ML17142A216: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION  
{{#Wiki_filter:UNITED STATES
REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257
                                  NUCLEAR REGULATORY COMMISSION
      May 19, 2017  
                                                REGION II
  Mr. B. Keith Taber  
                              245 PEACHTREE CENTER AVENUE NE, SUITE 1200
Vice President  
                                      ATLANTA, GEORGIA 30303-1257
 
                                      May 19, 2017
Southern Nuclear Operating Company, Inc.  
Mr. B. Keith Taber
Vogtle Electric Generating Plant  
Vice President
 
Southern Nuclear Operating Company, Inc.
7821 River Road  
Vogtle Electric Generating Plant
Waynesboro, GA 30830  
7821 River Road
Waynesboro, GA 30830
SUBJECT: REQUALIFICATION PROGRAM INSPECTION - VOGTLE ELECTRIC GENERATING PLANT UNITS 1 AND 2 05000424/2017002 AND  
SUBJECT:       REQUALIFICATION PROGRAM INSPECTION - VOGTLE ELECTRIC
 
                GENERATING PLANT UNITS 1 AND 2 05000424/2017002 AND
05000425/2017002  
                05000425/2017002
Dear Mr. Taber:  
Dear Mr. Taber:
 
In a telephone conversation on May 4, 2017, Mr. David Lanyi, Senior Operations Engineeer and
Mr. Ken Jenkins, Initial Exam Lead made arrangements for the NRC to inspect the licensed
In a telephone conversation on May 4, 2017, Mr. David Lanyi, Senior Operations Engineeer and  
operator requalification program at Vogtle Electric Generating Plant Units 1 and 2. The
Mr. Ken Jenkins, Initial Exam Lead made arrangements for the NRC to inspect the licensed operator requalification program at Vogtle Electric Generating Plant Units 1 and 2. The inspection is planned for the week of June 26, 2017, which coincides with your regularly  
inspection is planned for the week of June 26, 2017, which coincides with your regularly
scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program. It is our understanding that you have committed to maintain your plant-referenced  
scheduled requalification examination cycle. The staff at your facility should prepare and
simulator in accordance with ANSI/ANS-3.5-1985, "American National Standard for Nuclear  
conduct the requalification examinations in accordance with your NRC-approved requalification
Power Plant Simulators for Use in Operator Training and Examination."
program. It is our understanding that you have committed to maintain your plant-referenced
simulator in accordance with ANSI/ANS-3.5-1985, American National Standard for Nuclear
In accordance with 10 CFR 55.59, the NRC has requested that you submit June 2, 2017, the  
Power Plant Simulators for Use in Operator Training and Examination.
material as specified in paragraph "A" of the Enclosure, in order to support the NRC's inspection  
In accordance with 10 CFR 55.59, the NRC has requested that you submit June 2, 2017, the
program needs. The NRC has further requested t
material as specified in paragraph A of the Enclosure, in order to support the NRC's inspection
hat you have all items as specified in  
program needs. The NRC has further requested that you have all items as specified in
paragraph "B" of the Enclosure available for review for the inspectors on the first day they arrive on site. Mr. Jenkins has been advised of this request and provided with the name and address  
paragraph B of the Enclosure available for review for the inspectors on the first day they arrive
of the NRC lead inspector assigned to this inspection.  
on site. Mr. Jenkins has been advised of this request and provided with the name and address
 
of the NRC lead inspector assigned to this inspection.
This letter contains information collections that are subject to the Paperwork Reduction Act of
This letter contains information collections that are subject to the Paperwork Reduction Act of  
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
 
Management and Budget, approval number Part 55 (3150-0018).
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number Part 55 (3150-0018).  
The public reporting burden for this collection of information is estimated to average 4 hours per
response, including the time for reviewing instructions, gathering and maintaining the data
The public reporting burden for this collection of information is estimated to average 4 hours per  
needed, and completing and reviewing the collection of information. Send comments on any
response, including the time for reviewing instructions, gathering and maintaining the data  
aspect of this collection of information, including suggestions for reducing the burden, to the
needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission,  
Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov;  
Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov;
and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-
and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-
0101), Office of Management and Budget, Washington, DC 20503.


0101), Office of Management and Budget, Washington, DC 20503. 
B. Taber                                       2
B. Taber     2  
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection
of information unless it displays a currently valid OMB approval number.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB approval number.  
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice, " a copy of this letter and its  
Room or from the Publicly Available Records (PARS) component of NRCs document system
 
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at  
rm/adams.html. (The Public Electronic Reading Room).
http://www.nrc.gov/reading-rm/adams.html. (The Public Electronic Reading Room).  
Thank you for your cooperation in this matter. If you have any questions regarding this
Thank you for your cooperation in this matter. If you have any questions regarding this  
inspection please contact Mr. Lanyi at (404) 997-4487, (Internet E-mail: david.lanyi@nrc.gov),
inspection please contact Mr. Lanyi at (404)  
or me at (404) 997-4551, (Internet E-mail: Gerald.mccoy@nrc.gov).
997-4487, (Internet E-mail: david.lanyi@nrc.gov), or me at (404) 997-4551, (Internet E-mail: Gerald.mccoy@nrc.gov).  
                                              Sincerely,
 
                                              /RA/
                                              Gerald J. McCoy, Chief
      Sincerely,  
                                              Operations Branch 1
      /RA/ Gerald J. McCoy, Chief       Operations Branch 1       Division of Reactor Safety  
                                              Division of Reactor Safety
 
Docket Nos.: 50-424, 50-425
License Nos.: NPF-68, NPF-81
Docket Nos.: 50-424, 50-425  
Enclosure: Materials Request List
 
cc: Distribution via Listserv
License Nos.: NPF-68, NPF-81  
 
Enclosure: Materials Request List  
cc: Distribution via Listserv  
 
 


_________________________   SUNSI REVIEW COMPLETE  
B. Taber                                                    3
FORM 665 ATTACHED OFFICE RII/ OB1 RII/ OB1 SIGNATURE DRL GXM     NAME D. Lanyi G. McCoy     DATE 5/19/2017 5/19/2017 5/   /2017 5/   /2017 5/   /2017 5/   /2017 E-MAIL COPY?    YES NO       YES NO       YES NO      YES NO       YES NO      YES NO
SUBJECT:          REQUALIFICATION PROGRAM INSPECTION - VOGTLE ELECTRIC
                  GENERATING PLANT UNITS 1 AND 2 05000424/2017002 AND
                  05000425/2017002 DATED : MAY 19, 2017
DISTRIBUTION:
S. Sandal, RII, DRP
C. Kontz, RII, SPE
D. Mas-Peneranda, PE
A. Patz, RII DRP
M. Endress, RII SRI
A. Alen, RII, RI
S. Price, ORA/RC
K. Sloan, RII, EICS
* See previous page for concurrence
  PUBLICLY AVAILABLE                NON-PUBLICLY AVAILABLE                SENSITIVE                NON-
                                                                                          SENSITIVE
ADAMS:    Yes    ACCESSION NUMBER:_________________________                 SUNSI REVIEW COMPLETE
                  FORM 665 ATTACHED
  OFFICE             RII/ OB1       RII/ OB1
  SIGNATURE                 DRL           GXM
  NAME               D. Lanyi       G. McCoy
  DATE                   5/19/2017       5/19/2017   5/ /2017   5/ /2017       5/ /2017       5/ /2017
  E-MAIL COPY?         YES    NO     YES     NO   YES     NO YES     NO      YES   NO     YES     NO
        OFFICIAL  RECORD       COPY      DOCUMENT    NAME:  G:\DRSII\OBII\SITES\VOGTLE\REQUAL
        INSPECTIONS\VOGTLE 2017\REQUAL LETTER.DOCX
}}
}}

Latest revision as of 02:57, 30 October 2019

Requalification Program Inspection - Vogtle, Units 1 and 2 05000424/2017002 and 05000425/2017002
ML17142A216
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 05/19/2017
From: Gerald Mccoy
Division of Reactor Safety II
To: Taber B
Southern Nuclear Operating Co
References
IR 2017002
Download: ML17142A216 (3)


See also: IR 05000424/2017002

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

May 19, 2017

Mr. B. Keith Taber

Vice President

Southern Nuclear Operating Company, Inc.

Vogtle Electric Generating Plant

7821 River Road

Waynesboro, GA 30830

SUBJECT: REQUALIFICATION PROGRAM INSPECTION - VOGTLE ELECTRIC

GENERATING PLANT UNITS 1 AND 2 05000424/2017002 AND

05000425/2017002

Dear Mr. Taber:

In a telephone conversation on May 4, 2017, Mr. David Lanyi, Senior Operations Engineeer and

Mr. Ken Jenkins, Initial Exam Lead made arrangements for the NRC to inspect the licensed

operator requalification program at Vogtle Electric Generating Plant Units 1 and 2. The

inspection is planned for the week of June 26, 2017, which coincides with your regularly

scheduled requalification examination cycle. The staff at your facility should prepare and

conduct the requalification examinations in accordance with your NRC-approved requalification

program. It is our understanding that you have committed to maintain your plant-referenced

simulator in accordance with ANSI/ANS-3.5-1985, American National Standard for Nuclear

Power Plant Simulators for Use in Operator Training and Examination.

In accordance with 10 CFR 55.59, the NRC has requested that you submit June 2, 2017, the

material as specified in paragraph A of the Enclosure, in order to support the NRC's inspection

program needs. The NRC has further requested that you have all items as specified in

paragraph B of the Enclosure available for review for the inspectors on the first day they arrive

on site. Mr. Jenkins has been advised of this request and provided with the name and address

of the NRC lead inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of

Management and Budget, approval number Part 55 (3150-0018).

The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per

response, including the time for reviewing instructions, gathering and maintaining the data

needed, and completing and reviewing the collection of information. Send comments on any

aspect of this collection of information, including suggestions for reducing the burden, to the

Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission,

Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov;

and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-

0101), Office of Management and Budget, Washington, DC 20503.

B. Taber 2

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection

of information unless it displays a currently valid OMB approval number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRCs document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html. (The Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding this

inspection please contact Mr. Lanyi at (404) 997-4487, (Internet E-mail: david.lanyi@nrc.gov),

or me at (404) 997-4551, (Internet E-mail: Gerald.mccoy@nrc.gov).

Sincerely,

/RA/

Gerald J. McCoy, Chief

Operations Branch 1

Division of Reactor Safety

Docket Nos.: 50-424, 50-425

License Nos.: NPF-68, NPF-81

Enclosure: Materials Request List

cc: Distribution via Listserv

B. Taber 3

SUBJECT: REQUALIFICATION PROGRAM INSPECTION - VOGTLE ELECTRIC

GENERATING PLANT UNITS 1 AND 2 05000424/2017002 AND

05000425/2017002 DATED : MAY 19, 2017

DISTRIBUTION:

S. Sandal, RII, DRP

C. Kontz, RII, SPE

D. Mas-Peneranda, PE

A. Patz, RII DRP

M. Endress, RII SRI

A. Alen, RII, RI

S. Price, ORA/RC

K. Sloan, RII, EICS

  • See previous page for concurrence

PUBLICLY AVAILABLE NON-PUBLICLY AVAILABLE SENSITIVE NON-

SENSITIVE

ADAMS: Yes ACCESSION NUMBER:_________________________ SUNSI REVIEW COMPLETE

FORM 665 ATTACHED

OFFICE RII/ OB1 RII/ OB1

SIGNATURE DRL GXM

NAME D. Lanyi G. McCoy

DATE 5/19/2017 5/19/2017 5/ /2017 5/ /2017 5/ /2017 5/ /2017

E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO

OFFICIAL RECORD COPY DOCUMENT NAME: G:\DRSII\OBII\SITES\VOGTLE\REQUAL

INSPECTIONS\VOGTLE 2017\REQUAL LETTER.DOCX