{{#Wiki_filter:October 30, 2018 Mr. Scott Sharp Site Vice President Prairie Island Nuclear Generating Plant Northern States Power Company, Minnesota 1717 Wakonade Drive East Welch, MN 55089-9642 | {{#Wiki_filter:October 30, 2018 Mr. Scott Sharp Site Vice President Prairie Island Nuclear Generating Plant Northern States Power Company, Minnesota 1717 Wakonade Drive East Welch, MN 55089-9642 | ||
==SUBJECT:== | ==SUBJECT:== | ||
PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND | PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2REQUEST FOR INFORMATION FOR AN NRC DESIGN BASES ASSURANCE INSPECTION (PROGRAM): IMPLEMENTATION OF THE ENVIRONMENTAL QUALIFICATION PROGRAM; INSPECTION REPORT 05000282/2019011 AND 05000306/2019011 | ||
==Dear Mr. Sharp:== | ==Dear Mr. Sharp:== | ||
The first group lists information necessary for our initial inspection scoping activities. | On January 28, 2019, the U. S. Nuclear Regulatory Commission (NRC) will begin a triennial baseline Design Bases Assurance Inspection (Program) at Prairie Island Nuclear Generating Plant. This inspection will be performed in accordance with NRC Baseline Inspection Procedure 71111.21N, Attachment 1. | ||
This information should be provided to the lead inspector no later than November | The Design Bases Assurance Inspection will focus on the implementation of the electrical equipment Environmental Qualification (EQ) Program to verify you are maintaining the qualified status of equipment during the life of the plant. The EQ components to be reviewed during this baseline inspection will be identified during the inoffice preparation week that occurs prior to the onsite inspection week. | ||
The second group of documents requested is those items needed to support our in-office preparation activities for the selected set of 9 | The inspection will include two weeks of onsite inspection. The inspection team will consist of three NRC inspectors. The current inspection schedule is as follows: | ||
-12 EQ components. This set of documents should be provided to the lead inspector at the Regional Office no later than January 11, | * Preparation week: January 21-25, 2019; | ||
-office preparation activities, the team may identify additional information needed to support the inspection. | * Onsite inspection weeks: January 28, 2019, through February 1, 2019; and February 11-15, 2019. | ||
The last group includes the additional information above as well as plant specific reference material. This information should be available to the team onsite on January | Experience with previous baseline design inspections of similar depth and length has shown that this type of inspection is extremely resource intensive, both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for information needed for the inspection. | ||
The lead inspector for this inspection is Mr. Benny Jose. We understand that our licensing contact for this inspection is Mr. Bryan Dixon of your organization. | It is important that all of these documents are up-to-date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection. Insofar as possible, this information should be provided electronically to the lead inspector. The information request has been divided into three groups: | ||
If there are any questions about the inspection or the material requested in the enclosure, please contact the lead inspector at 630-829-9756 or via e-mail at Benny.Jose@nrc.gov | |||
S. Sharp | |||
-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number. This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading | * The first group lists information necessary for our initial inspection scoping activities. This information should be provided to the lead inspector no later than November 27, 2018. By November 29, 2018, the lead inspector will communicate the initial selected set of approximately 12 EQ components. | ||
-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Reguations, Part 2.390, | * The second group of documents requested is those items needed to support our in-office preparation activities for the selected set of 9-12 EQ components. This set of documents should be provided to the lead inspector at the Regional Office no later than January 11, 2019. During the in-office preparation activities, the team may identify additional information needed to support the inspection. | ||
Sincerely, | * The last group includes the additional information above as well as plant specific reference material. This information should be available to the team onsite on January 28, 2019. It is also requested that corrective action documents and/or questions developed during the inspection be provided to the lead inspector as the documents are generated. | ||
The lead inspector for this inspection is Mr. Benny Jose. We understand that our licensing contact for this inspection is Mr. Bryan Dixon of your organization. If there are any questions about the inspection or the material requested in the enclosure, please contact the lead inspector at 630-829-9756 or via e-mail at Benny.Jose@nrc.gov. | |||
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number. | |||
This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Reguations, Part 2.390, Public Inspections, Exemptions, Requests for Withholding. | |||
Sincerely, | |||
/RA/ | |||
Benny Jose, Senior Reactor Engineer Engineering Branch 2 Division of Reactor Safety Docket Nos. 50-282; 50-306 License Nos. DPR-42; DPR-60 | |||
==Enclosure:== | ==Enclosure:== | ||
Document Request for Design Bases Assurance Inspection cc: | Document Request for Design Bases Assurance Inspection cc: Distribution via LISTSERV | ||
Letter to Scott Sharp from Benny Jose dated October 30, 2018. | S. Sharp Letter to Scott Sharp from Benny Jose dated October 30, 2018. | ||
==SUBJECT:== | ==SUBJECT:== | ||
PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND | PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2REQUEST FOR INFORMATION FOR AN NRC DESIGN BASES ASSURANCE INSPECTION (PROGRAM): IMPLEMENTATION OF THE ENVIRONMENTAL QUALIFICATION PROGRAM; INSPECTION REPORT 05000282/2019011 AND 05000306/2019011 DISTRIBUTION: | ||
Christopher Cook RidsNrrPMPrairieIsland Resource RidsNrrDorlLpl3 RidsNrrDirsIrib Resource Steven West Darrell Roberts Jamnes Cameron Allan Barker DRPIII DRSIII ADAMS Accession Number: ML18304A077 OFFICE RIII NAME BJose:cl DATE 10/30/18 OFFICIAL RECORD COPY | |||
2019011 | |||
DOCUMENT REQUEST FOR DESIGN BASES ASSURANCE INSPECTION | DOCUMENT REQUEST FOR DESIGN BASES ASSURANCE INSPECTION Inspection Report: 05000282/2019011; 05000306/2019011 Inspection Dates: January 28, 2019, through February 1, 2019; and February 11-15, 2019 Inspection Procedure: Inspection Procedure 71111.21N, Design Bases Assurance Inspection (Program), Attachment 1, Environmental Qualification (EQ) under 10 CFR 50.49 Programs, Processes, and Procedures Lead Inspector: Benny Jose, Senior Reactor Engineer, DRS 630-829-9756 Benny.Jose@nrc.gov I. Information Requested for Initial Inspection Scoping Activities The following information is requested by November 27, 2018, or sooner, to facilitate inspection preparation. If you have any questions regarding this information, please call the team leader as soon as possible. (Please provide the information electronically in pdf files, Excel, or other searchable formats, preferably on some portable electronic media (e.g., CD-ROM, DVD, etc.). The portable electronic media should contain descriptive names, and be indexed and hyperlinked to facilitate ease of use. Information in lists should contain enough information to be easily understood by someone who has knowledge of light water reactor technology). | ||
: | : 1. Risk-ranking of top 50 components required to meet environmental qualifications (EQ) from your site specific probabilistic safety analysis sorted by Fussell Vesely Importance. Please provide Component ID, Description and their location in the plant (containment, aux. building, etc.) in an Excel Spread sheet along with their Fussell Vesely number. | ||
2019011 | : 2. U.S. Nuclear Regulatory Commission Safety Evaluation Report(s) associated with EQ. | ||
: January | : 3. Electronic copies of Updated Final Safety Analysis Report, Technical Specifications, and Technical Specifications Bases. Specifically identify which Updated Final Safety Analysis Report sections address EQ (including seismic). | ||
: Inspection Procedure 71111. | : 4. Identify the various EQ standards (including year, edition, or revision) that the station is committed to. | ||
: 5. Site (and corporate if applicable) procedures associated with the Title 10, Code of Federal Regulations (CFR), Part 50.49, EQ Program for electrical components. Include procedures for procurement of qualified equipment, maintenance of qualified equipment, modification to qualified equipment (including Equivalency or Commercial Grade Dedication (CGD) Programs), and material storage and shelf life controls. | |||
: 1. Risk-ranking of top 50 components required to meet environmental qualifications (EQ) from your site specific probabilistic safety analysis sorted by Fussell Vesely Importance | Enclosure | ||
. Please provide Component ID, Description and their location in the plant (containment, aux. building , etc.) in an Excel Spread sheet along with their Fussell Vesely number. 2. U.S. Nuclear Regulatory Commission Safety Evaluation Report(s) associated with EQ. 3. Electronic copies of Updated Final Safety Analysis Report, Technical Specifications, and Technical Specifications Bases. Specifically identify which Updated Final Safety Analysis Report sections address EQ (including seismic). | |||
: 4. Identify the various EQ standards (including year, edition, or revision) that the station is committed to. | |||
: 5. Site (and corporate if applicable) procedures associated with the Title 10, Code of Federal Regulations (CFR), Part 50.49, EQ Program for electrical components. Include procedures for procurement of qualified equipment, maintenance of qualified equipment, modification to qualified equipment (including Equivalency or Commercial Grade Dedication (CGD) Programs), | |||
DOCUMENT REQUEST FOR DESIGN BASES ASSURANCE INSPECTION | DOCUMENT REQUEST FOR DESIGN BASES ASSURANCE INSPECTION | ||
: 7. Copy of any open licensing commitments related to EQ, if applicable | : 6. Copy of EQ Design Basis Document, if applicable. | ||
: 7. Copy of any open licensing commitments related to EQ, if applicable. | |||
-related), Regulatory Guide 1.97 instrumentation, EQ (e.g., DOR, NUREG 588, 50.49), original or replaced after implementation of 50.49, and plant location. | : 8. EQ Master List. Specific issues to be identified include: safety classification (safety-related or nonsafety-related), Regulatory Guide 1.97 instrumentation, EQ (e.g., DOR, NUREG 588, 50.49), original or replaced after implementation of 50.49, and plant location. | ||
: 9. List of any installed equipment removed from the EQ Master List and basis for removal. 10. List of EQ solenoid valves that are normally continuously energized. | : 9. List of any installed equipment removed from the EQ Master List and basis for removal. | ||
: 11. List or drawings of plant | : 10. List of EQ solenoid valves that are normally continuously energized. | ||
-update (earliest available if multiple uprates). | : 11. List or drawings of plant areas that are subjected to EQ, identifying design (limiting) temperature, both normal and accident, high energy line break, radiation levels, etc. that the associated equipment will have to be qualified to meet EQ. If unit has obtained a power uprate (greater than 5 percent) provide same information pre-update (earliest available if multiple uprates). | ||
: 12. List of CGD evaluations performed, for which the dedicated parts have been issued for installation (parts issued for the last 10 years) on EQ applications in the plant. Include CGD evaluation number, name of part, component ID or description of the component the part was issued to repair, work order, and date issued or installed. | : 12. List of CGD evaluations performed, for which the dedicated parts have been issued for installation (parts issued for the last 10 years) on EQ applications in the plant. Include CGD evaluation number, name of part, component ID or description of the component the part was issued to repair, work order, and date issued or installed. | ||
: 13. List of Corrective Action Documents related to the EQ Program or EQ of specific components for the last 3 years. 14. Current management and engineering organizational chart. | : 13. List of Corrective Action Documents related to the EQ Program or EQ of specific components for the last 3 years. | ||
II. Information Requested (for the approximate 9- | : 14. Current management and engineering organizational chart. | ||
II. Information Requested (for the approximate 9-12 selected components) to be Available by January 11, 2019 | |||
: 1. EQ summary report for each component/subcomponent. | |||
: 2. Qualification Maintenance Requirement Sheet or equivalent. | |||
: 3. List of corrective action documents associated with each of the selected components for the last 3 years. | |||
: 4. Photos of any component in containment or high radiation areas, if available. | |||
: 5. EQ file, including associated Qualification Test Reports. | : 5. EQ file, including associated Qualification Test Reports. | ||
: 6. Vendor manual (electronic copy or availability of hard copy during inspection). | : 6. Vendor manual (electronic copy or availability of hard copy during inspection). | ||
: 7. Preventive maintenance template. | : 7. Preventive maintenance template. | ||
: 8. Last performed work order (WO) for each associated EQ preventive maintenance. | : 8. Last performed work order (WO) for each associated EQ preventive maintenance. | ||
2 | |||
DOCUMENT REQUEST FOR DESIGN BASES ASSURANCE INSPECTION | DOCUMENT REQUEST FOR DESIGN BASES ASSURANCE INSPECTION | ||
: 9. List of corrective maintenance WOs for the last 5 years. Include WO number, date performed, and brief one line description. | |||
: 10. If repair work (e.g., a motor rewind) was performed under a purchase order, provide copy of the purchase order. | : 10. If repair work (e.g., a motor rewind) was performed under a purchase order, provide copy of the purchase order. | ||
: 11. Thermal life calculation. | : 11. Thermal life calculation. | ||
: 12. Any self-assessments of the EQ program in the last 3 years. | : 12. Any self-assessments of the EQ program in the last 3 years. | ||
This information should be separated for each selected component, especially if provided electronically (e.g., folder with component name that includes EQ files , Qualification Test Reports , calculations, corrective action documents, maintenance history, etc | This information should be separated for each selected component, especially if provided electronically (e.g., folder with component name that includes EQ files, Qualification Test Reports, calculations, corrective action documents, maintenance history, etc.). | ||
.). | III. Additional Information to be Provided on January 28, 2019, Onsite | ||
-office preparation activities, the team may identify additional information needed to support the inspection. The lead inspector will provide a list of the additional information needed during the week of January 21, | : 1. During the in-office preparation activities, the team may identify additional information needed to support the inspection. The lead inspector will provide a list of the additional information needed during the week of January 21, 2019. | ||
: 1. Copies of any corrective action documents generated as a result of the | V. Information Requested to be Provided Throughout the Inspection | ||
: 1. Copies of any corrective action documents generated as a result of the teams questions or queries during this inspection. | |||
: 2. Copies of the list of questions submitted by the team members and the status/resolution of the information requested (provide daily by 2:00 p.m. | |||
during the inspection to each team member). | |||
If you have questions regarding the information requested, please contact the lead inspector. | |||
3}} |
Latest revision as of 11:34, 20 October 2019
ML18304A077 | |
Person / Time | |
---|---|
Site: | Prairie Island |
Issue date: | 10/30/2018 |
From: | Benny Jose NRC/RGN-III/DRS/EB2 |
To: | Sharp S Northern States Power Company, Minnesota |
References | |
IR 2019011 | |
Download: ML18304A077 (6) | |
Text
October 30, 2018 Mr. Scott Sharp Site Vice President Prairie Island Nuclear Generating Plant Northern States Power Company, Minnesota 1717 Wakonade Drive East Welch, MN 55089-9642
SUBJECT:
PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2REQUEST FOR INFORMATION FOR AN NRC DESIGN BASES ASSURANCE INSPECTION (PROGRAM): IMPLEMENTATION OF THE ENVIRONMENTAL QUALIFICATION PROGRAM; INSPECTION REPORT 05000282/2019011 AND 05000306/2019011
Dear Mr. Sharp:
On January 28, 2019, the U. S. Nuclear Regulatory Commission (NRC) will begin a triennial baseline Design Bases Assurance Inspection (Program) at Prairie Island Nuclear Generating Plant. This inspection will be performed in accordance with NRC Baseline Inspection Procedure 71111.21N, Attachment 1.
The Design Bases Assurance Inspection will focus on the implementation of the electrical equipment Environmental Qualification (EQ) Program to verify you are maintaining the qualified status of equipment during the life of the plant. The EQ components to be reviewed during this baseline inspection will be identified during the inoffice preparation week that occurs prior to the onsite inspection week.
The inspection will include two weeks of onsite inspection. The inspection team will consist of three NRC inspectors. The current inspection schedule is as follows:
- Preparation week: January 21-25, 2019;
- Onsite inspection weeks: January 28, 2019, through February 1, 2019; and February 11-15, 2019.
Experience with previous baseline design inspections of similar depth and length has shown that this type of inspection is extremely resource intensive, both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for information needed for the inspection.
It is important that all of these documents are up-to-date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection. Insofar as possible, this information should be provided electronically to the lead inspector. The information request has been divided into three groups:
S. Sharp
- The first group lists information necessary for our initial inspection scoping activities. This information should be provided to the lead inspector no later than November 27, 2018. By November 29, 2018, the lead inspector will communicate the initial selected set of approximately 12 EQ components.
- The second group of documents requested is those items needed to support our in-office preparation activities for the selected set of 9-12 EQ components. This set of documents should be provided to the lead inspector at the Regional Office no later than January 11, 2019. During the in-office preparation activities, the team may identify additional information needed to support the inspection.
- The last group includes the additional information above as well as plant specific reference material. This information should be available to the team onsite on January 28, 2019. It is also requested that corrective action documents and/or questions developed during the inspection be provided to the lead inspector as the documents are generated.
The lead inspector for this inspection is Mr. Benny Jose. We understand that our licensing contact for this inspection is Mr. Bryan Dixon of your organization. If there are any questions about the inspection or the material requested in the enclosure, please contact the lead inspector at 630-829-9756 or via e-mail at Benny.Jose@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.
This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Reguations, Part 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Benny Jose, Senior Reactor Engineer Engineering Branch 2 Division of Reactor Safety Docket Nos. 50-282; 50-306 License Nos. DPR-42; DPR-60
Enclosure:
Document Request for Design Bases Assurance Inspection cc: Distribution via LISTSERV
S. Sharp Letter to Scott Sharp from Benny Jose dated October 30, 2018.
SUBJECT:
PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2REQUEST FOR INFORMATION FOR AN NRC DESIGN BASES ASSURANCE INSPECTION (PROGRAM): IMPLEMENTATION OF THE ENVIRONMENTAL QUALIFICATION PROGRAM; INSPECTION REPORT 05000282/2019011 AND 05000306/2019011 DISTRIBUTION:
Christopher Cook RidsNrrPMPrairieIsland Resource RidsNrrDorlLpl3 RidsNrrDirsIrib Resource Steven West Darrell Roberts Jamnes Cameron Allan Barker DRPIII DRSIII ADAMS Accession Number: ML18304A077 OFFICE RIII NAME BJose:cl DATE 10/30/18 OFFICIAL RECORD COPY
DOCUMENT REQUEST FOR DESIGN BASES ASSURANCE INSPECTION Inspection Report: 05000282/2019011; 05000306/2019011 Inspection Dates: January 28, 2019, through February 1, 2019; and February 11-15, 2019 Inspection Procedure: Inspection Procedure 71111.21N, Design Bases Assurance Inspection (Program), Attachment 1, Environmental Qualification (EQ) under 10 CFR 50.49 Programs, Processes, and Procedures Lead Inspector: Benny Jose, Senior Reactor Engineer, DRS 630-829-9756 Benny.Jose@nrc.gov I. Information Requested for Initial Inspection Scoping Activities The following information is requested by November 27, 2018, or sooner, to facilitate inspection preparation. If you have any questions regarding this information, please call the team leader as soon as possible. (Please provide the information electronically in pdf files, Excel, or other searchable formats, preferably on some portable electronic media (e.g., CD-ROM, DVD, etc.). The portable electronic media should contain descriptive names, and be indexed and hyperlinked to facilitate ease of use. Information in lists should contain enough information to be easily understood by someone who has knowledge of light water reactor technology).
- 1. Risk-ranking of top 50 components required to meet environmental qualifications (EQ) from your site specific probabilistic safety analysis sorted by Fussell Vesely Importance. Please provide Component ID, Description and their location in the plant (containment, aux. building, etc.) in an Excel Spread sheet along with their Fussell Vesely number.
- 2. U.S. Nuclear Regulatory Commission Safety Evaluation Report(s) associated with EQ.
- 3. Electronic copies of Updated Final Safety Analysis Report, Technical Specifications, and Technical Specifications Bases. Specifically identify which Updated Final Safety Analysis Report sections address EQ (including seismic).
- 4. Identify the various EQ standards (including year, edition, or revision) that the station is committed to.
- 5. Site (and corporate if applicable) procedures associated with the Title 10, Code of Federal Regulations (CFR), Part 50.49, EQ Program for electrical components. Include procedures for procurement of qualified equipment, maintenance of qualified equipment, modification to qualified equipment (including Equivalency or Commercial Grade Dedication (CGD) Programs), and material storage and shelf life controls.
Enclosure
DOCUMENT REQUEST FOR DESIGN BASES ASSURANCE INSPECTION
- 6. Copy of EQ Design Basis Document, if applicable.
- 7. Copy of any open licensing commitments related to EQ, if applicable.
- 8. EQ Master List. Specific issues to be identified include: safety classification (safety-related or nonsafety-related), Regulatory Guide 1.97 instrumentation, EQ (e.g., DOR, NUREG 588, 50.49), original or replaced after implementation of 50.49, and plant location.
- 9. List of any installed equipment removed from the EQ Master List and basis for removal.
- 10. List of EQ solenoid valves that are normally continuously energized.
- 11. List or drawings of plant areas that are subjected to EQ, identifying design (limiting) temperature, both normal and accident, high energy line break, radiation levels, etc. that the associated equipment will have to be qualified to meet EQ. If unit has obtained a power uprate (greater than 5 percent) provide same information pre-update (earliest available if multiple uprates).
- 12. List of CGD evaluations performed, for which the dedicated parts have been issued for installation (parts issued for the last 10 years) on EQ applications in the plant. Include CGD evaluation number, name of part, component ID or description of the component the part was issued to repair, work order, and date issued or installed.
- 13. List of Corrective Action Documents related to the EQ Program or EQ of specific components for the last 3 years.
- 14. Current management and engineering organizational chart.
II. Information Requested (for the approximate 9-12 selected components) to be Available by January 11, 2019
- 1. EQ summary report for each component/subcomponent.
- 2. Qualification Maintenance Requirement Sheet or equivalent.
- 3. List of corrective action documents associated with each of the selected components for the last 3 years.
- 4. Photos of any component in containment or high radiation areas, if available.
- 5. EQ file, including associated Qualification Test Reports.
- 6. Vendor manual (electronic copy or availability of hard copy during inspection).
- 7. Preventive maintenance template.
2
DOCUMENT REQUEST FOR DESIGN BASES ASSURANCE INSPECTION
- 9. List of corrective maintenance WOs for the last 5 years. Include WO number, date performed, and brief one line description.
- 10. If repair work (e.g., a motor rewind) was performed under a purchase order, provide copy of the purchase order.
- 11. Thermal life calculation.
- 12. Any self-assessments of the EQ program in the last 3 years.
This information should be separated for each selected component, especially if provided electronically (e.g., folder with component name that includes EQ files, Qualification Test Reports, calculations, corrective action documents, maintenance history, etc.).
III. Additional Information to be Provided on January 28, 2019, Onsite
- 1. During the in-office preparation activities, the team may identify additional information needed to support the inspection. The lead inspector will provide a list of the additional information needed during the week of January 21, 2019.
V. Information Requested to be Provided Throughout the Inspection
- 1. Copies of any corrective action documents generated as a result of the teams questions or queries during this inspection.
- 2. Copies of the list of questions submitted by the team members and the status/resolution of the information requested (provide daily by 2:00 p.m.
during the inspection to each team member).
If you have questions regarding the information requested, please contact the lead inspector.
3