| issue date = 08/06/2013
| issue date = 08/06/2013
| title = Purdue University - Reply to Notice of Violation
| title = Purdue University - Reply to Notice of Violation
| author name = Jamieson L H
| author name = Jamieson L
| author affiliation = Purdue Univ
| author affiliation = Purdue Univ
| addressee name =  
| addressee name =  
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:PURDUEUNIVERSITY COLLEGE OF ENGINEERING Leah H. JamiesonThe John A. Edwardson Dean of Engineering Ransburg Distinguished Professor of Electrical  
{{#Wiki_filter:PURDUE UNIVERSITY                                                                  COLLEGE OF ENGINEERING Leah H. Jamieson The John A. Edwardson Dean of Engineering RansburgDistinguishedProfessor of Electrical& Computer Engineering August 6, 2013 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 RE: License R-87, Docket 50-182 Reply to Notice of Violation Document Control Desk, This letter and attachment are in response to the NRC inspection of the Purdue University Reactor (R-87) conducted from June 10-13, 2013. The inspection resulted in a Severity Level IV violation (Section 6.1).
& Computer Engineering August 6, 2013ATTN: Document Control DeskU.S. Nuclear Regulatory Commission Document Control DeskWashington, DC 20555-0001 RE: License R-87, Docket 50-182 Reply to Notice of Violation Document Control Desk,This letter and attachment are in response to the NRC inspection of the Purdue University Reactor (R-87)conducted from June 10-13, 2013. The inspection resulted in a Severity Level IV violation (Section 6.1).The response to the violation is contained on the attached document.
The response to the violation is contained on the attached document.
Please let me know if you have any questions.
Please let me know if you have any questions.
Sincerely, Leah H JamiesoThe John A. Edwardson Dean of Engineering Ransburg Distinguished Professor of Electrical and Computer Engineering Attachment A4020-Office of the DeanNeil Armstrong Hall of Engineering m 701 W. Stadium Avenue m West Lafayette, IN 47907-2045 (765) 494-5346 0 Fax: (765) 494-9321 o lhj@purdue.edu 0 httpsJ/engineering.purdue.edu RE: License R-87, Docket 50-182 Reply to Notice of Violation This letter in in response to the NRC inspection of the Purdue University Reactor (R-87)conducted from June 10-13, 2013. The inspection resulted in a Severity Level IV violation (Section 6.1). Below is the response to that violation:
Sincerely, Leah H Jamieso The John A. Edwardson Dean of Engineering Ransburg Distinguished Professor of Electrical and Computer Engineering Attachment 0
Violation Technical Specification 4.4.d requires that representative fuel assemblies shall be inspected
A402
: annually, with no interval to exceed 15 months.Contrary to Technical Specifications 4.4.d, the licensee failed to inspect representative fuelassemblies
-       Office of the Dean Neil Armstrong Hall of Engineering m 701 W. Stadium Avenue m West Lafayette, IN47907-2045 (765) 494-5346 0 Fax: (765) 494-9321 o lhj@purdue.edu 0 httpsJ/engineering.purdue.edu
: annually, with no interval exceeding 15 months. Specifically, the licensee failed toinspect representative fuel assemblies during calendar year 2012 and had not conducted a fuelinspection through June 13, 2013, a period in excess of the maximum of 15 months allowed.ResponseThe failure to perform this required surveillance was an oversight on our part. This surveillance was completed in accordance with the technical specifications on July 18, 2013 and the resultsof the fuel inspection were satisfactory.
 
RE: License R-87, Docket 50-182         Reply to Notice of Violation This letter in in response to the NRC inspection of the Purdue University Reactor (R-87) conducted from June 10-13, 2013. The inspection resulted in a Severity Level IV violation (Section 6.1). Below is the response to that violation:
Violation Technical Specification 4.4.d requires that representative fuel assemblies shall be inspected annually, with no interval to exceed 15 months.
Contrary to Technical Specifications 4.4.d, the licensee failed to inspect representative fuel assemblies annually, with no interval exceeding 15 months. Specifically, the licensee failed to inspect representative fuel assemblies during calendar year 2012 and had not conducted a fuel inspection through June 13, 2013, a period in excess of the maximum of 15 months allowed.
 
===Response===
The failure to perform this required surveillance was an oversight on our part. This surveillance was completed in accordance with the technical specifications on July 18, 2013 and the results of the fuel inspection were satisfactory.
The following corrective actions will be implemented immediately to prevent a recurrence:
The following corrective actions will be implemented immediately to prevent a recurrence:
: 1. Surveillances required by the technical specifications will be performed by the Radiation Safety Officer or Health Physicist during the interim period (vacancy of the facilitydirector).
: 1. Surveillances required by the technical specifications will be performed by the Radiation Safety Officer or Health Physicist during the interim period (vacancy of the facility director).
: 2. The technical specifications will be reviewed by the new facility  
: 2. The technical specifications will be reviewed by the new facility director, reactor supervisor, and reactor operator(s) upon hire.
: director, reactorsupervisor, and reactor operator(s) upon hire.3. The annual audit of the technical specifications will continue to occur. Any surveillance deficiencies identified will be reported to the Committee on Reactor Operations (CORO)and the Dean of the College of Engineering.
: 3. The annual audit of the technical specifications will continue to occur. Any surveillance deficiencies identified will be reported to the Committee on Reactor Operations (CORO) and the Dean of the College of Engineering.
We believe that the above corrective actions are adequate to address the violation identified and maintain compliance with other technical specifications.
We believe that the above corrective actions are adequate to address the violation identified and maintain compliance with other technical specifications. Please direct any questions to my attention.}}
Please direct any questions to myattention.}}

Latest revision as of 14:36, 4 November 2019

Purdue University - Reply to Notice of Violation
ML13232A009
Person / Time
Site: Purdue University
Issue date: 08/06/2013
From: Jamieson L
Purdue University Research Reactor
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML13232A009 (2)


Text

PURDUE UNIVERSITY COLLEGE OF ENGINEERING Leah H. Jamieson The John A. Edwardson Dean of Engineering RansburgDistinguishedProfessor of Electrical& Computer Engineering August 6, 2013 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 RE: License R-87, Docket 50-182 Reply to Notice of Violation Document Control Desk, This letter and attachment are in response to the NRC inspection of the Purdue University Reactor (R-87) conducted from June 10-13, 2013. The inspection resulted in a Severity Level IV violation (Section 6.1).

The response to the violation is contained on the attached document.

Please let me know if you have any questions.

Sincerely, Leah H Jamieso The John A. Edwardson Dean of Engineering Ransburg Distinguished Professor of Electrical and Computer Engineering Attachment 0

A402

- Office of the Dean Neil Armstrong Hall of Engineering m 701 W. Stadium Avenue m West Lafayette, IN47907-2045 (765) 494-5346 0 Fax: (765) 494-9321 o lhj@purdue.edu 0 httpsJ/engineering.purdue.edu

RE: License R-87, Docket 50-182 Reply to Notice of Violation This letter in in response to the NRC inspection of the Purdue University Reactor (R-87) conducted from June 10-13, 2013. The inspection resulted in a Severity Level IV violation (Section 6.1). Below is the response to that violation:

Violation Technical Specification 4.4.d requires that representative fuel assemblies shall be inspected annually, with no interval to exceed 15 months.

Contrary to Technical Specifications 4.4.d, the licensee failed to inspect representative fuel assemblies annually, with no interval exceeding 15 months. Specifically, the licensee failed to inspect representative fuel assemblies during calendar year 2012 and had not conducted a fuel inspection through June 13, 2013, a period in excess of the maximum of 15 months allowed.

Response

The failure to perform this required surveillance was an oversight on our part. This surveillance was completed in accordance with the technical specifications on July 18, 2013 and the results of the fuel inspection were satisfactory.

The following corrective actions will be implemented immediately to prevent a recurrence:

1. Surveillances required by the technical specifications will be performed by the Radiation Safety Officer or Health Physicist during the interim period (vacancy of the facility director).
2. The technical specifications will be reviewed by the new facility director, reactor supervisor, and reactor operator(s) upon hire.
3. The annual audit of the technical specifications will continue to occur. Any surveillance deficiencies identified will be reported to the Committee on Reactor Operations (CORO) and the Dean of the College of Engineering.

We believe that the above corrective actions are adequate to address the violation identified and maintain compliance with other technical specifications. Please direct any questions to my attention.