{{#Wiki_filter:June 20, 2018 10 CFR 54 Docket No. 50-443 SBK-L-18121 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Seabrook Station NEXT era ENERGY*& SEABROOK Additional Change to the Eighth Annual Update to the NextEra Energy Seabrook License Renewal Application  
{{#Wiki_filter:NEXTera ENERGY &
SEABROOK June 20, 2018 10 CFR 54 Docket No. 50-443 SBK-L-18121 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Seabrook Station Additional Change to the Eighth Annual Update to the NextEra Energy Seabrook License Renewal Application


==References:==
==References:==
: 1. NextEra Energy Seabrook, LLC letter SBK-L-10077, "Seabrook Station Application for Renewed Operating License," May 25, 2010. (Accession Number ML 101590099)  
: 1. NextEra Energy Seabrook, LLC letter SBK-L-10077, "Seabrook Station Application for Renewed Operating License," May 25, 2010 . (Accession Number ML101590099)
: 2. NextEra Energy Seabrook, LLC letter SBK-L-18075, "Eighth Annual Update to the Seabrook License Renewal Application," May 1, 2018. (Accession Number ML 18121A403)  
: 2. NextEra Energy Seabrook, LLC letter SBK-L-18075, "Eighth Annual Update to the Seabrook License Renewal Application, " May 1, 2018. (Accession Number ML18121A403)
: 3. NextEra Energy Seabrook, LLC letter SBK-L-18097, "Additional Changes to the Eighth Annual Update to the Seabrook License Renewal Application," May 24, 2018. (Accession Number ML 18144A242)
: 3. NextEra Energy Seabrook, LLC letter SBK-L-18097, "Additional Changes to the Eighth Annual Update to the Seabrook License Renewal Application," May 24, 2018 . (Accession Number ML18144A242)
In Reference 1, NextEra Energy Seabrook, LLC (NextEra Energy Seabrook) submitted an application for a renewed facility operating license for Seabrook Station Unit 1 in accordance with the Code of Federal Regulations, Title 10, Parts 50, 51, and 54. In Reference 2, NextEra Energy Seabrook provided the eighth annual review, which identified changes to the Current Licensing Basis (CLB) of the facility that materially affected the content of the License Renewal Application (LRA). Upon discussion with the NRC staff, NextEra Energy Seabrook agreed to revise a portion of the updated information in order to align with NUREG-1801 GALL Rev. 2. NextEra Energy Seabrook , LLC P.O. Box 300 , Lafayette Road , Seabrook , NH 03874 U.S. Nucl e ar Regulatory C ommission S BK-L-18121 I Pag e 2 In Reference 3, NextEra Energy Seabrook provided additional changes to the eighth annual review. Upon discussion with the NRG staff, NextEra Energy Seabrook agreed to clarify a portion of the updated information related to LRA section A.2.1.25. The Enclosure provides an additional change to the LRA. There are no new or revised regulatory commitments contained in this letter. If you have any questions regarding this correspondence, please contact Mr. Kenneth Browne, Licensing Manager, at (603) 773-7932. I declare under penalty of perjury that the foregoing is true and correct. Executed on June*to , 2018 Sincerely, NextEra Energy Seabrook, LLC Christopher Domingos Site Director  
In Reference 1, NextEra Energy Seabrook, LLC (NextEra Energy Seabrook) submitted an application for a renewed facility operating license for Seabrook Station Unit 1 in accordance with the Code of Federal Regulations, Title 10, Parts 50, 51, and 54.
In Reference 2, NextEra Energy Seabrook provided the eighth annual review, which identified changes to the Current Licensing Basis (CLB) of the facility that materially affected the content of the License Renewal Application (LRA). Upon discussion with the NRC staff, NextEra Energy Seabrook agreed to revise a portion of the updated information in order to align with NUREG-1801 GALL Rev. 2.
NextEra Energy Seabrook, LLC P.O. Box 300, Lafayette Road , Seabrook, NH 03874
 
U.S. Nuclear Regulatory Commission SBK-L-18121 I Page 2 In Reference 3, NextEra Energy Seabrook provided additional changes to the eighth annual review. Upon discussion with the NRG staff, NextEra Energy Seabrook agreed to clarify a portion of the updated information related to LRA section A.2.1 .25. The Enclosure provides an additional change to the LRA.
There are no new or revised regulatory commitments contained in this letter.
If you have any questions regarding this correspondence, please contact Mr. Kenneth Browne, Licensing Manager, at (603) 773-7932 .
I declare under penalty of perjury that the foregoing is true and correct.
Executed on June*to, 2018 Sincerely, NextEra Energy Seabrook, LLC Christopher Domingos Site Director


==Enclosure:==
==Enclosure:==
Additional Change to the Eighth Annual Update to the NextEra Energy Seabrook License Renewal Application cc:    D. H. Dorman                NRG  Region I Administrator J.C. Poole                  NRG  Project Manager P. C. Cataldo              NRG  Senior Resident Inspector E. H. Gettys              NRG    Project Manager, License Renewal T. M. Tran                  NRG    Project Manager, License Renewal B. H. Rogers              NRG    Project Manager, License Renewal
U.S. Nuclear Regulatory Commission SBK-L-18121IPage3 Mr. Perry Plummer Director Homeland Security and Emergency Management New Hampshire Department of Safety Division of Homeland Security and Emergency Management Bureau of Emergency Management 33 Hazen Drive Concord, NH 03305 perry.plummer@dos.nh.gov Mr. John Giarrusso, Jr., Nuclear Preparedness Manager The Commonwealth of Massachusetts Emergency Management Agency 400 Worcester Road Framingham, MA 01702-5399 John.Giarrusso@massmail.state.ma.us
Enclosure to SBK-L-18121 Additional Change to the Eighth Annual Update to the NextEra Energy Seabrook License Renewal Application


Additional Change to the Eighth Annual Update to the NextEra Energy Seabrook License Renewal Application cc: D. H. Dorman J.C. Poole P. C. Cataldo E. H. Gettys T. M. Tran B. H. Rogers NRG Region I Administrator NRG Project Manager NRG Senior Resident Inspecto r NRG Project Manager, License Renewal NRG Project Manager, License Renewal NRG Project Manager, License Renewal U.S. Nuclear Regulatory Commission SBK-L-18121IPage3 Mr. Perry Plummer Director Homeland Security and Emergency Management New Hampshire Department of Safety Division of Homeland Security and Emergency Management Bureau of Emergency Management 33 Hazen Drive Concord, NH 03305 perry.plummer@dos.nh.gov Mr. John Giarrusso, Jr., Nuclear Preparedness Manager The Commonwealth of Massachusetts Emergency Management Agency 400 Worcester Road Framingham, MA 01702-5399 John.Giarrusso@massmail.state.ma.us Enclosure to SBK-L-18121 Additional Change to the Eighth Annual Update to the NextEra Energy Seabrook License Renewal Application U.S. Nuclear Regulatory Commission SBK-L-18121 I Enclosure I Page 2 1. In Section A.2.1.25, Inspection of Internal Surfaces in Miscellaneous Piping and Ducting Components, add "blistering" to the list of aging effects.}}
U.S. Nuclear Regulatory Commission SBK-L-18121 I Enclosure I Page 2
: 1. In Section A.2.1.25, Inspection of Internal Surfaces in Miscellaneous Piping and Ducting Components, add "blistering" to the list of aging effects.}}

Latest revision as of 23:00, 20 October 2019

Additional Change to the Eighth Annual Update to the License Renewal Application
ML18172A045
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 06/20/2018
From: Domingos C
NextEra Energy Seabrook
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
SBK-L-18121
Download: ML18172A045 (5)


Text

NEXTera ENERGY &

SEABROOK June 20, 2018 10 CFR 54 Docket No. 50-443 SBK-L-18121 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Seabrook Station Additional Change to the Eighth Annual Update to the NextEra Energy Seabrook License Renewal Application

References:

1. NextEra Energy Seabrook, LLC letter SBK-L-10077, "Seabrook Station Application for Renewed Operating License," May 25, 2010 . (Accession Number ML101590099)
2. NextEra Energy Seabrook, LLC letter SBK-L-18075, "Eighth Annual Update to the Seabrook License Renewal Application, " May 1, 2018. (Accession Number ML18121A403)
3. NextEra Energy Seabrook, LLC letter SBK-L-18097, "Additional Changes to the Eighth Annual Update to the Seabrook License Renewal Application," May 24, 2018 . (Accession Number ML18144A242)

In Reference 1, NextEra Energy Seabrook, LLC (NextEra Energy Seabrook) submitted an application for a renewed facility operating license for Seabrook Station Unit 1 in accordance with the Code of Federal Regulations, Title 10, Parts 50, 51, and 54.

In Reference 2, NextEra Energy Seabrook provided the eighth annual review, which identified changes to the Current Licensing Basis (CLB) of the facility that materially affected the content of the License Renewal Application (LRA). Upon discussion with the NRC staff, NextEra Energy Seabrook agreed to revise a portion of the updated information in order to align with NUREG-1801 GALL Rev. 2.

NextEra Energy Seabrook, LLC P.O. Box 300, Lafayette Road , Seabrook, NH 03874

U.S. Nuclear Regulatory Commission SBK-L-18121 I Page 2 In Reference 3, NextEra Energy Seabrook provided additional changes to the eighth annual review. Upon discussion with the NRG staff, NextEra Energy Seabrook agreed to clarify a portion of the updated information related to LRA section A.2.1 .25. The Enclosure provides an additional change to the LRA.

There are no new or revised regulatory commitments contained in this letter.

If you have any questions regarding this correspondence, please contact Mr. Kenneth Browne, Licensing Manager, at (603) 773-7932 .

I declare under penalty of perjury that the foregoing is true and correct.

Executed on June*to, 2018 Sincerely, NextEra Energy Seabrook, LLC Christopher Domingos Site Director

Enclosure:

Additional Change to the Eighth Annual Update to the NextEra Energy Seabrook License Renewal Application cc: D. H. Dorman NRG Region I Administrator J.C. Poole NRG Project Manager P. C. Cataldo NRG Senior Resident Inspector E. H. Gettys NRG Project Manager, License Renewal T. M. Tran NRG Project Manager, License Renewal B. H. Rogers NRG Project Manager, License Renewal

U.S. Nuclear Regulatory Commission SBK-L-18121IPage3 Mr. Perry Plummer Director Homeland Security and Emergency Management New Hampshire Department of Safety Division of Homeland Security and Emergency Management Bureau of Emergency Management 33 Hazen Drive Concord, NH 03305 perry.plummer@dos.nh.gov Mr. John Giarrusso, Jr., Nuclear Preparedness Manager The Commonwealth of Massachusetts Emergency Management Agency 400 Worcester Road Framingham, MA 01702-5399 John.Giarrusso@massmail.state.ma.us

Enclosure to SBK-L-18121 Additional Change to the Eighth Annual Update to the NextEra Energy Seabrook License Renewal Application

U.S. Nuclear Regulatory Commission SBK-L-18121 I Enclosure I Page 2

1. In Section A.2.1.25, Inspection of Internal Surfaces in Miscellaneous Piping and Ducting Components, add "blistering" to the list of aging effects.