C.F.R. § FEDBPROP-00003619        eMail;eMail with attachment  Bockius            -- NOT FOR DISCLOSURE:                                  12/30/2011 2.390(a)(4)                            Contention 1 Morgan, Lewis &                                                                        FE Proprietary - 10 C.F.R. § FEDBPROP-00003620        Attachment                  Bockius            DB Table E.3-17 SAMA Core Inventory.pdf                12/30/2011 2.390(a)(4)                            Contention 4 eMail;eMail without          Morgan, Lewis &                                                                        FE Proprietary - 10 C.F.R. § FEDBPROP-00003621        attachment                  Bockius            Re: Norton Data for PowerGEM                            12/14/2011 2.390(a)(4)                            Contention 1 Standard file;Standard file  Morgan, Lewis &                                                                        FE Proprietary - 10 C.F.R. § FEDBPROP-00003622        without attachment          Bockius            mass.xls                                                12/28/2011 2.390(a)(4)                            Contention 4 Scanned Document;Standard                                                                                          FE Proprietary - 10 C.F.R. § file;Standard file without  Morgan, Lewis &    NORTON CAES MARKET SIMULATIONS UPDATED                            2.390(a)(4); Third-Party Proprietary -
FEDBPROP-00003623        attachment                  Bockius            RESULTS                                                11/14/2011 10 C.F.R. § 2.390(a)(4)                Contention 1 FE Proprietary - 10 C.F.R. § Morgan, Lewis &                                                                        2.390(a)(4); Third-Party Proprietary -
FEDBPROP-00003624        eMail;eMail with attachment  Bockius            PowerGEM Analysis of Norton Generation - December 2011  12/12/2011 10 C.F.R. § 2.390(a)(4)                Contention 1 FE Proprietary - 10 C.F.R. § Morgan, Lewis &                                                                        2.390(a)(4); Third-Party Proprietary -
FEDBPROP-00003625        Attachment                  Bockius            December xx presentation.pptx                          12/12/2011 10 C.F.R. § 2.390(a)(4)                Contention 1 Scanned Document;Standard file;Standard file without  Morgan, Lewis &                                                                        FE Proprietary - 10 C.F.R. § FEDBPROP-00003626        attachment                  Bockius            [NORTON FOR 130MW NET]                                  11/21/2011 2.390(a)(4)                            Contention 1 Scanned Document;Standard file;Standard file without  Morgan, Lewis &    WILLARD AND KELSEY SOLAR GROUP LLC                                Third-Party Proprietary - 10 C.F.R.
FEDBPROP-00003627        attachment                  Bockius            MANUFACTURING COST PER WATT FORECAST                    9/27/2011 § 2.390(a)(4)                          Contention 1 Scanned Document;Standard file;Standard file without  Morgan, Lewis &    RESERVE ENERGY EXPLORATION COLT STATION WIND                      Third-Party Proprietary - 10 C.F.R.
FEDBPROP-00003628        attachment                  Bockius            FARM                                                              § 2.390(a)(4)                          Contention 1 Scanned Document;Standard file;Standard file without  Morgan, Lewis &                                                                        FE Proprietary - 10 C.F.R. § FEDBPROP-00003629        attachment                  Bockius            FEVISIT GARY LEIDICH                                    9/27/2011 2.390(a)(4)                            Contention 1
*Morgan Lewis is located at 1111 Pennsylvania Avenue, NW Washington, DC 20004                                                                                                                        2


Counsel for FirstEnergy Nuclear Operating Co.
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD
Enclosures
                                                            )
In the Matter of                                            )
                                                            )      Docket No. 50-346-LR FIRSTENERGY NUCLEAR OPERATING COMPANY                        )
                                                            )
(Davis-Besse Nuclear Power Station, Unit 1)                  )      January 31, 2012
                                                            )
CERTIFICATE OF SERVICE I hereby certify that, on this date, a copy of FENOCs Second Update to Mandatory Disclosures Pursuant to 10 C.F.R. § 2.336 was filed with the Electronic Information Exchange in the above-captioned proceeding on the following recipients.
Administrative Judge                                  Administrative Judge William J. Froehlich, Chair                          Dr. Nicholas G. Trikouros Atomic Safety and Licensing Board Panel              Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission                    U.S. Nuclear Regulatory Commission Washington, DC 20555-0001                            Washington, DC 20555-0001 E-mail: wjf1@nrc.gov                                  E-mail: nicholas.trikouros@nrc.gov Administrative Judge                                  Office of the General Counsel Dr. William E. Kastenberg                            U.S. Nuclear Regulatory Commission Atomic Safety and Licensing Board Panel              Mail Stop O-15D21 U.S. Nuclear Regulatory Commission                    Washington, DC 20555-0001 Washington, DC 20555-0001                            Edward L. Williamson E-mail: wek1@nrc.gov                                  Lloyd B. Subin Brian G. Harris Brian P. Newell Office of the Secretary                              Catherine E. Kanatas U.S. Nuclear Regulatory Commission                    edward.williamson@nrc.gov; Rulemakings and Adjudications Staff                  lloyd.subin@nrc.gov; Washington, DC 20555-0001                            brian.harris@nrc.gov; E-mail: hearingdocket@nrc.gov                        brian.newell@nrc.gov; catherine.kanatas@nrc.gov


DB1/ 68936769.1 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD                          )
Office of Commission Appellate Adjudication U.S. Nuclear Regulatory Commission Mail Stop: O-16C1 Washington, DC 20555-0001 E-mail: ocaamail@nrc.gov                         Michael Keegan Dont Waste Michigan 811 Harrison Street Monroe, MI 48161 Kevin Kamps                                       E-mail: mkeeganj@comcast.net Paul Gunter Beyond Nuclear 6930 Carroll Avenue, Suite 400 Takoma Park, MD 20912                             Terry J. Lodge E-mail: kevin@beyondnuclear.org;                 316 N. Michigan St., Ste. 520 paul@beyondnuclear.org                            Toledo, OH 43604 E-mail: tjlodge50@yahoo.com Signed (electronically) by Jane T. Accomando Jane T. Accomando Morgan, Lewis & Bockius LLP 1111 Pennsylvania Avenue, N.W.
In the Matter of        )
Washington, DC 20004 Phone: 202-739-3000 Fax: 202-739-3001 E-mail: jaccomando@morganlewis.com COUNSEL FOR FENOC DB1/ 68426326.3 2}}
        ) Docket No. 50-346-LR FIRSTENERGY NUCLEAR OPERATING COMPANY ) 
        )
(Davis-Besse Nuclear Power Station, Unit 1)    ) 
                  )  AFFIDAVIT OF CLIFF CUSTER
: 1. My name is Cliff Custer. I am the Project Manager, License Renewal, at FirstEnergy Nuclear Operating Company (FENOC). Working with the attorneys for FENOC, I have been responsible for managing the collection of documents, data compilations, and tangible things to comply with the mandatory disclosure requirements in 10 C.F.R. § 2.336 and the Atomic Safety and Licensing Boards Initial Scheduling Order dated June 15, 2011 (Scheduling Order) in this proceeding, and the Licensing Boards Order Granting Motion for Modification of Initial Scheduling Order dated November 2, 2011 in this proceeding.
: 2. FENOC conducted a search of documents, data compilations, and tangible things in its possession, custody, and control for information relevant to the admitted contentions, and in the possession, custody, and control of its affiliated companies, as specified in 10 C.F.R. § 2.336(a). As provided in 10 C.F.R. § 2.336(c), this search encompassed information and documents reasonably available to FENOC and its affiliated companies, including:
: a. Both electronic and paper documents; DB1/ 68936769.1 2 b. Corporate records, Davis-Besse license renewal project files, and documents in the possession and control of individuals who have worked on the Davis-Besse license renewal project or on matters potentially relevant to the admitted
 
contentions; and
: c. Documents, data compilations, and tangible things in the possession and control of AREVA, Inc. (AREVA), which assisted FENOC in preparing portions of the Davis-Besse Environmental Report.
: 3. Consistent with the Boards Scheduling Order, Enclosure 2 to this Affidavit provides an index of relevant, non-privileged, non-protected documents, data compilations, and tangible things that were located as a result of this search.
: 4. Consistent with the Boards Scheduling Order, Enclosure 3 to this Affidavit provides the index of relevant documents, data compilations, and tangible things containing information that FENOC believes are proprietary to FENOC or its affiliated companies or third parties, or falls within the category of Sensitive Unclassified, Non-Safeguards Information (SUNSI).
: 5. FENOC has been conservative in identifying documents for inclusion in the Enclosures. Accordingly, FENOC is not suggesting that just because a document is listed on the Enclosure that it is indeed relevant to one of the admitted contentions. 
: 6. These disclosures are reasonably accurate and complete as of December 31, 2011.   
 
DB1/ 68936769.1 Enclosure 1 (Reserved)
DB1/ 68936769.1
 
Enclosure 2 First Energy-Davis-Besse License Renewal Proceeding Mandatory Disclosure Log Second Update, January 31, 2012Log No.CategoryLocation*Document TitleDateContentions FEDB-00000685 Standard file;Standard file without attachment Morgan, Lewis & BockiusCS_Photovoltaics_20090421.pdf4/21/2009Contention 1 FEDB-00000686 Standard file;Standard file without attachment Morgan, Lewis &
Bockius Second Generation of CAES Technology- Perf Operat -Energy Storage ESP PG 2009.pdf1/25/2010Contention 1 FEDB-00000687 Standard file;Standard file without attachment Morgan, Lewis & BockiusAA-CAES Diagram_EPRI.bmp1/21/2010Contention 1 FEDB-00000688 Standard file;Standard file without attachment Morgan, Lewis & BockiusAA-CAES Diagram_EPRI_2.bmp1/21/2010Contention 1 FEDB-00000689 Standard file;Standard file without attachment Morgan, Lewis &
Bockius Mason_CoupledWind-CAESPowerPlants_ComparativeBaseLoadPo
 
werPlantAnalysis__RERI_13August2009[1].pdf1/18/2010Contention 1 FEDB-00000690 Standard file;Standard file without attachment Morgan, Lewis & BockiusCompressed Air Energy Storage (CAES).htm1/14/2010Contention 1 FEDB-00000691 Standard file;Standard file without attachment Morgan, Lewis & BockiusEESAT%202005%20presentation.pdf1/12/2010Contention 1 FEDB-00000692 Standard file;Standard file without attachment Morgan, Lewis &
Bockius ESPC_Presentation_at_EESAT_May_2007.pdf1/21/2010Contention 1 FEDB-00000693 Standard file;Standard file without attachment Morgan, Lewis & BockiusESPC CT Caes AI.bmp2/11/2010Contention 1 FEDB-00000694 Standard file;Standard file without attachment Morgan, Lewis & BockiusESPC CT Caes AI_Expand.bmp2/11/2010Contention 1 FEDB-00000695 Standard file;Standard file without attachment Morgan, Lewis & BockiusPP Training_05_Storage 060110.ppt8/31/2010Contention 1 FEDB-00000696 Standard file;Standard file without attachment Morgan, Lewis & BockiusEWEC_Paper_Final_2004.pdf1/13/2010Contention 1 FEDB-00000697 Standard file;Standard file without attachment Morgan, Lewis & Bockiusprojekt_0507_engl_internetx.pdf1/13/2010Contention 1 FEDB-00000698 Standard file;Standard file without attachment Morgan, Lewis & BockiusMAAP input.pdf12/30/2011Contention 4 FEDB-00000699 Standard file;Standard file without attachment Morgan, Lewis & BockiusCaes1 vs CAES2 R1.pdf1/25/2010Contention 1 FEDB-00000700 Standard file;Standard file without attachment Morgan, Lewis & BockiusCompressed Air Energy Storage (CAES).txt1/13/2010Contention 1 FEDB-00000701 Standard file;Standard file without attachment Morgan, Lewis & BockiusDr_Paul_Denholm.pdf1/14/2010Contention 1 FEDB-00000702 Standard file;Standard file without attachment Morgan, Lewis & BockiusMechanical Energy Storage.ppt1/18/2010Contention 1
*Morgan Lewis is located at 1111 Pennsylvania Avenue, NW Washington, DC 20004 1
First Energy-Davis-Besse License Renewal Proceeding Mandatory Disclosure Log Second Update, January 31, 2012Log No.CategoryLocation*Document TitleDateContentions FEDB-00000703 eMail;eMail without attachment Morgan, Lewis &
Bockius Fw: [Prism 2.0 Project] Follow-up to Energy Storage Webcast12/22/2011Contention 1 FEDB-00000704 Scanned Document;Standard file;Standard file without attachment Morgan, Lewis &
Bockius OVERALL DESIGN PHILOSOPHY RIV 1 2-15-082/15/2008Contention 1
*Morgan Lewis is located at 1111 Pennsylvania Avenue, NW Washington, DC 20004 2
DB1/ 68936769.1 Enclosure 3
 
First Energy-Davis-Besse License Renewal Proceeding Proprietary Log Second Update, January 31, 2012Log No.CategoryLocation*Document TitleDateConfidentialityContentions FEDBPROP-00003596 S tan d ar d fil e;S tan d ar d fil e with attachment M organ, L ew i s & Bockius Ch apter 18 I mpacts o f F oss il F ue l Q ua li ty - P ower P o i nt Slid es - rev2a.ppt9/4/2008 FE P ropr i etary - 10 C.F.R. § 2.390(a)(4)Contention 1 FEDBPROP-00003597 S tan d ar d fil e;S tan d ar d fil e without attachment M organ, L ew i s & Bockius20090302090812-Gellings,%20EPRI.pdf1/14/2010 FE P ropr i etary - 10 C.F.R. § 2.390(a)(4)Contention 1 FEDBPROP-00003598 S tan d ar d fil e;S tan d ar d fil e without attachment M organ, L ew i s & BockiusAA-CAES_011510_RWC.ppt2/12/2010 FE P ropr i etary - 10 C.F.R. § 2.390(a)(4)Contention 1 FEDBPROP-00003599 S tan d ar d fil e;S tan d ar d fil e without attachment M organ, L ew i s & BockiusCAES Systems_011510_RWC.ppt2/22/2010 FE P ropr i etary - 10 C.F.R. § 2.390(a)(4)Contention 1FEDBPROP-00003600eMail;eMail with attachment Morgan, Lewis &
Bockius RE: [Prism 2.0 Project] Reminder on Energy Storage Webcast, Friday, Dec 16 from 12 to 1:30 pm ET.12/16/2011 Third-Party Proprietary - 10 C.F.R. § 2.390(a)(4)Contention 1FEDBPROP-00003601Attachment M organ, L ew i s & BockiusPrism 2_Energy Storage Webcast_Final.pdf12/16/2011 Thi r d-P arty P ropr i etary - 10 C.F.R. § 2.390(a)(4)Contention 1FEDBPROP-00003602eMail;eMail with attachment M organ, L ew i s & BockiusRe: Norton Data for PowerGEM12/6/2011 FE P ropr i etary - 10 C.F.R. § 2.390(a)(4)Contention 1 FEDBPROP-00003603 S tan d ar d fil e;S tan d ar d fil e without attachment M organ, L ew i s & Bockius000000000001016004[1].pdf1/25/2010 Thi r d-P arty P ropr i etary - 10 C.F.R. § 2.390(a)(4)Contention 1 FEDBPROP-00003604 Standard file;Standard file without attachment Morgan, Lewis &
Bockius 5.91+Haddington+-
+Norton+267+MW+2+Unit+Comp+Air+Detail+Cost+10.20.09.pdf1/18/2010 FE Proprietary - 10 C.F.R. § 2.390(a)(4)Contention 1 FEDBPROP-00003605 S tan d ar d fil e;S tan d ar d fil e without attachment M organ, L ew i s & Bockius14.29 NES Updated Model 090629shp.ppt2/10/2010 FE P ropr i etary - 10 C.F.R. § 2.390(a)(4)Contention 1 FEDBPROP-00003606 Scanned Document;Standard file;Standard file without
 
attachment Morgan, Lewis &
Bockius NORTON CAES MARKET SIMULATIONS FULL MODELING RESULTS11/28/2011 FE Proprietary - 10 C.F.R. § 2.390(a)(4); Third-Party Proprietary
-10 C.F.R. § 2.390(a)(4)Contention 1 FEDBPROP-00003607 S tan d ar d fil e;S tan d ar d fil e without attachment M organ, L ew i s & BockiusPDF 01.pdf1/5/2012 FE P ropr i etary - 10 C.F.R. § 2.390(a)(4)Contention 1 FEDBPROP-00003608 Standard file;Standard file without attachment Morgan, Lewis &
Bockius! 0_3%20EPRI%20-%20Energy%20Storage%20Overview%20
-%20Dan%20Rastler.pdf1/14/2010 Third-Party Proprietary - 10 C.F.R. § 2.390(a)(4)Contention 1 FEDBPROP-00003609 Standard file;Standard file without attachment Morgan, Lewis &
Bockius 5.92+Haddington+-
+Norton+267+MW+2+Unit+Comp+Air+Sum+Cost+10.20.09.p df1/18/2010 FE Proprietary - 10 C.F.R. § 2.390(a)(4)Contention 1FEDBPROP-00003610eMail;eMail with attachment Morgan, Lewis &
Bockius EPRI CAES Demonstration Project Webcast Will Be Today, December 15, 2011 (from 11am to 12noon, PST, which is 2pm to 3pm, EST)12/15/2011 Third-Party Proprietary - 10 C.F.R. § 2.390(a)(4)Contention 1FEDBPROP-00003611Attachment M organ, L ew i s & Bockius W e b cast EPRI CAES D emo P ro j W e b cast.D ec 15. 2011.V3.pdf12/15/2011 Thi r d-P arty P ropr i etary - 10 C.F.R. § 2.390(a)(4)Contention 1 FEDBPROP-00003612 S tan d ar d fil e;S tan d ar d fil e without attachment M organ, L ew i s & Bockius000000000001020444[1].pdf1/25/2010 Thi r d-P arty P ropr i etary - 10 C.F.R. § 2.390(a)(4)Contention 1 FEDBPROP-00003613 Standard file;Standard file without attachment Morgan, Lewis & Bockius5.20+Burns+and+Roe+Preliminary+Cost+Estimate.pdf1/18/2010 FE Proprietary - 10 C.F.R. § 2.390(a)(4); Third-Party Proprietary
-10 C.F.R. § 2.390(a)(4)Contention 1 FEDBPROP-00003614 S tan d ar d fil e;S tan d ar d fil e without attachment M organ, L ew i s & BockiusEPRI_Paper_on_CAES_Technology.pdf1/21/2010 Thi r d-P arty P ropr i etary - 10 C.F.R. § 2.390(a)(4)Contention 1 FEDBPROP-00003615 Standard file;Standard file without attachment Morgan, Lewis &
Bockius 5.98+Haddington+Norton+267+MW+2+Unit+Rev+112409+Lvl+II+Sum+Rept.pdf1/18/2010 FE Proprietary - 10 C.F.R. § 2.390(a)(4); Third-Party Proprietary
-10 C.F.R. § 2.390(a)(4)Contention 1
*Morgan Lewis is located at 1111 Pennsylvania Avenue, NW Washington, DC 20004 1
First Energy-Davis-Besse License Renewal Proceeding Proprietary Log Second Update, January 31, 2012Log No.CategoryLocation*Document TitleDateConfidentialityContentions FEDBPROP-00003616 S tan d ar d fil e;S tan d ar d fil e without attachment M organ, L ew i s & BockiusPower Generation Technologies.pdf5/24/2007 Thi r d-P arty P ropr i etary - 10 C.F.R. § 2.390(a)(4)Contention 1FEDBPROP-00003617eMail;eMail with attachment M organ, L ew i s & BockiusFW: ISPD Project Listing / Status Update for October11/17/2011 FE P ropr i etary - 10 C.F.R. § 2.390(a)(4)Contention 1FEDBPROP-00003618Attachment M organ, L ew i s & BockiusISPD Project Status Report October 2011_111611.doc11/17/2011 FE P ropr i etary - 10 C.F.R. § 2.390(a)(4)Contention 1FEDBPROP-00003619eMail;eMail with attachment Morgan, Lewis &
Bockius low Mass values: HIGHLY PRIVILEGED AND CONFIDENTIAL -- NOT FOR DISCLOSURE:12/30/2011 FE Proprietary - 10 C.F.R. § 2.390(a)(4)Contention 1FEDBPROP-00003620Attachment M organ, L ew i s & BockiusDB Table E.3-17 SAMA Core Inventory.pdf12/30/2011 FE P ropr i etary - 10 C.F.R. § 2.390(a)(4)Contention 4 FEDBPROP-00003621 e M a il;e M a il w i t h out attachment M organ, L ew i s & BockiusRe: Norton Data for PowerGEM12/14/2011 FE P ropr i etary - 10 C.F.R. § 2.390(a)(4)Contention 1 FEDBPROP-00003622 S tan d ar d fil e;S tan d ar d fil e without attachment M organ, L ew i s & Bockiusmass.xls12/28/2011 FE P ropr i etary - 10 C.F.R. § 2.390(a)(4)Contention 4 FEDBPROP-00003623 Scanned Document;Standard file;Standard file without
 
attachment Morgan, Lewis &
Bockius NORTON CAES MARKET SIMULATIONS UPDATED RESULTS11/14/2011 FE Proprietary - 10 C.F.R. § 2.390(a)(4); Third-Party Proprietary
-10 C.F.R. § 2.390(a)(4)Contention 1FEDBPROP-00003624eMail;eMail with attachment Morgan, Lewis & BockiusPowerGEM Analysis of Norton Generation - December 201112/12/2011 FE Proprietary - 10 C.F.R. § 2.390(a)(4); Third-Party Proprietary
-10 C.F.R. § 2.390(a)(4)Contention 1FEDBPROP-00003625Attachment Morgan, Lewis & BockiusDecember xx presentation.pptx12/12/2011 FE Proprietary - 10 C.F.R. § 2.390(a)(4); Third-Party Proprietary
-10 C.F.R. § 2.390(a)(4)Contention 1 FEDBPROP-00003626 Scanned Document;Standard file;Standard file without attachment Morgan, Lewis & Bockius[NORTON FOR 130MW NET]11/21/2011 FE Proprietary - 10 C.F.R. § 2.390(a)(4)Contention 1 FEDBPROP-00003627 Scanned Document;Standard file;Standard file without attachment Morgan, Lewis &
Bockius WILLARD AND KELSEY SOLAR GROUP LLC MANUFACTURING COST PER WATT FORECAST9/27/2011 Third-Party Proprietary - 10 C.F.R. § 2.390(a)(4)Contention 1 FEDBPROP-00003628 Scanned Document;Standard file;Standard file without attachment Morgan, Lewis &
Bockius RESERVE ENERGY EXPLORATION COLT STATION WIND FARM Third-Party Proprietary - 10 C.F.R. § 2.390(a)(4)Contention 1 FEDBPROP-00003629 Scanned Document;Standard file;Standard file without attachment Morgan, Lewis & BockiusFEVISIT GARY LEIDICH9/27/2011 FE Proprietary - 10 C.F.R. § 2.390(a)(4)Contention 1
*Morgan Lewis is located at 1111 Pennsylvania Avenue, NW Washington, DC 20004 2
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD                          )
In the Matter of        )
        ) Docket No. 50-346-LR FIRSTENERGY NUCLEAR OPERATING COMPANY ) 
        )
(Davis-Besse Nuclear Power Station, Unit 1)    ) January 31, 2012
                  )  CERTIFICATE OF SERVICE I hereby certify that, on this date, a copy of FENOCs Second Update to Mandatory Disclosures Pursuant to 10 C.F.R. § 2.336 was filed with the Electronic Information Exchange in the above-captioned proceeding on the following recipients. Administrative Judge William J. Froehlich, Chair Atomic Safety and Licensing Board Panel
 
U.S. Nuclear Regulatory Commission
 
Washington, DC  20555-0001 E-mail: wjf1@nrc.gov
 
Administrative Judge Dr. William E. Kastenberg Atomic Safety and Licensing Board Panel
 
U.S. Nuclear Regulatory Commission
 
Washington, DC  20555-0001 E-mail: wek1@nrc.gov
 
Office of the Secretary
 
U.S. Nuclear Regulatory Commission Rulemakings and Adjudications Staff
 
Washington, DC  20555-0001 E-mail: hearingdocket@nrc.gov
 
Administrative Judge Dr. Nicholas G. Trikouros Atomic Safety and Licensing Board Panel
 
U.S. Nuclear Regulatory Commission
 
Washington, DC  20555-0001 E-mail: nicholas.trikouros@nrc.gov
 
Office of the General Counsel 
 
U.S. Nuclear Regulatory Commission
 
Mail Stop O-15D21
 
Washington, DC  20555-0001 Edward L. Williamson
 
Lloyd B. Subin
 
Brian G. Harris
 
Brian P. Newell Catherine E. Kanatas edward.williamson@nrc.gov; lloyd.subin@nrc.gov; 
 
brian.harris@nrc.gov;
 
brian.newell@nrc.gov;
 
catherine.kanatas@nrc.gov
 
2  DB1/ 68426326.3 Office of Commission Appellate Adjudication U.S. Nuclear Regulatory Commission  
 
Mail Stop: O-16C1  
 
Washington, DC 20555-0001 E-mail: ocaamail@nrc.gov  
 
Kevin Kamps  
 
Paul Gunter  
 
Beyond Nuclear  
 
6930 Carroll Avenue, Suite 400 Takoma Park, MD 20912 E-mail: kevin@beyondnuclear.org;  
 
paul@beyondnuclear.org
 
Michael Keegan Dont Waste Michigan
 
811 Harrison Street
 
Monroe, MI 48161 E-mail: mkeeganj@comcast.net 
 
Terry J. Lodge
 
316 N. Michigan St., Ste. 520  
 
Toledo, OH 43604 E-mail: tjlodge50@yahoo.com Signed (electronically) by Jane T. Accomando Jane T. Accomando Morgan, Lewis & Bockius LLP 1111 Pennsylvania Avenue, N.W.  
 
Washington, DC 20004  
 
Phone: 202-739-3000  
 
Fax: 202-739-3001 E-mail: jaccomando@morganlewis.com COUNSEL FOR FENOC}}

Latest revision as of 09:01, 12 November 2019

Second Update to Mandatory Disclosures Pursuant to 10 C.F.R. Section 2.336 in the Matter of Davis-Besse License Renewal
ML12031A252
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/31/2012
From: Matthews T
FirstEnergy Nuclear Operating Co, Morgan, Morgan, Lewis & Bockius, LLP
To: Lodge T, Harris B
- No Known Affiliation, NRC/OGC
SECY RAS
References
RAS 21826, 50-346-LR, ASLBP 11-907-01-LR-BD01
Download: ML12031A252 (14)


Text

Morgan, Lew wis & Bockius LLP 1111 Pennsyylvania Avenue, NW W

Washington, DC 20004 Tel: 202-7399-3000 Fax: 202-7399-3001 www.morgannlewis.com Timothy P. P Matthews 202.739.552 27 tmatthews@@morganlewis.com m January 31, 3 2012 Via Elecctronic Inforrmation Exchange Terry J. Lodge, L Esq.

316 N. Michigan M St.,, Suite 520 Toledo, OH O 43604 Brian G. Harris, Esq..

Office off the Generall Counsel U.S. Nucclear Regulattory Commiission Washinggton, DC 205 555-0001 RE: Second Updaate to Mandaatory Disclossures Pursuaant to 10 C.F F.R. § 2.336; FirstEnergyy Nuclear Operrating Co., License N L Reneewal for Davvis-Besse Nuuclear Powerr Station, D

Docket No. 50-346

Dear Couunsel:

Pursuant to 10 C.F.R R. § 2.336, thhe Boards Innitial Scheduuling Order dated d June 15, 1 2011, andd the Boards Order O modiffying the Inittial Scheduliing Order daated Novembber 2, 2011, FirstEnergyy Nuclear Operating O Company C (FEENOC) is prooviding the enclosed e dissclosures forr Intervenorss Contentioons 1 and 4 as restated and a admittedd by the Boarrd on April 26, 2 2011 (LB BP-11-13).

FENOCs disclosures consist of the followinng:

  • Encloosure 1 is resserved for thhe names, adddresses, andd telephone numbersn of the t persons upon u

whosse opinion FE ENOC will baseb its positions on the contentions and upon whomw FENOC may relyr as witneesses, and a copy of the analyses andd authorities upon whichh they base thheir opiniions. FENOC has not yeet identified witnesses foor any hearinng on the conntentions, annd will update u Enclo osure 1 whenn it has identtified its witnnesses.

  • Encloosure 2 prov vides a descriiption, by caategory and location, l of the t documennts, data comppilations, and d tangible thhings in the possession, p c custody, or control c of FEENOC that maym be rellevant to thee admitted coontentions. Per P the Scheeduling Ordeer and our aggreement, these

Terry J. Lodge, Esq.

Brian G. Harris, Esq.

January 31, 2012 Page Two disclosures do not include privileged documents, or publicly-available documents unless FirstEnergy expects to rely on them at hearing. If you determine that you would like a copy of any of these documents, please inform me of which documents you would like, and I will provide a copy to you.

  • Enclosure 3 provides an index of documents, data compilations, or tangible things that may be relevant to the contentions but that contain proprietary information, Sensitive Unclassified Non-Safeguards Information (SUNSI), or otherwise protected information. Upon request, FENOC will provide a copy under the terms of a Protective Order issued by the Board.

In order to compile Enclosures 2 and 3, a search was conducted of documents in FENOCs possession, custody, or control. The attached affidavit attests that all relevant materials identified by this search that are required to be disclosed under the Scheduling Order have been disclosed.

When FENOC identifies additional relevant documents or the witnesses for any hearing on the contentions, FENOC will update these disclosures as required by the Boards Scheduling Order.

FENOC has been conservative in identifying documents for inclusion in Enclosures 2 and 3. By identifying documents in those Enclosures, FENOC does not necessarily concede that the documents are in fact relevant or material to the admitted contentions.

Sincerely, Executed in Accord with 10 C.F.R. § 2.304(d)

Signed (electronically) by Timothy P. Matthews Timothy P. Matthews Counsel for FirstEnergy Nuclear Operating Co.

Enclosures DB1/ 68343838.5

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD

)

In the Matter of )

) Docket No. 50-346-LR FIRSTENERGY NUCLEAR OPERATING COMPANY )

)

(Davis-Besse Nuclear Power Station, Unit 1) )

)

AFFIDAVIT OF CLIFF CUSTER

1. My name is Cliff Custer. I am the Project Manager, License Renewal, at FirstEnergy Nuclear Operating Company (FENOC). Working with the attorneys for FENOC, I have been responsible for managing the collection of documents, data compilations, and tangible things to comply with the mandatory disclosure requirements in 10 C.F.R. § 2.336 and the Atomic Safety and Licensing Boards Initial Scheduling Order dated June 15, 2011 (Scheduling Order) in this proceeding, and the Licensing Boards Order Granting Motion for Modification of Initial Scheduling Order dated November 2, 2011 in this proceeding.
2. FENOC conducted a search of documents, data compilations, and tangible things in its possession, custody, and control for information relevant to the admitted contentions, and in the possession, custody, and control of its affiliated companies, as specified in 10 C.F.R. § 2.336(a). As provided in 10 C.F.R. § 2.336(c), this search encompassed information and documents reasonably available to FENOC and its affiliated companies, including:
a. Both electronic and paper documents; DB1/ 68936769.1
b. Corporate records, Davis-Besse license renewal project files, and documents in the possession and control of individuals who have worked on the Davis-Besse license renewal project or on matters potentially relevant to the admitted contentions; and
c. Documents, data compilations, and tangible things in the possession and control of AREVA, Inc. (AREVA), which assisted FENOC in preparing portions of the Davis-Besse Environmental Report.
3. Consistent with the Boards Scheduling Order, Enclosure 2 to this Affidavit provides an index of relevant, non-privileged, non-protected documents, data compilations, and tangible things that were located as a result of this search.
4. Consistent with the Boards Scheduling Order, Enclosure 3 to this Affidavit provides the index of relevant documents, data compilations, and tangible things containing information that FENOC believes are proprietary to FENOC or its affiliated companies or third parties, or falls within the category of Sensitive Unclassified, Non-Safeguards Information (SUNSI).
5. FENOC has been conservative in identifying documents for inclusion in the Enclosures.

Accordingly, FENOC is not suggesting that just because a document is listed on the Enclosure that it is indeed relevant to one of the admitted contentions.

6. These disclosures are reasonably accurate and complete as of December 31, 2011.

DB1/ 68936769.1 2

Enclosure 1 (Reserved)

DB1/ 68936769.1

Enclosure 2 DB1/ 68936769.1

First Energy-Davis-Besse License Renewal Proceeding Mandatory Disclosure Log Second Update, January 31, 2012 Log No. Category Location* Document Title Date Contentions Standard file;Standard Morgan, Lewis &

FEDB-00000685 file without attachment Bockius CS_Photovoltaics_20090421.pdf 4/21/2009 Contention 1 Standard file;Standard Morgan, Lewis & Second Generation of CAES Technology- Perf FEDB-00000686 file without attachment Bockius Operat -Energy Storage ESP PG 2009.pdf 1/25/2010 Contention 1 Standard file;Standard Morgan, Lewis &

FEDB-00000687 file without attachment Bockius AA-CAES Diagram_EPRI.bmp 1/21/2010 Contention 1 Standard file;Standard Morgan, Lewis &

FEDB-00000688 file without attachment Bockius AA-CAES Diagram_EPRI_2.bmp 1/21/2010 Contention 1 Mason_CoupledWind-CAESPowerPlants_ComparativeBaseLoadPo Standard file;Standard Morgan, Lewis & werPlantAnalysis__RERI_13August2009[1].pd FEDB-00000689 file without attachment Bockius f 1/18/2010 Contention 1 Standard file;Standard Morgan, Lewis &

FEDB-00000690 file without attachment Bockius Compressed Air Energy Storage (CAES).htm 1/14/2010 Contention 1 Standard file;Standard Morgan, Lewis &

FEDB-00000691 file without attachment Bockius EESAT%202005%20presentation.pdf 1/12/2010 Contention 1 Standard file;Standard Morgan, Lewis & ESPC_Presentation_at_EESAT_May_2007.pd FEDB-00000692 file without attachment Bockius f 1/21/2010 Contention 1 Standard file;Standard Morgan, Lewis &

FEDB-00000693 file without attachment Bockius ESPC CT Caes AI.bmp 2/11/2010 Contention 1 Standard file;Standard Morgan, Lewis &

FEDB-00000694 file without attachment Bockius ESPC CT Caes AI_Expand.bmp 2/11/2010 Contention 1 Standard file;Standard Morgan, Lewis &

FEDB-00000695 file without attachment Bockius PP Training_05_Storage 060110.ppt 8/31/2010 Contention 1 Standard file;Standard Morgan, Lewis &

FEDB-00000696 file without attachment Bockius EWEC_Paper_Final_2004.pdf 1/13/2010 Contention 1 Standard file;Standard Morgan, Lewis &

FEDB-00000697 file without attachment Bockius projekt_0507_engl_internetx.pdf 1/13/2010 Contention 1 Standard file;Standard Morgan, Lewis &

FEDB-00000698 file without attachment Bockius MAAP input.pdf 12/30/2011 Contention 4 Standard file;Standard Morgan, Lewis &

FEDB-00000699 file without attachment Bockius Caes1 vs CAES2 R1.pdf 1/25/2010 Contention 1 Standard file;Standard Morgan, Lewis &

FEDB-00000700 file without attachment Bockius Compressed Air Energy Storage (CAES).txt 1/13/2010 Contention 1 Standard file;Standard Morgan, Lewis &

FEDB-00000701 file without attachment Bockius Dr_Paul_Denholm.pdf 1/14/2010 Contention 1 Standard file;Standard Morgan, Lewis &

FEDB-00000702 file without attachment Bockius Mechanical Energy Storage.ppt 1/18/2010 Contention 1

First Energy-Davis-Besse License Renewal Proceeding Mandatory Disclosure Log Second Update, January 31, 2012 Log No. Category Location* Document Title Date Contentions eMail;eMail without Morgan, Lewis & Fw: [Prism 2.0 Project] Follow-up to Energy FEDB-00000703 attachment Bockius Storage Webcast 12/22/2011 Contention 1 Scanned Document;Standard file;Standard file without Morgan, Lewis & OVERALL DESIGN PHILOSOPHY RIV 1 2 FEDB-00000704 attachment Bockius 08 2/15/2008 Contention 1

Enclosure 3 DB1/ 68936769.1

First Energy-Davis-Besse License Renewal Proceeding Proprietary Log Second Update, January 31, 2012 Log No. Category Location* Document Title Date Confidentiality Contentions Standard file;Standard file Morgan, Lewis & Chapter 18 Impacts of Fossil Fuel Quality - PowerPoint Slides - FE Proprietary - 10 C.F.R. § FEDBPROP-00003596 with attachment Bockius rev2a.ppt 9/4/2008 2.390(a)(4) Contention 1 Standard file;Standard file Morgan, Lewis & FE Proprietary - 10 C.F.R. § FEDBPROP-00003597 without attachment Bockius 20090302090812-Gellings,%20EPRI.pdf 1/14/2010 2.390(a)(4) Contention 1 Standard file;Standard file Morgan, Lewis & FE Proprietary - 10 C.F.R. § FEDBPROP-00003598 without attachment Bockius AA-CAES_011510_RWC.ppt 2/12/2010 2.390(a)(4) Contention 1 Standard file;Standard file Morgan, Lewis & FE Proprietary - 10 C.F.R. § FEDBPROP-00003599 without attachment Bockius CAES Systems_011510_RWC.ppt 2/22/2010 2.390(a)(4) Contention 1 Morgan, Lewis & RE: [Prism 2.0 Project] Reminder on Energy Storage Third-Party Proprietary - 10 C.F.R.

FEDBPROP-00003600 eMail;eMail with attachment Bockius Webcast, Friday, Dec 16 from 12 to 1:30 pm ET. 12/16/2011 § 2.390(a)(4) Contention 1 Morgan, Lewis & Third-Party Proprietary - 10 C.F.R.

FEDBPROP-00003601 Attachment Bockius Prism 2_Energy Storage Webcast_Final.pdf 12/16/2011 § 2.390(a)(4) Contention 1 Morgan, Lewis & FE Proprietary - 10 C.F.R. § FEDBPROP-00003602 eMail;eMail with attachment Bockius Re: Norton Data for PowerGEM 12/6/2011 2.390(a)(4) Contention 1 Standard file;Standard file Morgan, Lewis & Third-Party Proprietary - 10 C.F.R.

FEDBPROP-00003603 without attachment Bockius 000000000001016004[1].pdf 1/25/2010 § 2.390(a)(4) Contention 1 5.91+Haddington+-

Standard file;Standard file Morgan, Lewis & +Norton+267+MW+2+Unit+Comp+Air+Detail+Cost+10.20.09. FE Proprietary - 10 C.F.R. § FEDBPROP-00003604 without attachment Bockius pdf 1/18/2010 2.390(a)(4) Contention 1 Standard file;Standard file Morgan, Lewis & FE Proprietary - 10 C.F.R. § FEDBPROP-00003605 without attachment Bockius 14.29 NES Updated Model 090629shp.ppt 2/10/2010 2.390(a)(4) Contention 1 Scanned Document;Standard FE Proprietary - 10 C.F.R. § file;Standard file without Morgan, Lewis & NORTON CAES MARKET SIMULATIONS FULL MODELING 2.390(a)(4); Third-Party Proprietary -

FEDBPROP-00003606 attachment Bockius RESULTS 11/28/2011 10 C.F.R. § 2.390(a)(4) Contention 1 Standard file;Standard file Morgan, Lewis & FE Proprietary - 10 C.F.R. § FEDBPROP-00003607 without attachment Bockius PDF 01.pdf 1/5/2012 2.390(a)(4) Contention 1 Standard file;Standard file Morgan, Lewis &  ! 0_3%20EPRI%20-%20Energy%20Storage%20Overview%20- Third-Party Proprietary - 10 C.F.R.

FEDBPROP-00003608 without attachment Bockius %20Dan%20Rastler.pdf 1/14/2010 § 2.390(a)(4) Contention 1 5.92+Haddington+-

Standard file;Standard file Morgan, Lewis & +Norton+267+MW+2+Unit+Comp+Air+Sum+Cost+10.20.09.p FE Proprietary - 10 C.F.R. § FEDBPROP-00003609 without attachment Bockius df 1/18/2010 2.390(a)(4) Contention 1 EPRI CAES Demonstration Project Webcast Will Be Today, Morgan, Lewis & December 15, 2011 (from 11am to 12noon, PST, which is Third-Party Proprietary - 10 C.F.R.

FEDBPROP-00003610 eMail;eMail with attachment Bockius 2pm to 3pm, EST) 12/15/2011 § 2.390(a)(4) Contention 1 Morgan, Lewis & Webcast EPRI CAES Demo Proj Webcast.Dec 15. Third-Party Proprietary - 10 C.F.R.

FEDBPROP-00003611 Attachment Bockius 2011.V3.pdf 12/15/2011 § 2.390(a)(4) Contention 1 Standard file;Standard file Morgan, Lewis & Third-Party Proprietary - 10 C.F.R.

FEDBPROP-00003612 without attachment Bockius 000000000001020444[1].pdf 1/25/2010 § 2.390(a)(4) Contention 1 FE Proprietary - 10 C.F.R. § Standard file;Standard file Morgan, Lewis & 2.390(a)(4); Third-Party Proprietary -

FEDBPROP-00003613 without attachment Bockius 5.20+Burns+and+Roe+Preliminary+Cost+Estimate.pdf 1/18/2010 10 C.F.R. § 2.390(a)(4) Contention 1 Standard file;Standard file Morgan, Lewis & Third-Party Proprietary - 10 C.F.R.

FEDBPROP-00003614 without attachment Bockius EPRI_Paper_on_CAES_Technology.pdf 1/21/2010 § 2.390(a)(4) Contention 1 FE Proprietary - 10 C.F.R. § Standard file;Standard file Morgan, Lewis & 5.98+Haddington+Norton+267+MW+2+Unit+Rev+112409+Lvl 2.390(a)(4); Third-Party Proprietary -

FEDBPROP-00003615 without attachment Bockius +II+Sum+Rept.pdf 1/18/2010 10 C.F.R. § 2.390(a)(4) Contention 1

First Energy-Davis-Besse License Renewal Proceeding Proprietary Log Second Update, January 31, 2012 Log No. Category Location* Document Title Date Confidentiality Contentions Standard file;Standard file Morgan, Lewis & Third-Party Proprietary - 10 C.F.R.

FEDBPROP-00003616 without attachment Bockius Power Generation Technologies.pdf 5/24/2007 § 2.390(a)(4) Contention 1 Morgan, Lewis & FE Proprietary - 10 C.F.R. § FEDBPROP-00003617 eMail;eMail with attachment Bockius FW: ISPD Project Listing / Status Update for October 11/17/2011 2.390(a)(4) Contention 1 Morgan, Lewis & FE Proprietary - 10 C.F.R. § FEDBPROP-00003618 Attachment Bockius ISPD Project Status Report October 2011_111611.doc 11/17/2011 2.390(a)(4) Contention 1 Morgan, Lewis & low Mass values: HIGHLY PRIVILEGED AND CONFIDENTIAL FE Proprietary - 10 C.F.R. § FEDBPROP-00003619 eMail;eMail with attachment Bockius -- NOT FOR DISCLOSURE: 12/30/2011 2.390(a)(4) Contention 1 Morgan, Lewis & FE Proprietary - 10 C.F.R. § FEDBPROP-00003620 Attachment Bockius DB Table E.3-17 SAMA Core Inventory.pdf 12/30/2011 2.390(a)(4) Contention 4 eMail;eMail without Morgan, Lewis & FE Proprietary - 10 C.F.R. § FEDBPROP-00003621 attachment Bockius Re: Norton Data for PowerGEM 12/14/2011 2.390(a)(4) Contention 1 Standard file;Standard file Morgan, Lewis & FE Proprietary - 10 C.F.R. § FEDBPROP-00003622 without attachment Bockius mass.xls 12/28/2011 2.390(a)(4) Contention 4 Scanned Document;Standard FE Proprietary - 10 C.F.R. § file;Standard file without Morgan, Lewis & NORTON CAES MARKET SIMULATIONS UPDATED 2.390(a)(4); Third-Party Proprietary -

FEDBPROP-00003623 attachment Bockius RESULTS 11/14/2011 10 C.F.R. § 2.390(a)(4) Contention 1 FE Proprietary - 10 C.F.R. § Morgan, Lewis & 2.390(a)(4); Third-Party Proprietary -

FEDBPROP-00003624 eMail;eMail with attachment Bockius PowerGEM Analysis of Norton Generation - December 2011 12/12/2011 10 C.F.R. § 2.390(a)(4) Contention 1 FE Proprietary - 10 C.F.R. § Morgan, Lewis & 2.390(a)(4); Third-Party Proprietary -

FEDBPROP-00003625 Attachment Bockius December xx presentation.pptx 12/12/2011 10 C.F.R. § 2.390(a)(4) Contention 1 Scanned Document;Standard file;Standard file without Morgan, Lewis & FE Proprietary - 10 C.F.R. § FEDBPROP-00003626 attachment Bockius [NORTON FOR 130MW NET] 11/21/2011 2.390(a)(4) Contention 1 Scanned Document;Standard file;Standard file without Morgan, Lewis & WILLARD AND KELSEY SOLAR GROUP LLC Third-Party Proprietary - 10 C.F.R.

FEDBPROP-00003627 attachment Bockius MANUFACTURING COST PER WATT FORECAST 9/27/2011 § 2.390(a)(4) Contention 1 Scanned Document;Standard file;Standard file without Morgan, Lewis & RESERVE ENERGY EXPLORATION COLT STATION WIND Third-Party Proprietary - 10 C.F.R.

FEDBPROP-00003628 attachment Bockius FARM § 2.390(a)(4) Contention 1 Scanned Document;Standard file;Standard file without Morgan, Lewis & FE Proprietary - 10 C.F.R. § FEDBPROP-00003629 attachment Bockius FEVISIT GARY LEIDICH 9/27/2011 2.390(a)(4) Contention 1

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD

)

In the Matter of )

) Docket No. 50-346-LR FIRSTENERGY NUCLEAR OPERATING COMPANY )

)

(Davis-Besse Nuclear Power Station, Unit 1) ) January 31, 2012

)

CERTIFICATE OF SERVICE I hereby certify that, on this date, a copy of FENOCs Second Update to Mandatory Disclosures Pursuant to 10 C.F.R. § 2.336 was filed with the Electronic Information Exchange in the above-captioned proceeding on the following recipients.

Administrative Judge Administrative Judge William J. Froehlich, Chair Dr. Nicholas G. Trikouros Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 E-mail: wjf1@nrc.gov E-mail: nicholas.trikouros@nrc.gov Administrative Judge Office of the General Counsel Dr. William E. Kastenberg U.S. Nuclear Regulatory Commission Atomic Safety and Licensing Board Panel Mail Stop O-15D21 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 Edward L. Williamson E-mail: wek1@nrc.gov Lloyd B. Subin Brian G. Harris Brian P. Newell Office of the Secretary Catherine E. Kanatas U.S. Nuclear Regulatory Commission edward.williamson@nrc.gov; Rulemakings and Adjudications Staff lloyd.subin@nrc.gov; Washington, DC 20555-0001 brian.harris@nrc.gov; E-mail: hearingdocket@nrc.gov brian.newell@nrc.gov; catherine.kanatas@nrc.gov

Office of Commission Appellate Adjudication U.S. Nuclear Regulatory Commission Mail Stop: O-16C1 Washington, DC 20555-0001 E-mail: ocaamail@nrc.gov Michael Keegan Dont Waste Michigan 811 Harrison Street Monroe, MI 48161 Kevin Kamps E-mail: mkeeganj@comcast.net Paul Gunter Beyond Nuclear 6930 Carroll Avenue, Suite 400 Takoma Park, MD 20912 Terry J. Lodge E-mail: kevin@beyondnuclear.org; 316 N. Michigan St., Ste. 520 paul@beyondnuclear.org Toledo, OH 43604 E-mail: tjlodge50@yahoo.com Signed (electronically) by Jane T. Accomando Jane T. Accomando Morgan, Lewis & Bockius LLP 1111 Pennsylvania Avenue, N.W.

Washington, DC 20004 Phone: 202-739-3000 Fax: 202-739-3001 E-mail: jaccomando@morganlewis.com COUNSEL FOR FENOC DB1/ 68426326.3 2