ML15335A273: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Issue Date: 09/25/13 1 71013 NRC INSPECTION MANUAL   DLR INSPECTION PROCEDURE 71013   SITE INSPECTION FOR PLANTS WITH A TIMELY RENEWAL APPLICATION PROGRAM APPLICABILITY: IMC 2515
{{#Wiki_filter:United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of:                    Entergy Nuclear Operations, Inc.                                          NRC000183 (Indian Point Nuclear Generating Units 2 and 3)
ASLBP #: 07-858-03-LR-BD01                                                  Submitted: August 10, 2015 Docket #: 05000247 l 05000286 Exhibit #: NRC000183-00-BD01                Identified: 11/5/2015 Admitted: 11/5/2015                        Withdrawn:
Rejected:                                      Stricken:
Other:
NRC INSPECTION MANUAL                                       DLR INSPECTION PROCEDURE 71013 SITE INSPECTION FOR PLANTS WITH A TIMELY RENEWAL APPLICATION PROGRAM APPLICABILITY: IMC 2515 71013-01            INSPECTION OBJECTIVES 01.01                  To determine whether commitments made by the licensee to implement actions such as proposed license conditions, other regulatory commitments accepted by the staff during the course of license renewal, selected aging management programs (AMPs), and time-limited aging analyses (TLAAs) are implemented or completed 01.02                  To verify the license renewal application is updated annually in accordance with the requirement to submit changes to the current licensing basis (CLB) during the U.S. Nuclear Regulatory Commission (NRC) review of the license renewal application as required by 10 CFR 54.21(b) 01.03                  To verify the newly identified systems, structures, and components (SSCs) are or will be included in the annual updated final safety analysis report (UFSAR) updates as required by 10 CFR 54.37(b) 01.04                  To verify the description of the AMPs and related activities covered in §01.01 that are contained in the UFSAR supplement are consistent with the programs the licensee agreed to implement 01.05                  To verify changes to the regulatory commitments the licensee agreed to implement or complete for license renewal are evaluated in accordance with NEI 99-04, Guidelines for Managing NRC Commitment Changes as endorsed by regulatory issue summary (RIS) 2000-017, and changes to the license renewal activities incorporated as part of the UFSAR are evaluated in accordance with the requirements of Title 10 of the Code of Federal Regulations (10 CFR) 50.59 71013-02            INSPECTION REQUIREMENTS 02.01 General Inspection Requirements.
: a.      Verify that the licensee adequately completed the commitments made to implemented actions such as proposed license conditions, other regulatory commitments accepted by the staff during license renewal, AMPs and TLAAs.
: b.      Verify the license renewal application is updated annually in accordance with the requirement to submit changes to the CLB during NRC review of the license renewal application, according to 10 CFR 54.21(b).
Issue Date: 09/25/13                                                1                                71013
: c. Verify that newly identified SSCs are or will be included in the annual UFSAR updates as required by 10 CFR 54.37(b) and the guidance provided in RIS 2007-016.
: d. Verify the UFSAR supplement as revised describes the AMPs and TLAAs in the SER for license renewal. Also verify the UFSAR supplement description matches the AMP or TLAA being implemented and that changes, caused by the inclusion of newly identified SSCs, were included in the UFSAR supplement.
: e. Verify the licensee properly evaluated, and reported when necessary, changes to regulatory commitments in accordance with NEI 99-04 as endorsed by RIS 2000-017.
Review changes to license renewal activities incorporated as part of the UFSAR in accordance with 10 CFR 50.59. Review planned changes to AMPs, TLAAs and other license renewal actions.
71013-03      INSPECTION GUIDANCE 03.01 General Guidance.
In accordance with 10 CFR 2.109(b), if the licensee of a nuclear power plant files a sufficient application for renewal of an operating license at least 5 years before the expiration of the existing license, the existing license will not be deemed to have expired until the application has been finally determined. As such, the licensee will continue to conduct activities in accordance with the facilitys current licensing basis and this may involve operation of the plant beyond the expiration date of the original operating license. Inspection procedure (IP) 71013 was developed for the inspection of license renewal programs for licensees with timely renewal applications to allow for timely verification by NRC inspectors that the licensee has implemented its commitments to AMPs, TLAAs, regulatory commitments accepted by the staff during license renewal as well as commitments to proposed license conditions agreed to by the licensee while the application is being determined and before entering its post-40-year license period. In this case, IP 71003, Post-Approval Site Inspection for License Renewal, would not be applicable.
The intent is to perform either IP 71013 or IP 71003, but not both. The Regions should perform IP 71013 at those plants with license renewal applications that have not yet been determined.
The Regions should perform IP 71003 at those plants with renewed operating licenses.
03.02 Inspection Schedule.
A majority of this inspection is to be performed following the issuance of an SER for license renewal but prior to the expiration date of the original operating license. This may vary as changes occur in the license renewal review process. The inspections are scheduled to support completion of the review in sufficient time for licensees to make any necessary corrections to its AMPs before entering the period of operation beyond the expiration date of the original operating license. Since certain programs and activities may or may not be implemented or completed at the time this inspection occurs, the inspection may be performed in three phases to accommodate the sites implementation schedule, with the potential issuance of three separate inspection reports. Performing this inspection using a three-phase approach is a recommendation and not a requirement.
: a. Phase I: This portion of the inspection is likely to occur during the second to last and/or last refueling outage prior to the expiration date of the original operating license.
Issue Date: 09/25/13                                2                                          71013


71013-01 INSPECTION OBJECTIVES 01.01 To determine whether commitments made by the licensee to implement actions such as proposed license conditions, other regulatory commitments accepted by the staff during the course of license renewal, selected aging management programs (AMPs), and time-limited aging analyses (TLAAs) are implemented or completed 
This Phase of the inspection is intended to observe the implementation of select AMPs and activities described in the commitments made to proposed license conditions, the UFSAR supplement, AMPs, TLAAs and other regulatory commitments accepted by the staff during license renewal, as well as any testing, or visual inspections of SSCs which are only accessible at reduced power levels. Those SSCs may be located inside the containment, and other high radiation areas. This inspection may occur at each unit of a multi-unit site.
: b. Phase II: This portion of the inspection is likely to occur three months to a year prior to the expiration date of the original operating license, depending on the sites implementation schedule of outages and license renewal activities.
This Phase of the inspection is intended to be a one-time major team inspection per site. However, for multi-unit sites, subsequent Phase II inspections may be conducted, as deemed necessary by regional management. Subsequent Phase II inspections at multi-unit sites may not require the same level of effort as the Phase II inspection for the first unit. The inspectors will assess the adequacy and effectiveness of the implementation and/or completion of the programs and activities described in the regulatory commitments accepted by the staff during license renewal, UFSAR supplement program descriptions, TLAAs, and commitments made to proposed license conditions as agreed to by the licensee while the application for renewal is being determined, as well as evaluate the need for any additional follow-up inspections under this inspection procedure or as part of the reactor oversight program (ROP).
: c. Phase III: This portion of the inspection is likely to occur beyond the expiration date of the original operating license in accordance with the implementation schedule of the commitments made to proposed license conditions, AMPs, TLAAs and other regulatory commitments accepted by the staff during license renewal.
This Phase of the inspection is intended to review the implementation of the commitments made to proposed license conditions, regulatory commitments accepted by the staff during license renewal, TLAAs and AMPs with implementation schedules that extend beyond the expiration date of the original operating license, as agreed to by the licensee while the application for renewal is being determined. Additionally, this phase may be implemented to review corrective actions for issues of concern identified during Phases I and II inspections.
If, during the planning, execution, or documentation of this procedure, the NRC determines the operating license will not be renewed, inspection efforts should cease. If, during the planning, execution or documentation of this procedure, the NRC approves and renews the operating license, the inspection efforts should shift to the corresponding portion of IP 71003, Post-Approval Site Inspection for License Renewal.
03.03 Document Review.
Inspectors should familiarize themselves with the requirements and guidance related to license renewal. The inspectors should also familiarize themselves with the specific license renewal application and associated SER for the plant being inspected. License renewal requirements and guidance documents that should be reviewed prior to this inspection include:
Issue Date: 09/25/13                                3                                          71013


01.02 To verify the license renewal application is updated annually in accordance with the requirement to submit changes to the current licensing basis (CLB) during the U.S. Nuclear Regulatory Commission (NRC) review of the license renewal application as required by 10 CFR 54.21(b) 01.03 To verify the are or will be included in the annual updated final safety analysis report (UFSAR) updates as required by 10 CFR 54.37(b)   01.04 To verify the description of the AMPs and related activities covered in §01.01 that are contained in the UFSAR supplement are consistent with the programs the licensee agreed to implement 01.05 To verify changes to the regulatory commitments the licensee agreed to implement or complete for license renewal are evaluated in accordance with NEI 99-04,
10 CFR Part 54, Requirements for Renewal of Operating Licenses for Nuclear Power Plants The statement of consideration published with the revision to 10 CFR Part 54 in the Federal Register, Vol. 60, No. 88, Monday, May 8, 1995, pages 22461 to 22495 The SER and applicable supplements for the plant(s) to be inspected Appendix A of the SER, if applicable The UFSAR supplement as revised during the license renewal application review 03.04 Inspection Sample Attributes.
In selecting samples, consideration should be given to attributes such as:
The risk significance of SSCs associated with the regulatory commitments, using insights gained from sources such as the NRCs Significance Determination Process (SDP) Risk Informed Inspection Notebooks, Revision 2 The extent of previous license renewal audits and inspections of AMPs The extent that baseline inspection programs will inspect an SSC or commodity group The type and maturity of the AMP, for example, programs such as the selective leaching one-time inspection program, or infrequent inspection activities may take priority over long-standing programs such as the Steam Generator Tube Integrity Program, which are routinely inspected Issues that were addressed in an Atomic Safety Licensing Board (ASLB) hearing or Advisory Committee on Reactor Safeguards (ACRS) committee meeting Issues that were in the public domain at the time of the license renewal application review 03.05 Level of Effort.
This inspection is performed before the expiration date of the original operating license (with the exception of Phase III which may occur after the expiration of the original operating license).
Additionally, the number of AMPs, regulatory commitments, TLAAs and commitments made to proposed license conditions vary broadly from plant to plant. Therefore, this procedure does not contain a predetermined sample size for each component of the inspection that would uniformly represent each plant. As such, the lead inspector will determine the sample size and extent of review of the commitments made to proposed license conditions, AMPs, TLAAs and regulatory commitments prior to performing these inspections. The lead inspector should ensure that the team comprehensively inspects a majority (recommended greater than 70%) of the number of:
(1) new AMPs or enhancements to existing AMPs, (2) regulatory commitments, (3) TLAAs, and (4) commitments made to proposed license conditions to assess the adequacy and effectiveness of the license renewal program. Some sites may not require the same level of inspection effort as others and may be inspected using a smaller sample size. Also some multi-unit sites may contain units with similar designs, and therefore may not require the same level of inspection at the additional units as was received for the first unit. The lead inspector should use discretion in determining the inspection sample size at multi-unit sites with similar designs between the units.
03.06 Inspection Sample Selection.
Although the renewed operating license has not been issued, the licensee may have agreed to complete certain license renewal activities to support entering the period of extended operation.
Issue Date: 09/25/13                            4                                            71013


summary (RIS) 2000-017, and changes to the license renewal activities incorporated as part of the UFSAR are evaluated in accordance with the requirements of Title 10 of the Code of Federal Regulations (10 CFR) 50.59 
The sample section should be based upon the AMPs, TLAAs, regulatory commitments, and also commitments made to proposed license conditions the licensee has agreed to implement while the license renewal application is being determined.
: a. Selection of Commitments Made to Proposed License Conditions: The sample may include a review of selected commitments made to proposed license conditions. A sample population of commitments made to proposed license conditions will be inspected to the extent necessary to determine that the license conditions were implemented consistent with the licensees commitments. Inspection of the commitments made to proposed license conditions should include a review of supporting documentation to determine if the licensee has taken the appropriate actions, including corrective action, to satisfy a particular license condition. Appropriate technical expertise should be requested from the license renewal program office if needed.
: b. Selection of Regulatory Commitments: The sample should include a review of selected regulatory commitments which were accepted by the staff during the course of the license renewal application review and describes a modification or enhancement to a program, or future actions necessary for compliance with 10 CFR Part 50 or 10 CFR Part 54. The selected regulatory commitments will be inspected to the extent necessary to determine that the commitments were implemented, and any modifications were completed in accordance with NEI 99-04 as endorsed by RIS 2000-017. The inspection team should determine there is reasonable assurance the commitment tracking program is effective. The inspection of regulatory commitments should include a review of supporting documentation to determine if the licensee has taken the appropriate actions, including corrective action, to satisfy a particular commitment. Appropriate technical expertise should be requested from the license renewal program office if needed.
: c. Selection of AMPs: The sample should include a review of selected AMPs that are new, or have been modified or enhanced. The selected AMPs will be inspected to the extent necessary to determine that updates, modifications and implementation occurred consistent with the licensees commitments. AMP activities, bases and acceptance criteria should be appropriately proceduralized. The license renewal program office recommends that the inspector include as part of his or her sample selection the Buried and Underground Piping and Tanks Program, the One-Time Inspection Program, and the Selective Leaching Program on the basis that these programs may involve new or unique inspection or testing activities that are being performed by the licensee for the first time or may identify inspection or test results that the licensee may not have experienced in the past. Appropriate technical expertise should be requested from the license renewal program office if needed.
: d. Selection of TLAAs: The sample should include a review of selected TLAAs that have an associated AMP in accordance with 10 CFR 54.21(c)(1)(iii). The inspector should verify that the AMP describes how the licensee will manage, update or refine the TLAA during the PEO. The inspector should verify that the AMP demonstrates how the licensee meets the acceptance criteria for the CLB. The AMP should contain the licensees actions when the CLB acceptance criteria are exceeded. The licensees actions may include taking the appropriate corrective actions to repair and/or replace impacted SSCs, recalculating the TLAA, or initiating additional inspection activities.
Issue Date: 09/25/13                              5                                          71013


71013-02 INSPECTION REQUIREMENTS  02.01  General Inspection Requirements. a. Verify that the licensee adequately completed the commitments made to implemented actions such as proposed license conditions, other regulatory commitments accepted by the staff during license renewal, AMPs and TLAAs. 
AMP activities, bases and acceptance criteria that relate to TLAA acceptance under 10 CFR 54.21(c)(1)(iii) should be appropriately proceduralized. There are currently three programs that the inspector may want to include as part of his or her sample selection:
: b. Verify the license renewal application is updated annually in accordance with the requirement to submit changes to the CLB during NRC review of the license renewal application, according to 10 CFR 54.21(b).
the Fatigue Monitoring Program, the Concrete Containment Tendon Prestress Program, and the Environmental Qualification of Electric Components Program. However, the inspector may want to contact the license renewal program office to identify which TLAAs were of significant interest during the license renewal application review for a particular plant to determine which TLAAs will be reviewed for this portion of the inspection. Also, for questions or concerns by the inspector during the review of highly specialized TLAAs, or for errors identified by the inspector to have significant impact on 10 CFR 54.21(c)(1)(i) or 10 CFR 54.21(c)(1)(ii), assistance should be requested from the license renewal program office.
Issue Date:  09/25/13 2 71013  c. Verify  or will be included in the annual UFSAR updates as required by 10 CFR 54.37(b) and the guidance provided in RIS 2007-016. d. Verify the UFSAR supplement as revised describes the AMPs and TLAAs in the SER for license renewal. Also verify the UFSAR supplement description matches the AMP  e. Verify the licensee properly evaluated, and reported when necessary, changes to regulatory commitments in accordance with NEI 99-04 as endorsed by RIS 2000-017. Review changes to license renewal activities incorporated as part of the UFSAR in accordance with 10 CFR 50.59. Review planned changes to AMPs, TLAAs and other license renewal actions. 71013-03 INSPECTION GUIDANCE  03.01 General Guidance. In accordance with 10 CFR 2.109(b), if the licensee of a nuclear power plant files a sufficient application for renewal of an operating license at least 5 years before the expiration of the existing license, the existing license will not be deemed to have expired until the application has been finally determined. As such, the licensee will continue to conduct activities in accordance  and this may involve operation of the plant beyond the expiration date of the original operating license. Inspection procedure (IP) 71013 was developed for the inspection of license renewal programs for licensees with timely renewal applications to allow for timely verification by NRC inspectors that the licensee has implemented its commitments to AMPs, TLAAs, regulatory commitments accepted by the staff during license renewal as well as commitments to proposed license conditions agreed to by the licensee while the application is being determined and before entering its post-40-year license period. In this case-The intent is to perform either IP 71013 or IP 71003, but not both. The Regions should perform IP 71013 at those plants with license renewal applications that have not yet been determined. The Regions should perform IP 71003 at those plants with renewed operating licenses. 03.02  Inspection Schedule. A majority of this inspection is to be performed following the issuance of an SER for license renewal but prior to the expiration date of the original operating license. This may vary as changes occur in the license renewal review process. The inspections are scheduled to support completion of the review in sufficient time for licensees to make any necessary corrections to its AMPs before entering the period of operation beyond the expiration date of the original operating license. Since certain programs and activities may or may not be implemented or completed at the time this inspection occurs, the inspection may be performed in three phases separate inspection reports. Performing this inspection using a three-phase approach is a recommendation and not a requirement. a. Phase I:  This portion of the inspection is likely to occur during the second to last and/or last refueling outage prior to the expiration date of the original operating license.
: e. Inspection of Newly Identified Systems: Licensees may identify new SSCs that should be within the scope of its license renewal program at any time. Any newly identified SSCs may be inspected to the extent necessary to ensure that the licensee adequately evaluated and included applicable SSCs into its AMPs or TLAAs. Inspectors should contact Division of License Renewal (DLR) staff for: (1) information on generic communications that were issued naming newly identified SSCs, or (2) technical assistance regarding the review of new aging management programs that have been developed by the licensee.
Issue Date:  09/25/13 3 71013  This Phase of the inspection is intended to observe the implementation of select AMPs and activities described in the commitments made to proposed license conditions, the UFSAR supplement, AMPs, TLAAs and other regulatory commitments accepted by the staff during license renewal, as well as any testing, or visual inspections of SSCs which are only accessible at reduced power levels. Those SSCs may be located inside the containment, and other high radiation areas. This inspection may occur at each unit of a multi-unit site. b. Phase II:  This portion of the inspection is likely to occur three months to a year prior to the expiration date of the original operating license, implementation schedule of outages and license renewal activities. This Phase of the inspection is intended to be a one-time major team inspection per site. However, for multi-unit sites, subsequent Phase II inspections may be conducted, as deemed necessary by regional management. Subsequent Phase II inspections at multi-unit sites may not require the same level of effort as the Phase II inspection for the first unit. The inspectors will assess the adequacy and effectiveness of the implementation and/or completion of the programs and activities described in the regulatory commitments accepted by the staff during license renewal, UFSAR supplement program descriptions, TLAAs, and commitments made to proposed license conditions as agreed to by the licensee while the application for renewal is being determined, as well as evaluate the need for any additional follow-up inspections under this inspection procedure or as part of the reactor oversight program (ROP). c. Phase III:  This portion of the inspection is likely to occur beyond the expiration date of the original operating license in accordance with the implementation schedule of the commitments made to proposed license conditions, AMPs, TLAAs and other regulatory commitments accepted by the staff during license renewal. This Phase of the inspection is intended to review the implementation of the commitments made to proposed license conditions, regulatory commitments accepted by the staff during license renewal, TLAAs and AMPs with implementation schedules that extend beyond the expiration date of the original operating license, as agreed to by the licensee while the application for renewal is being determined. Additionally, this phase may be implemented to review corrective actions for issues of concern identified during Phases I and II inspections. If, during the planning, execution, or documentation of this procedure, the NRC determines the operating license will not be renewed, inspection efforts should cease. If, during the planning, execution or documentation of this procedure, the NRC approves and renews the operating -Approval Site Inspection for Licen  03.03 Document Review. Inspectors should familiarize themselves with the requirements and guidance related to license renewal. The inspectors should also familiarize themselves with the specific license renewal application and associated SER for the plant being inspected. License renewal requirements and guidance documents that should be reviewed prior to this inspection include:
: f. Inspection of the UFSAR supplement: The UFSAR supplement describes the AMPs and TLAAs in the SER for license renewal. This inspection verifies that the UFSAR supplement description matches the AMP or TLAA being implemented and that changes, caused by the inclusion of newly identified SSCs, were included in the UFSAR supplement. If the licensee has not submitted an UFSAR supplement update since implementing the AMP or TLAA, review the planned UFSAR supplement changes and verify that they are included in an appropriate tracking system.
Issue Date:  09/25/13 4 71013    The statement of consideration published with the revision to 10 CFR Part 54 in the Federal Register, Vol. 60, No. 88, Monday, May 8, 1995, pages 22461 to 22495  The SER and applicable supplements for the plant(s) to be inspected  Appendix A of the SER, if applicable  The UFSAR supplement as revised during the license renewal application review  03.04 Inspection Sample Attributes. In selecting samples, consideration should be given to attributes such as:  The risk significance of SSCs associated with the regulatory commitments, using insights gained from sources suignificance Determination Process (SDP)  The extent of previous license renewal audits and inspections of AMPs  The extent that baseline inspection programs will inspect an SSC or commodity group  The type and maturity of the AMP, for example, programs such as the selective leaching one-time inspection program, or infrequent inspection activities may take priority over long-standing programs such as the Steam Generator Tube Integrity Program, which are routinely inspected  Issues that were addressed in an Atomic Safety Licensing Board (ASLB) hearing or Advisory Committee on Reactor Safeguards (ACRS) committee meeting  Issues that were in the public domain at the time of the license renewal application review  03.05 Level of Effort. This inspection is performed before the expiration date of the original operating license (with the exception of Phase III which may occur after the expiration of the original operating license). Additionally, the number of AMPs, regulatory commitments, TLAAs and commitments made to proposed license conditions vary broadly from plant to plant. Therefore, this procedure does not contain a predetermined sample size for each component of the inspection that would uniformly represent each plant. As such, the lead inspector will determine the sample size and extent of review of the commitments made to proposed license conditions, AMPs, TLAAs and regulatory commitments prior to performing these inspections. The lead inspector should ensure that the team comprehensively inspects a majority (recommended greater than 70%) of the number of:  (1) new AMPs or enhancements to existing AMPs, (2) regulatory commitments, (3) TLAAs, and (4) commitments made to proposed license conditions to assess the adequacy and effectiveness of the license renewal program. Some sites may not require the same level of inspection effort as others and may be inspected using a smaller sample size. Also some multi-unit sites may contain units with similar designs, and therefore may not require the same level of inspection at the additional units as was received for the first unit. The lead inspector should use discretion in determining the inspection sample size at multi-unit sites with similar designs between the units. 03.06 Inspection Sample Selection. Although the renewed operating license has not been issued, the licensee may have agreed to complete certain license renewal activities to support entering the period of extended operation.
03.07 Dispositioning Issues of Concern.
Issue Date:  09/25/13 5 71013 The sample section should be based upon the AMPs, TLAAs, regulatory commitments, and also commitments made to proposed license conditions the licensee has agreed to implement while the license renewal application is being determined. a. Selection of Commitments Made to Proposed License Conditions:  The sample may include a review of selected commitments made to proposed license conditions. A sample population of commitments made to proposed license conditions will be inspected to the extent necessary to determine that the license conditions were implemented consistent with the licensee commitments. Inspection of the commitments made to proposed license conditions should include a review of supporting documentation to determine if the licensee has taken the appropriate actions, including corrective action, to satisfy a particular license condition. Appropriate technical expertise should be requested from the license renewal program office if needed. b. Selection of Regulatory Commitments:  The sample should include a review of selected regulatory commitments which were accepted by the staff during the course of the license renewal application review and describes a modification or enhancement to a program, or future actions necessary for compliance with 10 CFR Part 50 or 10 CFR Part 54. The selected regulatory commitments will be inspected to the extent necessary to determine that the commitments were implemented, and any modifications were completed in accordance with NEI 99-04 as endorsed by RIS 2000-017. The inspection team should determine there is reasonable assurance the commitment tracking program is effective. The inspection of regulatory commitments should include a review of supporting documentation to determine if the licensee has taken the appropriate actions, including corrective action, to satisfy a particular commitment. Appropriate technical expertise should be requested from the license renewal program office if needed. c. Selection of AMPs:  The sample should include a review of selected AMPs that are new, or have been modified or enhanced. The selected AMPs will be inspected to the extent necessary to determine that updates, modifications and implementation occurred consistent with the licensee commitments. AMP activities, bases and acceptance criteria should be appropriately proceduralized. The license renewal program office recommends that the inspector include as part of his or her sample selection the Buried and Underground Piping and Tanks Program, the One-Time Inspection Program, and the Selective Leaching Program on the basis that these programs may involve new or unique inspection or testing activities that are being performed by the licensee for the first time or may identify inspection or test results that the licensee may not have experienced in the past. Appropriate technical expertise should be requested from the license renewal program office if needed. d. Selection of TLAAs:  The sample should include a review of selected TLAAs that have an associated AMP in accordance with 10 CFR 54.21(c)(1)(iii). The inspector should verify that the AMP describes how the licensee will manage, update or refine the TLAA during the PEO. The inspector should verify that the AMP demonstrates how the licensee meets the acceptance criteria for the CLB. The AMP should contain the licenseelicenseeactions may include taking the appropriate corrective actions to repair and/or replace impacted SSCs, recalculating the TLAA, or initiating additional inspection activities.
The renewed operating license may not be issued at the time this inspection occurs. Therefore, inspectors can document observations and issues of concern associated with the implementation and/or completion of commitments made to proposed license conditions, regulatory commitments, TLAAs and AMPs, which will be evaluated and dispositioned using the guidance in Inspection Manual Chapters 0612 and 2516, and may be used to determine the acceptability of the license renewal application.
Issue Date:  09/25/13 6 71013 AMP activities, bases and acceptance criteria that relate to TLAA acceptance under 10 CFR 54.21(c)(1)(iii) should be appropriately proceduralized. There are currently three programs that the inspector may want to include as part of his or her sample selection: the Fatigue Monitoring Program, the Concrete Containment Tendon Prestress Program, and the Environmental Qualification of Electric Components Program. However, the inspector may want to contact the license renewal program office to identify which TLAAs were of significant interest during the license renewal application review for a particular plant to determine which TLAAs will be reviewed for this portion of the inspection. Also, for questions or concerns by the inspector during the review of highly specialized TLAAs, or for errors identified by the inspector to have significant impact on 10 CFR 54.21(c)(1)(i) or 10 CFR 54.21(c)(1)(ii), assistance should be requested from the license renewal program office. e. Inspection of Newly Identified Systems: Licensees may identify new SSCs that should be within the scope of its license renewal program at any time. SSCs may be inspected to the extent necessary to ensure that the licensee adequately evaluated and included applicable SSCs into its AMPs or TLAAs. Inspectors should contact Division of License Renewal (DLR) staff for: (1) information on generic communications that were issued naming newly identified SSCs, or (2) technical assistance regarding the review of new aging management programs that have been developed by the licensee. f. Inspection of the UFSAR supplement: The UFSAR supplement describes the AMPs and TLAAs in the SER for license renewal. This inspection verifies that the UFSAR supplement description matches the AMP or TLAA being implemented and that UFSAR supplement. If the licensee has not submitted an UFSAR supplement update since implementing the AMP or TLAA, review the planned UFSAR supplement changes and verify that they are included in an appropriate tracking system. 03.07 Dispositioning Issues of Concern. The renewed operating license may not be issued at the time this inspection occurs. Therefore, inspectors can document observations and issues of concern associated with the implementation and/or completion of commitments made to proposed license conditions, regulatory commitments, TLAAs and AMPs, which will be evaluated and dispositioned using the guidance in Inspection Manual Chapters 0612 and 2516, and may be used to determine the acceptability of the license renewal application. 71013-04 RESOURCE ESTIMATES The total resource expenditure of this inspection procedure is estimated to be approximately 1,120 hours for a one-unit site, 2,052 hours for a dual-unit site, and 2,850 hours for a three-unit site. This resource estimate includes the preparation and documentation weeks. This resource estimate does not include the time spent travelling to and from the site. It is expected that the four Regions will coordinate the scheduling of license renewal inspections and share resources so as not to exceed the total resources allocated per year for all license renewal inspections.
71013-04     RESOURCE ESTIMATES The total resource expenditure of this inspection procedure is estimated to be approximately 1,120 hours for a one-unit site, 2,052 hours for a dual-unit site, and 2,850 hours for a three-unit site. This resource estimate includes the preparation and documentation weeks. This resource estimate does not include the time spent travelling to and from the site. It is expected that the four Regions will coordinate the scheduling of license renewal inspections and share resources so as not to exceed the total resources allocated per year for all license renewal inspections.
Issue Date: 09/25/13 7 71013  71013-05 REFERENCES  -          -Water Reactor Inspection Program      NRR Office Instruction LIC-  NEI 99-  NUREG-r Nuclear  NUREG-  NRC-approved Interim Staff Guidance positions relating to license renewal  Regulatory Issue Summary (RIS) 2007-54.37(b) fo  RIS 2000-  END Issue Date:  09/25/13 Att1-1 71013 Attachment 1  Revision History For 71013  Commitment Tracking Number Accession Number Issue Date Change Notice Description of Change Description of Training Required and Completion Date  Comment and Feedback Resolution Accession Number  N/A ML13032A102 09/25/13 CN 13-023 A four year historical search for commitments was performed. Change Notice 11-004 for temporary instruction (TI) 2516/001 was found related to timely renewal inspection activities. TI 2516/001, Review of License Renewal Activities, expires on December 31, 2013, at which point timely renewal inspection activities will be conducted in accordance with  IP 71013. N/A N/A Issue Date:  09/25/13 1 71013 NRC INSPECTION MANUAL  DLR  INSPECTION PROCEDURE 71013    SITE INSPECTION FOR PLANTS WITH A TIMELY RENEWAL APPLICATION PROGRAM APPLICABILITY:  IMC 2515 
Issue Date: 09/25/13                             6                                          71013


71013-01 INSPECTION OBJECTIVES 01.01 To determine whether commitments made by the licensee to implement actions such as proposed license conditions, other regulatory commitments accepted by the staff during the course of license renewal, selected aging management programs (AMPs), and time-limited aging analyses (TLAAs) are implemented or completed 
71013-05    REFERENCES IP 71003, Post-Approval Site Inspection for License Renewal 10 CFR Part 50, Domestic Licensing of Production and Utilization Facilities 10 CFR Part 54, Requirements for Renewal of Operating Licenses for Nuclear Power Plants IMC 0308, Reactor Oversight Process Basis Document IMC 0612, Power Reactor Inspection Reports IMC 2515, Light-Water Reactor Inspection Program - Operations Phase IMC 2516, Policy and Guidance for the License Renewal Inspection Program NRR Office Instruction LIC-105, Managing Regulatory Commitments Made by the Licensee to the NRC NEI 99-04, Guidelines for Managing NRC Commitment Changes Revision 0, July 1999 NUREG-1800, Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants NUREG-1801, Generic Aging Lessons Learned (GALL) Report NRC-approved Interim Staff Guidance positions relating to license renewal Regulatory Issue Summary (RIS) 2007-16, Implementation of the Requirements of 10 CFR 54.37(b) for Holders of Renewed Licenses RIS 2000-017, Managing Regulatory Commitments Made by Power Reactor Licensees to the NRC Staff END Issue Date: 09/25/13                            7                                    71013


01.02 To verify the license renewal application is updated annually in accordance with the requirement to submit changes to the current licensing basis (CLB) during the U.S. Nuclear Regulatory Commission (NRC) review of the license renewal application as required by 10 CFR 54.21(b) 01.03 To verify the are or will be included in the annual updated final safety analysis report (UFSAR) updates as required by 10 CFR 54.37(b)   01.04 To verify the description of the AMPs and related activities covered in §01.01 that are contained in the UFSAR supplement are consistent with the programs the licensee agreed to implement 01.05 To verify changes to the regulatory commitments the licensee agreed to implement or complete for license renewal are evaluated in accordance with NEI 99-04,
Attachment 1 - Revision History For 71013 Commitment    Accession Number                  Description of Change                Description of  Comment and Tracking        Issue Date                                                          Training Required  Feedback Number        Change Notice                                                          and Completion    Resolution Date        Accession Number N/A            ML13032A102      A four year historical search for commitments was            N/A            N/A 09/25/13          performed. Change Notice 11-004 for temporary CN 13-023        instruction (TI) 2516/001 was found related to timely renewal inspection activities. TI 2516/001, Review of License Renewal Activities, expires on December 31, 2013, at which point timely renewal inspection activities will be conducted in accordance with IP 71013.
Issue Date: 09/25/13                                        Att1-1                                                71013


summary (RIS) 2000-017, and changes to the license renewal activities incorporated as part of the UFSAR are evaluated in accordance with the requirements of Title 10 of the Code of Federal Regulations (10 CFR) 50.59
United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of:                    Entergy Nuclear Operations, Inc.                                          NRC000183 (Indian Point Nuclear Generating Units 2 and 3)
ASLBP #: 07-858-03-LR-BD01                                                  Submitted: August 10, 2015 Docket #: 05000247 l 05000286 Exhibit #: NRC000183-00-BD01                Identified: 11/5/2015 Admitted: 11/5/2015                        Withdrawn:
Rejected:                                      Stricken:
Other:
NRC INSPECTION MANUAL                                      DLR INSPECTION PROCEDURE 71013 SITE INSPECTION FOR PLANTS WITH A TIMELY RENEWAL APPLICATION PROGRAM APPLICABILITY: IMC 2515 71013-01            INSPECTION OBJECTIVES 01.01                  To determine whether commitments made by the licensee to implement actions such as proposed license conditions, other regulatory commitments accepted by the staff during the course of license renewal, selected aging management programs (AMPs), and time-limited aging analyses (TLAAs) are implemented or completed 01.02                  To verify the license renewal application is updated annually in accordance with the requirement to submit changes to the current licensing basis (CLB) during the U.S. Nuclear Regulatory Commission (NRC) review of the license renewal application as required by 10 CFR 54.21(b) 01.03                  To verify the newly identified systems, structures, and components (SSCs) are or will be included in the annual updated final safety analysis report (UFSAR) updates as required by 10 CFR 54.37(b) 01.04                  To verify the description of the AMPs and related activities covered in §01.01 that are contained in the UFSAR supplement are consistent with the programs the licensee agreed to implement 01.05                  To verify changes to the regulatory commitments the licensee agreed to implement or complete for license renewal are evaluated in accordance with NEI 99-04, Guidelines for Managing NRC Commitment Changes as endorsed by regulatory issue summary (RIS) 2000-017, and changes to the license renewal activities incorporated as part of the UFSAR are evaluated in accordance with the requirements of Title 10 of the Code of Federal Regulations (10 CFR) 50.59 71013-02            INSPECTION REQUIREMENTS 02.01 General Inspection Requirements.
: a.      Verify that the licensee adequately completed the commitments made to implemented actions such as proposed license conditions, other regulatory commitments accepted by the staff during license renewal, AMPs and TLAAs.
: b.      Verify the license renewal application is updated annually in accordance with the requirement to submit changes to the CLB during NRC review of the license renewal application, according to 10 CFR 54.21(b).
Issue Date: 09/25/13                                                1                                71013
: c. Verify that newly identified SSCs are or will be included in the annual UFSAR updates as required by 10 CFR 54.37(b) and the guidance provided in RIS 2007-016.
: d. Verify the UFSAR supplement as revised describes the AMPs and TLAAs in the SER for license renewal. Also verify the UFSAR supplement description matches the AMP or TLAA being implemented and that changes, caused by the inclusion of newly identified SSCs, were included in the UFSAR supplement.
: e. Verify the licensee properly evaluated, and reported when necessary, changes to regulatory commitments in accordance with NEI 99-04 as endorsed by RIS 2000-017.
Review changes to license renewal activities incorporated as part of the UFSAR in accordance with 10 CFR 50.59. Review planned changes to AMPs, TLAAs and other license renewal actions.
71013-03      INSPECTION GUIDANCE 03.01 General Guidance.
In accordance with 10 CFR 2.109(b), if the licensee of a nuclear power plant files a sufficient application for renewal of an operating license at least 5 years before the expiration of the existing license, the existing license will not be deemed to have expired until the application has been finally determined. As such, the licensee will continue to conduct activities in accordance with the facilitys current licensing basis and this may involve operation of the plant beyond the expiration date of the original operating license. Inspection procedure (IP) 71013 was developed for the inspection of license renewal programs for licensees with timely renewal applications to allow for timely verification by NRC inspectors that the licensee has implemented its commitments to AMPs, TLAAs, regulatory commitments accepted by the staff during license renewal as well as commitments to proposed license conditions agreed to by the licensee while the application is being determined and before entering its post-40-year license period. In this case, IP 71003, Post-Approval Site Inspection for License Renewal, would not be applicable.
The intent is to perform either IP 71013 or IP 71003, but not both. The Regions should perform IP 71013 at those plants with license renewal applications that have not yet been determined.
The Regions should perform IP 71003 at those plants with renewed operating licenses.
03.02 Inspection Schedule.
A majority of this inspection is to be performed following the issuance of an SER for license renewal but prior to the expiration date of the original operating license. This may vary as changes occur in the license renewal review process. The inspections are scheduled to support completion of the review in sufficient time for licensees to make any necessary corrections to its AMPs before entering the period of operation beyond the expiration date of the original operating license. Since certain programs and activities may or may not be implemented or completed at the time this inspection occurs, the inspection may be performed in three phases to accommodate the sites implementation schedule, with the potential issuance of three separate inspection reports. Performing this inspection using a three-phase approach is a recommendation and not a requirement.
: a. Phase I: This portion of the inspection is likely to occur during the second to last and/or last refueling outage prior to the expiration date of the original operating license.
Issue Date: 09/25/13                                2                                          71013


71013-02 INSPECTION REQUIREMENTS  02.01  General Inspection Requirements. a. Verify that the licensee adequately completed the commitments made to implemented actions such as proposed license conditions, other regulatory commitments accepted by the staff during license renewal, AMPs and TLAAs.  
This Phase of the inspection is intended to observe the implementation of select AMPs and activities described in the commitments made to proposed license conditions, the UFSAR supplement, AMPs, TLAAs and other regulatory commitments accepted by the staff during license renewal, as well as any testing, or visual inspections of SSCs which are only accessible at reduced power levels. Those SSCs may be located inside the containment, and other high radiation areas. This inspection may occur at each unit of a multi-unit site.
: b. Verify the license renewal application is updated annually in accordance with the requirement to submit changes to the CLB during NRC review of the license renewal application, according to 10 CFR 54.21(b).
: b. Phase II: This portion of the inspection is likely to occur three months to a year prior to the expiration date of the original operating license, depending on the sites implementation schedule of outages and license renewal activities.
Issue Date: 09/25/13 2 71013  c. Verify  or will be included in the annual UFSAR updates as required by 10 CFR 54.37(b) and the guidance provided in RIS 2007-016. d. Verify the UFSAR supplement as revised describes the AMPs and TLAAs in the SER for license renewal. Also verify the UFSAR supplement description matches the AMP  e. Verify the licensee properly evaluated, and reported when necessary, changes to regulatory commitments in accordance with NEI 99-04 as endorsed by RIS 2000-017. Review changes to license renewal activities incorporated as part of the UFSAR in accordance with 10 CFR 50.59. Review planned changes to AMPs, TLAAs and other license renewal actions. 71013-03 INSPECTION GUIDANCE  03.01 General Guidance. In accordance with 10 CFR 2.109(b), if the licensee of a nuclear power plant files a sufficient application for renewal of an operating license at least 5 years before the expiration of the existing license, the existing license will not be deemed to have expired until the application has been finally determined. As such, the licensee will continue to conduct activities in accordance and this may involve operation of the plant beyond the expiration date of the original operating license. Inspection procedure (IP) 71013 was developed for the inspection of license renewal programs for licensees with timely renewal applications to allow for timely verification by NRC inspectors that the licensee has implemented its commitments to AMPs, TLAAs, regulatory commitments accepted by the staff during license renewal as well as commitments to proposed license conditions agreed to by the licensee while the application is being determined and before entering its post-40-year license period. In this case-The intent is to perform either IP 71013 or IP 71003, but not both. The Regions should perform IP 71013 at those plants with license renewal applications that have not yet been determined. The Regions should perform IP 71003 at those plants with renewed operating licenses. 03.02  Inspection Schedule. A majority of this inspection is to be performed following the issuance of an SER for license renewal but prior to the expiration date of the original operating license. This may vary as changes occur in the license renewal review process. The inspections are scheduled to support completion of the review in sufficient time for licensees to make any necessary corrections to its AMPs before entering the period of operation beyond the expiration date of the original operating license. Since certain programs and activities may or may not be implemented or completed at the time this inspection occurs, the inspection may be performed in three phases separate inspection reports. Performing this inspection using a three-phase approach is a recommendation and not a requirement. a. Phase I:  This portion of the inspection is likely to occur during the second to last and/or last refueling outage prior to the expiration date of the original operating license.
This Phase of the inspection is intended to be a one-time major team inspection per site. However, for multi-unit sites, subsequent Phase II inspections may be conducted, as deemed necessary by regional management. Subsequent Phase II inspections at multi-unit sites may not require the same level of effort as the Phase II inspection for the first unit. The inspectors will assess the adequacy and effectiveness of the implementation and/or completion of the programs and activities described in the regulatory commitments accepted by the staff during license renewal, UFSAR supplement program descriptions, TLAAs, and commitments made to proposed license conditions as agreed to by the licensee while the application for renewal is being determined, as well as evaluate the need for any additional follow-up inspections under this inspection procedure or as part of the reactor oversight program (ROP).
Issue Date: 09/25/13 3 71013  This Phase of the inspection is intended to observe the implementation of select AMPs and activities described in the commitments made to proposed license conditions, the UFSAR supplement, AMPs, TLAAs and other regulatory commitments accepted by the staff during license renewal, as well as any testing, or visual inspections of SSCs which are only accessible at reduced power levels. Those SSCs may be located inside the containment, and other high radiation areas. This inspection may occur at each unit of a multi-unit site. b. Phase II:  This portion of the inspection is likely to occur three months to a year prior to the expiration date of the original operating license, implementation schedule of outages and license renewal activities. This Phase of the inspection is intended to be a one-time major team inspection per site. However, for multi-unit sites, subsequent Phase II inspections may be conducted, as deemed necessary by regional management. Subsequent Phase II inspections at multi-unit sites may not require the same level of effort as the Phase II inspection for the first unit. The inspectors will assess the adequacy and effectiveness of the implementation and/or completion of the programs and activities described in the regulatory commitments accepted by the staff during license renewal, UFSAR supplement program descriptions, TLAAs, and commitments made to proposed license conditions as agreed to by the licensee while the application for renewal is being determined, as well as evaluate the need for any additional follow-up inspections under this inspection procedure or as part of the reactor oversight program (ROP). c. Phase III:  This portion of the inspection is likely to occur beyond the expiration date of the original operating license in accordance with the implementation schedule of the commitments made to proposed license conditions, AMPs, TLAAs and other regulatory commitments accepted by the staff during license renewal. This Phase of the inspection is intended to review the implementation of the commitments made to proposed license conditions, regulatory commitments accepted by the staff during license renewal, TLAAs and AMPs with implementation schedules that extend beyond the expiration date of the original operating license, as agreed to by the licensee while the application for renewal is being determined. Additionally, this phase may be implemented to review corrective actions for issues of concern identified during Phases I and II inspections. If, during the planning, execution, or documentation of this procedure, the NRC determines the operating license will not be renewed, inspection efforts should cease. If, during the planning, execution or documentation of this procedure, the NRC approves and renews the operating -Approval Site Inspection for Licen  03.03 Document Review. Inspectors should familiarize themselves with the requirements and guidance related to license renewal. The inspectors should also familiarize themselves with the specific license renewal application and associated SER for the plant being inspected. License renewal requirements and guidance documents that should be reviewed prior to this inspection include:
: c. Phase III: This portion of the inspection is likely to occur beyond the expiration date of the original operating license in accordance with the implementation schedule of the commitments made to proposed license conditions, AMPs, TLAAs and other regulatory commitments accepted by the staff during license renewal.
Issue Date:  09/25/13 4 71013    The statement of consideration published with the revision to 10 CFR Part 54 in the Federal Register, Vol. 60, No. 88, Monday, May 8, 1995, pages 22461 to 22495  The SER and applicable supplements for the plant(s) to be inspected  Appendix A of the SER, if applicable  The UFSAR supplement as revised during the license renewal application review 03.04 Inspection Sample Attributes. In selecting samples, consideration should be given to attributes such as:  The risk significance of SSCs associated with the regulatory commitments, using insights gained from sources suignificance Determination Process (SDP)  The extent of previous license renewal audits and inspections of AMPs  The extent that baseline inspection programs will inspect an SSC or commodity group  The type and maturity of the AMP, for example, programs such as the selective leaching one-time inspection program, or infrequent inspection activities may take priority over long-standing programs such as the Steam Generator Tube Integrity Program, which are routinely inspected   Issues that were addressed in an Atomic Safety Licensing Board (ASLB) hearing or Advisory Committee on Reactor Safeguards (ACRS) committee meeting  Issues that were in the public domain at the time of the license renewal application review  03.05 Level of Effort. This inspection is performed before the expiration date of the original operating license (with the exception of Phase III which may occur after the expiration of the original operating license). Additionally, the number of AMPs, regulatory commitments, TLAAs and commitments made to proposed license conditions vary broadly from plant to plant. Therefore, this procedure does not contain a predetermined sample size for each component of the inspection that would uniformly represent each plant. As such, the lead inspector will determine the sample size and extent of review of the commitments made to proposed license conditions, AMPs, TLAAs and regulatory commitments prior to performing these inspections. The lead inspector should ensure that the team comprehensively inspects a majority (recommended greater than 70%) of the number of:  (1) new AMPs or enhancements to existing AMPs, (2) regulatory commitments, (3) TLAAs, and (4) commitments made to proposed license conditions to assess the adequacy and effectiveness of the license renewal program. Some sites may not require the same level of inspection effort as others and may be inspected using a smaller sample size. Also some multi-unit sites may contain units with similar designs, and therefore may not require the same level of inspection at the additional units as was received for the first unit. The lead inspector should use discretion in determining the inspection sample size at multi-unit sites with similar designs between the units. 03.06 Inspection Sample Selection. Although the renewed operating license has not been issued, the licensee may have agreed to complete certain license renewal activities to support entering the period of extended operation.
This Phase of the inspection is intended to review the implementation of the commitments made to proposed license conditions, regulatory commitments accepted by the staff during license renewal, TLAAs and AMPs with implementation schedules that extend beyond the expiration date of the original operating license, as agreed to by the licensee while the application for renewal is being determined. Additionally, this phase may be implemented to review corrective actions for issues of concern identified during Phases I and II inspections.
Issue Date:  09/25/13 5 71013 The sample section should be based upon the AMPs, TLAAs, regulatory commitments, and also commitments made to proposed license conditions the licensee has agreed to implement while the license renewal application is being determined. a. Selection of Commitments Made to Proposed License Conditions: The sample may include a review of selected commitments made to proposed license conditions. A sample population of commitments made to proposed license conditions will be inspected to the extent necessary to determine that the license conditions were implemented consistent with the licensee commitments. Inspection of the commitments made to proposed license conditions should include a review of supporting documentation to determine if the licensee has taken the appropriate actions, including corrective action, to satisfy a particular license condition. Appropriate technical expertise should be requested from the license renewal program office if needed. b. Selection of Regulatory Commitments:  The sample should include a review of selected regulatory commitments which were accepted by the staff during the course of the license renewal application review and describes a modification or enhancement to a program, or future actions necessary for compliance with 10 CFR Part 50 or 10 CFR Part 54. The selected regulatory commitments will be inspected to the extent necessary to determine that the commitments were implemented, and any modifications were completed in accordance with NEI 99-04 as endorsed by RIS 2000-017. The inspection team should determine there is reasonable assurance the commitment tracking program is effective. The inspection of regulatory commitments should include a review of supporting documentation to determine if the licensee has taken the appropriate actions, including corrective action, to satisfy a particular commitment. Appropriate technical expertise should be requested from the license renewal program office if needed. c. Selection of AMPs:  The sample should include a review of selected AMPs that are new, or have been modified or enhanced. The selected AMPs will be inspected to the extent necessary to determine that updates, modifications and implementation occurred consistent with the licensee commitments. AMP activities, bases and acceptance criteria should be appropriately proceduralized. The license renewal program office recommends that the inspector include as part of his or her sample selection the Buried and Underground Piping and Tanks Program, the One-Time Inspection Program, and the Selective Leaching Program on the basis that these programs may involve new or unique inspection or testing activities that are being performed by the licensee for the first time or may identify inspection or test results that the licensee may not have experienced in the past. Appropriate technical expertise should be requested from the license renewal program office if needed. d. Selection of TLAAs: The sample should include a review of selected TLAAs that have an associated AMP in accordance with 10 CFR 54.21(c)(1)(iii). The inspector should verify that the AMP describes how the licensee will manage, update or refine the TLAA during the PEO. The inspector should verify that the AMP demonstrates how the licensee meets the acceptance criteria for the CLB. The AMP should contain the licenseelicenseeactions may include taking the appropriate corrective actions to repair and/or replace impacted SSCs, recalculating the TLAA, or initiating additional inspection activities.
If, during the planning, execution, or documentation of this procedure, the NRC determines the operating license will not be renewed, inspection efforts should cease. If, during the planning, execution or documentation of this procedure, the NRC approves and renews the operating license, the inspection efforts should shift to the corresponding portion of IP 71003, Post-Approval Site Inspection for License Renewal.
Issue Date:  09/25/13 6 71013 AMP activities, bases and acceptance criteria that relate to TLAA acceptance under 10 CFR 54.21(c)(1)(iii) should be appropriately proceduralized. There are currently three programs that the inspector may want to include as part of his or her sample selection:  the Fatigue Monitoring Program, the Concrete Containment Tendon Prestress Program, and the Environmental Qualification of Electric Components Program. However, the inspector may want to contact the license renewal program office to identify which TLAAs were of significant interest during the license renewal application review for a particular plant to determine which TLAAs will be reviewed for this portion of the inspection. Also, for questions or concerns by the inspector during the review of highly specialized TLAAs, or for errors identified by the inspector to have significant impact on 10 CFR 54.21(c)(1)(i) or 10 CFR 54.21(c)(1)(ii), assistance should be requested from the license renewal program office. e. Inspection of Newly Identified Systems:  Licensees may identify new SSCs that should be within the scope of its license renewal program at any time. SSCs may be inspected to the extent necessary to ensure that the licensee adequately evaluated and included applicable SSCs into its AMPs or TLAAs. Inspectors should contact Division of License Renewal (DLR) staff for:  (1) information on generic communications that were issued naming newly identified SSCs, or (2) technical assistance regarding the review of new aging management programs that have been developed by the licensee. f. Inspection of the UFSAR supplement:  The UFSAR supplement describes the AMPs and TLAAs in the SER for license renewal. This inspection verifies that the UFSAR supplement description matches the AMP or TLAA being implemented and that UFSAR supplement. If the licensee has not submitted an UFSAR supplement update since implementing the AMP or TLAA, review the planned UFSAR supplement changes and verify that they are included in an appropriate tracking system. 03.07 Dispositioning Issues of Concern. The renewed operating license may not be issued at the time this inspection occurs. Therefore, inspectors can document observations and issues of concern associated with the implementation and/or completion of commitments made to proposed license conditions, regulatory commitments, TLAAs and AMPs, which will be evaluated and dispositioned using the guidance in Inspection Manual Chapters 0612 and 2516, and may be used to determine the acceptability of the license renewal application. 71013-04 RESOURCE ESTIMATES  The total resource expenditure of this inspection procedure is estimated to be approximately 1,120 hours for a one-unit site, 2,052 hours for a dual-unit site, and 2,850 hours for a three-unit site. This resource estimate includes the preparation and documentation weeks. This resource estimate does not include the time spent travelling to and from the site. It is expected that the four Regions will coordinate the scheduling of license renewal inspections and share resources so as not to exceed the total resources allocated per year for all license renewal inspections.
03.03 Document Review.
Issue Date:  09/25/13 7 71013  71013-05 REFERENCES  -          -Water Reactor Inspection Program      NRR Office Instruction LIC-  NEI 99-  NUREG-r Nuclear  NUREG-  NRC-approved Interim Staff Guidance positions relating to license renewal  Regulatory Issue Summary (RIS) 2007-54.37(b) fo  RIS 2000-  END Issue Date:  09/25/13 Att1-1 71013 Attachment 1  Revision History For 71013  Commitment Tracking Number Accession Number Issue Date Change Notice Description of Change Description of Training Required and Completion Date  Comment and Feedback Resolution Accession Number  N/A ML13032A102 09/25/13 CN 13-023 A four year historical search for commitments was performed. Change Notice 11-004 for temporary instruction (TI) 2516/001 was found related to timely renewal inspection activities. TI 2516/001, Review of License Renewal Activities, expires on December 31, 2013, at which point timely renewal inspection activities will be conducted in accordance with  IP 71013. N/A N/A}}
Inspectors should familiarize themselves with the requirements and guidance related to license renewal. The inspectors should also familiarize themselves with the specific license renewal application and associated SER for the plant being inspected. License renewal requirements and guidance documents that should be reviewed prior to this inspection include:
Issue Date: 09/25/13                                3                                          71013
 
10 CFR Part 54, Requirements for Renewal of Operating Licenses for Nuclear Power Plants The statement of consideration published with the revision to 10 CFR Part 54 in the Federal Register, Vol. 60, No. 88, Monday, May 8, 1995, pages 22461 to 22495 The SER and applicable supplements for the plant(s) to be inspected Appendix A of the SER, if applicable The UFSAR supplement as revised during the license renewal application review 03.04 Inspection Sample Attributes.
In selecting samples, consideration should be given to attributes such as:
The risk significance of SSCs associated with the regulatory commitments, using insights gained from sources such as the NRCs Significance Determination Process (SDP) Risk Informed Inspection Notebooks, Revision 2 The extent of previous license renewal audits and inspections of AMPs The extent that baseline inspection programs will inspect an SSC or commodity group The type and maturity of the AMP, for example, programs such as the selective leaching one-time inspection program, or infrequent inspection activities may take priority over long-standing programs such as the Steam Generator Tube Integrity Program, which are routinely inspected Issues that were addressed in an Atomic Safety Licensing Board (ASLB) hearing or Advisory Committee on Reactor Safeguards (ACRS) committee meeting Issues that were in the public domain at the time of the license renewal application review 03.05 Level of Effort.
This inspection is performed before the expiration date of the original operating license (with the exception of Phase III which may occur after the expiration of the original operating license).
Additionally, the number of AMPs, regulatory commitments, TLAAs and commitments made to proposed license conditions vary broadly from plant to plant. Therefore, this procedure does not contain a predetermined sample size for each component of the inspection that would uniformly represent each plant. As such, the lead inspector will determine the sample size and extent of review of the commitments made to proposed license conditions, AMPs, TLAAs and regulatory commitments prior to performing these inspections. The lead inspector should ensure that the team comprehensively inspects a majority (recommended greater than 70%) of the number of:
(1) new AMPs or enhancements to existing AMPs, (2) regulatory commitments, (3) TLAAs, and (4) commitments made to proposed license conditions to assess the adequacy and effectiveness of the license renewal program. Some sites may not require the same level of inspection effort as others and may be inspected using a smaller sample size. Also some multi-unit sites may contain units with similar designs, and therefore may not require the same level of inspection at the additional units as was received for the first unit. The lead inspector should use discretion in determining the inspection sample size at multi-unit sites with similar designs between the units.
03.06 Inspection Sample Selection.
Although the renewed operating license has not been issued, the licensee may have agreed to complete certain license renewal activities to support entering the period of extended operation.
Issue Date: 09/25/13                            4                                            71013
 
The sample section should be based upon the AMPs, TLAAs, regulatory commitments, and also commitments made to proposed license conditions the licensee has agreed to implement while the license renewal application is being determined.
: a. Selection of Commitments Made to Proposed License Conditions: The sample may include a review of selected commitments made to proposed license conditions. A sample population of commitments made to proposed license conditions will be inspected to the extent necessary to determine that the license conditions were implemented consistent with the licensees commitments. Inspection of the commitments made to proposed license conditions should include a review of supporting documentation to determine if the licensee has taken the appropriate actions, including corrective action, to satisfy a particular license condition. Appropriate technical expertise should be requested from the license renewal program office if needed.
: b. Selection of Regulatory Commitments: The sample should include a review of selected regulatory commitments which were accepted by the staff during the course of the license renewal application review and describes a modification or enhancement to a program, or future actions necessary for compliance with 10 CFR Part 50 or 10 CFR Part 54. The selected regulatory commitments will be inspected to the extent necessary to determine that the commitments were implemented, and any modifications were completed in accordance with NEI 99-04 as endorsed by RIS 2000-017. The inspection team should determine there is reasonable assurance the commitment tracking program is effective. The inspection of regulatory commitments should include a review of supporting documentation to determine if the licensee has taken the appropriate actions, including corrective action, to satisfy a particular commitment. Appropriate technical expertise should be requested from the license renewal program office if needed.
: c. Selection of AMPs: The sample should include a review of selected AMPs that are new, or have been modified or enhanced. The selected AMPs will be inspected to the extent necessary to determine that updates, modifications and implementation occurred consistent with the licensees commitments. AMP activities, bases and acceptance criteria should be appropriately proceduralized. The license renewal program office recommends that the inspector include as part of his or her sample selection the Buried and Underground Piping and Tanks Program, the One-Time Inspection Program, and the Selective Leaching Program on the basis that these programs may involve new or unique inspection or testing activities that are being performed by the licensee for the first time or may identify inspection or test results that the licensee may not have experienced in the past. Appropriate technical expertise should be requested from the license renewal program office if needed.
: d. Selection of TLAAs: The sample should include a review of selected TLAAs that have an associated AMP in accordance with 10 CFR 54.21(c)(1)(iii). The inspector should verify that the AMP describes how the licensee will manage, update or refine the TLAA during the PEO. The inspector should verify that the AMP demonstrates how the licensee meets the acceptance criteria for the CLB. The AMP should contain the licensees actions when the CLB acceptance criteria are exceeded. The licensees actions may include taking the appropriate corrective actions to repair and/or replace impacted SSCs, recalculating the TLAA, or initiating additional inspection activities.
Issue Date: 09/25/13                              5                                          71013
 
AMP activities, bases and acceptance criteria that relate to TLAA acceptance under 10 CFR 54.21(c)(1)(iii) should be appropriately proceduralized. There are currently three programs that the inspector may want to include as part of his or her sample selection:
the Fatigue Monitoring Program, the Concrete Containment Tendon Prestress Program, and the Environmental Qualification of Electric Components Program. However, the inspector may want to contact the license renewal program office to identify which TLAAs were of significant interest during the license renewal application review for a particular plant to determine which TLAAs will be reviewed for this portion of the inspection. Also, for questions or concerns by the inspector during the review of highly specialized TLAAs, or for errors identified by the inspector to have significant impact on 10 CFR 54.21(c)(1)(i) or 10 CFR 54.21(c)(1)(ii), assistance should be requested from the license renewal program office.
: e. Inspection of Newly Identified Systems: Licensees may identify new SSCs that should be within the scope of its license renewal program at any time. Any newly identified SSCs may be inspected to the extent necessary to ensure that the licensee adequately evaluated and included applicable SSCs into its AMPs or TLAAs. Inspectors should contact Division of License Renewal (DLR) staff for: (1) information on generic communications that were issued naming newly identified SSCs, or (2) technical assistance regarding the review of new aging management programs that have been developed by the licensee.
: f. Inspection of the UFSAR supplement: The UFSAR supplement describes the AMPs and TLAAs in the SER for license renewal. This inspection verifies that the UFSAR supplement description matches the AMP or TLAA being implemented and that changes, caused by the inclusion of newly identified SSCs, were included in the UFSAR supplement. If the licensee has not submitted an UFSAR supplement update since implementing the AMP or TLAA, review the planned UFSAR supplement changes and verify that they are included in an appropriate tracking system.
03.07 Dispositioning Issues of Concern.
The renewed operating license may not be issued at the time this inspection occurs. Therefore, inspectors can document observations and issues of concern associated with the implementation and/or completion of commitments made to proposed license conditions, regulatory commitments, TLAAs and AMPs, which will be evaluated and dispositioned using the guidance in Inspection Manual Chapters 0612 and 2516, and may be used to determine the acceptability of the license renewal application.
71013-04    RESOURCE ESTIMATES The total resource expenditure of this inspection procedure is estimated to be approximately 1,120 hours for a one-unit site, 2,052 hours for a dual-unit site, and 2,850 hours for a three-unit site. This resource estimate includes the preparation and documentation weeks. This resource estimate does not include the time spent travelling to and from the site. It is expected that the four Regions will coordinate the scheduling of license renewal inspections and share resources so as not to exceed the total resources allocated per year for all license renewal inspections.
Issue Date: 09/25/13                              6                                          71013
 
71013-05    REFERENCES IP 71003, Post-Approval Site Inspection for License Renewal 10 CFR Part 50, Domestic Licensing of Production and Utilization Facilities 10 CFR Part 54, Requirements for Renewal of Operating Licenses for Nuclear Power Plants IMC 0308, Reactor Oversight Process Basis Document IMC 0612, Power Reactor Inspection Reports IMC 2515, Light-Water Reactor Inspection Program - Operations Phase IMC 2516, Policy and Guidance for the License Renewal Inspection Program NRR Office Instruction LIC-105, Managing Regulatory Commitments Made by the Licensee to the NRC NEI 99-04, Guidelines for Managing NRC Commitment Changes Revision 0, July 1999 NUREG-1800, Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants NUREG-1801, Generic Aging Lessons Learned (GALL) Report NRC-approved Interim Staff Guidance positions relating to license renewal Regulatory Issue Summary (RIS) 2007-16, Implementation of the Requirements of 10 CFR 54.37(b) for Holders of Renewed Licenses RIS 2000-017, Managing Regulatory Commitments Made by Power Reactor Licensees to the NRC Staff END Issue Date: 09/25/13                            7                                    71013
 
Attachment 1 - Revision History For 71013 Commitment    Accession Number                  Description of Change                Description of Comment and Tracking        Issue Date                                                          Training Required  Feedback Number        Change Notice                                                          and Completion    Resolution Date        Accession Number N/A            ML13032A102      A four year historical search for commitments was            N/A            N/A 09/25/13          performed. Change Notice 11-004 for temporary CN 13-023        instruction (TI) 2516/001 was found related to timely renewal inspection activities. TI 2516/001, Review of License Renewal Activities, expires on December 31, 2013, at which point timely renewal inspection activities will be conducted in accordance with IP 71013.
Issue Date: 09/25/13                                        Att1-1                                                71013}}

Latest revision as of 03:54, 31 October 2019

Official Exhibit - NRC000183-00-BD01 - NRC Inspection Manual, Inspection Procedure 71013, Site Inspection for Plants with a Timely Renewal Application (Sept. 25, 2013)
ML15335A273
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 08/10/2015
From:
NRC/OGC
To:
SECY RAS
References
RAS 28147, ASLBP 07-858-03-LR-BD01, 50-247-LR, 50-286-LR
Download: ML15335A273 (8)


Text

United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of: Entergy Nuclear Operations, Inc. NRC000183 (Indian Point Nuclear Generating Units 2 and 3)

ASLBP #: 07-858-03-LR-BD01 Submitted: August 10, 2015 Docket #: 05000247 l 05000286 Exhibit #: NRC000183-00-BD01 Identified: 11/5/2015 Admitted: 11/5/2015 Withdrawn:

Rejected: Stricken:

Other:

NRC INSPECTION MANUAL DLR INSPECTION PROCEDURE 71013 SITE INSPECTION FOR PLANTS WITH A TIMELY RENEWAL APPLICATION PROGRAM APPLICABILITY: IMC 2515 71013-01 INSPECTION OBJECTIVES 01.01 To determine whether commitments made by the licensee to implement actions such as proposed license conditions, other regulatory commitments accepted by the staff during the course of license renewal, selected aging management programs (AMPs), and time-limited aging analyses (TLAAs) are implemented or completed 01.02 To verify the license renewal application is updated annually in accordance with the requirement to submit changes to the current licensing basis (CLB) during the U.S. Nuclear Regulatory Commission (NRC) review of the license renewal application as required by 10 CFR 54.21(b) 01.03 To verify the newly identified systems, structures, and components (SSCs) are or will be included in the annual updated final safety analysis report (UFSAR) updates as required by 10 CFR 54.37(b) 01.04 To verify the description of the AMPs and related activities covered in §01.01 that are contained in the UFSAR supplement are consistent with the programs the licensee agreed to implement 01.05 To verify changes to the regulatory commitments the licensee agreed to implement or complete for license renewal are evaluated in accordance with NEI 99-04, Guidelines for Managing NRC Commitment Changes as endorsed by regulatory issue summary (RIS) 2000-017, and changes to the license renewal activities incorporated as part of the UFSAR are evaluated in accordance with the requirements of Title 10 of the Code of Federal Regulations (10 CFR) 50.59 71013-02 INSPECTION REQUIREMENTS 02.01 General Inspection Requirements.

a. Verify that the licensee adequately completed the commitments made to implemented actions such as proposed license conditions, other regulatory commitments accepted by the staff during license renewal, AMPs and TLAAs.
b. Verify the license renewal application is updated annually in accordance with the requirement to submit changes to the CLB during NRC review of the license renewal application, according to 10 CFR 54.21(b).

Issue Date: 09/25/13 1 71013

c. Verify that newly identified SSCs are or will be included in the annual UFSAR updates as required by 10 CFR 54.37(b) and the guidance provided in RIS 2007-016.
d. Verify the UFSAR supplement as revised describes the AMPs and TLAAs in the SER for license renewal. Also verify the UFSAR supplement description matches the AMP or TLAA being implemented and that changes, caused by the inclusion of newly identified SSCs, were included in the UFSAR supplement.
e. Verify the licensee properly evaluated, and reported when necessary, changes to regulatory commitments in accordance with NEI 99-04 as endorsed by RIS 2000-017.

Review changes to license renewal activities incorporated as part of the UFSAR in accordance with 10 CFR 50.59. Review planned changes to AMPs, TLAAs and other license renewal actions.

71013-03 INSPECTION GUIDANCE 03.01 General Guidance.

In accordance with 10 CFR 2.109(b), if the licensee of a nuclear power plant files a sufficient application for renewal of an operating license at least 5 years before the expiration of the existing license, the existing license will not be deemed to have expired until the application has been finally determined. As such, the licensee will continue to conduct activities in accordance with the facilitys current licensing basis and this may involve operation of the plant beyond the expiration date of the original operating license. Inspection procedure (IP) 71013 was developed for the inspection of license renewal programs for licensees with timely renewal applications to allow for timely verification by NRC inspectors that the licensee has implemented its commitments to AMPs, TLAAs, regulatory commitments accepted by the staff during license renewal as well as commitments to proposed license conditions agreed to by the licensee while the application is being determined and before entering its post-40-year license period. In this case, IP 71003, Post-Approval Site Inspection for License Renewal, would not be applicable.

The intent is to perform either IP 71013 or IP 71003, but not both. The Regions should perform IP 71013 at those plants with license renewal applications that have not yet been determined.

The Regions should perform IP 71003 at those plants with renewed operating licenses.

03.02 Inspection Schedule.

A majority of this inspection is to be performed following the issuance of an SER for license renewal but prior to the expiration date of the original operating license. This may vary as changes occur in the license renewal review process. The inspections are scheduled to support completion of the review in sufficient time for licensees to make any necessary corrections to its AMPs before entering the period of operation beyond the expiration date of the original operating license. Since certain programs and activities may or may not be implemented or completed at the time this inspection occurs, the inspection may be performed in three phases to accommodate the sites implementation schedule, with the potential issuance of three separate inspection reports. Performing this inspection using a three-phase approach is a recommendation and not a requirement.

a. Phase I: This portion of the inspection is likely to occur during the second to last and/or last refueling outage prior to the expiration date of the original operating license.

Issue Date: 09/25/13 2 71013

This Phase of the inspection is intended to observe the implementation of select AMPs and activities described in the commitments made to proposed license conditions, the UFSAR supplement, AMPs, TLAAs and other regulatory commitments accepted by the staff during license renewal, as well as any testing, or visual inspections of SSCs which are only accessible at reduced power levels. Those SSCs may be located inside the containment, and other high radiation areas. This inspection may occur at each unit of a multi-unit site.

b. Phase II: This portion of the inspection is likely to occur three months to a year prior to the expiration date of the original operating license, depending on the sites implementation schedule of outages and license renewal activities.

This Phase of the inspection is intended to be a one-time major team inspection per site. However, for multi-unit sites, subsequent Phase II inspections may be conducted, as deemed necessary by regional management. Subsequent Phase II inspections at multi-unit sites may not require the same level of effort as the Phase II inspection for the first unit. The inspectors will assess the adequacy and effectiveness of the implementation and/or completion of the programs and activities described in the regulatory commitments accepted by the staff during license renewal, UFSAR supplement program descriptions, TLAAs, and commitments made to proposed license conditions as agreed to by the licensee while the application for renewal is being determined, as well as evaluate the need for any additional follow-up inspections under this inspection procedure or as part of the reactor oversight program (ROP).

c. Phase III: This portion of the inspection is likely to occur beyond the expiration date of the original operating license in accordance with the implementation schedule of the commitments made to proposed license conditions, AMPs, TLAAs and other regulatory commitments accepted by the staff during license renewal.

This Phase of the inspection is intended to review the implementation of the commitments made to proposed license conditions, regulatory commitments accepted by the staff during license renewal, TLAAs and AMPs with implementation schedules that extend beyond the expiration date of the original operating license, as agreed to by the licensee while the application for renewal is being determined. Additionally, this phase may be implemented to review corrective actions for issues of concern identified during Phases I and II inspections.

If, during the planning, execution, or documentation of this procedure, the NRC determines the operating license will not be renewed, inspection efforts should cease. If, during the planning, execution or documentation of this procedure, the NRC approves and renews the operating license, the inspection efforts should shift to the corresponding portion of IP 71003, Post-Approval Site Inspection for License Renewal.

03.03 Document Review.

Inspectors should familiarize themselves with the requirements and guidance related to license renewal. The inspectors should also familiarize themselves with the specific license renewal application and associated SER for the plant being inspected. License renewal requirements and guidance documents that should be reviewed prior to this inspection include:

Issue Date: 09/25/13 3 71013

10 CFR Part 54, Requirements for Renewal of Operating Licenses for Nuclear Power Plants The statement of consideration published with the revision to 10 CFR Part 54 in the Federal Register, Vol. 60, No. 88, Monday, May 8, 1995, pages 22461 to 22495 The SER and applicable supplements for the plant(s) to be inspected Appendix A of the SER, if applicable The UFSAR supplement as revised during the license renewal application review 03.04 Inspection Sample Attributes.

In selecting samples, consideration should be given to attributes such as:

The risk significance of SSCs associated with the regulatory commitments, using insights gained from sources such as the NRCs Significance Determination Process (SDP) Risk Informed Inspection Notebooks, Revision 2 The extent of previous license renewal audits and inspections of AMPs The extent that baseline inspection programs will inspect an SSC or commodity group The type and maturity of the AMP, for example, programs such as the selective leaching one-time inspection program, or infrequent inspection activities may take priority over long-standing programs such as the Steam Generator Tube Integrity Program, which are routinely inspected Issues that were addressed in an Atomic Safety Licensing Board (ASLB) hearing or Advisory Committee on Reactor Safeguards (ACRS) committee meeting Issues that were in the public domain at the time of the license renewal application review 03.05 Level of Effort.

This inspection is performed before the expiration date of the original operating license (with the exception of Phase III which may occur after the expiration of the original operating license).

Additionally, the number of AMPs, regulatory commitments, TLAAs and commitments made to proposed license conditions vary broadly from plant to plant. Therefore, this procedure does not contain a predetermined sample size for each component of the inspection that would uniformly represent each plant. As such, the lead inspector will determine the sample size and extent of review of the commitments made to proposed license conditions, AMPs, TLAAs and regulatory commitments prior to performing these inspections. The lead inspector should ensure that the team comprehensively inspects a majority (recommended greater than 70%) of the number of:

(1) new AMPs or enhancements to existing AMPs, (2) regulatory commitments, (3) TLAAs, and (4) commitments made to proposed license conditions to assess the adequacy and effectiveness of the license renewal program. Some sites may not require the same level of inspection effort as others and may be inspected using a smaller sample size. Also some multi-unit sites may contain units with similar designs, and therefore may not require the same level of inspection at the additional units as was received for the first unit. The lead inspector should use discretion in determining the inspection sample size at multi-unit sites with similar designs between the units.

03.06 Inspection Sample Selection.

Although the renewed operating license has not been issued, the licensee may have agreed to complete certain license renewal activities to support entering the period of extended operation.

Issue Date: 09/25/13 4 71013

The sample section should be based upon the AMPs, TLAAs, regulatory commitments, and also commitments made to proposed license conditions the licensee has agreed to implement while the license renewal application is being determined.

a. Selection of Commitments Made to Proposed License Conditions: The sample may include a review of selected commitments made to proposed license conditions. A sample population of commitments made to proposed license conditions will be inspected to the extent necessary to determine that the license conditions were implemented consistent with the licensees commitments. Inspection of the commitments made to proposed license conditions should include a review of supporting documentation to determine if the licensee has taken the appropriate actions, including corrective action, to satisfy a particular license condition. Appropriate technical expertise should be requested from the license renewal program office if needed.
b. Selection of Regulatory Commitments: The sample should include a review of selected regulatory commitments which were accepted by the staff during the course of the license renewal application review and describes a modification or enhancement to a program, or future actions necessary for compliance with 10 CFR Part 50 or 10 CFR Part 54. The selected regulatory commitments will be inspected to the extent necessary to determine that the commitments were implemented, and any modifications were completed in accordance with NEI 99-04 as endorsed by RIS 2000-017. The inspection team should determine there is reasonable assurance the commitment tracking program is effective. The inspection of regulatory commitments should include a review of supporting documentation to determine if the licensee has taken the appropriate actions, including corrective action, to satisfy a particular commitment. Appropriate technical expertise should be requested from the license renewal program office if needed.
c. Selection of AMPs: The sample should include a review of selected AMPs that are new, or have been modified or enhanced. The selected AMPs will be inspected to the extent necessary to determine that updates, modifications and implementation occurred consistent with the licensees commitments. AMP activities, bases and acceptance criteria should be appropriately proceduralized. The license renewal program office recommends that the inspector include as part of his or her sample selection the Buried and Underground Piping and Tanks Program, the One-Time Inspection Program, and the Selective Leaching Program on the basis that these programs may involve new or unique inspection or testing activities that are being performed by the licensee for the first time or may identify inspection or test results that the licensee may not have experienced in the past. Appropriate technical expertise should be requested from the license renewal program office if needed.
d. Selection of TLAAs: The sample should include a review of selected TLAAs that have an associated AMP in accordance with 10 CFR 54.21(c)(1)(iii). The inspector should verify that the AMP describes how the licensee will manage, update or refine the TLAA during the PEO. The inspector should verify that the AMP demonstrates how the licensee meets the acceptance criteria for the CLB. The AMP should contain the licensees actions when the CLB acceptance criteria are exceeded. The licensees actions may include taking the appropriate corrective actions to repair and/or replace impacted SSCs, recalculating the TLAA, or initiating additional inspection activities.

Issue Date: 09/25/13 5 71013

AMP activities, bases and acceptance criteria that relate to TLAA acceptance under 10 CFR 54.21(c)(1)(iii) should be appropriately proceduralized. There are currently three programs that the inspector may want to include as part of his or her sample selection:

the Fatigue Monitoring Program, the Concrete Containment Tendon Prestress Program, and the Environmental Qualification of Electric Components Program. However, the inspector may want to contact the license renewal program office to identify which TLAAs were of significant interest during the license renewal application review for a particular plant to determine which TLAAs will be reviewed for this portion of the inspection. Also, for questions or concerns by the inspector during the review of highly specialized TLAAs, or for errors identified by the inspector to have significant impact on 10 CFR 54.21(c)(1)(i) or 10 CFR 54.21(c)(1)(ii), assistance should be requested from the license renewal program office.

e. Inspection of Newly Identified Systems: Licensees may identify new SSCs that should be within the scope of its license renewal program at any time. Any newly identified SSCs may be inspected to the extent necessary to ensure that the licensee adequately evaluated and included applicable SSCs into its AMPs or TLAAs. Inspectors should contact Division of License Renewal (DLR) staff for: (1) information on generic communications that were issued naming newly identified SSCs, or (2) technical assistance regarding the review of new aging management programs that have been developed by the licensee.
f. Inspection of the UFSAR supplement: The UFSAR supplement describes the AMPs and TLAAs in the SER for license renewal. This inspection verifies that the UFSAR supplement description matches the AMP or TLAA being implemented and that changes, caused by the inclusion of newly identified SSCs, were included in the UFSAR supplement. If the licensee has not submitted an UFSAR supplement update since implementing the AMP or TLAA, review the planned UFSAR supplement changes and verify that they are included in an appropriate tracking system.

03.07 Dispositioning Issues of Concern.

The renewed operating license may not be issued at the time this inspection occurs. Therefore, inspectors can document observations and issues of concern associated with the implementation and/or completion of commitments made to proposed license conditions, regulatory commitments, TLAAs and AMPs, which will be evaluated and dispositioned using the guidance in Inspection Manual Chapters 0612 and 2516, and may be used to determine the acceptability of the license renewal application.

71013-04 RESOURCE ESTIMATES The total resource expenditure of this inspection procedure is estimated to be approximately 1,120 hours0.00139 days <br />0.0333 hours <br />1.984127e-4 weeks <br />4.566e-5 months <br /> for a one-unit site, 2,052 hours6.018519e-4 days <br />0.0144 hours <br />8.597884e-5 weeks <br />1.9786e-5 months <br /> for a dual-unit site, and 2,850 hours0.00984 days <br />0.236 hours <br />0.00141 weeks <br />3.23425e-4 months <br /> for a three-unit site. This resource estimate includes the preparation and documentation weeks. This resource estimate does not include the time spent travelling to and from the site. It is expected that the four Regions will coordinate the scheduling of license renewal inspections and share resources so as not to exceed the total resources allocated per year for all license renewal inspections.

Issue Date: 09/25/13 6 71013

71013-05 REFERENCES IP 71003, Post-Approval Site Inspection for License Renewal 10 CFR Part 50, Domestic Licensing of Production and Utilization Facilities 10 CFR Part 54, Requirements for Renewal of Operating Licenses for Nuclear Power Plants IMC 0308, Reactor Oversight Process Basis Document IMC 0612, Power Reactor Inspection Reports IMC 2515, Light-Water Reactor Inspection Program - Operations Phase IMC 2516, Policy and Guidance for the License Renewal Inspection Program NRR Office Instruction LIC-105, Managing Regulatory Commitments Made by the Licensee to the NRC NEI 99-04, Guidelines for Managing NRC Commitment Changes Revision 0, July 1999 NUREG-1800, Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants NUREG-1801, Generic Aging Lessons Learned (GALL) Report NRC-approved Interim Staff Guidance positions relating to license renewal Regulatory Issue Summary (RIS) 2007-16, Implementation of the Requirements of 10 CFR 54.37(b) for Holders of Renewed Licenses RIS 2000-017, Managing Regulatory Commitments Made by Power Reactor Licensees to the NRC Staff END Issue Date: 09/25/13 7 71013

Attachment 1 - Revision History For 71013 Commitment Accession Number Description of Change Description of Comment and Tracking Issue Date Training Required Feedback Number Change Notice and Completion Resolution Date Accession Number N/A ML13032A102 A four year historical search for commitments was N/A N/A 09/25/13 performed. Change Notice 11-004 for temporary CN 13-023 instruction (TI) 2516/001 was found related to timely renewal inspection activities. TI 2516/001, Review of License Renewal Activities, expires on December 31, 2013, at which point timely renewal inspection activities will be conducted in accordance with IP 71013.

Issue Date: 09/25/13 Att1-1 71013

United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of: Entergy Nuclear Operations, Inc. NRC000183 (Indian Point Nuclear Generating Units 2 and 3)

ASLBP #: 07-858-03-LR-BD01 Submitted: August 10, 2015 Docket #: 05000247 l 05000286 Exhibit #: NRC000183-00-BD01 Identified: 11/5/2015 Admitted: 11/5/2015 Withdrawn:

Rejected: Stricken:

Other:

NRC INSPECTION MANUAL DLR INSPECTION PROCEDURE 71013 SITE INSPECTION FOR PLANTS WITH A TIMELY RENEWAL APPLICATION PROGRAM APPLICABILITY: IMC 2515 71013-01 INSPECTION OBJECTIVES 01.01 To determine whether commitments made by the licensee to implement actions such as proposed license conditions, other regulatory commitments accepted by the staff during the course of license renewal, selected aging management programs (AMPs), and time-limited aging analyses (TLAAs) are implemented or completed 01.02 To verify the license renewal application is updated annually in accordance with the requirement to submit changes to the current licensing basis (CLB) during the U.S. Nuclear Regulatory Commission (NRC) review of the license renewal application as required by 10 CFR 54.21(b) 01.03 To verify the newly identified systems, structures, and components (SSCs) are or will be included in the annual updated final safety analysis report (UFSAR) updates as required by 10 CFR 54.37(b) 01.04 To verify the description of the AMPs and related activities covered in §01.01 that are contained in the UFSAR supplement are consistent with the programs the licensee agreed to implement 01.05 To verify changes to the regulatory commitments the licensee agreed to implement or complete for license renewal are evaluated in accordance with NEI 99-04, Guidelines for Managing NRC Commitment Changes as endorsed by regulatory issue summary (RIS) 2000-017, and changes to the license renewal activities incorporated as part of the UFSAR are evaluated in accordance with the requirements of Title 10 of the Code of Federal Regulations (10 CFR) 50.59 71013-02 INSPECTION REQUIREMENTS 02.01 General Inspection Requirements.

a. Verify that the licensee adequately completed the commitments made to implemented actions such as proposed license conditions, other regulatory commitments accepted by the staff during license renewal, AMPs and TLAAs.
b. Verify the license renewal application is updated annually in accordance with the requirement to submit changes to the CLB during NRC review of the license renewal application, according to 10 CFR 54.21(b).

Issue Date: 09/25/13 1 71013

c. Verify that newly identified SSCs are or will be included in the annual UFSAR updates as required by 10 CFR 54.37(b) and the guidance provided in RIS 2007-016.
d. Verify the UFSAR supplement as revised describes the AMPs and TLAAs in the SER for license renewal. Also verify the UFSAR supplement description matches the AMP or TLAA being implemented and that changes, caused by the inclusion of newly identified SSCs, were included in the UFSAR supplement.
e. Verify the licensee properly evaluated, and reported when necessary, changes to regulatory commitments in accordance with NEI 99-04 as endorsed by RIS 2000-017.

Review changes to license renewal activities incorporated as part of the UFSAR in accordance with 10 CFR 50.59. Review planned changes to AMPs, TLAAs and other license renewal actions.

71013-03 INSPECTION GUIDANCE 03.01 General Guidance.

In accordance with 10 CFR 2.109(b), if the licensee of a nuclear power plant files a sufficient application for renewal of an operating license at least 5 years before the expiration of the existing license, the existing license will not be deemed to have expired until the application has been finally determined. As such, the licensee will continue to conduct activities in accordance with the facilitys current licensing basis and this may involve operation of the plant beyond the expiration date of the original operating license. Inspection procedure (IP) 71013 was developed for the inspection of license renewal programs for licensees with timely renewal applications to allow for timely verification by NRC inspectors that the licensee has implemented its commitments to AMPs, TLAAs, regulatory commitments accepted by the staff during license renewal as well as commitments to proposed license conditions agreed to by the licensee while the application is being determined and before entering its post-40-year license period. In this case, IP 71003, Post-Approval Site Inspection for License Renewal, would not be applicable.

The intent is to perform either IP 71013 or IP 71003, but not both. The Regions should perform IP 71013 at those plants with license renewal applications that have not yet been determined.

The Regions should perform IP 71003 at those plants with renewed operating licenses.

03.02 Inspection Schedule.

A majority of this inspection is to be performed following the issuance of an SER for license renewal but prior to the expiration date of the original operating license. This may vary as changes occur in the license renewal review process. The inspections are scheduled to support completion of the review in sufficient time for licensees to make any necessary corrections to its AMPs before entering the period of operation beyond the expiration date of the original operating license. Since certain programs and activities may or may not be implemented or completed at the time this inspection occurs, the inspection may be performed in three phases to accommodate the sites implementation schedule, with the potential issuance of three separate inspection reports. Performing this inspection using a three-phase approach is a recommendation and not a requirement.

a. Phase I: This portion of the inspection is likely to occur during the second to last and/or last refueling outage prior to the expiration date of the original operating license.

Issue Date: 09/25/13 2 71013

This Phase of the inspection is intended to observe the implementation of select AMPs and activities described in the commitments made to proposed license conditions, the UFSAR supplement, AMPs, TLAAs and other regulatory commitments accepted by the staff during license renewal, as well as any testing, or visual inspections of SSCs which are only accessible at reduced power levels. Those SSCs may be located inside the containment, and other high radiation areas. This inspection may occur at each unit of a multi-unit site.

b. Phase II: This portion of the inspection is likely to occur three months to a year prior to the expiration date of the original operating license, depending on the sites implementation schedule of outages and license renewal activities.

This Phase of the inspection is intended to be a one-time major team inspection per site. However, for multi-unit sites, subsequent Phase II inspections may be conducted, as deemed necessary by regional management. Subsequent Phase II inspections at multi-unit sites may not require the same level of effort as the Phase II inspection for the first unit. The inspectors will assess the adequacy and effectiveness of the implementation and/or completion of the programs and activities described in the regulatory commitments accepted by the staff during license renewal, UFSAR supplement program descriptions, TLAAs, and commitments made to proposed license conditions as agreed to by the licensee while the application for renewal is being determined, as well as evaluate the need for any additional follow-up inspections under this inspection procedure or as part of the reactor oversight program (ROP).

c. Phase III: This portion of the inspection is likely to occur beyond the expiration date of the original operating license in accordance with the implementation schedule of the commitments made to proposed license conditions, AMPs, TLAAs and other regulatory commitments accepted by the staff during license renewal.

This Phase of the inspection is intended to review the implementation of the commitments made to proposed license conditions, regulatory commitments accepted by the staff during license renewal, TLAAs and AMPs with implementation schedules that extend beyond the expiration date of the original operating license, as agreed to by the licensee while the application for renewal is being determined. Additionally, this phase may be implemented to review corrective actions for issues of concern identified during Phases I and II inspections.

If, during the planning, execution, or documentation of this procedure, the NRC determines the operating license will not be renewed, inspection efforts should cease. If, during the planning, execution or documentation of this procedure, the NRC approves and renews the operating license, the inspection efforts should shift to the corresponding portion of IP 71003, Post-Approval Site Inspection for License Renewal.

03.03 Document Review.

Inspectors should familiarize themselves with the requirements and guidance related to license renewal. The inspectors should also familiarize themselves with the specific license renewal application and associated SER for the plant being inspected. License renewal requirements and guidance documents that should be reviewed prior to this inspection include:

Issue Date: 09/25/13 3 71013

10 CFR Part 54, Requirements for Renewal of Operating Licenses for Nuclear Power Plants The statement of consideration published with the revision to 10 CFR Part 54 in the Federal Register, Vol. 60, No. 88, Monday, May 8, 1995, pages 22461 to 22495 The SER and applicable supplements for the plant(s) to be inspected Appendix A of the SER, if applicable The UFSAR supplement as revised during the license renewal application review 03.04 Inspection Sample Attributes.

In selecting samples, consideration should be given to attributes such as:

The risk significance of SSCs associated with the regulatory commitments, using insights gained from sources such as the NRCs Significance Determination Process (SDP) Risk Informed Inspection Notebooks, Revision 2 The extent of previous license renewal audits and inspections of AMPs The extent that baseline inspection programs will inspect an SSC or commodity group The type and maturity of the AMP, for example, programs such as the selective leaching one-time inspection program, or infrequent inspection activities may take priority over long-standing programs such as the Steam Generator Tube Integrity Program, which are routinely inspected Issues that were addressed in an Atomic Safety Licensing Board (ASLB) hearing or Advisory Committee on Reactor Safeguards (ACRS) committee meeting Issues that were in the public domain at the time of the license renewal application review 03.05 Level of Effort.

This inspection is performed before the expiration date of the original operating license (with the exception of Phase III which may occur after the expiration of the original operating license).

Additionally, the number of AMPs, regulatory commitments, TLAAs and commitments made to proposed license conditions vary broadly from plant to plant. Therefore, this procedure does not contain a predetermined sample size for each component of the inspection that would uniformly represent each plant. As such, the lead inspector will determine the sample size and extent of review of the commitments made to proposed license conditions, AMPs, TLAAs and regulatory commitments prior to performing these inspections. The lead inspector should ensure that the team comprehensively inspects a majority (recommended greater than 70%) of the number of:

(1) new AMPs or enhancements to existing AMPs, (2) regulatory commitments, (3) TLAAs, and (4) commitments made to proposed license conditions to assess the adequacy and effectiveness of the license renewal program. Some sites may not require the same level of inspection effort as others and may be inspected using a smaller sample size. Also some multi-unit sites may contain units with similar designs, and therefore may not require the same level of inspection at the additional units as was received for the first unit. The lead inspector should use discretion in determining the inspection sample size at multi-unit sites with similar designs between the units.

03.06 Inspection Sample Selection.

Although the renewed operating license has not been issued, the licensee may have agreed to complete certain license renewal activities to support entering the period of extended operation.

Issue Date: 09/25/13 4 71013

The sample section should be based upon the AMPs, TLAAs, regulatory commitments, and also commitments made to proposed license conditions the licensee has agreed to implement while the license renewal application is being determined.

a. Selection of Commitments Made to Proposed License Conditions: The sample may include a review of selected commitments made to proposed license conditions. A sample population of commitments made to proposed license conditions will be inspected to the extent necessary to determine that the license conditions were implemented consistent with the licensees commitments. Inspection of the commitments made to proposed license conditions should include a review of supporting documentation to determine if the licensee has taken the appropriate actions, including corrective action, to satisfy a particular license condition. Appropriate technical expertise should be requested from the license renewal program office if needed.
b. Selection of Regulatory Commitments: The sample should include a review of selected regulatory commitments which were accepted by the staff during the course of the license renewal application review and describes a modification or enhancement to a program, or future actions necessary for compliance with 10 CFR Part 50 or 10 CFR Part 54. The selected regulatory commitments will be inspected to the extent necessary to determine that the commitments were implemented, and any modifications were completed in accordance with NEI 99-04 as endorsed by RIS 2000-017. The inspection team should determine there is reasonable assurance the commitment tracking program is effective. The inspection of regulatory commitments should include a review of supporting documentation to determine if the licensee has taken the appropriate actions, including corrective action, to satisfy a particular commitment. Appropriate technical expertise should be requested from the license renewal program office if needed.
c. Selection of AMPs: The sample should include a review of selected AMPs that are new, or have been modified or enhanced. The selected AMPs will be inspected to the extent necessary to determine that updates, modifications and implementation occurred consistent with the licensees commitments. AMP activities, bases and acceptance criteria should be appropriately proceduralized. The license renewal program office recommends that the inspector include as part of his or her sample selection the Buried and Underground Piping and Tanks Program, the One-Time Inspection Program, and the Selective Leaching Program on the basis that these programs may involve new or unique inspection or testing activities that are being performed by the licensee for the first time or may identify inspection or test results that the licensee may not have experienced in the past. Appropriate technical expertise should be requested from the license renewal program office if needed.
d. Selection of TLAAs: The sample should include a review of selected TLAAs that have an associated AMP in accordance with 10 CFR 54.21(c)(1)(iii). The inspector should verify that the AMP describes how the licensee will manage, update or refine the TLAA during the PEO. The inspector should verify that the AMP demonstrates how the licensee meets the acceptance criteria for the CLB. The AMP should contain the licensees actions when the CLB acceptance criteria are exceeded. The licensees actions may include taking the appropriate corrective actions to repair and/or replace impacted SSCs, recalculating the TLAA, or initiating additional inspection activities.

Issue Date: 09/25/13 5 71013

AMP activities, bases and acceptance criteria that relate to TLAA acceptance under 10 CFR 54.21(c)(1)(iii) should be appropriately proceduralized. There are currently three programs that the inspector may want to include as part of his or her sample selection:

the Fatigue Monitoring Program, the Concrete Containment Tendon Prestress Program, and the Environmental Qualification of Electric Components Program. However, the inspector may want to contact the license renewal program office to identify which TLAAs were of significant interest during the license renewal application review for a particular plant to determine which TLAAs will be reviewed for this portion of the inspection. Also, for questions or concerns by the inspector during the review of highly specialized TLAAs, or for errors identified by the inspector to have significant impact on 10 CFR 54.21(c)(1)(i) or 10 CFR 54.21(c)(1)(ii), assistance should be requested from the license renewal program office.

e. Inspection of Newly Identified Systems: Licensees may identify new SSCs that should be within the scope of its license renewal program at any time. Any newly identified SSCs may be inspected to the extent necessary to ensure that the licensee adequately evaluated and included applicable SSCs into its AMPs or TLAAs. Inspectors should contact Division of License Renewal (DLR) staff for: (1) information on generic communications that were issued naming newly identified SSCs, or (2) technical assistance regarding the review of new aging management programs that have been developed by the licensee.
f. Inspection of the UFSAR supplement: The UFSAR supplement describes the AMPs and TLAAs in the SER for license renewal. This inspection verifies that the UFSAR supplement description matches the AMP or TLAA being implemented and that changes, caused by the inclusion of newly identified SSCs, were included in the UFSAR supplement. If the licensee has not submitted an UFSAR supplement update since implementing the AMP or TLAA, review the planned UFSAR supplement changes and verify that they are included in an appropriate tracking system.

03.07 Dispositioning Issues of Concern.

The renewed operating license may not be issued at the time this inspection occurs. Therefore, inspectors can document observations and issues of concern associated with the implementation and/or completion of commitments made to proposed license conditions, regulatory commitments, TLAAs and AMPs, which will be evaluated and dispositioned using the guidance in Inspection Manual Chapters 0612 and 2516, and may be used to determine the acceptability of the license renewal application.

71013-04 RESOURCE ESTIMATES The total resource expenditure of this inspection procedure is estimated to be approximately 1,120 hours0.00139 days <br />0.0333 hours <br />1.984127e-4 weeks <br />4.566e-5 months <br /> for a one-unit site, 2,052 hours6.018519e-4 days <br />0.0144 hours <br />8.597884e-5 weeks <br />1.9786e-5 months <br /> for a dual-unit site, and 2,850 hours0.00984 days <br />0.236 hours <br />0.00141 weeks <br />3.23425e-4 months <br /> for a three-unit site. This resource estimate includes the preparation and documentation weeks. This resource estimate does not include the time spent travelling to and from the site. It is expected that the four Regions will coordinate the scheduling of license renewal inspections and share resources so as not to exceed the total resources allocated per year for all license renewal inspections.

Issue Date: 09/25/13 6 71013

71013-05 REFERENCES IP 71003, Post-Approval Site Inspection for License Renewal 10 CFR Part 50, Domestic Licensing of Production and Utilization Facilities 10 CFR Part 54, Requirements for Renewal of Operating Licenses for Nuclear Power Plants IMC 0308, Reactor Oversight Process Basis Document IMC 0612, Power Reactor Inspection Reports IMC 2515, Light-Water Reactor Inspection Program - Operations Phase IMC 2516, Policy and Guidance for the License Renewal Inspection Program NRR Office Instruction LIC-105, Managing Regulatory Commitments Made by the Licensee to the NRC NEI 99-04, Guidelines for Managing NRC Commitment Changes Revision 0, July 1999 NUREG-1800, Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants NUREG-1801, Generic Aging Lessons Learned (GALL) Report NRC-approved Interim Staff Guidance positions relating to license renewal Regulatory Issue Summary (RIS) 2007-16, Implementation of the Requirements of 10 CFR 54.37(b) for Holders of Renewed Licenses RIS 2000-017, Managing Regulatory Commitments Made by Power Reactor Licensees to the NRC Staff END Issue Date: 09/25/13 7 71013

Attachment 1 - Revision History For 71013 Commitment Accession Number Description of Change Description of Comment and Tracking Issue Date Training Required Feedback Number Change Notice and Completion Resolution Date Accession Number N/A ML13032A102 A four year historical search for commitments was N/A N/A 09/25/13 performed. Change Notice 11-004 for temporary CN 13-023 instruction (TI) 2516/001 was found related to timely renewal inspection activities. TI 2516/001, Review of License Renewal Activities, expires on December 31, 2013, at which point timely renewal inspection activities will be conducted in accordance with IP 71013.

Issue Date: 09/25/13 Att1-1 71013