|
|
Line 17: |
Line 17: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION | | {{#Wiki_filter:UNITED STATES |
| REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 | | NUCLEAR REGULATORY COMMISSION |
| May 3, 2017
| | REGION II |
|
| | 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 |
| Southern Nuclear Operating Company, Inc. ATTN: Mr. Darren Stiles, Training Manager Vogtle Electric Generating Plant
| | ATLANTA, GEORGIA 30303-1257 |
| | May 3, 2017 |
| | Southern Nuclear Operating Company, Inc. |
| | ATTN: Mr. Darren Stiles, Training Manager |
| | Vogtle Electric Generating Plant |
| | 7821 River Road |
| | Bin 63030 |
| | Waynesboro, GA 30830-2965 |
| | SUBJECT: VOGTLE - OPERATOR LICENSING WRITTEN EXAMINATION APPROVAL |
| | 05000424/2017301 AND 05000425/2017301 |
| | Dear Mr. Stiles: |
| | The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing |
| | written examination at Vogtle Electric Generating Plant. |
| | The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license |
| | applications submitted in connection with this examination and separately provided a list of |
| | approved applicants to your office. The NRC staff will administer operating tests to these |
| | individuals, as applicable, the weeks of May 8 and May 15, 2017. Note that any examination |
| | waivers and application denials have been addressed in separate correspondence. |
| | The NRC has approved the subject written examination and hereby authorizes you to administer |
| | the written examination in accordance with Revision 10 of NUREG-1021, Operator Licensing |
| | Examination Standards for Power Reactors, the week of May 22, 2017. |
| | This examination has undergone extensive review by my staff and representatives responsible for |
| | operator training at your facility. Based on this review, I have concluded that the examination |
| | meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By |
| | administering this examination, you also agree that it meets NUREG-1021 guidelines, and is |
| | appropriate for measuring the qualifications of licensed operators at your facility. If you determine |
| | that this examination is not appropriate for licensing operators at your facility, do not administer |
| | the examination and contact me at (404) 997-4662. |
| | Please contact your Chief Examiner, Mr. Michael Kennard, at (404) 997-4627 if you have any |
| | questions or identify any errors or changes in license level (RO or SRO) specified for each |
| | applicant on the list of approved applicants. |
| | Sincerely, |
| | /RA Gerald J. McCoy Acting for/ |
| | Eugene F. Guthrie, Chief |
| | Operations Branch 2 |
| | Division of Reactor Safety |
| | Docket Nos.: 50-424, 50-425 |
| | License Nos.: NPF-68, NPF-81 |
|
| |
|
| 7821 River Road
| |
|
| |
|
| Bin 63030
| | D. Stiles 2 |
| | | VOGTLE - OPERATOR LICENSING WRITTEN EXAMINATION APPROVAL |
| Waynesboro, GA 30830-2965
| | 050000424/2017301 AND 050000425/2017301 May 3, 2017 |
| SUBJECT: VOGTLE - OPERATOR LICENSING WRITTEN EXAMINATION APPROVAL 05000424/2017301 AND 05000425/2017301
| | X PUBLICLY AVAILABLE NON-PUBLICLY AVAILABLE SENSITIVE X NON-SENSITIVE |
| | | ADAMS: Yes |
| Dear Mr. Stiles:
| | ACCESSION NUMBER: ML17125A343 X SUNSI REVIEW COMPLETE |
| | | OFFICE RII:DRS RII:DRS RII:DRS RII:DRS RII DRS RII DRS |
| The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing written examination at Vogtle Electric Generating Plant.
| | SIGNATURE JHK MK GMCOY |
| | | NAME JKIRBY MKENNARD EGUTHRIE |
|
| | DATE 5/ /2017 5/ /2017 5/ /2017 5/ /2017 5/ /2017 5/ /2017 |
| The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license
| | E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO |
| applications submitted in connection with this examination and separately provided a list of approved applicants to your office. The NRC st
| | OFFICIAL FILE COPY |
| aff will administer operating tests to these individuals, as applicable, the weeks of May 8 and May 15, 2017. Note that any examination
| |
| waivers and application denials have been addressed in separate correspondence.
| |
| | |
|
| |
| The NRC has approved the subject written examination and hereby authorizes you to administer the written examination in accordance with Revision 10 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," the week of May 22, 2017.
| |
|
| |
| This examination has undergone extensive review by my staff and representatives responsible for operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By
| |
| administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operators at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer
| |
| the examination and contact me at (404) 997-4662.
| |
| | |
|
| |
| Please contact your Chief Examiner, Mr. Mic
| |
| hael Kennard, at (404) 997-4627 if you have any questions or identify any errors or changes in license level (RO or SRO) specified for each applicant on the list of approved applicants.
| |
| | |
| Sincerely,
| |
|
| |
| /RA Gerald J. McCoy Acting for/
| |
| Eugene F. Guthrie, Chief
| |
| | |
| Operations Branch 2
| |
| | |
| Division of Reactor Safety
| |
| Docket Nos.: 50-424, 50-425
| |
| | |
| License Nos.: NPF-68, NPF-81
| |
|
| |
| D. Stiles 2
| |
|
| |
|
| |
| VOGTLE - OPERATOR LICENSING WRITTEN EXAMINATION APPROVAL | |
| 050000424/2017301 AND 050000425/2017301 May 3, 2017 | |
| | |
| X PUBLICLY AVAILABLE NON-PUBLICLY AVAILABLE SENSITIVE X NON-SENSITIVE
| |
| ADAMS: Yes
| |
| | |
|
| |
| ACCESSION NUMBER: ML17125A343 X SUNSI REVIEW COMPLETE OFFICE RII:DRS RII:DRS RII:DRS RII:DRS RII DRS RII DRS SIGNATURE JHK MK GMCOY NAME JKIRBY MKENNARD EGUTHRIE DATE 5/ /2017 5/ /2017 5/ /2017 5/ /2017 5/ /2017 5/ /2017 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO | |
| OFFICIAL FILE COPY
| |
| }} | | }} |
|
---|
Category:Letter
MONTHYEARML24269A2502024-09-26026 September 2024 Acknowledgement of the Withdrawal of the Requested Exemption and License Amendment Request to Remove Tier 1 and Tier 2* Requirements NL-24-0369, Withdrawal of License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2 Requirements2024-09-25025 September 2024 Withdrawal of License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2 Requirements NL-24-0350, Core Operating Limits Report, Cycle 24, Version 22024-09-25025 September 2024 Core Operating Limits Report, Cycle 24, Version 2 ML24243A0072024-09-10010 September 2024 – Correction of Amendment Nos. 223 and 206 Regarding Revision to Technical Specifications to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-14483 NL-24-0337, Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program2024-09-0909 September 2024 Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program ML24102A2642024-09-0909 September 2024 – Exemption Request Regarding Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0013) - Letter ML24249A2942024-09-0606 September 2024 Correction of Amendment Nos. 218 and 201 Regarding Revision to Technical Specifications to Use Online Monitoring Methodology 05200025/LER-2024-002, Manual Reactor Protection System and Automatic Safeguards Actuation Due to an Unexpected Change in Position of a Main Feedwater Pump Minimum Flow Control Valve2024-09-0505 September 2024 Manual Reactor Protection System and Automatic Safeguards Actuation Due to an Unexpected Change in Position of a Main Feedwater Pump Minimum Flow Control Valve IR 05000424/20240052024-08-26026 August 2024 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 and 2 - Report 05000424/2024005 and 05000425/2024005 ML24235A1952024-08-22022 August 2024 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 3 and 4 - Report 05200025/2024005 and 05200026/2024005 IR 05000424/20244012024-08-15015 August 2024 4 - Security Baseline Inspection Report 05000424-2024401, 05000425-2024401, 05200025-2024402, and 05200026-2024403 - Cover Letter NL-24-0299, Exemption Request: Final Safety Analysis Report Update Schedule, Response to Request for Additional Information2024-08-14014 August 2024 Exemption Request: Final Safety Analysis Report Update Schedule, Response to Request for Additional Information 05000425/LER-2024-001, (Vegp), Unit 2, Manual Actuation of the Reactor Protection System Due to a Rod Control Fuse Opening Causing a Misaligned Shutdown Rod2024-08-0909 August 2024 (Vegp), Unit 2, Manual Actuation of the Reactor Protection System Due to a Rod Control Fuse Opening Causing a Misaligned Shutdown Rod ML24218A1842024-08-0707 August 2024 Examination Report and Cover Letter 05200026/LER-2024-001, (Vegp), Unit 4, Manual Reactor Protection System Actuation Due to Procedure Not Optimally Sequenced to Reset the Rapid Power Reduction Signal2024-08-0606 August 2024 (Vegp), Unit 4, Manual Reactor Protection System Actuation Due to Procedure Not Optimally Sequenced to Reset the Rapid Power Reduction Signal ML24212A1442024-08-0101 August 2024 Integrated Inspection Report 05200025/2024002 and 05200026/2024002 IR 05000424/20240022024-07-29029 July 2024 Integrated Inspection Report 05000424/2024002 and 05000425/2024002 IR 05000424/20244042024-07-26026 July 2024 Material Control and Accounting Program Inspection Report 05000424/2024404 and 05000425/2024404 (Cover Letter) NL-24-0282, License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements2024-07-25025 July 2024 License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements NL-24-0126, – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.62024-07-25025 July 2024 – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.6 ML24204A0722024-07-23023 July 2024 Issuance of Amendment No. 225, Regarding LAR to Revise TS 3.7.9 for a one-time Change to Support Nuclear Service Cooling Water Transfer Pump Repairs - Emergency Circumstances NL-24-0286, Emergency Request to Revise Technical Specification 3.7.9 for a One-Time Change to Support a Unit 1 Nuclear Service Cooling Water Transfer Pump Repair2024-07-20020 July 2024 Emergency Request to Revise Technical Specification 3.7.9 for a One-Time Change to Support a Unit 1 Nuclear Service Cooling Water Transfer Pump Repair ML24191A4562024-07-19019 July 2024 Request for Relief and Alternative Requirements for Squib (Explosively Actuated) Valves First Test Interval NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 ML24194A0342024-07-12012 July 2024 Review of the Refueling Outage 1R24 Steam Generator Tube Inspection Report ML24191A3792024-07-10010 July 2024 – Initial Test Program and Operational Programs Inspection Report 05200026/2024011 NL-24-0227, Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2024-07-0303 July 2024 Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0234, Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown2024-06-28028 June 2024 Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in NL-24-0087, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks2024-06-21021 June 2024 License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks NL-24-0201, Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2024-06-18018 June 2024 Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0243, Registration of Spent Fuel Cask Use2024-06-18018 June 2024 Registration of Spent Fuel Cask Use ML24163A0632024-06-12012 June 2024 2024 Licensed Operator Re-qualification Inspection Notification Letter Vogtle, Units 3 & 4 ML24155A1772024-06-0505 June 2024 Regulatory Audit in Support of Review of the LAR to Revise Emergency Diesel Generator Frequency and Voltage Ranges for Technical Specification 3.8.1, Surveillance Requirements NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24094A1402024-05-16016 May 2024 Staff Response to Request for Revision to NRC Staff Assessment of Updated Seismic Hazard Information and Latest Understanding of Seismic Hazards at the Vogtle Plant Site Following the NRC Process for the Ongoing Assessment of Natural Hazard ML24130A2412024-05-13013 May 2024 Integrated Inspection Report 05200025/2024001 and 05200026/2024001 ML24120A1812024-05-13013 May 2024 Request for Withholding Information from Public Disclosure Responses to NRC Request for Additional Information for Refueling Outage IR24 Steam Generator Tube Inspection Report – Enclosure 2 ML24101A2112024-05-11011 May 2024 Expedited Issuance of Amendment No. 198 Change to Technical Specification 5.5.13, Ventilation Filter Testing Program (VFTP) NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 ML24127A2372024-05-0909 May 2024 Initial Test Program and Operational Programs Inspection Report 05200026/2024010 NL-24-0194, Revised Request for Relief and Alternative Requirements for Squib Valves First Test Interval (V34-IST-ALT-03-R1)2024-05-0707 May 2024 Revised Request for Relief and Alternative Requirements for Squib Valves First Test Interval (V34-IST-ALT-03-R1) IR 05000424/20244032024-05-0101 May 2024 Cyber Security Inspection Report 05000424/2024403 and 05000425/2024403 Public ML24120A2832024-04-30030 April 2024 Project Manager Reassignment NL-24-0170, Responses to Second Round NRC Request for Additional Information for Refueling Outage 1 R24 Steam Generator Tube Inspection Report2024-04-25025 April 2024 Responses to Second Round NRC Request for Additional Information for Refueling Outage 1 R24 Steam Generator Tube Inspection Report NL-24-0165, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20232024-04-25025 April 2024 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2023 IR 05000424/20240012024-04-23023 April 2024 –Integrated Inspection Report 05000424/2024001 and 05000425/2024001 NL-24-0154, Preservice Inspection Progam Owners Activity Report2024-04-16016 April 2024 Preservice Inspection Progam Owners Activity Report ML24030A9092024-04-10010 April 2024 Issuance of Amendment Nos. 224 and 207, Regarding Revision to Technical Specification 3.4.14 (Reactor Coolant System) Pressure Isolation Valve Leakage Surveillance Requirement 3.4.14.1 2024-09-09
[Table view] |
See also: IR 05000424/2017301
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
245 PEACHTREE CENTER AVENUE NE, SUITE 1200
ATLANTA, GEORGIA 30303-1257
May 3, 2017
Southern Nuclear Operating Company, Inc.
ATTN: Mr. Darren Stiles, Training Manager
Vogtle Electric Generating Plant
7821 River Road
Bin 63030
Waynesboro, GA 30830-2965
SUBJECT: VOGTLE - OPERATOR LICENSING WRITTEN EXAMINATION APPROVAL
05000424/2017301 AND 05000425/2017301
Dear Mr. Stiles:
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing
written examination at Vogtle Electric Generating Plant.
The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license
applications submitted in connection with this examination and separately provided a list of
approved applicants to your office. The NRC staff will administer operating tests to these
individuals, as applicable, the weeks of May 8 and May 15, 2017. Note that any examination
waivers and application denials have been addressed in separate correspondence.
The NRC has approved the subject written examination and hereby authorizes you to administer
the written examination in accordance with Revision 10 of NUREG-1021, Operator Licensing
Examination Standards for Power Reactors, the week of May 22, 2017.
This examination has undergone extensive review by my staff and representatives responsible for
operator training at your facility. Based on this review, I have concluded that the examination
meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By
administering this examination, you also agree that it meets NUREG-1021 guidelines, and is
appropriate for measuring the qualifications of licensed operators at your facility. If you determine
that this examination is not appropriate for licensing operators at your facility, do not administer
the examination and contact me at (404) 997-4662.
Please contact your Chief Examiner, Mr. Michael Kennard, at (404) 997-4627 if you have any
questions or identify any errors or changes in license level (RO or SRO) specified for each
applicant on the list of approved applicants.
Sincerely,
/RA Gerald J. McCoy Acting for/
Eugene F. Guthrie, Chief
Operations Branch 2
Division of Reactor Safety
Docket Nos.: 50-424, 50-425
License Nos.: NPF-68, NPF-81
D. Stiles 2
VOGTLE - OPERATOR LICENSING WRITTEN EXAMINATION APPROVAL
050000424/2017301 AND 050000425/2017301 May 3, 2017
X PUBLICLY AVAILABLE NON-PUBLICLY AVAILABLE SENSITIVE X NON-SENSITIVE
ADAMS: Yes
ACCESSION NUMBER: ML17125A343 X SUNSI REVIEW COMPLETE
OFFICE RII:DRS RII:DRS RII:DRS RII:DRS RII DRS RII DRS
SIGNATURE JHK MK GMCOY
NAME JKIRBY MKENNARD EGUTHRIE
DATE 5/ /2017 5/ /2017 5/ /2017 5/ /2017 5/ /2017 5/ /2017
E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO
OFFICIAL FILE COPY