Line 3: Line 3:
| issue date = 06/22/2012
| issue date = 06/22/2012
| title = Acknowledgement Letter to Omaha Public Power District for Their Response to Notice of Violation and NRC Inspection Report 05000285-12-010
| title = Acknowledgement Letter to Omaha Public Power District for Their Response to Notice of Violation and NRC Inspection Report 05000285-12-010
| author name = Miller G B
| author name = Miller G
| author affiliation = NRC/RGN-IV/DRS/EB-2
| author affiliation = NRC/RGN-IV/DRS/EB-2
| addressee name = Bannister D J
| addressee name = Bannister D
| addressee affiliation = Omaha Public Power District
| addressee affiliation = Omaha Public Power District
| docket = 05000285
| docket = 05000285
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter: June 22, 2012 EA-12-023  
{{#Wiki_filter:UNITED STATES
  David J. Bannister, Vice President     and Chief Nuclear Officer Omaha Public Power District  
                                NUCLEAR REGULATORY COMMISSION
Fort Calhoun Station FC-2-4 P.O. Box 550 Fort Calhoun, NE 68023-0550 Subject: RESPONSE TO NOTICE OF VIOLATION AND NRC INSPECTION REPORT 05000285/2012010 Dear Mr. Bannister: Thank you for your letter of May 24, 2012, in which you responded to our April 10, 2012, letter  
                                                REGION I V
and Notice of Violation regarding deficient modification, inadequate maintenance of the safety-related 480 Vac electrical distribution system, and failure to maintain in effect all provisions of the approved fire protection program. We will review the implementation of your corrective actions during a future inspection to determine that full compliance has been achieved and will be maintained. Sincerely,
                                            1600 EAST LAMAR BLVD
/RA/ Geoffrey Miller, Chief Engineering Branch 2     Division of Reactor Safety    
                                        ARLINGTON, TEXAS 76011-4511
Docket: 50-285 License: DPR-40   UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511
                                          June 22, 2012
D. Bannister - 2 - Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Art.Howell@nrc.gov) DRP Director (Kriss.Kennedy@nrc.gov) Acting DRS Director (Tom.Blount@nrc.gov) Acting DRS Deputy Director (Patrick.Louden@nrc.gov)
EA-12-023
Senior Resident Inspector (John.Kirkland@nrc.gov) Resident Inspector (Jacob.Wingebach@nrc.gov) Branch Chief, DRP/F (Jeff.Clark@nrc.gov) Senior Project Engineer, DRP/F (Rick.Deese@nrc.gov) Project Engineer, DRP/F (Chris.Smith@nrc.gov)
David J. Bannister, Vice President
FCS Administrative Assistant (Berni.Madison@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov) Acting Branch Chief, DRS/TSB (Dale.Powers@nrc.gov) Project Manager (Lynnea.Wilkins@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov)
  and Chief Nuclear Officer
Technical Support Assistant (Loretta.Williams@nrc.gov) DRP Admin Assistants (R4DRP_AA@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) OEMail Resource 
Omaha Public Power District
   
Fort Calhoun Station FC-2-4
   
P.O. Box 550
   
Fort Calhoun, NE 68023-0550
    SUNSI Review Completed:  _STG___ ADAMS:  X  Yes            Initials: _STG__  X  Publicly Available        X  Non-Sensitive          ML SRI:DRS/EB2    C:EB 2 SGraves    GMiller /RA/    /RA/ 6/13/12    6/20/12 OFFICIAL RECORD COPY  T=Telephone          E=E-mail        F=Fax 
Subject:       RESPONSE TO NOTICE OF VIOLATION AND NRC INSPECTION
              REPORT 05000285/2012010
Dear Mr. Bannister:
Thank you for your letter of May 24, 2012, in which you responded to our April 10, 2012, letter
and Notice of Violation regarding deficient modification, inadequate maintenance of the safety-
related 480 Vac electrical distribution system, and failure to maintain in effect all provisions of
the approved fire protection program. We will review the implementation of your corrective
actions during a future inspection to determine that full compliance has been achieved and will
be maintained.
                                              Sincerely,
                                                  /RA/
                                              Geoffrey Miller, Chief
                                              Engineering Branch 2
                                              Division of Reactor Safety
Docket: 50-285
License: DPR-40


D. Bannister                                  -2-
Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Art.Howell@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
Acting DRS Director (Tom.Blount@nrc.gov)
Acting DRS Deputy Director (Patrick.Louden@nrc.gov)
Senior Resident Inspector (John.Kirkland@nrc.gov)
Resident Inspector (Jacob.Wingebach@nrc.gov)
Branch Chief, DRP/F (Jeff.Clark@nrc.gov)
Senior Project Engineer, DRP/F (Rick.Deese@nrc.gov)
Project Engineer, DRP/F (Chris.Smith@nrc.gov)
FCS Administrative Assistant (Berni.Madison@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Acting Branch Chief, DRS/TSB (Dale.Powers@nrc.gov)
Project Manager (Lynnea.Wilkins@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
DRP Admin Assistants (R4DRP_AA@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OEMail Resource
SUNSI Review Completed: _STG___              ADAMS: X Yes          Initials: _STG__
        X Publicly Available                      X Non-Sensitive
                                                                  ML
SRI:DRS/EB2                                                              C:EB 2
SGraves                                                                  GMiller
/RA/                                                                    /RA/
6/13/12                                                                  6/20/12
OFFICIAL RECORD COPY T=Telephone                  E=E-mail  F=Fax
}}
}}

Latest revision as of 02:42, 12 November 2019

Acknowledgement Letter to Omaha Public Power District for Their Response to Notice of Violation and NRC Inspection Report 05000285-12-010
ML12174A137
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 06/22/2012
From: Geoffrey Miller
NRC/RGN-IV/DRS/EB-2
To: Bannister D
Omaha Public Power District
References
EA-12-023 IR-12-010
Download: ML12174A137 (2)


See also: IR 05000285/2012010

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION I V

1600 EAST LAMAR BLVD

ARLINGTON, TEXAS 76011-4511

June 22, 2012

EA-12-023

David J. Bannister, Vice President

and Chief Nuclear Officer

Omaha Public Power District

Fort Calhoun Station FC-2-4

P.O. Box 550

Fort Calhoun, NE 68023-0550

Subject: RESPONSE TO NOTICE OF VIOLATION AND NRC INSPECTION

REPORT 05000285/2012010

Dear Mr. Bannister:

Thank you for your letter of May 24, 2012, in which you responded to our April 10, 2012, letter

and Notice of Violation regarding deficient modification, inadequate maintenance of the safety-

related 480 Vac electrical distribution system, and failure to maintain in effect all provisions of

the approved fire protection program. We will review the implementation of your corrective

actions during a future inspection to determine that full compliance has been achieved and will

be maintained.

Sincerely,

/RA/

Geoffrey Miller, Chief

Engineering Branch 2

Division of Reactor Safety

Docket: 50-285

License: DPR-40

D. Bannister -2-

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Art.Howell@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

Acting DRS Director (Tom.Blount@nrc.gov)

Acting DRS Deputy Director (Patrick.Louden@nrc.gov)

Senior Resident Inspector (John.Kirkland@nrc.gov)

Resident Inspector (Jacob.Wingebach@nrc.gov)

Branch Chief, DRP/F (Jeff.Clark@nrc.gov)

Senior Project Engineer, DRP/F (Rick.Deese@nrc.gov)

Project Engineer, DRP/F (Chris.Smith@nrc.gov)

FCS Administrative Assistant (Berni.Madison@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Acting Branch Chief, DRS/TSB (Dale.Powers@nrc.gov)

Project Manager (Lynnea.Wilkins@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

DRP Admin Assistants (R4DRP_AA@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource

SUNSI Review Completed: _STG___ ADAMS: X Yes Initials: _STG__

X Publicly Available X Non-Sensitive

ML

SRI:DRS/EB2 C:EB 2

SGraves GMiller

/RA/ /RA/

6/13/12 6/20/12

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax