ML14358A073: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 12/24/2014
| issue date = 12/24/2014
| title = Request for Additional Information for License Amendment Request 13-05. Fixed Incore Detector System Analysis Methodology
| title = Request for Additional Information for License Amendment Request 13-05. Fixed Incore Detector System Analysis Methodology
| author name = Lamb J G
| author name = Lamb J
| author affiliation = NRC/NRR/DORL/LPLI-2
| author affiliation = NRC/NRR/DORL/LPLI-2
| addressee name = Curtland D A
| addressee name = Curtland D
| addressee affiliation = NextEra Energy Seabrook, LLC
| addressee affiliation = NextEra Energy Seabrook, LLC
| docket = 05000443
| docket = 05000443
| license number = NPF-086
| license number = NPF-086
| contact person = Lamb J G
| contact person = Lamb J
| case reference number = TAC MF2751
| case reference number = TAC MF2751
| document type = Letter, Request for Additional Information (RAI)
| document type = Letter, Request for Additional Information (RAI)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 24, 2014 Mr. Dean Curtland, Site Vice President c/o Michael Ossing Seabrook Station NextEra Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 24, 2014 Mr. Dean Curtland, Site Vice President c/o Michael Ossing Seabrook Station NextEra Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874


==SUBJECT:==
==SUBJECT:==
SEABROOK STATION, UNIT NO. 1 -REQUEST FOR ADDITIONAL INFORMATION FOR LICENSE AMENDMENT REQUEST 13-05, "FIXED INCORE DETECTOR SYSTEM ANALYSIS METHODOLOGY" (TAC NO. MF2751)  
SEABROOK STATION, UNIT NO. 1 -REQUEST FOR ADDITIONAL INFORMATION FOR LICENSE AMENDMENT REQUEST 13-05, "FIXED INCORE DETECTOR SYSTEM ANALYSIS METHODOLOGY" (TAC NO. MF2751)


==Dear Mr. Curtland:==
==Dear Mr. Curtland:==


By letter dated September 10, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 13260A 160), as supplemented by letters dated March 12, June 12, and December 11, 2014 (ADAMS Accession Nos. ML 14078A059, ML 14167 A430, and ML 14349A646, respectively), NextEra Energy Seabrook, LLC (NextEra or the licensee) submitted license amendment request (LAR) 13-05 for Seabrook Station, Unit No. 1 (Seabrook).
By letter dated September 10, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13260A160), as supplemented by letters dated March 12, June 12, and December 11, 2014 (ADAMS Accession Nos. ML14078A059, ML14167A430, and ML14349A646, respectively), NextEra Energy Seabrook, LLC (NextEra or the licensee) submitted license amendment request (LAR) 13-05 for Seabrook Station, Unit No. 1 (Seabrook).
The proposed amendment will modify the Seabrook Technical Specifications (TS). Specifically, the proposed amendment will revise TS 6.8.1.6.b, "Core Operating Limits Report," by adding AREVA Licensing Report ANP-3243P, Revision 1, "Seabrook Station, Unit 1 Fixed lncore Detector System Analysis Supplement to YAEC-1855PA," dated May 2014 (ADAMS Accession No. ML14167 A432), which supplements and modifies the previously approved methodology.
The proposed amendment will modify the Seabrook Technical Specifications (TS). Specifically, the proposed amendment will revise TS 6.8.1.6.b, "Core Operating Limits Report," by adding AREVA Licensing Report ANP-3243P, Revision 1, "Seabrook Station, Unit 1 Fixed lncore Detector System Analysis Supplement to YAEC-1855PA," dated May 2014 (ADAMS Accession No. ML14167A432), which supplements and modifies the previously approved methodology. A nonproprietary version of the AREVA Licensing Report ANP-3243NP, Revision 1, is contained in ADAMS Accession No. ML14167A431. The proposed change also modifies the surveillance requirements associated with the heat flux hot channel factor and nuclear enthalpy rise hot channel factor to include revised uncertainty values when measurement is obtained using the fixed incore detector system.
A nonproprietary version of the AREVA Licensing Report ANP-3243NP, Revision 1, is contained in ADAMS Accession No. ML 14167 A431. The proposed change also modifies the surveillance requirements associated with the heat flux hot channel factor and nuclear enthalpy rise hot channel factor to include revised uncertainty values when measurement is obtained using the fixed incore detector system. The U.S. Nuclear Regulatory Commission (NRC) staff has determined that additional information is required to complete its review. The NRC staff's request for additional information (RAJ) is contained in the enclosure.
The U.S. Nuclear Regulatory Commission (NRC) staff has determined that additional information is required to complete its review. The NRC staff's request for additional information (RAJ) is contained in the enclosure. A draft of these questions was previously sent to Mr. Michael Ossing of your staff on December 23, 2014, with an opportunity to have a teleconference to ensure that the licensee understood the questions and their regulatory basis, as well as to verify that the information was not previously docketed.
A draft of these questions was previously sent to Mr. Michael Ossing of your staff on December 23, 2014, with an opportunity to have a teleconference to ensure that the licensee understood the questions and their regulatory basis, as well as to verify that the information was not previously docketed.
 
D. Curtland A conference call was held on December 23, 2014, and Mr. Michael Ossing agreed that NextEra would respond to the RAI in 30 days from the date of the letter. Please note that if you do not respond to the RAI within 30 days from the date of the letter, or provide an acceptable alternate date in writing, the NRC staff may reject your LAR under the provisions of Title 10 of the Code of Federal Regulations, Section 2.1 08, "Denial of application for failure to supply information." If you have questions, you can contact me at 301-415-3100 or by e-mail at john.lamb@nrc.gov . Docket No. 50-443  
D. Curtland                                     A conference call was held on December 23, 2014, and Mr. Michael Ossing agreed that NextEra would respond to the RAI in 30 days from the date of the letter. Please note that if you do not respond to the RAI within 30 days from the date of the letter, or provide an acceptable alternate date in writing, the NRC staff may reject your LAR under the provisions of Title 10 of the Code of Federal Regulations, Section 2.1 08, "Denial of application for failure to supply information."
If you have questions, you can contact me at 301-415-3100 or by e-mail at john.lamb@nrc.gov .
                                                        . Lamb, Senior Project Manager t Licensing Branch 1-2 Div son of Operating Reactor Licensing e
Offi of Nuclear Reactor Regulation Docket No. 50-443


==Enclosure:==
==Enclosure:==


RAI cc w/encl: Distribution via Listserv . Lamb, Senior Project Manager t Licensing Branch 1-2 Div son of Operating Reactor Licensing Offi e of Nuclear Reactor Regulation REQUEST FOR ADDITIONAL INFORMATION LICENSE AMENDMENT REQUEST 13-05 NEXTERA ENERGY SEABROOK.
RAI cc w/encl: Distribution via Listserv
LLC. SEABROOK STATION. UNIT NO. 1 DOCKET NO. 50-443 By letter dated September 10, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 13260A 160), as supplemented by letters dated March 12, June 12, and December 11, 2014 (ADAMS Accession Nos. ML 14078A059, ML 14167A430, and ML 14349A646, respectively), NextEra Energy Seabrook, LLC (NextEra or the licensee) submitted license amendment request (LAR) 13-05 for Seabrook Station, Unit No. 1 (Seabrook).
 
The proposed amendment will modify the Seabrook Technical Specifications (TS). Specifically, the proposed amendment will revise TS 6.8.1.6.b, "Core Operating Limits Report," by adding AREVA Licensing Report ANP-3243P, Revision 1, "Seabrook Station, Unit 1 Fixed lncore Detector System Analysis Supplement to YAEC-1855PA," dated May 2014 (ADAMS Accession No. ML 14167A432), which supplements and modifies the previously approved methodology.
REQUEST FOR ADDITIONAL INFORMATION LICENSE AMENDMENT REQUEST 13-05 NEXTERA ENERGY SEABROOK. LLC.
A nonproprietary version of the AREVA Licensing Report ANP-3243NP, Revision 1, is contained in ADAMS Accession No. ML 14167 A431. The proposed change also modifies the surveillance requirements associated with the heat flux hot channel factor and nuclear enthalpy rise hot channel factor to include revised uncertainty values when measurement is obtained using the fixed incore detector system. The U.S. Nuclear Regulatory Commission (NRC) staff has determined that additional information is necessary to complete its review under TAC No. MF2751. REQUEST FOR ADDITIONAL INFORMATION (RAI) Appendix B of the letter, dated June 12, 2014, provides a methodology for extrapolation of the evaluation model (EM) to conditions outside of the perturbation bounds used in the analysis.
SEABROOK STATION. UNIT NO. 1 DOCKET NO. 50-443 By letter dated September 10, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13260A160), as supplemented by letters dated March 12, June 12, and December 11, 2014 (ADAMS Accession Nos. ML14078A059, ML14167A430, and ML14349A646, respectively), NextEra Energy Seabrook, LLC (NextEra or the licensee) submitted license amendment request (LAR) 13-05 for Seabrook Station, Unit No. 1 (Seabrook).
The NRC staff finds that the methodology provided in Appendix B is reasonable, but the NRC staff cannot determine the limits of the extrapolation.
The proposed amendment will modify the Seabrook Technical Specifications (TS). Specifically, the proposed amendment will revise TS 6.8.1.6.b, "Core Operating Limits Report," by adding AREVA Licensing Report ANP-3243P, Revision 1, "Seabrook Station, Unit 1 Fixed lncore Detector System Analysis Supplement to YAEC-1855PA," dated May 2014 (ADAMS Accession No. ML14167A432), which supplements and modifies the previously approved methodology. A nonproprietary version of the AREVA Licensing Report ANP-3243NP, Revision 1, is contained in ADAMS Accession No. ML14167A431. The proposed change also modifies the surveillance requirements associated with the heat flux hot channel factor and nuclear enthalpy rise hot channel factor to include revised uncertainty values when measurement is obtained using the fixed incore detector system.
This situation is expected to occur very rarely, but as such, the NRC staff needs to make sure it is captured in a licensing document.
The U.S. Nuclear Regulatory Commission (NRC) staff has determined that additional information is necessary to complete its review under TAC No. MF2751.
The NRC proposes the following Facility Operating License Condition 2.G: If the methodology described in Appendix B of ANP-3243P, Revision 1, "Seabrook Station, Unit 1 Fixed lncore Detector System Analysis Supplement to YAEC-1855PA," is utilized in any plant surveillance then NextEra must notify the NRC by letter of the plant's conditions and results of that surveillance.
REQUEST FOR ADDITIONAL INFORMATION (RAI)
Appendix B of the letter, dated June 12, 2014, provides a methodology for extrapolation of the evaluation model (EM) to conditions outside of the perturbation bounds used in the analysis.
The NRC staff finds that the methodology provided in Appendix B is reasonable, but the NRC staff cannot determine the limits of the extrapolation. This situation is expected to occur very rarely, but as such, the NRC staff needs to make sure it is captured in a licensing document.
The NRC proposes the following Facility Operating License Condition 2.G:
If the methodology described in Appendix B of ANP-3243P, Revision 1, "Seabrook Station, Unit 1 Fixed lncore Detector System Analysis Supplement to YAEC-1855PA," is utilized in any plant surveillance then NextEra must notify the NRC by letter of the plant's conditions and results of that surveillance.
In lieu of the proposed Facility Operating License Condition 2.G, NextEra may propose a change toTS 6.8, "Reporting Requirements," that captures the above information.
In lieu of the proposed Facility Operating License Condition 2.G, NextEra may propose a change toTS 6.8, "Reporting Requirements," that captures the above information.
Enclosure D. Curtland A conference call was held on December 23, 2014, and Mr. Michael Ossing agreed that NextEra would respond to the RAI in 30 days from the date of the letter. Please note that if you do not respond to the RAI within 30 days from the date of the letter, or provide an acceptable alternate date in writing, the NRC staff may reject your LAR under the provisions of Title 10 of the Code of Federal Regulations, Section 2.1 08, "Denial of application for failure to supply information." If you have questions, you can contact me at 301-415-3100 or by e-mail at john.lamb@nrc.gov.
Enclosure
Sincerely, IRA/ John G. Lamb, Senior Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-443
 
==Enclosure:==


RAI cc w/encl: Distribution via Listserv DISTRIBUTION:
ML14358A073                                  *via email OFFICE     DORL/LPL 1-2/PM       DORLILPL 1-2/LA*       DORLILPL 1-2/BC     DORL/LPL 1-2/PM NAME       Jlamb                 A Baxter               MKhanna (REnnis for) Jlamb DATE       12/23/14             12/22/14               12/24/14             12/24/14}}
PUBLIC LPLI-2 R/F RidsNrrLAABaxter Resource RidsNrrPMSeabrook Resource RidsAcrsAcnw_MaiiCTR Resource RidsNRRDorllpl1-2 Resource RidsRgn1 MaiiCenter Resource RidsNrrDoriDpr Resource ADAMS Accession No.: ML 14358A073
*via email OFFICE DORL/LPL 1-2/PM DORLILPL 1-2/LA* DORLILPL 1-2/BC NAME Jlamb A Baxter MKhanna (REnnis for) DATE 12/23/14 12/22/14 12/24/14 OFFICIAL RECORD COPY DORL/LPL 1-2/PM Jlamb 12/24/14}}

Latest revision as of 18:31, 31 October 2019

Request for Additional Information for License Amendment Request 13-05. Fixed Incore Detector System Analysis Methodology
ML14358A073
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 12/24/2014
From: John Lamb
Plant Licensing Branch 1
To: Dean Curtland
NextEra Energy Seabrook
Lamb J
References
TAC MF2751
Download: ML14358A073 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 24, 2014 Mr. Dean Curtland, Site Vice President c/o Michael Ossing Seabrook Station NextEra Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874

SUBJECT:

SEABROOK STATION, UNIT NO. 1 -REQUEST FOR ADDITIONAL INFORMATION FOR LICENSE AMENDMENT REQUEST 13-05, "FIXED INCORE DETECTOR SYSTEM ANALYSIS METHODOLOGY" (TAC NO. MF2751)

Dear Mr. Curtland:

By letter dated September 10, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13260A160), as supplemented by letters dated March 12, June 12, and December 11, 2014 (ADAMS Accession Nos. ML14078A059, ML14167A430, and ML14349A646, respectively), NextEra Energy Seabrook, LLC (NextEra or the licensee) submitted license amendment request (LAR) 13-05 for Seabrook Station, Unit No. 1 (Seabrook).

The proposed amendment will modify the Seabrook Technical Specifications (TS). Specifically, the proposed amendment will revise TS 6.8.1.6.b, "Core Operating Limits Report," by adding AREVA Licensing Report ANP-3243P, Revision 1, "Seabrook Station, Unit 1 Fixed lncore Detector System Analysis Supplement to YAEC-1855PA," dated May 2014 (ADAMS Accession No. ML14167A432), which supplements and modifies the previously approved methodology. A nonproprietary version of the AREVA Licensing Report ANP-3243NP, Revision 1, is contained in ADAMS Accession No. ML14167A431. The proposed change also modifies the surveillance requirements associated with the heat flux hot channel factor and nuclear enthalpy rise hot channel factor to include revised uncertainty values when measurement is obtained using the fixed incore detector system.

The U.S. Nuclear Regulatory Commission (NRC) staff has determined that additional information is required to complete its review. The NRC staff's request for additional information (RAJ) is contained in the enclosure. A draft of these questions was previously sent to Mr. Michael Ossing of your staff on December 23, 2014, with an opportunity to have a teleconference to ensure that the licensee understood the questions and their regulatory basis, as well as to verify that the information was not previously docketed.

D. Curtland A conference call was held on December 23, 2014, and Mr. Michael Ossing agreed that NextEra would respond to the RAI in 30 days from the date of the letter. Please note that if you do not respond to the RAI within 30 days from the date of the letter, or provide an acceptable alternate date in writing, the NRC staff may reject your LAR under the provisions of Title 10 of the Code of Federal Regulations, Section 2.1 08, "Denial of application for failure to supply information."

If you have questions, you can contact me at 301-415-3100 or by e-mail at john.lamb@nrc.gov .

. Lamb, Senior Project Manager t Licensing Branch 1-2 Div son of Operating Reactor Licensing e

Offi of Nuclear Reactor Regulation Docket No. 50-443

Enclosure:

RAI cc w/encl: Distribution via Listserv

REQUEST FOR ADDITIONAL INFORMATION LICENSE AMENDMENT REQUEST 13-05 NEXTERA ENERGY SEABROOK. LLC.

SEABROOK STATION. UNIT NO. 1 DOCKET NO. 50-443 By letter dated September 10, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13260A160), as supplemented by letters dated March 12, June 12, and December 11, 2014 (ADAMS Accession Nos. ML14078A059, ML14167A430, and ML14349A646, respectively), NextEra Energy Seabrook, LLC (NextEra or the licensee) submitted license amendment request (LAR) 13-05 for Seabrook Station, Unit No. 1 (Seabrook).

The proposed amendment will modify the Seabrook Technical Specifications (TS). Specifically, the proposed amendment will revise TS 6.8.1.6.b, "Core Operating Limits Report," by adding AREVA Licensing Report ANP-3243P, Revision 1, "Seabrook Station, Unit 1 Fixed lncore Detector System Analysis Supplement to YAEC-1855PA," dated May 2014 (ADAMS Accession No. ML14167A432), which supplements and modifies the previously approved methodology. A nonproprietary version of the AREVA Licensing Report ANP-3243NP, Revision 1, is contained in ADAMS Accession No. ML14167A431. The proposed change also modifies the surveillance requirements associated with the heat flux hot channel factor and nuclear enthalpy rise hot channel factor to include revised uncertainty values when measurement is obtained using the fixed incore detector system.

The U.S. Nuclear Regulatory Commission (NRC) staff has determined that additional information is necessary to complete its review under TAC No. MF2751.

REQUEST FOR ADDITIONAL INFORMATION (RAI)

Appendix B of the letter, dated June 12, 2014, provides a methodology for extrapolation of the evaluation model (EM) to conditions outside of the perturbation bounds used in the analysis.

The NRC staff finds that the methodology provided in Appendix B is reasonable, but the NRC staff cannot determine the limits of the extrapolation. This situation is expected to occur very rarely, but as such, the NRC staff needs to make sure it is captured in a licensing document.

The NRC proposes the following Facility Operating License Condition 2.G:

If the methodology described in Appendix B of ANP-3243P, Revision 1, "Seabrook Station, Unit 1 Fixed lncore Detector System Analysis Supplement to YAEC-1855PA," is utilized in any plant surveillance then NextEra must notify the NRC by letter of the plant's conditions and results of that surveillance.

In lieu of the proposed Facility Operating License Condition 2.G, NextEra may propose a change toTS 6.8, "Reporting Requirements," that captures the above information.

Enclosure

ML14358A073 *via email OFFICE DORL/LPL 1-2/PM DORLILPL 1-2/LA* DORLILPL 1-2/BC DORL/LPL 1-2/PM NAME Jlamb A Baxter MKhanna (REnnis for) Jlamb DATE 12/23/14 12/22/14 12/24/14 12/24/14