CCW PUMP 1B CS-205.
106 CONT SW START AFTER START AFTER STOP STOP PULL TO I OCK LOCAL PB STATION 14-2D N
0 A
N D
OR A
N D
SEQUENCE OF EVENTS REC.
COMPONENT CLG WATER PUMP 1B RUN STOP R
106 G
106 STOP OR SWITCHGEAR 1B3 BUS UNDERVOLTAGE ELECTR ICAI FAULT CONTROL RM ISOL SW CUB j/4 SWGR 1B3 NORMAL ISOLATE CONT SW SWGR CLOSE TRIP 0
A N
D OR 106(S 32) 101(A14) 106 (S-Z2)
CONTAINMENT ISOLATION SIAS CHNL B ON EDG BKR CLOSED &
BUS TIE BKR OPEN CCWP 1B MTR OUTBD BRG TIS-14-291B1 TEMP HIGH 6
SEC OR N
D OR OR 106 (S 42)
NOTE:
1.
FOR ELECTRICAL FAULT AND PERMISSIVE CIRCUITS SEE CWD'S REFERENCE DWGS:
CONTROL WIRING DIAGRAM 8770 B-327 SH.205 FLOW DiAGRAM 8770-G-083 INSTRUMENT VST 8770 B270 FEH 238%
NLICLEAR RECORDS DOCUMENT CONTROL CEMi R FOR REFERENCE ONLY CCWP 1B MTR INBD BRG TIS-14-29182 TEMP HIGH COMPONENT COOLING WATER PUMP 1B R4 REVISED 8c REDRAWN PER PCM 182 193 NUCLEAR SAFETY RELATED DATE BY CHK APPROVED DIV:
I8cC DR: AZ CH:
CA DATE:
DEC 14, 1971 APPROVAL R,C.
HAEKLER FLORIDA POWER 8c LIGHT CO.
ST.
LUCIE PLANT UNIT No.
1 CONTROI R
BLOCK DIAGRAM 8770-8-276 SHEET 14.2C C>O WLN USE00216