ML14346A009: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ENCLOSURE 2Calculation Number 13922-0402, Revision 0,Helium Leak Rate Evaluation for 24PHB DSC E-40451Enclosure 2CONTROLLED COPY E-181Fom3.- Calculation No. 13922-0402 A Form 3.2-1Calculation Cover Sheet Revision No. 0A R EVA TIP 3.2 (Revision
{{#Wiki_filter:ENCLOSURE 2 Calculation Number 13922-0402, Revision 0, Helium Leak Rate Evaluation for 24PHB DSC
: 6) Page 1 of 11DCR NO (if applicable):
NA PROJECT NAME: OcS tationOconee Nuclear StationPROJECT NO: 13922 CLIENT: Duke EnergyCALCULATION TITLE:Helium Leak Rate Evaluation for 24PHB DSCSUMMARY DESCRIPTION:
: 1) Calculation SummaryThis calculation determines the reference leak rate in air based on the bounding leak rate for heliumprovided by Oconee Nuclear Station (OCS). Using the bounding helium leak rate from OCS, the amount ofhelium remaining within the DSC cavity after 100 years of storage in HSM is also evaluated.
: 2) Storage Media Description Secure network initially, then redundant tape backup.If original issue, is licensing review per TIP 3.5 required?
Yes El No X (explain below) Licensing Review No.:This calculation is performed to support an exemption request by Oconee Nuclear Station from therequirements of helium leak rate for 24PHB DSC as specified in Section 1.2.4a of Technical Specification for Amendment 9 to CoC 1004. Therefore, a licensing review per TIP 3.5 is not applicable.
Software utilized (subject to test requirements of TIP 3.3): Version:None N/ACalculation is complete Date:Originator Name and
-- ýva Guzeyev -. /Calculation has been checked for consistenicy, completeness, and correctness Date:Checker Name and Signature:
Venkata Venigalla Calculation is approved for useProject Engineer Name and Signature:
'in $ W Tom Edwards AAREVACalculation No. 13922-0402 Revision No. 0Calculation REVISION SUMMARYAffected AffectedRev. Date Description Pages Disks0 8/13/14 Initial issue All All Calculation No. 13922-0402 Revision No. 0AR EVA Calculation Page 3ofllTABLE OF CONTENTSPage1 .0 P U R P O S E ... ...........................................................................................................................................
42.0 CO NSERVATISM
..................................................................................................................................
43.0 ASSUM PTIO NS ....................................................................................................................................
54.0 DESIG N INPUT/DATA
..........................................................................................................................
64 .1 D e s ig n In p u t .................................................................................................................................
65.0 M ETHO DO LO GY ..................................................................................................................................
65 .1 A ir L e a k R a te ...............................................................................................................................
65.2 Am ount of Helium w ithin the 24PHB DSC ..............................................................................


==66.0 REFERENCES==
E-40451 CONTROLLED COPY E-181 Enclosure 2 A                        Fom3.-
Form 3.2-1 Calculation Cover Sheet Calculation No.
Revision No.
13922-0402 0
Page 1 of 11 A R EVA                            TIP 3.2 (Revision 6)
PROJECT NAME:          OcS            tation DCR NO (if applicable): NA                                                Oconee Nuclear Station PROJECT NO: 13922                                              CLIENT:    Duke Energy CALCULATION TITLE:
Helium Leak Rate Evaluation for 24PHB DSC


......................................................................................................................................
==SUMMARY==
87.0 NO M ENCLATURE
DESCRIPTION:
................................................................................................................................
: 1) Calculation Summary This calculation determines the reference leak rate in air based on the bounding leak rate for helium provided by Oconee Nuclear Station (OCS). Using the bounding helium leak rate from OCS, the amount of helium remaining within the DSC cavity after 100 years of storage in HSM is also evaluated.
88.0 CO M PUTATIO NS .................................................................................................................................
: 2) Storage Media Description Secure network initially, then redundant tape backup.
98.1 Reference Air Leak Rate .....................................................................................................
Iforiginal issue, is licensing review per TIP 3.5 required?
98.2 Am ount of Helium in the 24PHB DSC Cavity ...........................................................................
Yes El          No X (explain below)            Licensing Review No.:
99.0 RESULTS, CO NCLUSIO NS, AND RECO M M ENDATIO NS ...........................................................
This calculation is performed to support an exemption request by Oconee Nuclear Station from the requirements of helium leak rate for 24PHB DSC as specified in Section 1.2.4a of Technical Specification for Amendment 9 to CoC 1004. Therefore, a licensing review per TIP 3.5 is not applicable.
1010.0 LISTING O F CO M PUTER FILES .......................................................................................................
Software utilized (subject to test requirements of TIP 3.3):                                  Version:
1011.0 APPENDIX A .......................................................................................................................................
None                                                                                          N/A Calculation is complete                                                                      Date:
11LIST OF TABLESPageTable 1: Leakage from 24PHB DSC at 100 Years of Storage ..................................................................
Originator Name and Signatur*e.                   --                    ýva Guzeyev            -.       /
10Table 2: List of Spreadsheets
Calculation has been checked for consistenicy, completeness, and correctness                  Date:
.......................................................................................................................
Checker Name and Signature:                                            Venkata Venigalla Calculation is approved for use Project Engineer Name and Signature:      'in          $
10 Calculation No. 13922-0402 Revision No. 0A R EVA Calculation Page 4ofll1.0 PURPOSEOconee Nuclear Station (OCS) ISFSI utilizes 24PHB DSCs to store spent nuclear fuel. Each of the DSCsloaded at OCS undergoes a helium leak test to ensure that the leakage rate limit of lx1 0-7 ref cc/s specified in Section 1.2.4a of Technical Specification for 24PHB DSC [6.2] is satisfied.
                                                        *_}2v4*wz W          Tom Edwards
Since the leak rate specified in[6.2] is based on air, OCS uses an equivalent helium leak rate of 3.4x10-8 atm cc/s during the leak test [6.1,6.5].Further, for each leak test a correction factor depending on the ambient temperature is applied to themeasured leakage rate from the Helium Leak Detector to ensure that it remains below the equivalent heliumleak rate of 3.4x10.8 atm cc/s. However, for five DSCs noted in [6.4], the ambient temperature records at thetime of leak test could not be retrieved.
 
Therefore, to bound the temperature in the operating bay OCS isutilizing a conservative ambient temperature of 1050F. Using correction factor based on an ambienttemperature of 1050F the helium leak rate was determined to be 3.79 x 10.8 atm cc/s [6.4], which is higherthan the equivalent helium leak rate of 3.4x10-8 atm cc/s.Since the measured leak rate exceeds the leak rate specified in the Technical Specification for 24PHB DSCin Section 1.2.4a of [6.2], this calculation is performed to:a) Determine the reference leak rate in air using the bounding helium leak rate of 3.79x10-8 atm cc/s, sothat it can be compared directly to the leakage rate of lx1 0-7 ref. cc/s specified in Section 1.2.4a of theTechnical Specification for 24PHB DSC [6.2].b) Using the helium leak rate of 3.79x10-8atm cc/s, determine the leakage from the DSC and amount ofhelium remaining within the 24PHB DSC after 100 years of storage in HSM.2.0 CONSERVATISM The following conservatisms are considered in this evaluation:
Calculation No. 13922-0402 A                                        Revision No. 0 AREVA                      Calculation REVISION
 
==SUMMARY==
 
Affected        Affected Rev. Date                Description          Pages          Disks 0  8/13/14 Initial issue                    All            All
 
Calculation No.               13922-0402 0
Revision No.
AR EVA                                                  Calculation                                                                    Page        3ofll TABLE OF CONTENTS Page 1.0  P UR P O S E ... . .......................................................................................................................................... 4 2.0  CO NSERVATISM ..................................................................................................................................               4 3.0  ASSUM PTIO NS ....................................................................................................................................             5 4.0  DESIG N INPUT/DATA ..........................................................................................................................                 6 4 .1 De s ig n Inp u t .................................................................................................................................       6 5.0 METHO DO LO GY ..................................................................................................................................               6 5 .1 A ir Le a k R a te ...............................................................................................................................        6 5.2 Am ount of Helium w ithin the 24PHB DSC .............................................................................. 6
 
==6.0 REFERENCES==
......................................................................................................................................                8 7.0 NO MENCLATURE ................................................................................................................................                  8 8.0 CO MPUTATIO NS .................................................................................................................................                9 8.1 Reference Air Leak Rate ..................................................................................................... 9 8.2 Am ount of Helium in the 24PHB DSC Cavity ...........................................................................                                      9 9.0 RESULTS, CO NCLUSIO NS, AND RECO MMENDATIO NS ........................................................... 10 10.0 LISTING O F CO MPUTER FILES .......................................................................................................                            10 11.0 APPENDIX A .......................................................................................................................................            11 LIST OF TABLES Page Table 1: Leakage from 24PHB DSC at 100 Years of Storage .................................................................. 10 Table 2: List of Spreadsheets .......................................................................................................................              10
 
Calculation No. 13922-0402 0
Revision No.
A R EVA                                  Calculation                                    Page  4ofll 1.0      PURPOSE Oconee Nuclear Station (OCS) ISFSI utilizes 24PHB DSCs to store spent nuclear fuel. Each of the DSCs loaded at OCS undergoes a helium leak test to ensure that the leakage rate limit of lx1 0-7 ref cc/s specified in Section 1.2.4a of Technical Specification for 24PHB DSC [6.2] is satisfied. Since the leak rate specified in
[6.2] is based on air, OCS uses an equivalent helium leak rate of 3.4x10- 8 atm cc/s during the leak test [6.1, 6.5].
Further, for each leak test a correction factor depending on the ambient temperature is applied to the measured leakage rate from the Helium Leak Detector to ensure that it remains below the equivalent helium leak rate of 3.4x10.8 atm cc/s. However, for five DSCs noted in [6.4], the ambient temperature records at the time of leak test could not be retrieved. Therefore, to bound the temperature in the operating bay OCS is utilizing a conservative ambient temperature of 105 0 F. Using correction factor based on an ambient temperature of 105 0 F the helium leak rate was determined to be 3.79 x 10.8 atm cc/s [6.4], which is higher than the equivalent helium leak rate of 3.4x10-8 atm cc/s.
Since the measured leak rate exceeds the leak rate specified in the Technical Specification for 24PHB DSC in Section 1.2.4a of [6.2], this calculation is performed to:
a) Determine the reference leak rate in air using the bounding helium leak rate of 3.79x10-8 atm cc/s, so that it can be compared directly to the leakage rate of lx1 0-7 ref. cc/s specified in Section 1.2.4a of the Technical Specification for 24PHB DSC [6.2].
b) Using the helium leak rate of 3.79x10-8 atm cc/s, determine the leakage from the DSC and amount of helium remaining within the 24PHB DSC after 100 years of storage in HSM.
2.0     CONSERVATISM The following conservatisms are considered in this evaluation:
: 1. The leak rate from DSC is higher at the beginning of storage due to the higher DSC internal pressure.
: 1. The leak rate from DSC is higher at the beginning of storage due to the higher DSC internal pressure.
As the heat load drops with time, the DSC internal pressure is reduced and this in turn lowers the leakrate. However, the bounding leak rate measured at the beginning of the storage is used to determine the leakage over a period of 100 years storage.2. Currently the 24PHB DSCs are licensed for 20 years with a possibility for 40 years extension bringingthe total storage time to 60 years. However a storage time of 100 years is considered to conservatively bound leakage.3. The maximum heat load of 24 kW allowed for storage in the 24PHB DSC [6.2] is considered todetermine the amount of helium within the DSC cavity at the time of backfill.
As the heat load drops with time, the DSC internal pressure is reduced and this in turn lowers the leak rate. However, the bounding leak rate measured at the beginning of the storage is used to determine the leakage over a period of 100 years storage.
Using the maximum heatload provides the maximum average helium temperature in DSC cavity. This is conservative since ahigher temperature will results in lower amount of helium within the DSC as the backfill pressure isconstant at 2.5 psig.In determining the reference leak rate in air this calculation considers the same conservatisms as noted inSection 1 of [6.5].
: 2. Currently the 24PHB DSCs are licensed for 20 years with a possibility for 40 years extension bringing the total storage time to 60 years. However a storage time of 100 years is considered to conservatively bound leakage.
Calculation No. 13922-0402 Revision No. 0A R EVA Calculation Page 5ofll3.0 ASSUMPTIONS In determining the reference leak rate in air, this calculation considers the same assumptions as noted in[6.5]. Since the bounding helium leak rate of 3.79x1 0-8 atm cc/s from OCS is based on a 1050F ambienttemperature
: 3. The maximum heat load of 24 kW allowed for storage in the 24PHB DSC [6.2] is considered to determine the amount of helium within the DSC cavity at the time of backfill. Using the maximum heat load provides the maximum average helium temperature in DSC cavity. This is conservative since a higher temperature will results in lower amount of helium within the DSC as the backfill pressure is constant at 2.5 psig.
[6.4], it is assumed in this evaluation that the helium temperature is 1050F. This is acceptable since the helium temperature is in general above that of the ambient temperature.
In determining the reference leak rate in air this calculation considers the same conservatisms as noted in Section 1 of [6.5].
The following assumptions are also considered in calculating the helium leakage from 24PHB DSC:1. The 24PTH DSC is assumed to be backfilled with helium at a nominal pressure of 2.5 psig aftervacuum drying, as shown in Section 1.2.3a from [6.2] and [6.4].
 
Calculation No. 13922-0402 Revision No. 0A R EVA Calculation Page 6ofll4.0 DESIGN INPUT/DATA 4.1 Design InputThe following input is obtained from OCS [6.4].a. The bounding helium leak rate is 3.79x10-8 atm cc/s.b. The bounding ambient temperature at the time of helium leak test is 1050F.c. A nominal internal pressure of 2.5 psig is considered for the 24PHB DSCs at the time of backfilling.
Calculation No. 13922-0402 0
In addition to determine the amount of helium at the time of backfilling the following inputs are obtained from[6.6]:a. The free volume of the 24PHB DSC = 384,463 in3,b. The average temperature of the backfill  
Revision No.
= 449°F.The dynamic viscosity for air and helium is calculated using polynomial gas equations from [6.7].Maximum gas temperature after welding is 350°F [6.5].Mixture of 50% air and 50% helium is considered beneath the port covers in this calculation based on themethodology from [6.5].5.0 METHODOLOGY 5.1 Air Leak RateTo determine the reference air leak rate, i.e. the equivalent leak rate in air using the bounding helium leakrate of 3.79x1 08 atm cc/s this evaluation uses the methodology specified in Section 5 of [6.5]. However thisevaluation reverses the sequence of steps as listed below:1) The helium temperature of 1050F is used to evaluate the equivalent leakage hole diameter for boundinghelium leak rate.2) Using the equivalent leakage hole diameter calculated in Step "1", the leak rate in air is calculated usingthe equations listed in Section B.3 of ANSI N14.5 [6.3].5.2 Amount of Helium within the 24PHB DSCThe following steps are used to determine the amount of helium remaining in the DSC cavity after the 100years storage based on the bounding helium leak rate of 3.79x1 08 atm cc/s from OCS [6.4] and also usingthe equivalent helium leak rate of 3.4x1 0-8 atm cc/s corresponding to the Technical Specifications air leakrate limit of lx10-7 ref cc/s:1) Calculate the mass of helium at the beginning of the DSC storage for 2.5 psig backfill pressure.
A R EVA                                 Calculation                                   Page   5ofll 3.0     ASSUMPTIONS In determining the reference leak rate in air, this calculation considers the same assumptions as noted in
Calculation No. 13922-0402 Revision No. 0A R EVA Calculation Page 7 ofll2) Calculate the mass of the helium lost from DSC cavity after 100 years of storage using the boundinghelium leak rate of 3.79x1 0-8 atm cc/s from OCS [6.4].3) Calculate the mass of the helium lost from DSC cavity at 100 years of storage using the equivalent heliumleak rate of 3.4x10.8 atm cc/s corresponding to the acceptance limit of lx1i07 ref cc/s specified in Section1.2.4a of the Technical Specification for 24PHB DSC [6.2].4) Calculate and compare total mass of helium in DSC cavity for the leakage determined in Step 2 and 3.
[6.5]. Since the bounding helium leak rate of 3.79x1 0-8 atm cc/s from OCS is based on a 105 0 F ambient temperature [6.4], it is assumed in this evaluation that the helium temperature is 105 0 F. This is acceptable since the helium temperature is in general above that of the ambient temperature.
Calculation No. 13922-0402 Revision No. 0A R EVA Calculation Page 8ofll
The following assumptions are also considered in calculating the helium leakage from 24PHB DSC:
: 1. The 24PTH DSC is assumed to be backfilled with helium at a nominal pressure of 2.5 psig after vacuum drying, as shown in Section 1.2.3a from [6.2] and [6.4].
 
Calculation No. 13922-0402 0
Revision No.
A R EVA                                 Calculation                                   Page 6ofll 4.0     DESIGN INPUT/DATA 4.1     Design Input The following input is obtained from OCS [6.4].
: a. The bounding helium leak rate is 3.79x10-8 atm cc/s.
: b. The bounding ambient temperature at the time of helium leak test is 105 0F.
: c. A nominal internal pressure of 2.5 psig is considered for the 24PHB DSCs at the time of backfilling.
In addition to determine the amount of helium at the time of backfilling the following inputs are obtained from
[6.6]:
: a. The free volume of the 24PHB DSC = 384,463 in3,
: b. The average temperature of the backfill = 449°F.
The dynamic viscosity for air and helium is calculated using polynomial gas equations from [6.7].
Maximum gas temperature after welding is 350°F [6.5].
Mixture of 50% air and 50% helium is considered beneath the port covers in this calculation based on the methodology from [6.5].
5.0     METHODOLOGY 5.1     Air Leak Rate To determine the reference air leak rate, i.e. the equivalent leak rate in air using the bounding helium leak rate of 3.79x1 08 atm cc/s this evaluation uses the methodology specified in Section 5 of [6.5]. However this evaluation reverses the sequence of steps as listed below:
: 1) The helium temperature of 105 0F is used to evaluate the equivalent leakage hole diameter for bounding helium leak rate.
: 2) Using the equivalent leakage hole diameter calculated in Step "1", the leak rate in air is calculated using the equations listed in Section B.3 of ANSI N14.5 [6.3].
5.2     Amount of Helium within the 24PHB DSC The following steps are used to determine the amount of helium remaining in the DSC cavity after the 100 years storage based on the bounding helium leak rate of 3.79x1 08 atm cc/s from OCS [6.4] and also using the equivalent helium leak rate of 3.4x1 0-8 atm cc/s corresponding to the Technical Specifications air leak rate limit of lx10-7 ref cc/s:
: 1) Calculate the mass of helium at the beginning of the DSC storage for 2.5 psig backfill pressure.
 
Calculation No. 13922-0402 0
Revision No.
A R EVA                                 Calculation                                 Page   7 ofll
: 2) Calculate the mass of the helium lost from DSC cavity after 100 years of storage using the bounding helium leak rate of 3.79x1 0-8 atm cc/s from OCS [6.4].
: 3) Calculate the mass of the helium lost from DSC cavity at 100 years of storage using the equivalent helium leak rate of 3.4x10.8 atm cc/s corresponding to the acceptance limit of lx1i07 ref cc/s specified in Section 1.2.4a of the Technical Specification for 24PHB DSC [6.2].
: 4) Calculate and compare total mass of helium in DSC cavity for the leakage determined in Step 2 and 3.
 
Calculation No. 13922-0402 0
Revision No.
A R EVA                               Calculation                                 Page 8ofll
 
==6.0    REFERENCES==
 
6.1. TN Document, "Acceptance Criteria for Leak Testing at Canister Closure," No. E-31157, July Ist, 2011.
6.2. TN Technical Specification, "Standardized NUHOMS Horizontal Modular Storage System. Certificate of Compliance No. 1004, Amendment 9," Docket 72-1004.
6.3. ANSI N14.5, "American National Standard for Radioactive Materials - Leakage Tests on Packages for Shipment," Revision of ANSI N14.5-1997, February, 1998.
6.4. Letter from Oconee Nuclear Station. See Appendix A.
6.5. TN Calculation, "Helium Leak Testing Vent & Siphon Ports for Leak Tight NUHOMS DSC's," 1098-8 Rev.3.
6.6. TN Calculation, "24P Internal Pressure Calculation with B&W 15x15 55 GWD/MTU Burn-Up," NUH-HBU.0402 Rev.0.
6.7. Roshenow, W. M., J. P. Hartnett, and Y. I. Cho, Handbook of Heat Transfer,3 rd Edition, 1998.
7.0    NOMENCLATURE DSC - Dry Shielded Canister HSM - Horizontal Storage Module Other nomenclatures used in the equations are specifically listed with the equations.
 
Calculation No. 13922-0402 0
Revision No.
A R EVA                                          Calculation                                  Page  9ofll 8.0        COMPUTATIONS 8.1        Reference Air Leak Rate The steps described in Section 5.1 are used to determine the reference air leak rate i.e. the equivalent leak rate in air using the bounding helium leak rate of 3.79x10-8 atm cc/s. Based on the step 1 of Section 5.1 the equivalent hole size is determined as 1.342x1 0-4 cm. Using this equivalent hole size, the reference leak rate is calculated as noted in step 2 of Section 5.1. The reference air leak rate is 1.02x10 7 ref cc/s. The computations for the reference leak rate are captured in excel spreadsheet "24PHBLeakage.xls".
8.2      Amount of Helium in the 24PHB DSC Cavity The initial mass of helium in the DSC cavity for nominal internal pressure of 2.5 psig at the beginning of storage is:
minit =  Pint " VDSC cavity" M I (R. Tbaclkfil) where minit                                            - is mass of helium at the time of backfill, Ibm, Pinit = 2.5 psig =17.2 psia                      - is initial backfill pressure, VDsccjty = 384,463 in3 = 222.49 ft 3 - is free volume in 24PHB DSC cavity from Section 3.1.2 of [6.6],
Tbackfll = 449°F = 909'R                          - is average backfill helium temperature for 24PHB DSC from Section 3.1.2 of [6.6].
The volume of helium lost due to leakage is Vhe = Lu he't , ft*,
where Vhe      - volume of helium lost, ft3 ,
t        - time for leakage, seconds, Luhe    -helium leakage rate, cm 3/s.
Mass of helium lost from DSC cavity due to leakage is mleakage 100yrs = Pstd - Vu he"    M / (R
* TStd) where mleakage 1OOyrs                - is mass of helium lost due to leakage, Ibm, Pstd =14.7 psia                - is atmospheric pressure, R = 1545 ft'lbf/(Ibmr°R) - is gas constant.
Total mass of helium in DSC cavity after 100 year of storage is mHe_100 = minit - mleakage l0Oyrs.
The spreadsheet "24PHBLeakage.xls" includes calculation to determine the helium in the 24PHB DSC cavity, presents the amount of helium lost due to the standard and bounding leak rates specified in Section 5.2.


==6.0 REFERENCES==
Calculation No.          13922-0402 0
Revision No.
A R EVA                                          Calculation                                                        Page    10ofll 9.0    RESULTS, CONCLUSIONS, AND RECOMMENDATIONS As seen from Table 1, the amount of helium leakage from 24PHB DSC cavity in 100 years is insignificant for the bounding helium leak rate of 3.79x10-8 atm cc/s listed in OCS letter [6.4]. Further, a comparison of this conservative bounding leak rate to the helium leak rate from the Technical Specification [6.2] shows the difference in leakage is negligible. Therefore, there is no impact on maintaining an inert helium atmosphere within the 24PHB DSCs.
Table 1: Leakage from 24PHB DSC at 100 Years of Storage Leak Rate                                                                        Tech Spec                Bounding Leak Rate                Leak Rate Leak rate in air, cmG/s                                                              1.0e-07                  1.02e-07 Leak rate in helium, cm 3/s                                                        3.40e-08                  3.79e-08 Leaking hole diameter, cm                                                          1.334e-04                1.342e-04 Backfill helium in DSC cavity, Ibm                                                      1.57                    1.57 Helium mass lost from DSC cavity after 100 years, Ibm                              3.87e-05                4.31e-05 Helium mass in DSC cavity after 100 years, Ibm                                        1.57(1)                  1.57(1)
Note 1: The difference in the mass using the two different leak rates is not within the significant digits.
10.0 LISTING OF COMPUTER FILES Table 2 presents the spreadsheet used to compute the leakage from 24PHB DSC in this calculation.
Table 2: List of Spreadsheets File Name                                Date & Time                                          Description Spreadsheet to calculate leak rate for 08/8/2014 5:51 PM EST                standard and bounding conditions, calculate 24PHB_Leakage.xls                                                            mass of helium in DSC cavity after backfill, volume and mass of helium leakage from 24PHB DSC cavity after 100 years storage.


6.1. TN Document, "Acceptance Criteria for Leak Testing at Canister Closure,"
Calculation No.       13922-0402 0
No. E-31157, July Ist, 2011.6.2. TN Technical Specification, "Standardized NUHOMS Horizontal Modular Storage System. Certificate of Compliance No. 1004, Amendment 9," Docket 72-1004.6.3. ANSI N14.5, "American National Standard for Radioactive Materials
Revision No.
-Leakage Tests on Packages forShipment,"
AR EVA                                       Calculation                                           Page     11of11 11.0 APPENDIX A August 6, 2014 To:               Tom Edwards
Revision of ANSI N14.5-1997,
: February, 1998.6.4. Letter from Oconee Nuclear Station.
See Appendix A.6.5. TN Calculation, "Helium Leak Testing Vent & Siphon Ports for Leak Tight NUHOMS DSC's," 1098-8Rev.3.6.6. TN Calculation, "24P Internal Pressure Calculation with B&W 15x15 55 GWD/MTU Burn-Up,"
NUH-HBU.0402 Rev.0.6.7. Roshenow, W. M., J. P. Hartnett, and Y. I. Cho, Handbook of Heat Transfer, 3rd Edition, 1998.7.0 NOMENCLATURE DSC -Dry Shielded CanisterHSM -Horizontal Storage ModuleOther nomenclatures used in the equations are specifically listed with the equations.
Calculation No. 13922-0402 Revision No. 0A R EVA Calculation Page 9ofll8.0 COMPUTATIONS 8.1 Reference Air Leak RateThe steps described in Section 5.1 are used to determine the reference air leak rate i.e. the equivalent leakrate in air using the bounding helium leak rate of 3.79x10-8 atm cc/s. Based on the step 1 of Section 5.1 theequivalent hole size is determined as 1.342x1 0-4 cm. Using this equivalent hole size, the reference leak rateis calculated as noted in step 2 of Section 5.1. The reference air leak rate is 1.02x107 ref cc/s. Thecomputations for the reference leak rate are captured in excel spreadsheet "24PHBLeakage.xls".
8.2 Amount of Helium in the 24PHB DSC CavityThe initial mass of helium in the DSC cavity for nominal internal pressure of 2.5 psig at the beginning ofstorage is:minit = Pint " VDSC cavity" M I (R. Tbaclkfil) whereminit -is mass of helium at the time of backfill, Ibm,Pinit = 2.5 psig =17.2 psia -is initial backfill
: pressure, VDsccjty
= 384,463 in3 = 222.49 ft3 -is free volume in 24PHB DSC cavity from Section 3.1.2 of [6.6],Tbackfll
= 449°F = 909'R -is average backfill helium temperature for 24PHB DSC fromSection 3.1.2 of [6.6].The volume of helium lost due to leakage isVhe = Lu he't , whereVhe -volume of helium lost, ft3,t -time for leakage, seconds,Luhe -helium leakage rate, cm3/s.Mass of helium lost from DSC cavity due to leakage ismleakage 100yrs = Pstd -Vu he" M / (R
* TStd)wheremleakage 1OOyrs -is mass of helium lost due to leakage, Ibm,Pstd =14.7 psia -is atmospheric
: pressure, R = 1545 ft'lbf/(Ibmr°R)
-is gas constant.
Total mass of helium in DSC cavity after 100 year of storage ismHe_100 = minit -mleakage l0Oyrs.The spreadsheet "24PHBLeakage.xls" includes calculation to determine the helium in the 24PHB DSCcavity, presents the amount of helium lost due to the standard and bounding leak rates specified in Section5.2.
Calculation No. 13922-0402 Revision No. 0A R EVA Calculation Page 10ofll9.0 RESULTS, CONCLUSIONS, AND RECOMMENDATIONS As seen from Table 1, the amount of helium leakage from 24PHB DSC cavity in 100 years is insignificant forthe bounding helium leak rate of 3.79x10-8 atm cc/s listed in OCS letter [6.4]. Further, a comparison of thisconservative bounding leak rate to the helium leak rate from the Technical Specification
[6.2] shows thedifference in leakage is negligible.
Therefore, there is no impact on maintaining an inert helium atmosphere within the 24PHB DSCs.Table 1: Leakage from 24PHB DSC at 100 Years of StorageLeak Rate Tech Spec BoundingLeak Rate Leak RateLeak rate in air, cmG/s 1.0e-07 1.02e-07Leak rate in helium, cm3/s 3.40e-08 3.79e-08Leaking hole diameter, cm 1.334e-04 1.342e-04 Backfill helium in DSC cavity, Ibm 1.57 1.57Helium mass lost from DSC cavity after 100 years, Ibm 3.87e-05 4.31e-05Helium mass in DSC cavity after 100 years, Ibm 1.57(1) 1.57(1)Note 1: The difference in the mass using the two different leak rates is not within the significant digits.10.0 LISTING OF COMPUTER FILESTable 2 presents the spreadsheet used to compute the leakage from 24PHB DSC in this calculation.
Table 2: List of Spreadsheets File Name Date & Time Description Spreadsheet to calculate leak rate for08/8/2014 5:51 PM EST standard and bounding conditions, calculate 24PHB_Leakage.xls mass of helium in DSC cavity after backfill, volume and mass of helium leakage from24PHB DSC cavity after 100 years storage.
Calculation No. 13922-0402 Revision No. 0AR EVA Calculation Page 11of1111.0 APPENDIX AAugust 6, 2014To: Tom Edwards


==Subject:==
==Subject:==
 
He Leak Rate Dry Shielded Canisters 93,94,100,105,106 Oconee performed leak rate verification in accordance with CoC 1004 for 24PHB canisters, The leak standard was verified at 23°C. A correction must be applied for any measurement made not at that temperature. The correction made was 3%/=C and should have been 4%/°C. Since the paper work cannot be found documenting the ambient temperature at which the He leak rate verification was performed, a bounding leak rate limit is desired. If the ambient temperature of the measurement was assumed to be 40.55C (105F) for what is realistically the worst case temperature it could have been, a new leak rate limit may be calculated.
He Leak RateDry Shielded Canisters 93,94,100,105,106 Oconee performed leak rate verification in accordance with CoC 1004 for 24PHB canisters, The leakstandard was verified at 23°C. A correction must be applied for any measurement made not at thattemperature.
That would be (40.SS - 23) = 17.SSC correction required.
The correction made was 3%/=C and should have been 4%/°C. Since the paper workcannot be found documenting the ambient temperature at which the He leak rate verification wasperformed, a bounding leak rate limit is desired.
If the ambient temperature of the measurement wasassumed to be 40.55C (105F) for what is realistically the worst case temperature it could have been, anew leak rate limit may be calculated.
That would be (40.SS -23) = 17.SSC correction required.
17.55
17.55
* 0.03 = 0.5265So back out the 3%/OC correction 3.4E-8/1.5265  
* 0.03 = 0.5265 So back out the 3%/OC correction           3.4E-8/1.5265 = 2.23E-8 Determine the 4%/°C correction 17.55
= 2.23E-8Determine the 4%/°C correction 17.55
* 0.04 = 0.702 And put in 4%/°C correction                 2.23E-8*1.702 = 3.79E-8 Then, to determine a revised leak rate limit, the ratio of these values is determined as follows:
* 0.04 = 0.702And put in 4%/°C correction 2.23E-8*1.702  
3.78E-8/2.23E-8 x 1.OE-7       1.7E-7 Can this ratio be applied to the corresponding value stated in the Technical Specifications (1.OE-7 ref cc/s) creating a new limit of 1.7E-7 re cc/s?
= 3.79E-8Then, to determine a revised leak rate limit, the ratio of these values is determined as follows:3.78E-8/2.23E-8 x 1.OE-7 1.7E-7Can this ratio be applied to the corresponding value stated in the Technical Specifications (1.OE-7 refcc/s) creating a new limit of 1.7E-7 re cc/s?If this is the allowed new Technical Specification limit and an initial He pressure of 2.5 psig is assumed,would the leakage analysis demonstrate that an inert atmosphere will be maintained within the caskduring the storage lifetime?
If this is the allowed new Technical Specification limit and an initial He pressure of 2.5 psig is assumed, would the leakage analysis demonstrate that an inert atmosphere will be maintained within the cask during the storage lifetime?
Steve PerreroReactor Engineering 864 873 3278}}
Steve Perrero Reactor Engineering 864 873 3278}}

Latest revision as of 19:37, 31 October 2019

Calculation 13922-0402, Revision 0, Helium Leak Rate Evaluation for 24PHB Dsc.
ML14346A009
Person / Time
Site: Oconee, 07200040  Duke Energy icon.png
Issue date: 08/13/2014
From: Guzeyev S
AREVA
To:
Office of Nuclear Material Safety and Safeguards
References
13922-0402, Rev 0
Download: ML14346A009 (12)


Text

ENCLOSURE 2 Calculation Number 13922-0402, Revision 0, Helium Leak Rate Evaluation for 24PHB DSC

E-40451 CONTROLLED COPY E-181 Enclosure 2 A Fom3.-

Form 3.2-1 Calculation Cover Sheet Calculation No.

Revision No.

13922-0402 0

Page 1 of 11 A R EVA TIP 3.2 (Revision 6)

PROJECT NAME: OcS tation DCR NO (if applicable): NA Oconee Nuclear Station PROJECT NO: 13922 CLIENT: Duke Energy CALCULATION TITLE:

Helium Leak Rate Evaluation for 24PHB DSC

SUMMARY

DESCRIPTION:

1) Calculation Summary This calculation determines the reference leak rate in air based on the bounding leak rate for helium provided by Oconee Nuclear Station (OCS). Using the bounding helium leak rate from OCS, the amount of helium remaining within the DSC cavity after 100 years of storage in HSM is also evaluated.
2) Storage Media Description Secure network initially, then redundant tape backup.

Iforiginal issue, is licensing review per TIP 3.5 required?

Yes El No X (explain below) Licensing Review No.:

This calculation is performed to support an exemption request by Oconee Nuclear Station from the requirements of helium leak rate for 24PHB DSC as specified in Section 1.2.4a of Technical Specification for Amendment 9 to CoC 1004. Therefore, a licensing review per TIP 3.5 is not applicable.

Software utilized (subject to test requirements of TIP 3.3): Version:

None N/A Calculation is complete Date:

Originator Name and Signatur*e. -- ýva Guzeyev -. /

Calculation has been checked for consistenicy, completeness, and correctness Date:

Checker Name and Signature: Venkata Venigalla Calculation is approved for use Project Engineer Name and Signature: 'in $

  • _}2v4*wz W Tom Edwards

Calculation No. 13922-0402 A Revision No. 0 AREVA Calculation REVISION

SUMMARY

Affected Affected Rev. Date Description Pages Disks 0 8/13/14 Initial issue All All

Calculation No. 13922-0402 0

Revision No.

AR EVA Calculation Page 3ofll TABLE OF CONTENTS Page 1.0 P UR P O S E ... . .......................................................................................................................................... 4 2.0 CO NSERVATISM .................................................................................................................................. 4 3.0 ASSUM PTIO NS .................................................................................................................................... 5 4.0 DESIG N INPUT/DATA .......................................................................................................................... 6 4 .1 De s ig n Inp u t ................................................................................................................................. 6 5.0 METHO DO LO GY .................................................................................................................................. 6 5 .1 A ir Le a k R a te ............................................................................................................................... 6 5.2 Am ount of Helium w ithin the 24PHB DSC .............................................................................. 6

6.0 REFERENCES

...................................................................................................................................... 8 7.0 NO MENCLATURE ................................................................................................................................ 8 8.0 CO MPUTATIO NS ................................................................................................................................. 9 8.1 Reference Air Leak Rate ..................................................................................................... 9 8.2 Am ount of Helium in the 24PHB DSC Cavity ........................................................................... 9 9.0 RESULTS, CO NCLUSIO NS, AND RECO MMENDATIO NS ........................................................... 10 10.0 LISTING O F CO MPUTER FILES ....................................................................................................... 10 11.0 APPENDIX A ....................................................................................................................................... 11 LIST OF TABLES Page Table 1: Leakage from 24PHB DSC at 100 Years of Storage .................................................................. 10 Table 2: List of Spreadsheets ....................................................................................................................... 10

Calculation No. 13922-0402 0

Revision No.

A R EVA Calculation Page 4ofll 1.0 PURPOSE Oconee Nuclear Station (OCS) ISFSI utilizes 24PHB DSCs to store spent nuclear fuel. Each of the DSCs loaded at OCS undergoes a helium leak test to ensure that the leakage rate limit of lx1 0-7 ref cc/s specified in Section 1.2.4a of Technical Specification for 24PHB DSC [6.2] is satisfied. Since the leak rate specified in

[6.2] is based on air, OCS uses an equivalent helium leak rate of 3.4x10- 8 atm cc/s during the leak test [6.1, 6.5].

Further, for each leak test a correction factor depending on the ambient temperature is applied to the measured leakage rate from the Helium Leak Detector to ensure that it remains below the equivalent helium leak rate of 3.4x10.8 atm cc/s. However, for five DSCs noted in [6.4], the ambient temperature records at the time of leak test could not be retrieved. Therefore, to bound the temperature in the operating bay OCS is utilizing a conservative ambient temperature of 105 0 F. Using correction factor based on an ambient temperature of 105 0 F the helium leak rate was determined to be 3.79 x 10.8 atm cc/s [6.4], which is higher than the equivalent helium leak rate of 3.4x10-8 atm cc/s.

Since the measured leak rate exceeds the leak rate specified in the Technical Specification for 24PHB DSC in Section 1.2.4a of [6.2], this calculation is performed to:

a) Determine the reference leak rate in air using the bounding helium leak rate of 3.79x10-8 atm cc/s, so that it can be compared directly to the leakage rate of lx1 0-7 ref. cc/s specified in Section 1.2.4a of the Technical Specification for 24PHB DSC [6.2].

b) Using the helium leak rate of 3.79x10-8 atm cc/s, determine the leakage from the DSC and amount of helium remaining within the 24PHB DSC after 100 years of storage in HSM.

2.0 CONSERVATISM The following conservatisms are considered in this evaluation:

1. The leak rate from DSC is higher at the beginning of storage due to the higher DSC internal pressure.

As the heat load drops with time, the DSC internal pressure is reduced and this in turn lowers the leak rate. However, the bounding leak rate measured at the beginning of the storage is used to determine the leakage over a period of 100 years storage.

2. Currently the 24PHB DSCs are licensed for 20 years with a possibility for 40 years extension bringing the total storage time to 60 years. However a storage time of 100 years is considered to conservatively bound leakage.
3. The maximum heat load of 24 kW allowed for storage in the 24PHB DSC [6.2] is considered to determine the amount of helium within the DSC cavity at the time of backfill. Using the maximum heat load provides the maximum average helium temperature in DSC cavity. This is conservative since a higher temperature will results in lower amount of helium within the DSC as the backfill pressure is constant at 2.5 psig.

In determining the reference leak rate in air this calculation considers the same conservatisms as noted in Section 1 of [6.5].

Calculation No. 13922-0402 0

Revision No.

A R EVA Calculation Page 5ofll 3.0 ASSUMPTIONS In determining the reference leak rate in air, this calculation considers the same assumptions as noted in

[6.5]. Since the bounding helium leak rate of 3.79x1 0-8 atm cc/s from OCS is based on a 105 0 F ambient temperature [6.4], it is assumed in this evaluation that the helium temperature is 105 0 F. This is acceptable since the helium temperature is in general above that of the ambient temperature.

The following assumptions are also considered in calculating the helium leakage from 24PHB DSC:

1. The 24PTH DSC is assumed to be backfilled with helium at a nominal pressure of 2.5 psig after vacuum drying, as shown in Section 1.2.3a from [6.2] and [6.4].

Calculation No. 13922-0402 0

Revision No.

A R EVA Calculation Page 6ofll 4.0 DESIGN INPUT/DATA 4.1 Design Input The following input is obtained from OCS [6.4].

a. The bounding helium leak rate is 3.79x10-8 atm cc/s.
b. The bounding ambient temperature at the time of helium leak test is 105 0F.
c. A nominal internal pressure of 2.5 psig is considered for the 24PHB DSCs at the time of backfilling.

In addition to determine the amount of helium at the time of backfilling the following inputs are obtained from

[6.6]:

a. The free volume of the 24PHB DSC = 384,463 in3,
b. The average temperature of the backfill = 449°F.

The dynamic viscosity for air and helium is calculated using polynomial gas equations from [6.7].

Maximum gas temperature after welding is 350°F [6.5].

Mixture of 50% air and 50% helium is considered beneath the port covers in this calculation based on the methodology from [6.5].

5.0 METHODOLOGY 5.1 Air Leak Rate To determine the reference air leak rate, i.e. the equivalent leak rate in air using the bounding helium leak rate of 3.79x1 08 atm cc/s this evaluation uses the methodology specified in Section 5 of [6.5]. However this evaluation reverses the sequence of steps as listed below:

1) The helium temperature of 105 0F is used to evaluate the equivalent leakage hole diameter for bounding helium leak rate.
2) Using the equivalent leakage hole diameter calculated in Step "1", the leak rate in air is calculated using the equations listed in Section B.3 of ANSI N14.5 [6.3].

5.2 Amount of Helium within the 24PHB DSC The following steps are used to determine the amount of helium remaining in the DSC cavity after the 100 years storage based on the bounding helium leak rate of 3.79x1 08 atm cc/s from OCS [6.4] and also using the equivalent helium leak rate of 3.4x1 0-8 atm cc/s corresponding to the Technical Specifications air leak rate limit of lx10-7 ref cc/s:

1) Calculate the mass of helium at the beginning of the DSC storage for 2.5 psig backfill pressure.

Calculation No. 13922-0402 0

Revision No.

A R EVA Calculation Page 7 ofll

2) Calculate the mass of the helium lost from DSC cavity after 100 years of storage using the bounding helium leak rate of 3.79x1 0-8 atm cc/s from OCS [6.4].
3) Calculate the mass of the helium lost from DSC cavity at 100 years of storage using the equivalent helium leak rate of 3.4x10.8 atm cc/s corresponding to the acceptance limit of lx1i07 ref cc/s specified in Section 1.2.4a of the Technical Specification for 24PHB DSC [6.2].
4) Calculate and compare total mass of helium in DSC cavity for the leakage determined in Step 2 and 3.

Calculation No. 13922-0402 0

Revision No.

A R EVA Calculation Page 8ofll

6.0 REFERENCES

6.1. TN Document, "Acceptance Criteria for Leak Testing at Canister Closure," No. E-31157, July Ist, 2011.

6.2. TN Technical Specification, "Standardized NUHOMS Horizontal Modular Storage System. Certificate of Compliance No. 1004, Amendment 9," Docket 72-1004.

6.3. ANSI N14.5, "American National Standard for Radioactive Materials - Leakage Tests on Packages for Shipment," Revision of ANSI N14.5-1997, February, 1998.

6.4. Letter from Oconee Nuclear Station. See Appendix A.

6.5. TN Calculation, "Helium Leak Testing Vent & Siphon Ports for Leak Tight NUHOMS DSC's," 1098-8 Rev.3.

6.6. TN Calculation, "24P Internal Pressure Calculation with B&W 15x15 55 GWD/MTU Burn-Up," NUH-HBU.0402 Rev.0.

6.7. Roshenow, W. M., J. P. Hartnett, and Y. I. Cho, Handbook of Heat Transfer,3 rd Edition, 1998.

7.0 NOMENCLATURE DSC - Dry Shielded Canister HSM - Horizontal Storage Module Other nomenclatures used in the equations are specifically listed with the equations.

Calculation No. 13922-0402 0

Revision No.

A R EVA Calculation Page 9ofll 8.0 COMPUTATIONS 8.1 Reference Air Leak Rate The steps described in Section 5.1 are used to determine the reference air leak rate i.e. the equivalent leak rate in air using the bounding helium leak rate of 3.79x10-8 atm cc/s. Based on the step 1 of Section 5.1 the equivalent hole size is determined as 1.342x1 0-4 cm. Using this equivalent hole size, the reference leak rate is calculated as noted in step 2 of Section 5.1. The reference air leak rate is 1.02x10 7 ref cc/s. The computations for the reference leak rate are captured in excel spreadsheet "24PHBLeakage.xls".

8.2 Amount of Helium in the 24PHB DSC Cavity The initial mass of helium in the DSC cavity for nominal internal pressure of 2.5 psig at the beginning of storage is:

minit = Pint " VDSC cavity" M I (R. Tbaclkfil) where minit - is mass of helium at the time of backfill, Ibm, Pinit = 2.5 psig =17.2 psia - is initial backfill pressure, VDsccjty = 384,463 in3 = 222.49 ft 3 - is free volume in 24PHB DSC cavity from Section 3.1.2 of [6.6],

Tbackfll = 449°F = 909'R - is average backfill helium temperature for 24PHB DSC from Section 3.1.2 of [6.6].

The volume of helium lost due to leakage is Vhe = Lu he't , ft*,

where Vhe - volume of helium lost, ft3 ,

t - time for leakage, seconds, Luhe -helium leakage rate, cm 3/s.

Mass of helium lost from DSC cavity due to leakage is mleakage 100yrs = Pstd - Vu he" M / (R

  • TStd) where mleakage 1OOyrs - is mass of helium lost due to leakage, Ibm, Pstd =14.7 psia - is atmospheric pressure, R = 1545 ft'lbf/(Ibmr°R) - is gas constant.

Total mass of helium in DSC cavity after 100 year of storage is mHe_100 = minit - mleakage l0Oyrs.

The spreadsheet "24PHBLeakage.xls" includes calculation to determine the helium in the 24PHB DSC cavity, presents the amount of helium lost due to the standard and bounding leak rates specified in Section 5.2.

Calculation No. 13922-0402 0

Revision No.

A R EVA Calculation Page 10ofll 9.0 RESULTS, CONCLUSIONS, AND RECOMMENDATIONS As seen from Table 1, the amount of helium leakage from 24PHB DSC cavity in 100 years is insignificant for the bounding helium leak rate of 3.79x10-8 atm cc/s listed in OCS letter [6.4]. Further, a comparison of this conservative bounding leak rate to the helium leak rate from the Technical Specification [6.2] shows the difference in leakage is negligible. Therefore, there is no impact on maintaining an inert helium atmosphere within the 24PHB DSCs.

Table 1: Leakage from 24PHB DSC at 100 Years of Storage Leak Rate Tech Spec Bounding Leak Rate Leak Rate Leak rate in air, cmG/s 1.0e-07 1.02e-07 Leak rate in helium, cm 3/s 3.40e-08 3.79e-08 Leaking hole diameter, cm 1.334e-04 1.342e-04 Backfill helium in DSC cavity, Ibm 1.57 1.57 Helium mass lost from DSC cavity after 100 years, Ibm 3.87e-05 4.31e-05 Helium mass in DSC cavity after 100 years, Ibm 1.57(1) 1.57(1)

Note 1: The difference in the mass using the two different leak rates is not within the significant digits.

10.0 LISTING OF COMPUTER FILES Table 2 presents the spreadsheet used to compute the leakage from 24PHB DSC in this calculation.

Table 2: List of Spreadsheets File Name Date & Time Description Spreadsheet to calculate leak rate for 08/8/2014 5:51 PM EST standard and bounding conditions, calculate 24PHB_Leakage.xls mass of helium in DSC cavity after backfill, volume and mass of helium leakage from 24PHB DSC cavity after 100 years storage.

Calculation No. 13922-0402 0

Revision No.

AR EVA Calculation Page 11of11 11.0 APPENDIX A August 6, 2014 To: Tom Edwards

Subject:

He Leak Rate Dry Shielded Canisters 93,94,100,105,106 Oconee performed leak rate verification in accordance with CoC 1004 for 24PHB canisters, The leak standard was verified at 23°C. A correction must be applied for any measurement made not at that temperature. The correction made was 3%/=C and should have been 4%/°C. Since the paper work cannot be found documenting the ambient temperature at which the He leak rate verification was performed, a bounding leak rate limit is desired. If the ambient temperature of the measurement was assumed to be 40.55C (105F) for what is realistically the worst case temperature it could have been, a new leak rate limit may be calculated.

That would be (40.SS - 23) = 17.SSC correction required.

17.55

  • 0.03 = 0.5265 So back out the 3%/OC correction 3.4E-8/1.5265 = 2.23E-8 Determine the 4%/°C correction 17.55
  • 0.04 = 0.702 And put in 4%/°C correction 2.23E-8*1.702 = 3.79E-8 Then, to determine a revised leak rate limit, the ratio of these values is determined as follows:

3.78E-8/2.23E-8 x 1.OE-7 1.7E-7 Can this ratio be applied to the corresponding value stated in the Technical Specifications (1.OE-7 ref cc/s) creating a new limit of 1.7E-7 re cc/s?

If this is the allowed new Technical Specification limit and an initial He pressure of 2.5 psig is assumed, would the leakage analysis demonstrate that an inert atmosphere will be maintained within the cask during the storage lifetime?

Steve Perrero Reactor Engineering 864 873 3278