ML16127A528: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(6 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 05/11/2016
| issue date = 05/11/2016
| title = EN-16-009, Palisades Nuclear Plant Confirmatory Order Enforcement Notification for (EA-15-039)
| title = EN-16-009, Palisades Nuclear Plant Confirmatory Order Enforcement Notification for (EA-15-039)
| author name = Hilton N D
| author name = Hilton N
| author affiliation = NRC/OE
| author affiliation = NRC/OE
| addressee name =  
| addressee name =  
Line 9: Line 9:
| docket = 05000255
| docket = 05000255
| license number = DPR-020
| license number = DPR-020
| contact person = Gulla G J
| contact person = Gulla G
| case reference number = EA-15-039
| case reference number = EA-15-039
| document report number = EN-16-009
| document report number = EN-16-009
| document type = Enforcement Notification
| document type = Enforcement Notification
| page count = 2
| page count = 2
| revision = 0
| project =  
| stage = Other
}}
}}
=Text=
{{#Wiki_filter:May 11, 2016 EN 16-009 OFFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION Licensee:      Palisades Nuclear Plant                                      EA-15-039 Covert, MI Docket No.: 50-255
==Subject:==
ISSUANCE OF CONFIRMATORY ORDER This is to inform the Commission that a publicly available Confirmatory Order (Order) will be issued on or about May 16, 2016, to Palisades Nuclear Plant (Palisades). This Order will confirm commitments reached as part of an alternative dispute resolution (ADR) settlement agreement addressing apparent violations identified through an investigation at Palisades.
Apparent violations were identified during an investigation conducted by the NRCs Office of Investigations (OI) to determine whether personnel deliberately failed to provide complete and accurate information to the NRC associated with a Safety Injection Refueling Water Tank (SIRWT) leak. The apparent violations involved: (1) the willful failure, on the part of four individuals, to enter information concerning a leak in the SIRWT into the corrective action program as required by procedure; (2) the failure to perform adequate operability determinations of conditions associated with the SIRWT leak as required by 10 CFR Part 50, Appendix B, Criterion V; and (3) the failure to perform either a missed surveillance test within 24 hours or a risk evaluation to complete the surveillance at a later time as required by Technical Specifications, Surveillance Requirement 3.0.3.
In a letter dated February 22, 2016, the U.S. Nuclear Regulatory Commission (NRC) provided Palisades the results of the investigation, and offered the opportunity to attend a Predecisional Enforcement Conference, or to request ADR.
In response to this letter, Palisades requested ADR. An ADR mediation session was held on March 25, 2016, and a preliminary settlement agreement was reached. The settlement actions include, but are not limited to: (1) ensuring site personnel understand lessons learned from this matter, (2) sharing lessons learned from this matter with other reactor licensees, (3) reviewing the applicable procedures in light of the lessons learned from events associated with leakage of the SIRWT and revise these procedures as appropriate, and (4) modification to its current program of public outreach at Palisades. It should also be noted that the NRC found that the four Palisades personnel acted with careless disregard and will receive close-out letters.
It should be noted that Palisades has been specifically informed of, and agrees to, this enforcement action. The schedule of issuance and notification is:
Mailing of Notice                                    May 16, 2016 Telephone Notification of Palisades                  May 16, 2016 The state of Michigan will be notified.
CONTACTS: Gerry Gulla, OE/EB                                  Nick Hilton, OE/EB (301) 415-2872                                (301) 415-2741
DISTRIBUTION: EN-16-009, May 11, 2016 Chairman Burns      EDO          OCFO      Regional Offices Comm. Svinicki      DEDM        OIS        RI      RII Comm. Ostendorff    OE          RES        RIII    RIV Comm. Baran          OGC          ACRS SECY                NRR          NRO        MAIL OCA                  OI          NMSS      ADAMS OPA                  OIG          NSIR      OE staff OIP                              OPS Center Electronic DISTRIBUTION:
P. Holahan, OE N. Hilton, OE G. Gulla, OE OE r/f EN binder X PUBLIC X NON-SENSITIVE ADAMS ACCESSION NO.: ML16127A528 OFFICE          OE:ES        OE:BC NAME            GGulla      NHilton DATE            5/10/2016    5/10/2016 OFFICIAL RECORD COPY
May 11, 2016 EN 16-009 OFFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION Licensee:      Palisades Nuclear Plant                                      EA-15-039 Covert, MI Docket No.: 50-255
==Subject:==
ISSUANCE OF CONFIRMATORY ORDER This is to inform the Commission that a publicly available Confirmatory Order (Order) will be issued on or about May 16, 2016, to Palisades Nuclear Plant (Palisades). This Order will confirm commitments reached as part of an alternative dispute resolution (ADR) settlement agreement addressing apparent violations identified through an investigation at Palisades.
Apparent violations were identified during an investigation conducted by the NRCs Office of Investigations (OI) to determine whether personnel deliberately failed to provide complete and accurate information to the NRC associated with a Safety Injection Refueling Water Tank (SIRWT) leak. The apparent violations involved: (1) the willful failure, on the part of four individuals, to enter information concerning a leak in the SIRWT into the corrective action program as required by procedure; (2) the failure to perform adequate operability determinations of conditions associated with the SIRWT leak as required by 10 CFR Part 50, Appendix B, Criterion V; and (3) the failure to perform either a missed surveillance test within 24 hours or a risk evaluation to complete the surveillance at a later time as required by Technical Specifications, Surveillance Requirement 3.0.3.
In a letter dated February 22, 2016, the U.S. Nuclear Regulatory Commission (NRC) provided Palisades the results of the investigation, and offered the opportunity to attend a Predecisional Enforcement Conference, or to request ADR.
In response to this letter, Palisades requested ADR. An ADR mediation session was held on March 25, 2016, and a preliminary settlement agreement was reached. The settlement actions include, but are not limited to: (1) ensuring site personnel understand lessons learned from this matter, (2) sharing lessons learned from this matter with other reactor licensees, (3) reviewing the applicable procedures in light of the lessons learned from events associated with leakage of the SIRWT and revise these procedures as appropriate, and (4) modification to its current program of public outreach at Palisades. It should also be noted that the NRC found that the four Palisades personnel acted with careless disregard and will receive close-out letters.
It should be noted that Palisades has been specifically informed of, and agrees to, this enforcement action. The schedule of issuance and notification is:
Mailing of Notice                                    May 16, 2016 Telephone Notification of Palisades                  May 16, 2016 The state of Michigan will be notified.
CONTACTS: Gerry Gulla, OE/EB                                  Nick Hilton, OE/EB (301) 415-2872                                (301) 415-2741
DISTRIBUTION: EN-16-009, May 11, 2016 Chairman Burns      EDO          OCFO      Regional Offices Comm. Svinicki      DEDM        OIS        RI      RII Comm. Ostendorff    OE          RES        RIII    RIV Comm. Baran          OGC          ACRS SECY                NRR          NRO        MAIL OCA                  OI          NMSS      ADAMS OPA                  OIG          NSIR      OE staff OIP                              OPS Center Electronic DISTRIBUTION:
P. Holahan, OE N. Hilton, OE G. Gulla, OE OE r/f EN binder X PUBLIC X NON-SENSITIVE ADAMS ACCESSION NO.: ML16127A528 OFFICE          OE:ES        OE:BC NAME            GGulla      NHilton DATE            5/10/2016    5/10/2016 OFFICIAL RECORD COPY}}

Latest revision as of 19:28, 30 October 2019

EN-16-009, Palisades Nuclear Plant Confirmatory Order Enforcement Notification for (EA-15-039)
ML16127A528
Person / Time
Site: Palisades Entergy icon.png
Issue date: 05/11/2016
From: Nick Hilton
NRC/OE
To:
Gulla G
References
EA-15-039 EN-16-009
Download: ML16127A528 (2)


Text

May 11, 2016 EN 16-009 OFFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION Licensee: Palisades Nuclear Plant EA-15-039 Covert, MI Docket No.: 50-255

Subject:

ISSUANCE OF CONFIRMATORY ORDER This is to inform the Commission that a publicly available Confirmatory Order (Order) will be issued on or about May 16, 2016, to Palisades Nuclear Plant (Palisades). This Order will confirm commitments reached as part of an alternative dispute resolution (ADR) settlement agreement addressing apparent violations identified through an investigation at Palisades.

Apparent violations were identified during an investigation conducted by the NRCs Office of Investigations (OI) to determine whether personnel deliberately failed to provide complete and accurate information to the NRC associated with a Safety Injection Refueling Water Tank (SIRWT) leak. The apparent violations involved: (1) the willful failure, on the part of four individuals, to enter information concerning a leak in the SIRWT into the corrective action program as required by procedure; (2) the failure to perform adequate operability determinations of conditions associated with the SIRWT leak as required by 10 CFR Part 50, Appendix B, Criterion V; and (3) the failure to perform either a missed surveillance test within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or a risk evaluation to complete the surveillance at a later time as required by Technical Specifications, Surveillance Requirement 3.0.3.

In a letter dated February 22, 2016, the U.S. Nuclear Regulatory Commission (NRC) provided Palisades the results of the investigation, and offered the opportunity to attend a Predecisional Enforcement Conference, or to request ADR.

In response to this letter, Palisades requested ADR. An ADR mediation session was held on March 25, 2016, and a preliminary settlement agreement was reached. The settlement actions include, but are not limited to: (1) ensuring site personnel understand lessons learned from this matter, (2) sharing lessons learned from this matter with other reactor licensees, (3) reviewing the applicable procedures in light of the lessons learned from events associated with leakage of the SIRWT and revise these procedures as appropriate, and (4) modification to its current program of public outreach at Palisades. It should also be noted that the NRC found that the four Palisades personnel acted with careless disregard and will receive close-out letters.

It should be noted that Palisades has been specifically informed of, and agrees to, this enforcement action. The schedule of issuance and notification is:

Mailing of Notice May 16, 2016 Telephone Notification of Palisades May 16, 2016 The state of Michigan will be notified.

CONTACTS: Gerry Gulla, OE/EB Nick Hilton, OE/EB (301) 415-2872 (301) 415-2741

DISTRIBUTION: EN-16-009, May 11, 2016 Chairman Burns EDO OCFO Regional Offices Comm. Svinicki DEDM OIS RI RII Comm. Ostendorff OE RES RIII RIV Comm. Baran OGC ACRS SECY NRR NRO MAIL OCA OI NMSS ADAMS OPA OIG NSIR OE staff OIP OPS Center Electronic DISTRIBUTION:

P. Holahan, OE N. Hilton, OE G. Gulla, OE OE r/f EN binder X PUBLIC X NON-SENSITIVE ADAMS ACCESSION NO.: ML16127A528 OFFICE OE:ES OE:BC NAME GGulla NHilton DATE 5/10/2016 5/10/2016 OFFICIAL RECORD COPY

May 11, 2016 EN 16-009 OFFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION Licensee: Palisades Nuclear Plant EA-15-039 Covert, MI Docket No.: 50-255

Subject:

ISSUANCE OF CONFIRMATORY ORDER This is to inform the Commission that a publicly available Confirmatory Order (Order) will be issued on or about May 16, 2016, to Palisades Nuclear Plant (Palisades). This Order will confirm commitments reached as part of an alternative dispute resolution (ADR) settlement agreement addressing apparent violations identified through an investigation at Palisades.

Apparent violations were identified during an investigation conducted by the NRCs Office of Investigations (OI) to determine whether personnel deliberately failed to provide complete and accurate information to the NRC associated with a Safety Injection Refueling Water Tank (SIRWT) leak. The apparent violations involved: (1) the willful failure, on the part of four individuals, to enter information concerning a leak in the SIRWT into the corrective action program as required by procedure; (2) the failure to perform adequate operability determinations of conditions associated with the SIRWT leak as required by 10 CFR Part 50, Appendix B, Criterion V; and (3) the failure to perform either a missed surveillance test within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or a risk evaluation to complete the surveillance at a later time as required by Technical Specifications, Surveillance Requirement 3.0.3.

In a letter dated February 22, 2016, the U.S. Nuclear Regulatory Commission (NRC) provided Palisades the results of the investigation, and offered the opportunity to attend a Predecisional Enforcement Conference, or to request ADR.

In response to this letter, Palisades requested ADR. An ADR mediation session was held on March 25, 2016, and a preliminary settlement agreement was reached. The settlement actions include, but are not limited to: (1) ensuring site personnel understand lessons learned from this matter, (2) sharing lessons learned from this matter with other reactor licensees, (3) reviewing the applicable procedures in light of the lessons learned from events associated with leakage of the SIRWT and revise these procedures as appropriate, and (4) modification to its current program of public outreach at Palisades. It should also be noted that the NRC found that the four Palisades personnel acted with careless disregard and will receive close-out letters.

It should be noted that Palisades has been specifically informed of, and agrees to, this enforcement action. The schedule of issuance and notification is:

Mailing of Notice May 16, 2016 Telephone Notification of Palisades May 16, 2016 The state of Michigan will be notified.

CONTACTS: Gerry Gulla, OE/EB Nick Hilton, OE/EB (301) 415-2872 (301) 415-2741

DISTRIBUTION: EN-16-009, May 11, 2016 Chairman Burns EDO OCFO Regional Offices Comm. Svinicki DEDM OIS RI RII Comm. Ostendorff OE RES RIII RIV Comm. Baran OGC ACRS SECY NRR NRO MAIL OCA OI NMSS ADAMS OPA OIG NSIR OE staff OIP OPS Center Electronic DISTRIBUTION:

P. Holahan, OE N. Hilton, OE G. Gulla, OE OE r/f EN binder X PUBLIC X NON-SENSITIVE ADAMS ACCESSION NO.: ML16127A528 OFFICE OE:ES OE:BC NAME GGulla NHilton DATE 5/10/2016 5/10/2016 OFFICIAL RECORD COPY