{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION | {{#Wiki_filter:UNITED STATES | ||
REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA | NUCLEAR REGULATORY COMMISSION | ||
REGION II | |||
245 PEACHTREE CENTER AVENUE NE, SUITE 1200 | |||
Vice President | ATLANTA, GEORGIA 30303-1257 | ||
May 19, 2017 | |||
Southern Nuclear Operating Company, Inc. | Mr. B. Keith Taber | ||
Vogtle Electric Generating Plant | Vice President | ||
Southern Nuclear Operating Company, Inc. | |||
7821 River Road | Vogtle Electric Generating Plant | ||
Waynesboro, GA 30830 | 7821 River Road | ||
Waynesboro, GA 30830 | |||
SUBJECT: | SUBJECT: REQUALIFICATION PROGRAM INSPECTION - VOGTLE ELECTRIC | ||
GENERATING PLANT UNITS 1 AND 2 05000424/2017002 AND | |||
05000425/2017002 | 05000425/2017002 | ||
Dear Mr. Taber: | |||
In a telephone conversation on May 4, 2017, Mr. David Lanyi, Senior Operations Engineeer and | |||
Mr. Ken Jenkins, Initial Exam Lead made arrangements for the NRC to inspect the licensed | |||
In a telephone conversation on May 4, 2017, Mr. David Lanyi, Senior Operations Engineeer and | operator requalification program at Vogtle Electric Generating Plant Units 1 and 2. The | ||
Mr. Ken Jenkins, Initial Exam Lead made arrangements for the NRC to inspect the licensed operator requalification program at Vogtle Electric Generating Plant Units 1 and 2. | inspection is planned for the week of June 26, 2017, which coincides with your regularly | ||
scheduled requalification examination cycle. | scheduled requalification examination cycle. The staff at your facility should prepare and | ||
simulator in accordance with ANSI/ANS-3.5-1985, | conduct the requalification examinations in accordance with your NRC-approved requalification | ||
Power Plant Simulators for Use in Operator Training and Examination. | program. It is our understanding that you have committed to maintain your plant-referenced | ||
simulator in accordance with ANSI/ANS-3.5-1985, American National Standard for Nuclear | |||
In accordance with 10 CFR 55.59, the NRC has requested that you submit June 2, 2017, the | Power Plant Simulators for Use in Operator Training and Examination. | ||
material as specified in paragraph | In accordance with 10 CFR 55.59, the NRC has requested that you submit June 2, 2017, the | ||
program needs. | material as specified in paragraph A of the Enclosure, in order to support the NRC's inspection | ||
program needs. The NRC has further requested that you have all items as specified in | |||
paragraph | paragraph B of the Enclosure available for review for the inspectors on the first day they arrive | ||
of the NRC lead inspector assigned to this inspection. | on site. Mr. Jenkins has been advised of this request and provided with the name and address | ||
of the NRC lead inspector assigned to this inspection. | |||
This letter contains information collections that are subject to the Paperwork Reduction Act of | |||
This letter contains information collections that are subject to the Paperwork Reduction Act of | 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of | ||
Management and Budget, approval number Part 55 (3150-0018). | |||
1995 (44 U.S.C. 3501 et seq.). | The public reporting burden for this collection of information is estimated to average 4 hours per | ||
response, including the time for reviewing instructions, gathering and maintaining the data | |||
The public reporting burden for this collection of information is estimated to average 4 hours per | needed, and completing and reviewing the collection of information. Send comments on any | ||
response, including the time for reviewing instructions, gathering and maintaining the data | aspect of this collection of information, including suggestions for reducing the burden, to the | ||
needed, and completing and reviewing the collection of information. | Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, | ||
Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; | Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; | ||
and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150- | and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150- | ||
0101), Office of Management and Budget, Washington, DC 20503. | |||
B. Taber 2 | |||
B. Taber | The NRC may not conduct or sponsor, and a person is not required to respond to, a collection | ||
of information unless it displays a currently valid OMB approval number. | |||
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB approval number. | In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its | ||
enclosure will be available electronically for public inspection in the NRC Public Document | |||
In accordance with 10 CFR 2.390 of the | Room or from the Publicly Available Records (PARS) component of NRCs document system | ||
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading- | |||
enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of | rm/adams.html. (The Public Electronic Reading Room). | ||
http://www.nrc.gov/reading-rm/adams.html. (The Public Electronic Reading Room). | Thank you for your cooperation in this matter. If you have any questions regarding this | ||
inspection please contact Mr. Lanyi at (404) 997-4487, (Internet E-mail: david.lanyi@nrc.gov), | |||
inspection please contact Mr. Lanyi at (404) | or me at (404) 997-4551, (Internet E-mail: Gerald.mccoy@nrc.gov). | ||
997-4487, (Internet E-mail: david.lanyi@nrc.gov), or me at (404) 997-4551, (Internet E-mail: Gerald.mccoy@nrc.gov). | Sincerely, | ||
/RA/ | |||
Gerald J. McCoy, Chief | |||
Operations Branch 1 | |||
Division of Reactor Safety | |||
Docket Nos.: 50-424, 50-425 | |||
License Nos.: NPF-68, NPF-81 | |||
Docket Nos.: 50-424, 50-425 | Enclosure: Materials Request List | ||
cc: Distribution via Listserv | |||
License Nos.: NPF-68, NPF-81 | |||
cc: Distribution via Listserv | |||
_________________________ | B. Taber 3 | ||
SUBJECT: REQUALIFICATION PROGRAM INSPECTION - VOGTLE ELECTRIC | |||
GENERATING PLANT UNITS 1 AND 2 05000424/2017002 AND | |||
05000425/2017002 DATED : MAY 19, 2017 | |||
DISTRIBUTION: | |||
S. Sandal, RII, DRP | |||
C. Kontz, RII, SPE | |||
D. Mas-Peneranda, PE | |||
A. Patz, RII DRP | |||
M. Endress, RII SRI | |||
A. Alen, RII, RI | |||
S. Price, ORA/RC | |||
K. Sloan, RII, EICS | |||
* See previous page for concurrence | |||
PUBLICLY AVAILABLE NON-PUBLICLY AVAILABLE SENSITIVE NON- | |||
SENSITIVE | |||
ADAMS: Yes ACCESSION NUMBER:_________________________ SUNSI REVIEW COMPLETE | |||
FORM 665 ATTACHED | |||
OFFICE RII/ OB1 RII/ OB1 | |||
SIGNATURE DRL GXM | |||
NAME D. Lanyi G. McCoy | |||
DATE 5/19/2017 5/19/2017 5/ /2017 5/ /2017 5/ /2017 5/ /2017 | |||
E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO | |||
OFFICIAL RECORD COPY DOCUMENT NAME: G:\DRSII\OBII\SITES\VOGTLE\REQUAL | |||
INSPECTIONS\VOGTLE 2017\REQUAL LETTER.DOCX | |||
}} | }} |
Latest revision as of 02:57, 30 October 2019
ML17142A216 | |
Person / Time | |
---|---|
Site: | Vogtle |
Issue date: | 05/19/2017 |
From: | Gerald Mccoy Division of Reactor Safety II |
To: | Taber B Southern Nuclear Operating Co |
References | |
IR 2017002 | |
Download: ML17142A216 (3) | |
See also: IR 05000424/2017002
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
245 PEACHTREE CENTER AVENUE NE, SUITE 1200
ATLANTA, GEORGIA 30303-1257
May 19, 2017
Mr. B. Keith Taber
Vice President
Southern Nuclear Operating Company, Inc.
Vogtle Electric Generating Plant
7821 River Road
Waynesboro, GA 30830
SUBJECT: REQUALIFICATION PROGRAM INSPECTION - VOGTLE ELECTRIC
GENERATING PLANT UNITS 1 AND 2 05000424/2017002 AND
Dear Mr. Taber:
In a telephone conversation on May 4, 2017, Mr. David Lanyi, Senior Operations Engineeer and
Mr. Ken Jenkins, Initial Exam Lead made arrangements for the NRC to inspect the licensed
operator requalification program at Vogtle Electric Generating Plant Units 1 and 2. The
inspection is planned for the week of June 26, 2017, which coincides with your regularly
scheduled requalification examination cycle. The staff at your facility should prepare and
conduct the requalification examinations in accordance with your NRC-approved requalification
program. It is our understanding that you have committed to maintain your plant-referenced
simulator in accordance with ANSI/ANS-3.5-1985, American National Standard for Nuclear
Power Plant Simulators for Use in Operator Training and Examination.
In accordance with 10 CFR 55.59, the NRC has requested that you submit June 2, 2017, the
material as specified in paragraph A of the Enclosure, in order to support the NRC's inspection
program needs. The NRC has further requested that you have all items as specified in
paragraph B of the Enclosure available for review for the inspectors on the first day they arrive
on site. Mr. Jenkins has been advised of this request and provided with the name and address
of the NRC lead inspector assigned to this inspection.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
Management and Budget, approval number Part 55 (3150-0018).
The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per
response, including the time for reviewing instructions, gathering and maintaining the data
needed, and completing and reviewing the collection of information. Send comments on any
aspect of this collection of information, including suggestions for reducing the burden, to the
Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov;
and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-
0101), Office of Management and Budget, Washington, DC 20503.
B. Taber 2
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection
of information unless it displays a currently valid OMB approval number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRCs document system
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html. (The Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding this
inspection please contact Mr. Lanyi at (404) 997-4487, (Internet E-mail: david.lanyi@nrc.gov),
or me at (404) 997-4551, (Internet E-mail: Gerald.mccoy@nrc.gov).
Sincerely,
/RA/
Gerald J. McCoy, Chief
Operations Branch 1
Division of Reactor Safety
Docket Nos.: 50-424, 50-425
Enclosure: Materials Request List
cc: Distribution via Listserv
B. Taber 3
SUBJECT: REQUALIFICATION PROGRAM INSPECTION - VOGTLE ELECTRIC
GENERATING PLANT UNITS 1 AND 2 05000424/2017002 AND
05000425/2017002 DATED : MAY 19, 2017
DISTRIBUTION:
S. Sandal, RII, DRP
C. Kontz, RII, SPE
D. Mas-Peneranda, PE
A. Patz, RII DRP
M. Endress, RII SRI
A. Alen, RII, RI
S. Price, ORA/RC
K. Sloan, RII, EICS
- See previous page for concurrence
PUBLICLY AVAILABLE NON-PUBLICLY AVAILABLE SENSITIVE NON-
SENSITIVE
ADAMS: Yes ACCESSION NUMBER:_________________________ SUNSI REVIEW COMPLETE
FORM 665 ATTACHED
OFFICE RII/ OB1 RII/ OB1
SIGNATURE DRL GXM
NAME D. Lanyi G. McCoy
DATE 5/19/2017 5/19/2017 5/ /2017 5/ /2017 5/ /2017 5/ /2017
E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO
OFFICIAL RECORD COPY DOCUMENT NAME: G:\DRSII\OBII\SITES\VOGTLE\REQUAL
INSPECTIONS\VOGTLE 2017\REQUAL LETTER.DOCX