(6 intermediate revisions by the same user not shown) |
Line 3: |
Line 3: |
| | issue date = 05/19/2017 | | | issue date = 05/19/2017 |
| | title = Requalification Program Inspection - Vogtle, Units 1 and 2 05000424/2017002 and 05000425/2017002 | | | title = Requalification Program Inspection - Vogtle, Units 1 and 2 05000424/2017002 and 05000425/2017002 |
| | author name = McCoy G J | | | author name = Mccoy G |
| | author affiliation = NRC/RGN-II/DRS | | | author affiliation = NRC/RGN-II/DRS |
| | addressee name = Taber B K | | | addressee name = Taber B |
| | addressee affiliation = Southern Nuclear Operating Co, Inc | | | addressee affiliation = Southern Nuclear Operating Co, Inc |
| | docket = 05000424, 05000425 | | | docket = 05000424, 05000425 |
Line 14: |
Line 14: |
| | page count = 3 | | | page count = 3 |
| }} | | }} |
| See also: [[followed by::IR 05000424/2017002]] | | See also: [[see also::IR 05000424/2017002]] |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter: | | {{#Wiki_filter:UNITED STATES |
| [[Issue date::May 19, 2017]]
| | NUCLEAR REGULATORY COMMISSION |
| | REGION II |
| | 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 |
| | ATLANTA, GEORGIA 30303-1257 |
| | May 19, 2017 |
| | Mr. B. Keith Taber |
| | Vice President |
| | Southern Nuclear Operating Company, Inc. |
| | Vogtle Electric Generating Plant |
| | 7821 River Road |
| | Waynesboro, GA 30830 |
| | SUBJECT: REQUALIFICATION PROGRAM INSPECTION - VOGTLE ELECTRIC |
| | GENERATING PLANT UNITS 1 AND 2 05000424/2017002 AND |
| | 05000425/2017002 |
| | Dear Mr. Taber: |
| | In a telephone conversation on May 4, 2017, Mr. David Lanyi, Senior Operations Engineeer and |
| | Mr. Ken Jenkins, Initial Exam Lead made arrangements for the NRC to inspect the licensed |
| | operator requalification program at Vogtle Electric Generating Plant Units 1 and 2. The |
| | inspection is planned for the week of June 26, 2017, which coincides with your regularly |
| | scheduled requalification examination cycle. The staff at your facility should prepare and |
| | conduct the requalification examinations in accordance with your NRC-approved requalification |
| | program. It is our understanding that you have committed to maintain your plant-referenced |
| | simulator in accordance with ANSI/ANS-3.5-1985, American National Standard for Nuclear |
| | Power Plant Simulators for Use in Operator Training and Examination. |
| | In accordance with 10 CFR 55.59, the NRC has requested that you submit June 2, 2017, the |
| | material as specified in paragraph A of the Enclosure, in order to support the NRC's inspection |
| | program needs. The NRC has further requested that you have all items as specified in |
| | paragraph B of the Enclosure available for review for the inspectors on the first day they arrive |
| | on site. Mr. Jenkins has been advised of this request and provided with the name and address |
| | of the NRC lead inspector assigned to this inspection. |
| | This letter contains information collections that are subject to the Paperwork Reduction Act of |
| | 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of |
| | Management and Budget, approval number Part 55 (3150-0018). |
| | The public reporting burden for this collection of information is estimated to average 4 hours per |
| | response, including the time for reviewing instructions, gathering and maintaining the data |
| | needed, and completing and reviewing the collection of information. Send comments on any |
| | aspect of this collection of information, including suggestions for reducing the burden, to the |
| | Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, |
| | Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; |
| | and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150- |
| | 0101), Office of Management and Budget, Washington, DC 20503. |
|
| |
|
| Mr. B. Keith Taber Vice President Southern Nuclear Operating Company, Inc. | | B. Taber 2 |
| | The NRC may not conduct or sponsor, and a person is not required to respond to, a collection |
| | of information unless it displays a currently valid OMB approval number. |
| | In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its |
| | enclosure will be available electronically for public inspection in the NRC Public Document |
| | Room or from the Publicly Available Records (PARS) component of NRCs document system |
| | (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading- |
| | rm/adams.html. (The Public Electronic Reading Room). |
| | Thank you for your cooperation in this matter. If you have any questions regarding this |
| | inspection please contact Mr. Lanyi at (404) 997-4487, (Internet E-mail: david.lanyi@nrc.gov), |
| | or me at (404) 997-4551, (Internet E-mail: Gerald.mccoy@nrc.gov). |
| | Sincerely, |
| | /RA/ |
| | Gerald J. McCoy, Chief |
| | Operations Branch 1 |
| | Division of Reactor Safety |
| | Docket Nos.: 50-424, 50-425 |
| | License Nos.: NPF-68, NPF-81 |
| | Enclosure: Materials Request List |
| | cc: Distribution via Listserv |
|
| |
|
| Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830
| | B. Taber 3 |
| | | SUBJECT: REQUALIFICATION PROGRAM INSPECTION - VOGTLE ELECTRIC |
| SUBJECT: REQUALIFICATION PROGRAM INSPECTION - VOGTLE ELECTRIC GENERATING PLANT UNITS 1 AND 2 05000424/2017002 AND 05000425/2017002 | | GENERATING PLANT UNITS 1 AND 2 05000424/2017002 AND |
| | | 05000425/2017002 DATED : MAY 19, 2017 |
| ==Dear Mr. Taber:==
| | DISTRIBUTION: |
| In a telephone conversation on May 4, 2017, Mr. David Lanyi, Senior Operations Engineeer and Mr. Ken Jenkins, Initial Exam Lead made arrangements for the NRC to inspect the licensed operator requalification program at Vogtle Electric Generating Plant Units 1 and 2. The inspection is planned for the week of June 26, 2017, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program. It is our understanding that you have committed to maintain your plant-referenced simulator in accordance with ANSI/ANS-3.5-1985, "American National Standard for Nuclear Power Plant Simulators for Use in Operator Training and Examination."
| | S. Sandal, RII, DRP |
| | | C. Kontz, RII, SPE |
| In accordance with 10 CFR 55.59, the NRC has requested that you submit June 2, 2017, the material as specified in paragraph "A" of the Enclosure, in order to support the NRC's inspection program needs. The NRC has further requested that you have all items as specified in paragraph "B" of the Enclosure available for review for the inspectors on the first day they arrive on site. Mr. Jenkins has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.
| | D. Mas-Peneranda, PE |
| | | A. Patz, RII DRP |
| This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number Part 55 (3150-0018).
| | M. Endress, RII SRI |
| | | A. Alen, RII, RI |
| The public reporting burden for this collection of information is estimated to average 4 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-
| | S. Price, ORA/RC |
| 0101), Office of Management and Budget, Washington, DC 20503. The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB approval number.
| | K. Sloan, RII, EICS |
| | | * See previous page for concurrence |
| In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice, " a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. (The Public Electronic Reading Room). Thank you for your cooperation in this matter. If you have any questions regarding this inspection please contact Mr. Lanyi at (404) 997-4487, (Internet E-mail: david.lanyi@nrc.gov), or me at (404) 997-4551, (Internet E-mail: Gerald.mccoy@nrc.gov).
| | PUBLICLY AVAILABLE NON-PUBLICLY AVAILABLE SENSITIVE NON- |
| | | SENSITIVE |
| Sincerely,/RA/ Gerald J. McCoy, Chief Operations Branch 1 Division of Reactor Safety
| | ADAMS: Yes ACCESSION NUMBER:_________________________ SUNSI REVIEW COMPLETE |
| | | FORM 665 ATTACHED |
| Docket Nos.: 50-424, 50-425 License Nos.: NPF-68, NPF-81
| | OFFICE RII/ OB1 RII/ OB1 |
| | | SIGNATURE DRL GXM |
| ===Enclosure:===
| | NAME D. Lanyi G. McCoy |
| Materials Request List cc: Distribution via Listserv
| | DATE 5/19/2017 5/19/2017 5/ /2017 5/ /2017 5/ /2017 5/ /2017 |
| | E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO |
| | OFFICIAL RECORD COPY DOCUMENT NAME: G:\DRSII\OBII\SITES\VOGTLE\REQUAL |
| | INSPECTIONS\VOGTLE 2017\REQUAL LETTER.DOCX |
| }} | | }} |
|
---|
Category:Letter
MONTHYEARNL-24-0385, Request for Action Matrix Deviation Due to Recent Events Impacting the Unplanned Scram with Complications Performance Indicator2024-10-31031 October 2024 Request for Action Matrix Deviation Due to Recent Events Impacting the Unplanned Scram with Complications Performance Indicator IR 05000424/20240032024-10-30030 October 2024 – Integrated Inspection Report 05000424/2024003 and 05000425/2024003 NL-24-0392, Response to Requests for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-0022024-10-28028 October 2024 Response to Requests for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-002 NL-24-0386, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks Response to Request for Additional Information2024-10-28028 October 2024 License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks Response to Request for Additional Information NL-24-0366, Core Operating Limits Report, Cycle 26, Version 12024-10-25025 October 2024 Core Operating Limits Report, Cycle 26, Version 1 ML24297A6482024-10-23023 October 2024 5 to the Updated Final Safety Analysis Report, Technical Specification Bases Changes, Technical Requirements Manual Changes, Summary Report and Revised NRC Commitments Report ML24269A2502024-09-26026 September 2024 Acknowledgement of the Withdrawal of the Requested Exemption and License Amendment Request to Remove Tier 1 and Tier 2* Requirements NL-24-0369, Withdrawal of License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2 Requirements2024-09-25025 September 2024 Withdrawal of License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2 Requirements NL-24-0350, Core Operating Limits Report, Cycle 24, Version 22024-09-25025 September 2024 Core Operating Limits Report, Cycle 24, Version 2 ML24243A0072024-09-10010 September 2024 – Correction of Amendment Nos. 223 and 206 Regarding Revision to Technical Specifications to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-14483 ML24102A2642024-09-0909 September 2024 – Exemption Request Regarding Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0013) - Letter NL-24-0337, Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program2024-09-0909 September 2024 Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program ML24249A2942024-09-0606 September 2024 Correction of Amendment Nos. 218 and 201 Regarding Revision to Technical Specifications to Use Online Monitoring Methodology 05200025/LER-2024-002, Manual Reactor Protection System and Automatic Safeguards Actuation Due to an Unexpected Change in Position of a Main Feedwater Pump Minimum Flow Control Valve2024-09-0505 September 2024 Manual Reactor Protection System and Automatic Safeguards Actuation Due to an Unexpected Change in Position of a Main Feedwater Pump Minimum Flow Control Valve IR 05000424/20240052024-08-26026 August 2024 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 and 2 - Report 05000424/2024005 and 05000425/2024005 ML24235A1952024-08-22022 August 2024 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 3 and 4 - Report 05200025/2024005 and 05200026/2024005 IR 05000424/20244012024-08-15015 August 2024 4 - Security Baseline Inspection Report 05000424-2024401, 05000425-2024401, 05200025-2024402, and 05200026-2024403 - Cover Letter NL-24-0299, Exemption Request: Final Safety Analysis Report Update Schedule, Response to Request for Additional Information2024-08-14014 August 2024 Exemption Request: Final Safety Analysis Report Update Schedule, Response to Request for Additional Information 05000425/LER-2024-001, Manual Actuation of the Reactor Protection System Due to a Rod Control Fuse Opening Causing a Misaligned Shutdown Rod2024-08-0909 August 2024 Manual Actuation of the Reactor Protection System Due to a Rod Control Fuse Opening Causing a Misaligned Shutdown Rod ML24218A1842024-08-0707 August 2024 Examination Report and Cover Letter 05200026/LER-2024-001, Manual Reactor Protection System Actuation Due to Procedure Not Optimally Sequenced to Reset the Rapid Power Reduction Signal2024-08-0606 August 2024 Manual Reactor Protection System Actuation Due to Procedure Not Optimally Sequenced to Reset the Rapid Power Reduction Signal ML24212A1442024-08-0101 August 2024 Integrated Inspection Report 05200025/2024002 and 05200026/2024002 IR 05000424/20240022024-07-29029 July 2024 Integrated Inspection Report 05000424/2024002 and 05000425/2024002 IR 05000424/20244042024-07-26026 July 2024 Material Control and Accounting Program Inspection Report 05000424/2024404 and 05000425/2024404 (Cover Letter) NL-24-0282, License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements2024-07-25025 July 2024 License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements NL-24-0126, – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.62024-07-25025 July 2024 – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.6 ML24204A0722024-07-23023 July 2024 Issuance of Amendment No. 225, Regarding LAR to Revise TS 3.7.9 for a one-time Change to Support Nuclear Service Cooling Water Transfer Pump Repairs - Emergency Circumstances NL-24-0286, Emergency Request to Revise Technical Specification 3.7.9 for a One-Time Change to Support a Unit 1 Nuclear Service Cooling Water Transfer Pump Repair2024-07-20020 July 2024 Emergency Request to Revise Technical Specification 3.7.9 for a One-Time Change to Support a Unit 1 Nuclear Service Cooling Water Transfer Pump Repair NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 ML24191A4562024-07-19019 July 2024 Request for Relief and Alternative Requirements for Squib (Explosively Actuated) Valves First Test Interval ML24194A0342024-07-12012 July 2024 Review of the Refueling Outage 1R24 Steam Generator Tube Inspection Report ML24191A3792024-07-10010 July 2024 – Initial Test Program and Operational Programs Inspection Report 05200026/2024011 NL-24-0227, Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2024-07-0303 July 2024 Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0234, Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown2024-06-28028 June 2024 Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in NL-24-0087, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks2024-06-21021 June 2024 License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks NL-24-0201, Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2024-06-18018 June 2024 Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0243, Registration of Spent Fuel Cask Use2024-06-18018 June 2024 Registration of Spent Fuel Cask Use ML24163A0632024-06-12012 June 2024 2024 Licensed Operator Re-qualification Inspection Notification Letter Vogtle, Units 3 & 4 ML24155A1772024-06-0505 June 2024 Regulatory Audit in Support of Review of the LAR to Revise Emergency Diesel Generator Frequency and Voltage Ranges for Technical Specification 3.8.1, Surveillance Requirements NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24094A1402024-05-16016 May 2024 Staff Response to Request for Revision to NRC Staff Assessment of Updated Seismic Hazard Information and Latest Understanding of Seismic Hazards at the Vogtle Plant Site Following the NRC Process for the Ongoing Assessment of Natural Hazard ML24130A2412024-05-13013 May 2024 Integrated Inspection Report 05200025/2024001 and 05200026/2024001 ML24120A1812024-05-13013 May 2024 Request for Withholding Information from Public Disclosure Responses to NRC Request for Additional Information for Refueling Outage IR24 Steam Generator Tube Inspection Report – Enclosure 2 ML24101A2112024-05-11011 May 2024 Expedited Issuance of Amendment No. 198 Change to Technical Specification 5.5.13, Ventilation Filter Testing Program (VFTP) NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 ML24127A2372024-05-0909 May 2024 Initial Test Program and Operational Programs Inspection Report 05200026/2024010 NL-24-0194, Revised Request for Relief and Alternative Requirements for Squib Valves First Test Interval (V34-IST-ALT-03-R1)2024-05-0707 May 2024 Revised Request for Relief and Alternative Requirements for Squib Valves First Test Interval (V34-IST-ALT-03-R1) ML24120A2832024-04-30030 April 2024 Project Manager Reassignment 2024-09-09
[Table view] |
See also: IR 05000424/2017002
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
245 PEACHTREE CENTER AVENUE NE, SUITE 1200
ATLANTA, GEORGIA 30303-1257
May 19, 2017
Mr. B. Keith Taber
Vice President
Southern Nuclear Operating Company, Inc.
Vogtle Electric Generating Plant
7821 River Road
Waynesboro, GA 30830
SUBJECT: REQUALIFICATION PROGRAM INSPECTION - VOGTLE ELECTRIC
GENERATING PLANT UNITS 1 AND 2 05000424/2017002 AND
05000425/2017002
Dear Mr. Taber:
In a telephone conversation on May 4, 2017, Mr. David Lanyi, Senior Operations Engineeer and
Mr. Ken Jenkins, Initial Exam Lead made arrangements for the NRC to inspect the licensed
operator requalification program at Vogtle Electric Generating Plant Units 1 and 2. The
inspection is planned for the week of June 26, 2017, which coincides with your regularly
scheduled requalification examination cycle. The staff at your facility should prepare and
conduct the requalification examinations in accordance with your NRC-approved requalification
program. It is our understanding that you have committed to maintain your plant-referenced
simulator in accordance with ANSI/ANS-3.5-1985, American National Standard for Nuclear
Power Plant Simulators for Use in Operator Training and Examination.
In accordance with 10 CFR 55.59, the NRC has requested that you submit June 2, 2017, the
material as specified in paragraph A of the Enclosure, in order to support the NRC's inspection
program needs. The NRC has further requested that you have all items as specified in
paragraph B of the Enclosure available for review for the inspectors on the first day they arrive
on site. Mr. Jenkins has been advised of this request and provided with the name and address
of the NRC lead inspector assigned to this inspection.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
Management and Budget, approval number Part 55 (3150-0018).
The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per
response, including the time for reviewing instructions, gathering and maintaining the data
needed, and completing and reviewing the collection of information. Send comments on any
aspect of this collection of information, including suggestions for reducing the burden, to the
Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov;
and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-
0101), Office of Management and Budget, Washington, DC 20503.
B. Taber 2
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection
of information unless it displays a currently valid OMB approval number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRCs document system
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html. (The Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding this
inspection please contact Mr. Lanyi at (404) 997-4487, (Internet E-mail: david.lanyi@nrc.gov),
or me at (404) 997-4551, (Internet E-mail: Gerald.mccoy@nrc.gov).
Sincerely,
/RA/
Gerald J. McCoy, Chief
Operations Branch 1
Division of Reactor Safety
Docket Nos.: 50-424, 50-425
License Nos.: NPF-68, NPF-81
Enclosure: Materials Request List
cc: Distribution via Listserv
B. Taber 3
SUBJECT: REQUALIFICATION PROGRAM INSPECTION - VOGTLE ELECTRIC
GENERATING PLANT UNITS 1 AND 2 05000424/2017002 AND
05000425/2017002 DATED : MAY 19, 2017
DISTRIBUTION:
S. Sandal, RII, DRP
C. Kontz, RII, SPE
D. Mas-Peneranda, PE
A. Patz, RII DRP
M. Endress, RII SRI
A. Alen, RII, RI
S. Price, ORA/RC
K. Sloan, RII, EICS
- See previous page for concurrence
PUBLICLY AVAILABLE NON-PUBLICLY AVAILABLE SENSITIVE NON-
SENSITIVE
ADAMS: Yes ACCESSION NUMBER:_________________________ SUNSI REVIEW COMPLETE
FORM 665 ATTACHED
OFFICE RII/ OB1 RII/ OB1
SIGNATURE DRL GXM
NAME D. Lanyi G. McCoy
DATE 5/19/2017 5/19/2017 5/ /2017 5/ /2017 5/ /2017 5/ /2017
E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO
OFFICIAL RECORD COPY DOCUMENT NAME: G:\DRSII\OBII\SITES\VOGTLE\REQUAL