ML16081A326: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 03/21/2016
| issue date = 03/21/2016
| title = Certificate of Service for Corrected Staff Testimony
| title = Certificate of Service for Corrected Staff Testimony
| author name = Harris B G
| author name = Harris B
| author affiliation = NRC/OGC
| author affiliation = NRC/OGC
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of                            )
                                            )
ENTERGY NUCLEAR OPERATIONS, INC. )                  Docket Nos. 50-247-LR, 50-286-LR
                                            )
(Indian Point Nuclear Generating            )
Units 2 and 3)                      )
CERTIFICATE OF SERVICE Pursuant to 10 C.F.R § 2.305 (revised), I hereby certify that corrected copies of the NRC STAFF TESTIMONY OF DR. ALLEN HISER, JEFFREY POEHLER, DR. CHING NG, AND ON YEE REGARDING NYS-25, NYS-26B, AND NYS-38/RK-TC-5 (Public, Redacted), letter from Sherwin E. Turk to the Atomic Safety and Licensing Board, and an Updated Exhibit List, all dated March 21, 2016, in the above-captioned proceeding have been served upon the Electronic Information Exchange, the NRCs E-Filing System, this 21st day of March, 2016.
                                                    /Signed (electronically) by/
Brian G. Harris Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 415-1392 E-mail: brian.harris@nrc.gov Date of signature: March 21, 2016
 
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of                            )
                                            )
ENTERGY NUCLEAR OPERATIONS, INC. )                  Docket Nos. 50-247-LR, 50-286-LR
                                            )
(Indian Point Nuclear Generating            )
Units 2 and 3)                      )
CERTIFICATE OF SERVICE Pursuant to 10 C.F.R § 2.305 (revised), I hereby certify that corrected copies of the NRC STAFF TESTIMONY OF DR. ALLEN HISER, JEFFREY POEHLER, DR. CHING NG, AND ON YEE REGARDING NYS-25, NYS-26B, AND NYS-38/RK-TC-5 (Public, Redacted), letter from Sherwin E. Turk to the Atomic Safety and Licensing Board, and an Updated Exhibit List, all dated March 21, 2016, in the above-captioned proceeding have been served upon the Electronic Information Exchange, the NRCs E-Filing System, this 21st day of March, 2016.
                                                    /Signed (electronically) by/
Brian G. Harris Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 415-1392 E-mail: brian.harris@nrc.gov Date of signature: March 21, 2016}}

Latest revision as of 22:42, 30 October 2019

Certificate of Service for Corrected Staff Testimony
ML16081A326
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 03/21/2016
From: Harris B
NRC/OGC
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
50-247-LR, 50-286-LR, ASLBP 07-858-03-LR-BD01, RAS 51017
Download: ML16081A326 (1)


Text

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

ENTERGY NUCLEAR OPERATIONS, INC. ) Docket Nos. 50-247-LR, 50-286-LR

)

(Indian Point Nuclear Generating )

Units 2 and 3) )

CERTIFICATE OF SERVICE Pursuant to 10 C.F.R § 2.305 (revised), I hereby certify that corrected copies of the NRC STAFF TESTIMONY OF DR. ALLEN HISER, JEFFREY POEHLER, DR. CHING NG, AND ON YEE REGARDING NYS-25, NYS-26B, AND NYS-38/RK-TC-5 (Public, Redacted), letter from Sherwin E. Turk to the Atomic Safety and Licensing Board, and an Updated Exhibit List, all dated March 21, 2016, in the above-captioned proceeding have been served upon the Electronic Information Exchange, the NRCs E-Filing System, this 21st day of March, 2016.

/Signed (electronically) by/

Brian G. Harris Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 415-1392 E-mail: brian.harris@nrc.gov Date of signature: March 21, 2016

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

ENTERGY NUCLEAR OPERATIONS, INC. ) Docket Nos. 50-247-LR, 50-286-LR

)

(Indian Point Nuclear Generating )

Units 2 and 3) )

CERTIFICATE OF SERVICE Pursuant to 10 C.F.R § 2.305 (revised), I hereby certify that corrected copies of the NRC STAFF TESTIMONY OF DR. ALLEN HISER, JEFFREY POEHLER, DR. CHING NG, AND ON YEE REGARDING NYS-25, NYS-26B, AND NYS-38/RK-TC-5 (Public, Redacted), letter from Sherwin E. Turk to the Atomic Safety and Licensing Board, and an Updated Exhibit List, all dated March 21, 2016, in the above-captioned proceeding have been served upon the Electronic Information Exchange, the NRCs E-Filing System, this 21st day of March, 2016.

/Signed (electronically) by/

Brian G. Harris Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 415-1392 E-mail: brian.harris@nrc.gov Date of signature: March 21, 2016