(4 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML12083A020 | | | number = ML12083A020 |
| | issue date = 03/30/2012 | | | issue date = 03/30/2012 |
| | title = Browns Ferry Nuclear Plant, Request for Additional Information Regarding License Renewal Commitment to Submit Implementing Procedures for the Unit 1 Periodic Inspection Program (TAC No. ME7126) | | | title = Request for Additional Information Regarding License Renewal Commitment to Submit Implementing Procedures for the Unit 1 Periodic Inspection Program |
| | author name = Jones H M | | | author name = Jones H |
| | author affiliation = NRC/NRR/DLR/RPOB | | | author affiliation = NRC/NRR/DLR/RPOB |
| | addressee name = Shea J W | | | addressee name = Shea J |
| | addressee affiliation = Tennessee Valley Authority | | | addressee affiliation = Tennessee Valley Authority |
| | docket = 05000259 | | | docket = 05000259 |
| | license number = | | | license number = |
| | contact person = Jones H M | | | contact person = Jones H |
| | case reference number = TAC ME7126 | | | case reference number = TAC ME7126 |
| | document type = Letter, Request for Additional Information (RAI) | | | document type = Letter, Request for Additional Information (RAI) |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555*0001 March 30, 2012 Mr. Joseph W. Shea Manager, Corp. Nuclear Licensing Programs Tennessee Valley Authority 1101 Market Street, LP 4B-C Chattanooga, TN 37402-2801 BROWNS FERRY NUCLEAR PLANT: REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSE RENEWAL COMMITMENT TO SUBMIT IMPLEMENTING PROCEDURES FOR THE UNIT 1 PERIODIC INSPECTION PROGRAM (TAC NO. ME7126) | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 March 30, 2012 Mr. Joseph W. Shea Manager, Corp. Nuclear Licensing Programs Tennessee Valley Authority 1101 Market Street, LP 4B-C Chattanooga, TN 37402-2801 |
| | |
| | ==SUBJECT:== |
| | BROWNS FERRY NUCLEAR PLANT: REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSE RENEWAL COMMITMENT TO SUBMIT IMPLEMENTING PROCEDURES FOR THE UNIT 1 PERIODIC INSPECTION PROGRAM (TAC NO. ME7126) |
|
| |
|
| ==Dear Mr. Shea:== | | ==Dear Mr. Shea:== |
| By letter dated April 21 ,2006, the Tennessee Valley Authority (TVA) submitted Commitment No. 49 to develop and submit to the U.S. Nuclear Regulatory Commission (NRC), the implementing procedures for the Unit 1 Periodic Inspection Program. By letter dated April 23, 2007, TVA submitted implementing procedure 1-TI-521, "Unit 1 Periodic Inspection Program for License Renewal." To verify completion of the commitment, the staff requested additional information which is shown in the enclosure. A date for the response is within 30 days from the date of this letter. If you have any questions, please contact me by telephone at 301-415-4054 or by email at Heather.Jones@nrc.gov. Sincerely, H ather M. Jones, roject Manager Program Operations Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-259 | | |
| | By letter dated April 21 ,2006, the Tennessee Valley Authority (TVA) submitted Commitment No. 49 to develop and submit to the U.S. Nuclear Regulatory Commission (NRC), the implementing procedures for the Unit 1 Periodic Inspection Program. By letter dated April 23, 2007, TVA submitted implementing procedure 1-TI-521, "Unit 1 Periodic Inspection Program for License Renewal." |
| | To verify completion of the commitment, the staff requested additional information which is shown in the enclosure. A date for the response is within 30 days from the date of this letter. |
| | If you have any questions, please contact me by telephone at 301-415-4054 or by email at Heather.Jones@nrc.gov. |
| | Sincerely, H ather M. Jones, roject Manager Program Operations Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-259 |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
| As stated cc w/encl: Listserv OFFICE OF NUCLEAR REACTOR REGULATION REQUEST FOR ADDITIONAL INFORMATION TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT, UNIT 1 DOCKET NO. 50-259 By letter dated April 21 ,2006, the Tennessee Valley Authority (TVA) submitted Commitment No. 49 to develop and submit to the U.S. Nuclear Regulatory Commission, the implementing procedures for the Unit 1 Periodic Inspection Program. By letter dated April 23, 2007 , TVA submitted implementing procedure 1-TI-521, "Unit 1 Periodic Inspection Program for License Renewal." In the procedure, the licensee stated that no candidate piping was identified for the stainless steel/raw water population, because all the pipe diameters were 1 inch or smaller, making ultrasonic testing (UT) measurements impractical. The licensee also stated that only nine inspection locations were identified for the stainless steel/treated water grouping, because the piping was either of small diameter or had been replaced. The license renewal application aging management program stated that the inspection sample is based on 95/95 assurance criterion (95 percent confidence level that 95 percent of a population is not experiencing degradation), which would specify a maximum of 59 inspection locations for an infinite lot size. It does not appear that implementing procedure 1-1'1-521 contains any inspections for the stainless steel/raw water material-environment population and only a limited number of inspections for the stainless steel/treated water population. Describe the alternative aging management approach that will be taken for small-diameter stainless steel piping under the Unit 1 Periodic Inspection Program as a result of limitations of the UT inspection technique.
| |
| March 30, 2012 Mr. Joseph W. Shea Manager, Corp. Nuclear Licensing Programs Tennessee Valley Authority 1101 Market Street, LP 4B-C Chattanooga, TN 37402-2801 BROWNS FERRY NUCLEAR PLANT: REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSE RENEWAL COMMITMENT TO SUBMIT IMPLEMENTING PROCEDURES FOR THE UNIT 1 PERIODIC INSPECTION PROGRAM (TAC NO. ME7126)
| |
|
| |
|
| ==Dear Mr. Shea:==
| | As stated cc w/encl: Listserv |
| By letter dated April 21,2006, the Tennessee Valley Authority (TVA) submitted Commitment No. 49 to develop and submit to the U.S. Nuclear Regulatory Commission (NRC), the implementing procedures for the Unit 1 Periodic Inspection Program. By letter dated April 23, 2007, TVA submitted implementing procedure 1-TI-521, "Unit 1 Periodic Inspection Program for License Renewal." To verify completion of the commitment, the staff requested additional information which is shown in the enclosure. A date for the response is within 30 days from the date of this letter. If you have any questions, please contact me by telephone at 301-415-4054 or by email at Heather.Jones@nrc.gov. Sincerely, IRA! Heather M. Jones, Project Manager Program Operations Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-259 | | |
| | OFFICE OF NUCLEAR REACTOR REGULATION REQUEST FOR ADDITIONAL INFORMATION TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT, UNIT 1 DOCKET NO. 50-259 |
| | : 1. By letter dated April 21 ,2006, the Tennessee Valley Authority (TVA) submitted Commitment No. 49 to develop and submit to the U.S. Nuclear Regulatory Commission, the implementing procedures for the Unit 1 Periodic Inspection Program. By letter dated April 23, 2007 , TVA submitted implementing procedure 1-TI-521, "Unit 1 Periodic Inspection Program for License Renewal." |
| | In the procedure, the licensee stated that no candidate piping was identified for the stainless steel/raw water population, because all the pipe diameters were 1 inch or smaller, making ultrasonic testing (UT) measurements impractical. The licensee also stated that only nine inspection locations were identified for the stainless steel/treated water grouping, because the piping was either of small diameter or had been replaced. |
| | The license renewal application aging management program stated that the inspection sample is based on 95/95 assurance criterion (95 percent confidence level that 95 percent of a population is not experiencing degradation), which would specify a maximum of 59 inspection locations for an infinite lot size. |
| | It does not appear that implementing procedure 1-1'1-521 contains any inspections for the stainless steel/raw water material-environment population and only a limited number of inspections for the stainless steel/treated water population. Describe the alternative aging management approach that will be taken for small-diameter stainless steel piping under the Unit 1 Periodic Inspection Program as a result of limitations of the UT inspection technique. |
| | ENCLOSURE |
| | |
| | ... ML12083A020 OFFICE LA:RPB1 :DLR PM:RPOB/DLR BC: RPOB/DLR NAME YEdmonds HJones YDiaz-Sanabria DATE 3/27/2012 3/27/2012 3/30/2012 |
| | |
| | Letter to Mr. Shea from H. Jones dated March 30, 2012 |
|
| |
|
| ==Enclosure:== | | ==SUBJECT:== |
| As stated cc w/encl: Listserv DISTRIBUTION: See next page ADAMS Accession No . ML 12083A020 .. OFFICE LA:RPB1 :DLR PM:RPOB/DLR BC: RPOB/DLR NAME YEdmonds HJones YDiaz-Sanabria DATE 3/27/2012 3/27/2012 3/30/2012 OFFICIAL RECORD Letter to Mr. Shea from H. Jones dated March 30, 2012 BROWNS FERRY NUCLEAR PLANT: REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSE RENEWAL COMMITMENT TO SUBMIT IMPLEMENTING PROCEDURES FOR THE UNIT 1 PERIODIC INSPECTION PROGRAM (TAC NO. ME7126) DISTRIBUTION: E-MAIL: PUBLIC RidsNrrDlr Resource HJones YDiaz-Sanabria
| | BROWNS FERRY NUCLEAR PLANT: REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSE RENEWAL COMMITMENT TO SUBMIT IMPLEMENTING PROCEDURES FOR THE UNIT 1 PERIODIC INSPECTION PROGRAM (TAC NO. ME7126) |
| }} | | DISTRIBUTION: |
| | E-MAIL: |
| | PUBLIC RidsNrrDlr Resource HJones YDiaz-Sanabria}} |
Letter Sequence RAI |
---|
|
|
MONTHYEARML12083A0202012-03-30030 March 2012 Request for Additional Information Regarding License Renewal Commitment to Submit Implementing Procedures for the Unit 1 Periodic Inspection Program Project stage: RAI ML12177A3072012-07-0505 July 2012 Review of Commitment Submittal for License Renewal Regarding the Unit 1 Periodic Inspection Program Project stage: Approval 2012-03-30
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000259/20240032024-11-0404 November 2024 Integrated Inspection Report 05000259/2024003 and 05000260/2024003 and 05000296/2024003 CNL-24-043, Application for Subsequent Renewed Operating Licenses, Second Safety Supplement2024-11-0101 November 2024 Application for Subsequent Renewed Operating Licenses, Second Safety Supplement ML24305A1692024-10-31031 October 2024 Site Emergency Plan Implementing Procedure Revision 05000259/LER-2024-003, Valid Specified System Actuation Caused the Automatic Start of Emergency Diesel Generators2024-10-29029 October 2024 Valid Specified System Actuation Caused the Automatic Start of Emergency Diesel Generators 05000259/LER-2024-001-02, Secondary Containment Isolation Valve Inoperable Due to Mechanical Failure2024-10-28028 October 2024 Secondary Containment Isolation Valve Inoperable Due to Mechanical Failure ML24299A2632024-10-25025 October 2024 Response to Apparent Violation in NRC Inspection Report 05000260/2024090, EA-24-075 ML24289A1232024-10-24024 October 2024 Letter to James Barstow Re Environmental Scoping Summary Report for Browns Ferry CNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24308A0042024-10-16016 October 2024 Ahc 24-1578 Environmental Review of the Browns Ferry Nuclear Plant, Units 1, 2 and 3 Subsequent License Renewal Application Limestone County CNL-24-077, Application for Subsequent Renewed Operating Licenses, Response to Request for Additional Information, Set 12024-10-0909 October 2024 Application for Subsequent Renewed Operating Licenses, Response to Request for Additional Information, Set 1 ML24270A2162024-09-27027 September 2024 Notice of Intentions Regarding Preliminary Finding from NRC Inspection Report 05000260/2024090, EA-24-075 CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description ML24262A1502024-09-24024 September 2024 Requalification Program Inspection - Browns Ferry Nuclear Plant ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML24263A2952024-09-19019 September 2024 Site Emergency Plan Implementing Procedure Revision CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000260/20240902024-09-17017 September 2024 NRC Inspection Report 05000260/2024090 and Preliminary White Finding and Apparent Violation - 1 CNL-24-062, Cycle 16 Reload Analysis Report2024-09-16016 September 2024 Cycle 16 Reload Analysis Report ML24255A8862024-09-10010 September 2024 Core Operating Limits Report for Cycle 16 Operation, Revision 0 ML24239A3332024-09-0303 September 2024 Full Audit Plan IR 05000259/20244042024-09-0303 September 2024 Cyber Security Inspection Report 05000259/2024404 and 05000260-2024404 and 05000296/2024404-Cover Letter IR 05000259/20240052024-08-26026 August 2024 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2024005, 05000260/2024005 and 05000296/2024005 ML24225A1682024-08-16016 August 2024 – Notification of Inspection and Request IR 05000259/20244022024-08-0606 August 2024 Security Baseline Inspection Report 05000259/2024402 and 05000260/2024402 and 05000296/2024402 ML24219A0272024-08-0606 August 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000259/20240022024-08-0202 August 2024 Brown Ferry Nuclear Plant – Integrated Inspection Report05000259/2024002 and 05000260/2024002 and 05000296/2024002 ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24183A4142024-07-10010 July 2024 – License Renewal Regulatory Limited Scope Audit Regarding the Environmental Review of the License Renewal Application (EPID Number: L-2024-SLE-0000) (Docket Numbers: 50-259, 50-260, and 50-296) 05000296/LER-2024-003, Main Steam Relief Valves Lift Settings Outside of Technical Specifications Required Setpoints2024-07-0808 July 2024 Main Steam Relief Valves Lift Settings Outside of Technical Specifications Required Setpoints 05000259/LER-2024-001-01, Inoperability of Unit 3 Diesel Generator Due to Relay Failure2024-07-0303 July 2024 Inoperability of Unit 3 Diesel Generator Due to Relay Failure ML24184A1142024-07-0202 July 2024 Site Emergency Plan Implementing Procedure Revision ML24183A3842024-07-0101 July 2024 Registration of Use of Cask to Store Spent Fuel (MPC-364, -365) ML24179A0282024-06-26026 June 2024 Evaluation of Effects of Out-of-Limits Condition as Described in IWB-3720(a) 05000259/LER-2024-002, Reactor Scram Due to Generator Step-Up Transformer Failure2024-06-24024 June 2024 Reactor Scram Due to Generator Step-Up Transformer Failure ML24175A0042024-06-23023 June 2024 Interim Report of a Deviation or Failure to Comply Associated with a Valve in the Unit 3 High Pressure Coolant Injection System ML24176A1132024-06-23023 June 2024 American Society of Mechanical Engineers, Section XI, Fourth 10 Year Inspection Interval, Inservice Inspection, System Pressure Test, Containment Inspection, and Repair and Replacement Programs, Owner’S Activity Report Cycle 21 Oper ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24155A0042024-06-18018 June 2024 Proposed Alternative to the Requirements of the ASME Code (Revised Alternative Request 0-ISI-47) ML24158A5312024-06-0606 June 2024 Registration of Use of Cask to Store Spent Fuel (MPC-361, -362, -363) ML24071A0292024-06-0505 June 2024 Subsequent License Renewal Application Enclosure 3 - Proprietary Determination Letter ML24068A2612024-06-0505 June 2024 SLRA Fluence Methodology Report - Proprietary Determination Letter IR 05000259/20244032024-05-22022 May 2024 – Security Baseline Report 05000259/2024403 and 05000260/2024403 and 05000296/2024403 05000260/LER-2024-002, High Pressure Coolant Injection Inoperable Due to Rupture Disc Failure and Resulting System Isolation2024-05-20020 May 2024 High Pressure Coolant Injection Inoperable Due to Rupture Disc Failure and Resulting System Isolation ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A0702024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report IR 05000259/20240012024-05-14014 May 2024 Integrated Inspection Report 05000259/2024001, 05000260/2024001, and 05000296/2024001 CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24123A2012024-05-0202 May 2024 NRC Cybersecurity Baseline Inspection (NRC Inspection Report 05000259/2024404, 05000260-2024404, 05000296/2024404) and Request for Information ML24122A6852024-05-0101 May 2024 2023 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual 2024-09-03
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24255A5822024-09-10010 September 2024 SLRA - Requests for Additional Information - Set 1 ML24255A5802024-09-10010 September 2024 SLRA - Requests for Additional Information - Set 1 - Email from Jessica Hammock to James Barstow ML24116A2012024-04-17017 April 2024 Nrctva ISFSI CBS (RFI) ML24045A0272024-02-14014 February 2024 NRR E-mail Capture - Request for Additional Information Related to the Exemption Request for the 10 CFR Part 73 Enhanced Weapons Rule ML23332A0042023-11-27027 November 2023 NRR E-mail Capture - Request for Additional Information Related to Proposed Revised Alternative 0-ISI-47 ML23243A9892023-08-29029 August 2023 Inspection Information Request ML23124A0082023-05-0303 May 2023 NRR E-mail Capture - Request for Additional Information Related to Proposed Alternative Requests for the 5th 10-Year Inservice Testing Interval for Browns Ferry Nuclear Plant, Units 1, 2, and 3 ML23041A0022023-02-0909 February 2023 NRR E-mail Capture - Request for Additional Information Related to TVA Alternative Request BFN-0-ISI-32 (CNL-22-025) ML22299A0292022-10-26026 October 2022 NRR E-mail Capture - Request for Additional Information for Relief Request BFN-2-ISI-003 Re Weld Examination Coverage ML22292A2722022-10-19019 October 2022 NRR E-mail Capture - Request for Additional Information Related to TVAs Request to Adopt TSTF-505 and TSTF-439 for Browns Ferry Nuclear Plant, Units 1, 2, and 3 ML22208A2172022-07-15015 July 2022 NRR E-mail Capture - Request for Additional Information Related to TVA Relief Request BFN-21-ISI-02 (CNL-21-081) ML22174A2722022-06-24024 June 2022 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML22168A0802022-06-17017 June 2022 NRR E-mail Capture - Request for Confirmation of Information and Additional Information Related to TVAs Request to Use Control Bay Chiller Cross-Tie ML22160A4742022-06-0303 June 2022 NRR E-mail Capture - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Additional Information Re LAR to Use Advanced Framatome Methodologies in Support of Atrium 11 Fuel ML22168A0392022-05-13013 May 2022 NRR E-mail Capture - Draft Request for Confirmation of Information and Additional Information Related to TVAs Request to Use Control Bay Chiller Cross-Tie ML22144A1002022-05-12012 May 2022 NRR E-mail Capture - Request for Additional Information Related to TVAs Request to Revised the TVA Plants Radiological Emergency Plans ML22047A1612022-02-16016 February 2022 NRR E-mail Capture - Request for Additional Information Regarding TVAs Request to Expand the SFP Criticality Safety Analysis for Browns Ferry Nuclear Plant, Units 1, 2, and 3 ML22025A4132022-01-25025 January 2022 RP Inspection Doc Request ML21343A4232021-12-0909 December 2021 Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000259/2022010, 05000260/2022010, and 05000296/2022010) and Request for Information (RFI) ML21173A1042021-06-21021 June 2021 NRR E-mail Capture - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Additional Information Regarding Request to TS 3.8.6 ML21041A5422021-02-10010 February 2021 NRR E-mail Capture - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Additional Information Regarding Request to Adopt 10 CFR 50.69 ML21041A5432021-02-0505 February 2021 NRR E-mail Capture - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Draft Request for Additional Information Regarding 10 CFR 50.69 LAR ML21026A1652021-01-26026 January 2021 Document Request for Browns Ferry Nuclear Plant - Radiation Protection Inspection - Inspection Report 2021-02 ML20297A3012020-10-22022 October 2020 NRR E-mail Capture - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Additional Information Regarding Request to Adopt TSTF-425 ML20296A3782020-10-22022 October 2020 NRR E-mail Capture - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Additional Information Regarding Request to Incorporate TMRE ML20294A3762020-09-23023 September 2020 NRR E-mail Capture - Draft Request for Additional Information - Browns Ferry Nuclear Plant, Units 1, 2, and 3, Request to Adopt TSTF-425 ML20266G4472020-09-22022 September 2020 Notification of Inspection and Request for Information ML20224A4732020-08-11011 August 2020 Requalification Program Inspection Browns Ferry Nuclear ML20195B1302020-07-13013 July 2020 NRR E-mail Capture - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Additional Information Regarding Alternative Request No. 0-ISI-47 ML20149K3212020-05-27027 May 2020 RP Inspection Document Request, Browns Ferry 2020-003 ML20254A3032020-05-13013 May 2020 Request for Supporting Information for the Browns Ferry, Units 1, 2, and 3 Seismic Probabilistic Risk Assessment Audit Review ML20054B8592020-02-20020 February 2020 Emergency Preparedness Program Inspection Request for Information ML20014E6552020-01-14014 January 2020 01 RP Inspection Document Request ML19196A0752019-07-12012 July 2019 NRR E-mail Capture - Final RAIs Browns Ferry Nuclear, Units 1, 2, 3 - Application to Revise Technical Specifications to Adopt TSTF-542 Revision 2, Reactor Pressure Vessel Water Inventory Control ML19116A0712019-06-0303 June 2019 Request for Additional Information Related Resubmittal of Proposed Alternative Request No. 1-ISI-27 for the Period of Extended Operation ML18331A5442018-12-0606 December 2018 Request for Additional Information Regarding Maximum Extended Load Line Limit Plus License Amendment Request (EPID L-2018-LLA-0048) - (Non-Proprietary) ML18317A1642018-11-20020 November 2018 Request for Additional Information Regarding Maximum Extended Load Line Limit Plus License Amendment Request (EPID L-2018-LLA-0048) - Non-Proprietary ML18263A1412018-09-11011 September 2018 NRR E-mail Capture - Browns Ferry Unit 1: RAI Associated with Relief Request 1-ISI-28 ML18138A1102018-05-17017 May 2018 Enclosurequest for Additional Information (Letter to E. D. Schrull Request for Additional Information Regarding Tennessee Valley Authority'S Decommissioning Funding Plan Update for Browns Ferry and Sequoyah Isfsis) ML18108A1872018-04-18018 April 2018 Information Request for the Cyber-Security Baseline Security Inspection, Notification to Perform Inspection 05000259/2018411, 05000260/2018411, and 05000296/2018411 ML18057A6372018-02-23023 February 2018 NRR E-mail Capture - Request for Additional Information Related to TVA Fleet Topical Report TVA-NPG-AWA16 - EPIC: L-2016-TOP-0011) ML17216A0062017-08-18018 August 2017 Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Additional Information Related to LAR to Revise Modifications and Implementations Related to NFPA 805 for Fire Protection for Light Water Reactor Generating Plants (CAC Nos. MF9814-MF9816) ML17163A0502017-06-0808 June 2017 NRR E-mail Capture - RAI for Browns Ferry RR 3-ISI-28 CAC No. MF9257 ML17150A0792017-05-23023 May 2017 NRR E-mail Capture - Request for Additional Information Related to TVA Fleet LAR for EAL Change to Adopt NEI-99-01 Rev.6 (CAC Nos. MF9054 - MF9060) ML16288A0182016-10-27027 October 2016 Browns Ferry Nuclear Plant, Units 2 and 3 - RAI Related to Relief Request for the Use of Alternatives to Certain American Society of Mechanical Engineers, Boiler and Pressure Vessel Code, Section XI Requirements (CAC Nos. MF7795 and MF7796) ML16236A0732016-08-31031 August 2016 Request for Additional Information Related to License Amendment Request to Add New Technical Specification 3.3.8.3 ML16203A0272016-07-25025 July 2016 Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Additional Information Related to License Amendment Request for Adding New Specifications to Technical Specification 3.3.8.3 (CAC Nos. MF6738, MF6739, and MF6740) ML16194A2292016-07-21021 July 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate ML16187A2932016-07-21021 July 2016 Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate (CAC Nos. MF6741, MF6742, and MF6743) ML16154A5442016-06-21021 June 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate 2024-09-10
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 March 30, 2012 Mr. Joseph W. Shea Manager, Corp. Nuclear Licensing Programs Tennessee Valley Authority 1101 Market Street, LP 4B-C Chattanooga, TN 37402-2801
SUBJECT:
BROWNS FERRY NUCLEAR PLANT: REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSE RENEWAL COMMITMENT TO SUBMIT IMPLEMENTING PROCEDURES FOR THE UNIT 1 PERIODIC INSPECTION PROGRAM (TAC NO. ME7126)
Dear Mr. Shea:
By letter dated April 21 ,2006, the Tennessee Valley Authority (TVA) submitted Commitment No. 49 to develop and submit to the U.S. Nuclear Regulatory Commission (NRC), the implementing procedures for the Unit 1 Periodic Inspection Program. By letter dated April 23, 2007, TVA submitted implementing procedure 1-TI-521, "Unit 1 Periodic Inspection Program for License Renewal."
To verify completion of the commitment, the staff requested additional information which is shown in the enclosure. A date for the response is within 30 days from the date of this letter.
If you have any questions, please contact me by telephone at 301-415-4054 or by email at Heather.Jones@nrc.gov.
Sincerely, H ather M. Jones, roject Manager Program Operations Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-259
Enclosure:
As stated cc w/encl: Listserv
OFFICE OF NUCLEAR REACTOR REGULATION REQUEST FOR ADDITIONAL INFORMATION TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT, UNIT 1 DOCKET NO. 50-259
- 1. By letter dated April 21 ,2006, the Tennessee Valley Authority (TVA) submitted Commitment No. 49 to develop and submit to the U.S. Nuclear Regulatory Commission, the implementing procedures for the Unit 1 Periodic Inspection Program. By letter dated April 23, 2007 , TVA submitted implementing procedure 1-TI-521, "Unit 1 Periodic Inspection Program for License Renewal."
In the procedure, the licensee stated that no candidate piping was identified for the stainless steel/raw water population, because all the pipe diameters were 1 inch or smaller, making ultrasonic testing (UT) measurements impractical. The licensee also stated that only nine inspection locations were identified for the stainless steel/treated water grouping, because the piping was either of small diameter or had been replaced.
The license renewal application aging management program stated that the inspection sample is based on 95/95 assurance criterion (95 percent confidence level that 95 percent of a population is not experiencing degradation), which would specify a maximum of 59 inspection locations for an infinite lot size.
It does not appear that implementing procedure 1-1'1-521 contains any inspections for the stainless steel/raw water material-environment population and only a limited number of inspections for the stainless steel/treated water population. Describe the alternative aging management approach that will be taken for small-diameter stainless steel piping under the Unit 1 Periodic Inspection Program as a result of limitations of the UT inspection technique.
ENCLOSURE
... ML12083A020 OFFICE LA:RPB1 :DLR PM:RPOB/DLR BC: RPOB/DLR NAME YEdmonds HJones YDiaz-Sanabria DATE 3/27/2012 3/27/2012 3/30/2012
Letter to Mr. Shea from H. Jones dated March 30, 2012
SUBJECT:
BROWNS FERRY NUCLEAR PLANT: REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSE RENEWAL COMMITMENT TO SUBMIT IMPLEMENTING PROCEDURES FOR THE UNIT 1 PERIODIC INSPECTION PROGRAM (TAC NO. ME7126)
DISTRIBUTION:
E-MAIL:
PUBLIC RidsNrrDlr Resource HJones YDiaz-Sanabria