| title = University of New Mexico, Electronic Mail Regarding Review of Draft License Amendment No. 5
| title = University of New Mexico, Electronic Mail Regarding Review of Draft License Amendment No. 5
| author name = Busch R D
| author name = Busch R
| author affiliation = Univ of New Mexico
| author affiliation = Univ of New Mexico
| addressee name = Helvenston E
| addressee name = Helvenston E
Line 13: Line 13:
| document type = E-Mail
| document type = E-Mail
| page count = 2
| page count = 2
| project =
| stage = Draft Other
}}
}}


=Text=
=Text=
{{#Wiki_filter:From:Robert Douglas BuschTo:Helvenston, EdwardCc:Tran, Linh; Lynch, Steven; Kenneth Carpenter
{{#Wiki_filter:From:             Robert Douglas Busch To:               Helvenston, Edward Cc:               Tran, Linh; Lynch, Steven; Kenneth Carpenter


==Subject:==
==Subject:==
[External_Sender] Re: Draft of UNM AGN Research Reactor License Amendment No. 5Date:Thursday, April 26, 2018 1:54:40 PMAttachments:UNM License Amendment No. 5 DRAFT.pdfEd, I have reviewed the draft copy of the License Amendment. I find all of the draft changepages to be correct and consistent with our amendment request dated December 15, 2014 assupplemented. I also confirm that the "and" was missing from the last sentence of TS 6.1.3and should be added.Thank you, BobRobert D. Busch, Ph.D, P.E.Chief Reactor Supervisor, UNM AGN-201M ReactorFrom: Helvenston, Edward <Edward.Helvenston@nrc.gov>Sent: Monday, April 23, 2018 3:22:17 PMTo: Robert Douglas BuschCc: Tran, Linh; Lynch, Steven
[External_Sender] Re: Draft of UNM AGN Research Reactor License Amendment No. 5 Date:             Thursday, April 26, 2018 1:54:40 PM Attachments:     UNM License Amendment No. 5 DRAFT.pdf Ed, I have reviewed the draft copy of the License Amendment. I find all of the draft change pages to be correct and consistent with our amendment request dated December 15, 2014 as supplemented. I also confirm that the "and" was missing from the last sentence of TS 6.1.3 and should be added.
Thank you, Bob Robert D. Busch, Ph.D, P.E.
Chief Reactor Supervisor, UNM AGN-201M Reactor From: Helvenston, Edward <Edward.Helvenston@nrc.gov>
Sent: Monday, April 23, 2018 3:22:17 PM To: Robert Douglas Busch Cc: Tran, Linh; Lynch, Steven


==Subject:==
==Subject:==
Draft of UNM AGN Research Reactor License Amendment No. 5 Good afternoon Bob, Attached is a draft copy of License Amendment No. 5 for the University of New Mexico(UNM) research reactor, including the draft license and Technical Specification (TS)change pages. I would request that you please review this draft, and confirm by responseto this email whether the draft change pages (including the wording of all proposed TSs)are correct and consistent with UNM's amendment request dated December 15, 2014, assupplemented. In addition, the NRC staff noted that UNM's proposed wording for TS 6.1.3, "ReactorAdministrator," appears to be missing an "and," in that "[-] procedures governing facilityoperation; submits the annual report to NRC," should read "[-] procedures governingfacility operation; and submits the annual report to NRC.The NRC staff has added the"and" to TS 6.1.3 in the attached draft, but I would also request that you please confirm thatthe "and" was missing from TS 6.1.3 and should be added. Thank you for your review. The NRC staff will place this email, the attachment, and yourresponse confirming the above into NRC public ADAMS. Regards,Ed Ed Helvenston, U.S. NRC Research and Test Reactor Licensing Branch (PRLB)Division of Licensing Projects (DLP)Office of Nuclear Reactor Regulation (NRR)O-12C07(301) 415-4067}}
Draft of UNM AGN Research Reactor License Amendment No. 5 Good afternoon Bob, Attached is a draft copy of License Amendment No. 5 for the University of New Mexico (UNM) research reactor, including the draft license and Technical Specification (TS) change pages. I would request that you please review this draft, and confirm by response to this email whether the draft change pages (including the wording of all proposed TSs) are correct and consistent with UNMs amendment request dated December 15, 2014, as supplemented.
In addition, the NRC staff noted that UNMs proposed wording for TS 6.1.3, Reactor Administrator, appears to be missing an and, in that [] procedures governing facility operation; submits the annual report to NRC, should read [] procedures governing facility operation; and submits the annual report to NRC. The NRC staff has added the and to TS 6.1.3 in the attached draft, but I would also request that you please confirm that the and was missing from TS 6.1.3 and should be added.
Thank you for your review. The NRC staff will place this email, the attachment, and your response confirming the above into NRC public ADAMS.
: Regards, Ed Ed Helvenston, U.S. NRC
 
Research and Test Reactor Licensing Branch (PRLB)
Division of Licensing Projects (DLP)
Office of Nuclear Reactor Regulation (NRR)
O-12C07 (301) 415-4067}}

Latest revision as of 06:33, 21 October 2019

University of New Mexico, Electronic Mail Regarding Review of Draft License Amendment No. 5
ML18116A650
Person / Time
Site: University of New Mexico
Issue date: 04/26/2018
From: Busch R
Univ of New Mexico
To: Edward Helvenston
Research and Test Reactors Licensing Projects Branch
Helvenston E
Shared Package
ML18116A649 List:
References
Download: ML18116A650 (2)


Text

From: Robert Douglas Busch To: Helvenston, Edward Cc: Tran, Linh; Lynch, Steven; Kenneth Carpenter

Subject:

[External_Sender] Re: Draft of UNM AGN Research Reactor License Amendment No. 5 Date: Thursday, April 26, 2018 1:54:40 PM Attachments: UNM License Amendment No. 5 DRAFT.pdf Ed, I have reviewed the draft copy of the License Amendment. I find all of the draft change pages to be correct and consistent with our amendment request dated December 15, 2014 as supplemented. I also confirm that the "and" was missing from the last sentence of TS 6.1.3 and should be added.

Thank you, Bob Robert D. Busch, Ph.D, P.E.

Chief Reactor Supervisor, UNM AGN-201M Reactor From: Helvenston, Edward <Edward.Helvenston@nrc.gov>

Sent: Monday, April 23, 2018 3:22:17 PM To: Robert Douglas Busch Cc: Tran, Linh; Lynch, Steven

Subject:

Draft of UNM AGN Research Reactor License Amendment No. 5 Good afternoon Bob, Attached is a draft copy of License Amendment No. 5 for the University of New Mexico (UNM) research reactor, including the draft license and Technical Specification (TS) change pages. I would request that you please review this draft, and confirm by response to this email whether the draft change pages (including the wording of all proposed TSs) are correct and consistent with UNMs amendment request dated December 15, 2014, as supplemented.

In addition, the NRC staff noted that UNMs proposed wording for TS 6.1.3, Reactor Administrator, appears to be missing an and, in that [] procedures governing facility operation; submits the annual report to NRC, should read [] procedures governing facility operation; and submits the annual report to NRC. The NRC staff has added the and to TS 6.1.3 in the attached draft, but I would also request that you please confirm that the and was missing from TS 6.1.3 and should be added.

Thank you for your review. The NRC staff will place this email, the attachment, and your response confirming the above into NRC public ADAMS.

Regards, Ed Ed Helvenston, U.S. NRC

Research and Test Reactor Licensing Branch (PRLB)

Division of Licensing Projects (DLP)

Office of Nuclear Reactor Regulation (NRR)

O-12C07 (301) 415-4067