ML15236A407: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the matter of Pacific Gas and Electric Company Docket Nos. 50
{{#Wiki_filter:UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the matter of Pacific Gas and Electric Company                     Docket Nos. 50-275-LR Diablo Canyon Nuclear Power Plant                                 50-323-LR Units 1 and 2 SAN LUIS OBISPO MOTHERS FOR PEACES UNOPPOSED MOTION FOR EXTENSION OF TIME TO FILE REPLY Pursuant to 10 C.F.R. §§ 2.323, San Luis Obispo Mothers for Peace (SLOMFP) seeks an extension of time to respond to anticipated responses by Pacific Gas & Electric Company (PG&E) and the U.S. Nuclear Regulatory Commission (NRC) Staff to SLOMFPs Motion to File Amended Contention C (Inadequate Consideration of Seismic Risks in SAMA Analysis as Supplemented by SHU-SAMA Evaluation) (July 31, 2015). Pursuant to 10 C.F.R. § 2.309, these responses are due tomorrow, August 25; and SLOMFP reply is due on September 1.
-275-LR Diablo Canyon Nuclear Power Plant 50-323-LR Units 1 and 2 SAN LUIS OBISPO MOTHERS FOR PEACE'S UNOPPOSED MOTION FOR EXTENSION OF TIME TO FILE REPLY Pursuant to 10 C.F.R. §§ 2.3 23, San Luis Obispo Mothers for Peace ("SLOMFP") seeks an extension of time to respond to anticipated responses by Pacific Gas & Electric Company ("PG&E") and the U.S. Nuclear Regulatory Commission ("NRC") Staff to SLOMFP's Motion to File Amended Contention C (Inadequate Consideration of Seismic Risks in SAMA Analysis as Supplemented by SHU
SLOMFP requests an extension of time to file its reply until September 14, due to an unexpected and serious illness in undersigned counsels immediate family, which requires her full attention for an uncertain period. SLOMFP does not have other counsel to prepare the reply.
-SAMA Evaluation) (July 31, 2015). Pursuant to 10 C.F.R.  
Counsel for SLOMFP has been authorized to state that PG&E and the NRC Staff do not oppose this motion.
§ 2.309, the se responses are due tomorrow, August 25; and SLOMFP' reply is due on September 1.
Respectfully submitted,
SLOMFP requests an extension of time to file its reply until September 14, due to an unexpected and serious illness in undersigned counsel's immediate family, which requires her full attention for an uncertain period. SLOMFP does not have other counsel to prepare the reply.
[Electronically signed by]
Counsel for SLOMFP has been authorized to state that PG&E and the NRC Staff do not oppose this motion.  
 
Respectfully submitted, [Electronically signed by]
Diane Curran Harmon, Curran, Spielberg & Eisenberg, L.L.P.
Diane Curran Harmon, Curran, Spielberg & Eisenberg, L.L.P.
1726 M Street N.W. Suite 600
1726 M Street N.W. Suite 600 Washington, D.C. 20036 202-328-3500 E-mail: dcurran@harmoncurran.com August 24, 2015}}
 
Washington, D.C. 20036
 
202-328-3500 E-mail: dcurran@harmoncurran.com
 
August 24 , 2015}}

Latest revision as of 08:30, 31 October 2019

Unopposed Motion for Extension of Time to File Reply
ML15236A407
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 08/24/2015
From: Curran D
Harmon, Curran, Harmon, Curran, Spielberg & Eisenberg, LLP, San Luis Obispo Mothers for Peace
To:
Atomic Safety and Licensing Board Panel
SECY RAS
Shared Package
ML15236A406 List:
References
50-275-LR, 50-323-LR, ASLBP 10-900-01-LR-BD01, RAS 28197
Download: ML15236A407 (1)


Text

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the matter of Pacific Gas and Electric Company Docket Nos. 50-275-LR Diablo Canyon Nuclear Power Plant 50-323-LR Units 1 and 2 SAN LUIS OBISPO MOTHERS FOR PEACES UNOPPOSED MOTION FOR EXTENSION OF TIME TO FILE REPLY Pursuant to 10 C.F.R. §§ 2.323, San Luis Obispo Mothers for Peace (SLOMFP) seeks an extension of time to respond to anticipated responses by Pacific Gas & Electric Company (PG&E) and the U.S. Nuclear Regulatory Commission (NRC) Staff to SLOMFPs Motion to File Amended Contention C (Inadequate Consideration of Seismic Risks in SAMA Analysis as Supplemented by SHU-SAMA Evaluation) (July 31, 2015). Pursuant to 10 C.F.R. § 2.309, these responses are due tomorrow, August 25; and SLOMFP reply is due on September 1.

SLOMFP requests an extension of time to file its reply until September 14, due to an unexpected and serious illness in undersigned counsels immediate family, which requires her full attention for an uncertain period. SLOMFP does not have other counsel to prepare the reply.

Counsel for SLOMFP has been authorized to state that PG&E and the NRC Staff do not oppose this motion.

Respectfully submitted,

[Electronically signed by]

Diane Curran Harmon, Curran, Spielberg & Eisenberg, L.L.P.

1726 M Street N.W. Suite 600 Washington, D.C. 20036 202-328-3500 E-mail: dcurran@harmoncurran.com August 24, 2015