ML16152A595: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML16152A595
| number = ML16152A595
| issue date = 06/06/2016
| issue date = 06/06/2016
| title = Waterford, Unit 3 License Renewal Scoping and Screening Methodology Audit Documentation List 6/13/16 - 6/16/16
| title = License Renewal Scoping and Screening Methodology Audit Documentation List 6/13/16 - 6/16/16
| author name =  
| author name =  
| author affiliation = NRC/NRR/DLR
| author affiliation = NRC/NRR/DLR
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:ENCLOSURE 1 Waterford Unit 3 License Renewal Scoping and Screening Methodology Audit Documentation List 6/13/16 - 6/16/16
{{#Wiki_filter:Waterford Unit 3 License Renewal Scoping and Screening Methodology Audit Documentation List 6/13/16 - 6/16/16
* Engineering reports and procedures which contain requirements or guidelines for the implementation of scoping and screening methodology.
* Engineering reports and procedures which contain requirements or guidelines for the implementation of scoping and screening methodology.
* 10 CFR 54.4(a)(1) plant evaluations and implementing procedures.
* 10 CFR 54.4(a)(1) plant evaluations and implementing procedures.
Line 32: Line 32:
* Assisted access to the plant equipment database and applicable administrative controls procedures.
* Assisted access to the plant equipment database and applicable administrative controls procedures.
* Assisted access to the corrective action and operating experience database and applicable administrative controls procedures.
* Assisted access to the corrective action and operating experience database and applicable administrative controls procedures.
ENCLOSURE 1 Waterford Unit 3 License Renewal Scoping and Screening Methodology Audit Documentation List 6/13/16 - 6/16/16
ENCLOSURE 1
 
Waterford Unit 3 License Renewal Scoping and Screening Methodology Audit Documentation List 6/13/16 - 6/16/16
* Engineering reports and procedures which contain requirements or guidelines for the implementation of scoping and screening methodology.
* Engineering reports and procedures which contain requirements or guidelines for the implementation of scoping and screening methodology.
* 10 CFR 54.4(a)(1) plant evaluations and implementing procedures.
* 10 CFR 54.4(a)(1) plant evaluations and implementing procedures.
Line 46: Line 48:
* Documentation of training activities associated with license renewal application development.
* Documentation of training activities associated with license renewal application development.
* Assisted access to the plant equipment database and applicable administrative controls procedures.
* Assisted access to the plant equipment database and applicable administrative controls procedures.
* Assisted access to the corrective action and operating experience database and applicable administrative controls procedures.}}
* Assisted access to the corrective action and operating experience database and applicable administrative controls procedures.
ENCLOSURE 1}}

Latest revision as of 19:25, 30 October 2019

License Renewal Scoping and Screening Methodology Audit Documentation List 6/13/16 - 6/16/16
ML16152A595
Person / Time
Site: Waterford Entergy icon.png
Issue date: 06/06/2016
From:
Division of License Renewal
To:
Clark P, NRR/DLR, 415-6447
References
Download: ML16152A595 (1)


Text

Waterford Unit 3 License Renewal Scoping and Screening Methodology Audit Documentation List 6/13/16 - 6/16/16

  • Engineering reports and procedures which contain requirements or guidelines for the implementation of scoping and screening methodology.
  • 10 CFR 54.4(a)(3) plant evaluations, implementing procedures and any specific analyses performed.
  • Description of the design basis events included in the final safety analysis report, and all other additional events (e.g. high energy line break, fire, high wind, earthquakes, flooding, tornadoes), which were evaluated during the scoping process.
  • Site drawing with structural locations.
  • System design basis documents and system and component level scoping and screening reports for the selected systems and structures.
  • Assisted access to the plant equipment database and applicable administrative controls procedures.
  • Assisted access to the corrective action and operating experience database and applicable administrative controls procedures.

ENCLOSURE 1

Waterford Unit 3 License Renewal Scoping and Screening Methodology Audit Documentation List 6/13/16 - 6/16/16

  • Engineering reports and procedures which contain requirements or guidelines for the implementation of scoping and screening methodology.
  • 10 CFR 54.4(a)(3) plant evaluations, implementing procedures and any specific analyses performed.
  • Description of the design basis events included in the final safety analysis report, and all other additional events (e.g. high energy line break, fire, high wind, earthquakes, flooding, tornadoes), which were evaluated during the scoping process.
  • Site drawing with structural locations.
  • System design basis documents and system and component level scoping and screening reports for the selected systems and structures.
  • Assisted access to the plant equipment database and applicable administrative controls procedures.
  • Assisted access to the corrective action and operating experience database and applicable administrative controls procedures.

ENCLOSURE 1