ML17312A040: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:CCW PUMP 1B CS-205.106 CONT SW START AFTER START AFTER STOP STOP PULL TO I OCK LOCAL PB STATION | {{#Wiki_filter:CCW PUMP 1B SEQUENCE OF CS-205. 106 CONT SW EVENTS REC. | ||
START N | |||
AFTER START 0 R 106 AFTER STOP OR COMPONENT CLG WATER PUMP 1B STOP A A N | |||
N RUN D | |||
PULL TO I OCK D STOP 14-2D LOCAL PB STATION G 106 STOP OR SWITCHGEAR 1B3 BUS UNDERVOLTAGE 106(S 32) | |||
ELECTR ICAI FAULT 101(A 14) 106 OR CONTROL RM ISOL SW (S-Z2) | |||
CUB j/4 SWGR 1B3 NORMAL ISOLATE 0 | |||
CONT SW SWGR CLOSE A N | |||
TRIP D CONTAINMENT ISOLATION OR FEH 238% | |||
N SIAS CHNL B ON D NLICLEAR RECORDS NOTE: DOCUMENT CONTROL CEMi R | |||
: 1. FOR ELECTRICAL FAULT AND OR PERMISSIVE CIRCUITS SEE CWD'S EDG BKR CLOSED & | |||
BUS TIE BKR OPEN 6 SEC REFERENCE DWGS: | |||
CONTROL WIRING DIAGRAM 8770 B-327 SH.205 FLOW DiAGRAM 8770-G-083 FOR REFERENCE ONLY INSTRUMENT VST 8770 B 270 CCWP 1B MTR OUTBD BRG TIS-14-291B1 TEMP HIGH 106 OR (S 42) | |||
CCWP 1B MTR INBD BRG TIS-14-29182 TEMP HIGH COMPONENT COOLING WATER PUMP 1B R4 REVISED 8c REDRAWN PER PCM 182 193 NUCLEAR SAFETY RELATED C> | |||
O FLORIDA POWER 8c LIGHT CO. | |||
DIV: I8cC DR: AZ APPROVAL ST. LUCIE PLANT UNIT No. 1 8770-8-276 W L | |||
N CH: CA R,C. HAEKLER CONTROI R BLOCK DIAGRAM SHEET 14.2C BY CHK APPROVED DATE: DEC 14, 1971 DATE USE00216 /G}} |
Latest revision as of 09:09, 29 October 2019
ML17312A040 | |
Person / Time | |
---|---|
Site: | Saint Lucie ![]() |
Issue date: | 01/04/1995 |
From: | EBASCO SERVICES, INC. |
To: | |
Shared Package | |
ML17312A008 | List:
|
References | |
8770-B-276-02, 8770-B-276-2, NUDOCS 9702040156 | |
Download: ML17312A040 (1) | |
Text
CCW PUMP 1B SEQUENCE OF CS-205. 106 CONT SW EVENTS REC.
START N
AFTER START 0 R 106 AFTER STOP OR COMPONENT CLG WATER PUMP 1B STOP A A N
N RUN D
PULL TO I OCK D STOP 14-2D LOCAL PB STATION G 106 STOP OR SWITCHGEAR 1B3 BUS UNDERVOLTAGE 106(S 32)
ELECTR ICAI FAULT 101(A 14) 106 OR CONTROL RM ISOL SW (S-Z2)
CUB j/4 SWGR 1B3 NORMAL ISOLATE 0
TRIP D CONTAINMENT ISOLATION OR FEH 238%
N SIAS CHNL B ON D NLICLEAR RECORDS NOTE: DOCUMENT CONTROL CEMi R
BUS TIE BKR OPEN 6 SEC REFERENCE DWGS:
CONTROL WIRING DIAGRAM 8770 B-327 SH.205 FLOW DiAGRAM 8770-G-083 FOR REFERENCE ONLY INSTRUMENT VST 8770 B 270 CCWP 1B MTR OUTBD BRG TIS-14-291B1 TEMP HIGH 106 OR (S 42)
CCWP 1B MTR INBD BRG TIS-14-29182 TEMP HIGH COMPONENT COOLING WATER PUMP 1B R4 REVISED 8c REDRAWN PER PCM 182 193 NUCLEAR SAFETY RELATED C>
O FLORIDA POWER 8c LIGHT CO.
DIV: I8cC DR: AZ APPROVAL ST. LUCIE PLANT UNIT No. 1 8770-8-276 W L
N CH: CA R,C. HAEKLER CONTROI R BLOCK DIAGRAM SHEET 14.2C BY CHK APPROVED DATE: DEC 14, 1971 DATE USE00216 /G