ML13046A426: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 02/15/2013
| issue date = 02/15/2013
| title = Deviations from the Approved Alert and Notification System Design Report Identified at Fort Calhoun Station During the November 2012 NRC Inspection
| title = Deviations from the Approved Alert and Notification System Design Report Identified at Fort Calhoun Station During the November 2012 NRC Inspection
| author name = Haire M S
| author name = Haire M
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| addressee name = McCabe R
| addressee name = Mccabe R
| addressee affiliation = US Dept of Homeland Security, US Federal Emergency Mgmt Agency (FEMA)
| addressee affiliation = US Dept of Homeland Security, US Federal Emergency Mgmt Agency (FEMA)
| docket = 05000285
| docket = 05000285
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:February 15, 2013  
{{#Wiki_filter:UNITE D S TATE S NUC LEAR RE GULATOR Y C OMMI S SI ON R E G IO N I V 1600 EAST LAMAR BLVD AR L I NGTON , TEXAS 7 601 1- 4511 February 15, 2013 Mr. Ronald McCabe Chairperson, Radiological Assistance Committee Region VII Federal Emergency Management Agency Department of Homeland Security 9221 Ward Parkway Suite 300 Kansas City, MO 64114-3372
 
Mr. Ronald McCabe Chairperson, Radiological Assistance Committee  
 
Region VII Federal Emergency Management Agency Department of Homeland Security  
 
9221 Ward Parkway  
 
Suite 300  
 
Kansas City, MO 64114-3372  


==SUBJECT:==
==SUBJECT:==
DEVIATIONS FROM THE APPROVED ALERT AND NOTICATION SYSTEM DESIGN REPORT IDENTIFIED AT FORT CALHOUN STATION DURING THE NOVEMBER 2012 NRC INSPECTION  
DEVIATIONS FROM THE APPROVED ALERT AND NOTICATION SYSTEM DESIGN REPORT IDENTIFIED AT FORT CALHOUN STATION DURING THE NOVEMBER 2012 NRC INSPECTION


==Dear Mr. McCabe:==
==Dear Mr. McCabe:==


The purpose of this letter is to request the assistance of FEMA, Region VII, in determining whether Fort Calhoun Station is acceptably implementing a preventative maintenance program for their offsite emergency warning siren system.  
The purpose of this letter is to request the assistance of FEMA, Region VII, in determining whether Fort Calhoun Station is acceptably implementing a preventative maintenance program for their offsite emergency warning siren system.
 
During an onsite inspection conducted at Fort Calhoun Station in November 2012, the NRC identified possible deviations between the preventative maintenance program required to be performed by the approved Alert and Notification System Design Report and the actual preventative maintenance program. Siren maintenance and testing at Fort Calhoun is performed by the Corporate Telecommunications Department of Omaha Public Power District, rather than by Fort Calhoun Station personnel. The NRC requested that Fort Calhoun Station provide a description of their preventative maintenance program for the alert and notification system with an analysis comparing the actual program against program requirements. The NRC received Fort Calhoun Stations response on January 21, 2013. This information was discussed with you and your staff during a conference call conducted February 8, 2013.
During an onsite inspection conducted at Fort Calhoun Station in November 2012, the NRC identified possible deviations between the preventative maintenance program required to be performed by the approved Alert and Notification System Design Report and the actual preventative maintenance program. Siren maintenance and testing at Fort Calhoun is performed by the Corporate Telecommunications Department of Omaha Public Power District, rather than by Fort Calhoun Station personnel. The NRC requested that Fort Calhoun Station provide a description of their preventative maintenance program for the alert and notification system with an analysis comparing the actual program against program requirements. The NRC received Fort Calhoun Station's response on January 21, 2013. This information was discussed with you and your staff during a conference call conducted February 8, 2013.  
 
This letter transmits documents related to the Alert and Notification System maintenance program at Fort Calhoun Station, including the following:
This letter transmits documents related to the Alert and Notification System maintenance program at Fort Calhoun Station, including the following:
* Fort Calhoun Station Alert Notification System Maintenance Program;
* Fort Calhoun Station Alert Notification System Maintenance Program;
* EPT-68, "Alert Notification System Monthly Battery Test," Revision 0, dated December 13, 2012;
* EPT-68, Alert Notification System Monthly Battery Test, Revision 0, dated December 13, 2012;
* FCS ANS Maintenance Program Analysis (spreadsheet);
* FCS ANS Maintenance Program Analysis (spreadsheet);
* Applicable Design Report Sections;
* Applicable Design Report Sections;
* NRC Evaluation of the Fort Calhoun Station Response to the Unresolved Item; and
* NRC Evaluation of the Fort Calhoun Station Response to the Unresolved Item; and
* NRC Inspection Report 05000285/2012012 (excerpts).
* NRC Inspection Report 05000285/2012012 (excerpts).
UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511
The Nuclear Regulatory Commission requests that FEMA Region VII evaluate Fort Calhoun Station's siren maintenance program as described in the enclosed documents and determine, (1) whether Fort Calhoun Station is in compliance with Alert and Notification System Design Report commitments for a preventative maintenance program for the alert and notification system, and (2) whether any identified deviations from the Alert and Notification System Design Report are acceptable to FEMA Region VII. The NRC requests a determination on this issue by March 29, 2013. The NRC will rely on the FE MA Region VII evaluation in determining whether Fort Calhoun Station is in compliance with NRC requirements.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


R. McCabe                                      The Nuclear Regulatory Commission requests that FEMA Region VII evaluate Fort Calhoun Stations siren maintenance program as described in the enclosed documents and determine, (1) whether Fort Calhoun Station is in compliance with Alert and Notification System Design Report commitments for a preventative maintenance program for the alert and notification system, and (2) whether any identified deviations from the Alert and Notification System Design Report are acceptable to FEMA Region VII. The NRC requests a determination on this issue by March 29, 2013. The NRC will rely on the FEMA Region VII evaluation in determining whether Fort Calhoun Station is in compliance with NRC requirements.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If you have any further questions, please contact Paul J. Elkmann at (817) 200-1539, or Rayomand Kumana (817) 200-1185.
If you have any further questions, please contact Paul J. Elkmann at (817) 200-1539, or Rayomand Kumana (817) 200-1185.
Sincerely,  
Sincerely,
  /RA/ by Paul Elkmann for Mark Haire
                                            /RA/ by Paul Elkmann for Mark Haire Mark Haire, Chief Plant Support Branch-1 Division of Reactor Safety Docket: 50-285 License: DPR-40
 
Mark Haire, Chief       Plant Support Branch-1 Division of Reactor Safety  
 
Docket:   50-285 License: DPR-40  


==Enclosures:==
==Enclosures:==
: 1. Fort Calhoun Station Alert Notification System Maintenance Program
: 1. Fort Calhoun Station Alert Notification System Maintenance Program
: 2. EPT-68, "Alert Notification System Monthly Battery Test,Revision 0, dated December 13, 2012 3. FCS ANS Maintenance Program Analysis (spreadsheet)
: 2. EPT-68, Alert Notification System Monthly Battery Test, Revision 0, dated December 13, 2012
: 3. FCS ANS Maintenance Program Analysis (spreadsheet)
: 4. Applicable Design Report Sections
: 4. Applicable Design Report Sections
: 5. NRC Evaluation of the Fort Calhoun Station Response to the Unresolved Item 6. NRC Inspection Report 05000285/2012012 (excerpts)  
: 5. NRC Evaluation of the Fort Calhoun Station Response to the Unresolved Item
 
: 6. NRC Inspection Report 05000285/2012012 (excerpts) cc w/enclosures: Electronic Distribution for Fort Calhoun Station
cc w/enclosures: Electronic Distribution for Fort Calhoun Station  


ML13046A426 ADAMS:   No       Yes SUNSI Review Complete Reviewer Initials: PJE Publicly Available   Non-Sensitive Non-publicly Available   Sensitive Inspector Elkmann RSLO   DRS:BC PSB-1 PElkmann BMaier  MHaire /RA/ /RA/ /RA/ PElkmann for 2/15/2013 2/15/2013 2/15/2013}}
ML13046A426 ADAMS: No       Yes       SUNSI Review Complete       Reviewer Initials: PJE Publicly Available           Non-Sensitive Non-publicly Available       Sensitive Inspector Elkmann   RSLO                                           DRS:BC PSB-1 PElkmann           BMaier                                         MHaire
  /RA/               /RA/                                           /RA/ PElkmann for 2/15/2013           2/15/2013                                       2/15/2013}}

Latest revision as of 23:02, 4 November 2019

Deviations from the Approved Alert and Notification System Design Report Identified at Fort Calhoun Station During the November 2012 NRC Inspection
ML13046A426
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 02/15/2013
From: Mark Haire
Plant Support Branch-1
To: Mccabe R
US Dept of Homeland Security, Federal Emergency Management Agency
References
Download: ML13046A426 (3)


Text

UNITE D S TATE S NUC LEAR RE GULATOR Y C OMMI S SI ON R E G IO N I V 1600 EAST LAMAR BLVD AR L I NGTON , TEXAS 7 601 1- 4511 February 15, 2013 Mr. Ronald McCabe Chairperson, Radiological Assistance Committee Region VII Federal Emergency Management Agency Department of Homeland Security 9221 Ward Parkway Suite 300 Kansas City, MO 64114-3372

SUBJECT:

DEVIATIONS FROM THE APPROVED ALERT AND NOTICATION SYSTEM DESIGN REPORT IDENTIFIED AT FORT CALHOUN STATION DURING THE NOVEMBER 2012 NRC INSPECTION

Dear Mr. McCabe:

The purpose of this letter is to request the assistance of FEMA, Region VII, in determining whether Fort Calhoun Station is acceptably implementing a preventative maintenance program for their offsite emergency warning siren system.

During an onsite inspection conducted at Fort Calhoun Station in November 2012, the NRC identified possible deviations between the preventative maintenance program required to be performed by the approved Alert and Notification System Design Report and the actual preventative maintenance program. Siren maintenance and testing at Fort Calhoun is performed by the Corporate Telecommunications Department of Omaha Public Power District, rather than by Fort Calhoun Station personnel. The NRC requested that Fort Calhoun Station provide a description of their preventative maintenance program for the alert and notification system with an analysis comparing the actual program against program requirements. The NRC received Fort Calhoun Stations response on January 21, 2013. This information was discussed with you and your staff during a conference call conducted February 8, 2013.

This letter transmits documents related to the Alert and Notification System maintenance program at Fort Calhoun Station, including the following:

  • Fort Calhoun Station Alert Notification System Maintenance Program;
  • EPT-68, Alert Notification System Monthly Battery Test, Revision 0, dated December 13, 2012;
  • FCS ANS Maintenance Program Analysis (spreadsheet);
  • Applicable Design Report Sections;
  • NRC Evaluation of the Fort Calhoun Station Response to the Unresolved Item; and

R. McCabe The Nuclear Regulatory Commission requests that FEMA Region VII evaluate Fort Calhoun Stations siren maintenance program as described in the enclosed documents and determine, (1) whether Fort Calhoun Station is in compliance with Alert and Notification System Design Report commitments for a preventative maintenance program for the alert and notification system, and (2) whether any identified deviations from the Alert and Notification System Design Report are acceptable to FEMA Region VII. The NRC requests a determination on this issue by March 29, 2013. The NRC will rely on the FEMA Region VII evaluation in determining whether Fort Calhoun Station is in compliance with NRC requirements.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If you have any further questions, please contact Paul J. Elkmann at (817) 200-1539, or Rayomand Kumana (817) 200-1185.

Sincerely,

/RA/ by Paul Elkmann for Mark Haire Mark Haire, Chief Plant Support Branch-1 Division of Reactor Safety Docket: 50-285 License: DPR-40

Enclosures:

1. Fort Calhoun Station Alert Notification System Maintenance Program
2. EPT-68, Alert Notification System Monthly Battery Test, Revision 0, dated December 13, 2012
3. FCS ANS Maintenance Program Analysis (spreadsheet)
4. Applicable Design Report Sections
5. NRC Evaluation of the Fort Calhoun Station Response to the Unresolved Item
6. NRC Inspection Report 05000285/2012012 (excerpts) cc w/enclosures: Electronic Distribution for Fort Calhoun Station

ML13046A426 ADAMS: No Yes SUNSI Review Complete Reviewer Initials: PJE Publicly Available Non-Sensitive Non-publicly Available Sensitive Inspector Elkmann RSLO DRS:BC PSB-1 PElkmann BMaier MHaire

/RA/ /RA/ /RA/ PElkmann for 2/15/2013 2/15/2013 2/15/2013