| issue date = 05/19/2017
| issue date = 05/19/2017
| title = Requalification Program Inspection - Vogtle, Units 1 and 2 05000424/2017002 and 05000425/2017002
| title = Requalification Program Inspection - Vogtle, Units 1 and 2 05000424/2017002 and 05000425/2017002
| author name = McCoy G J
| author name = Mccoy G
| author affiliation = NRC/RGN-II/DRS
| author affiliation = NRC/RGN-II/DRS
| addressee name = Taber B K
| addressee name = Taber B
| addressee affiliation = Southern Nuclear Operating Co, Inc
| addressee affiliation = Southern Nuclear Operating Co, Inc
| docket = 05000424, 05000425
| docket = 05000424, 05000425
Line 14: Line 14:
| page count = 3
| page count = 3
}}
}}
See also: [[followed by::IR 05000424/2017002]]
See also: [[see also::IR 05000424/2017002]]


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:UNITED STATES
[[Issue date::May 19, 2017]]
                                  NUCLEAR REGULATORY COMMISSION
                                                REGION II
                              245 PEACHTREE CENTER AVENUE NE, SUITE 1200
                                      ATLANTA, GEORGIA 30303-1257
                                      May 19, 2017
Mr. B. Keith Taber
Vice President
Southern Nuclear Operating Company, Inc.
Vogtle Electric Generating Plant
7821 River Road
Waynesboro, GA 30830
SUBJECT:       REQUALIFICATION PROGRAM INSPECTION - VOGTLE ELECTRIC
                GENERATING PLANT UNITS 1 AND 2 05000424/2017002 AND
                05000425/2017002
Dear Mr. Taber:
In a telephone conversation on May 4, 2017, Mr. David Lanyi, Senior Operations Engineeer and
Mr. Ken Jenkins, Initial Exam Lead made arrangements for the NRC to inspect the licensed
operator requalification program at Vogtle Electric Generating Plant Units 1 and 2. The
inspection is planned for the week of June 26, 2017, which coincides with your regularly
scheduled requalification examination cycle. The staff at your facility should prepare and
conduct the requalification examinations in accordance with your NRC-approved requalification
program. It is our understanding that you have committed to maintain your plant-referenced
simulator in accordance with ANSI/ANS-3.5-1985, American National Standard for Nuclear
Power Plant Simulators for Use in Operator Training and Examination.
In accordance with 10 CFR 55.59, the NRC has requested that you submit June 2, 2017, the
material as specified in paragraph A of the Enclosure, in order to support the NRC's inspection
program needs. The NRC has further requested that you have all items as specified in
paragraph B of the Enclosure available for review for the inspectors on the first day they arrive
on site. Mr. Jenkins has been advised of this request and provided with the name and address
of the NRC lead inspector assigned to this inspection.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
Management and Budget, approval number Part 55 (3150-0018).
The public reporting burden for this collection of information is estimated to average 4 hours per
response, including the time for reviewing instructions, gathering and maintaining the data
needed, and completing and reviewing the collection of information. Send comments on any
aspect of this collection of information, including suggestions for reducing the burden, to the
Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov;
and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-
0101), Office of Management and Budget, Washington, DC 20503.


Mr. B. Keith Taber Vice President Southern Nuclear Operating Company, Inc.
B. Taber                                      2
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection
of information unless it displays a currently valid OMB approval number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice,  a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRCs document system
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html. (The Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding this
inspection please contact Mr. Lanyi at (404) 997-4487, (Internet E-mail: david.lanyi@nrc.gov),
or me at (404) 997-4551, (Internet E-mail: Gerald.mccoy@nrc.gov).
                                              Sincerely,
                                              /RA/
                                              Gerald J. McCoy, Chief
                                              Operations Branch 1
                                              Division of Reactor Safety
Docket Nos.: 50-424, 50-425
License Nos.: NPF-68, NPF-81
Enclosure: Materials Request List
cc: Distribution via Listserv


Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830
B. Taber                                                    3
 
SUBJECT:         REQUALIFICATION PROGRAM INSPECTION - VOGTLE ELECTRIC
SUBJECT: REQUALIFICATION PROGRAM INSPECTION - VOGTLE ELECTRIC GENERATING PLANT UNITS 1 AND 2 05000424/2017002 AND 05000425/2017002
                  GENERATING PLANT UNITS 1 AND 2 05000424/2017002 AND
 
                  05000425/2017002 DATED : MAY 19, 2017
==Dear Mr. Taber:==
DISTRIBUTION:
In a telephone conversation on May 4, 2017, Mr. David Lanyi, Senior Operations Engineeer and Mr. Ken Jenkins, Initial Exam Lead made arrangements for the NRC to inspect the licensed operator requalification program at Vogtle Electric Generating Plant Units 1 and 2. The inspection is planned for the week of June 26, 2017, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program. It is our understanding that you have committed to maintain your plant-referenced simulator in accordance with ANSI/ANS-3.5-1985, "American National Standard for Nuclear Power Plant Simulators for Use in Operator Training and Examination."
S. Sandal, RII, DRP
 
C. Kontz, RII, SPE
In accordance with 10 CFR 55.59, the NRC has requested that you submit June 2, 2017, the material as specified in paragraph "A" of the Enclosure, in order to support the NRC's inspection program needs. The NRC has further requested that you have all items as specified in paragraph "B" of the Enclosure available for review for the inspectors on the first day they arrive on site. Mr. Jenkins has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.
D. Mas-Peneranda, PE
 
A. Patz, RII DRP
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number Part 55 (3150-0018).
M. Endress, RII SRI
 
A. Alen, RII, RI
The public reporting burden for this collection of information is estimated to average 4 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-
S. Price, ORA/RC
0101), Office of Management and Budget, Washington, DC 20503. The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB approval number.
K. Sloan, RII, EICS
 
* See previous page for concurrence
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice, " a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. (The Public Electronic Reading Room). Thank you for your cooperation in this matter. If you have any questions regarding this inspection please contact Mr. Lanyi at (404) 997-4487, (Internet E-mail: david.lanyi@nrc.gov), or me at (404) 997-4551, (Internet E-mail: Gerald.mccoy@nrc.gov).
  PUBLICLY AVAILABLE                NON-PUBLICLY AVAILABLE                SENSITIVE                NON-
 
                                                                                          SENSITIVE
Sincerely,/RA/ Gerald J. McCoy, Chief Operations Branch 1 Division of Reactor Safety
ADAMS:     Yes    ACCESSION NUMBER:_________________________                  SUNSI REVIEW COMPLETE
 
                  FORM 665 ATTACHED
Docket Nos.: 50-424, 50-425 License Nos.: NPF-68, NPF-81
  OFFICE            RII/ OB1        RII/ OB1
 
  SIGNATURE                DRL            GXM
===Enclosure:===
  NAME              D. Lanyi        G. McCoy
Materials Request List cc: Distribution via Listserv
  DATE                  5/19/2017      5/19/2017    5/  /2017  5/  /2017        5/ /2017      5/ /2017
  E-MAIL COPY?        YES    NO    YES      NO  YES    NO  YES    NO      YES    NO      YES    NO
        OFFICIAL  RECORD      COPY      DOCUMENT    NAME:   G:\DRSII\OBII\SITES\VOGTLE\REQUAL
        INSPECTIONS\VOGTLE 2017\REQUAL LETTER.DOCX
}}
}}

Latest revision as of 02:57, 30 October 2019

Requalification Program Inspection - Vogtle, Units 1 and 2 05000424/2017002 and 05000425/2017002
ML17142A216
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 05/19/2017
From: Gerald Mccoy
Division of Reactor Safety II
To: Taber B
Southern Nuclear Operating Co
References
IR 2017002
Download: ML17142A216 (3)


See also: IR 05000424/2017002

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

May 19, 2017

Mr. B. Keith Taber

Vice President

Southern Nuclear Operating Company, Inc.

Vogtle Electric Generating Plant

7821 River Road

Waynesboro, GA 30830

SUBJECT: REQUALIFICATION PROGRAM INSPECTION - VOGTLE ELECTRIC

GENERATING PLANT UNITS 1 AND 2 05000424/2017002 AND

05000425/2017002

Dear Mr. Taber:

In a telephone conversation on May 4, 2017, Mr. David Lanyi, Senior Operations Engineeer and

Mr. Ken Jenkins, Initial Exam Lead made arrangements for the NRC to inspect the licensed

operator requalification program at Vogtle Electric Generating Plant Units 1 and 2. The

inspection is planned for the week of June 26, 2017, which coincides with your regularly

scheduled requalification examination cycle. The staff at your facility should prepare and

conduct the requalification examinations in accordance with your NRC-approved requalification

program. It is our understanding that you have committed to maintain your plant-referenced

simulator in accordance with ANSI/ANS-3.5-1985, American National Standard for Nuclear

Power Plant Simulators for Use in Operator Training and Examination.

In accordance with 10 CFR 55.59, the NRC has requested that you submit June 2, 2017, the

material as specified in paragraph A of the Enclosure, in order to support the NRC's inspection

program needs. The NRC has further requested that you have all items as specified in

paragraph B of the Enclosure available for review for the inspectors on the first day they arrive

on site. Mr. Jenkins has been advised of this request and provided with the name and address

of the NRC lead inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of

Management and Budget, approval number Part 55 (3150-0018).

The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per

response, including the time for reviewing instructions, gathering and maintaining the data

needed, and completing and reviewing the collection of information. Send comments on any

aspect of this collection of information, including suggestions for reducing the burden, to the

Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission,

Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov;

and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-

0101), Office of Management and Budget, Washington, DC 20503.

B. Taber 2

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection

of information unless it displays a currently valid OMB approval number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRCs document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html. (The Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding this

inspection please contact Mr. Lanyi at (404) 997-4487, (Internet E-mail: david.lanyi@nrc.gov),

or me at (404) 997-4551, (Internet E-mail: Gerald.mccoy@nrc.gov).

Sincerely,

/RA/

Gerald J. McCoy, Chief

Operations Branch 1

Division of Reactor Safety

Docket Nos.: 50-424, 50-425

License Nos.: NPF-68, NPF-81

Enclosure: Materials Request List

cc: Distribution via Listserv

B. Taber 3

SUBJECT: REQUALIFICATION PROGRAM INSPECTION - VOGTLE ELECTRIC

GENERATING PLANT UNITS 1 AND 2 05000424/2017002 AND

05000425/2017002 DATED : MAY 19, 2017

DISTRIBUTION:

S. Sandal, RII, DRP

C. Kontz, RII, SPE

D. Mas-Peneranda, PE

A. Patz, RII DRP

M. Endress, RII SRI

A. Alen, RII, RI

S. Price, ORA/RC

K. Sloan, RII, EICS

  • See previous page for concurrence

PUBLICLY AVAILABLE NON-PUBLICLY AVAILABLE SENSITIVE NON-

SENSITIVE

ADAMS: Yes ACCESSION NUMBER:_________________________ SUNSI REVIEW COMPLETE

FORM 665 ATTACHED

OFFICE RII/ OB1 RII/ OB1

SIGNATURE DRL GXM

NAME D. Lanyi G. McCoy

DATE 5/19/2017 5/19/2017 5/ /2017 5/ /2017 5/ /2017 5/ /2017

E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO

OFFICIAL RECORD COPY DOCUMENT NAME: G:\DRSII\OBII\SITES\VOGTLE\REQUAL