Line 9: Line 9:
| docket = 05000005
| docket = 05000005
| license number = R-002, R-2
| license number = R-002, R-2
| contact person = Balazik M F, NRR/DLP/PRLB, 415-2856
| contact person = Balazik M, NRR/DLP/PRLB, 415-2856
| case reference number = EPID L-2019-LLA-0090
| case reference number = EPID L-2019-LLA-0090
| document type = Letter
| document type = Letter
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:June 3, 2019 Dr. Kenan Unlu, Director The Pennsylvania State University Breazeale Nuclear Reactor Radiation Science and Engineering Center University Park, PA 16802
{{#Wiki_filter:June 3, 2019 Dr. Kenan Unlu, Director The Pennsylvania State University Breazeale Nuclear Reactor Radiation Science and Engineering Center University Park, PA 16802-2301
-2301


==SUBJECT:==
==SUBJECT:==
PENNSYLVANIA STATE UNIVERSITY  
PENNSYLVANIA STATE UNIVERSITY ACCEPTANCE OF THE APPLICATION FOR A LICENSE AMENDMENT RE: AN INCREASE IN THE POSSESSION LIMIT FOR SPECIAL NUCLEAR MATERIAL (EPID NO.
- ACCEPTANCE OF THE APPLICATION FOR A LICENSE AMENDMENT RE: AN INCREASE IN THE POSSESSION LIMIT FOR SPECIAL NUCLEAR MATERIAL (EPID NO.
L-2019-LLA-0090)
L-2019-LLA-0090)


==Dear Dr. Unlu:==
==Dear Dr. Unlu:==
By letter dated March 26, 2019 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML19094A260), Pennsylvania State University (PSU) applied for an amendment to Facility License No. R
 
-2 for the Penn State Breazeale Reactor (PSBR).
By letter dated March 26, 2019 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML19094A260), Pennsylvania State University (PSU) applied for an amendment to Facility License No. R-2 for the Penn State Breazeale Reactor (PSBR). The license amendment request (LAR) proposes to change the possession limits for special nuclear material to include 1 gram of uranium-235 and 1 gram of uranium-233 in any form for use in experiments associated with the operation of the PSBR. Consistent with Title 10 of the Code of Federal Regulations (10 CFR) Section 50.90, Application for amendment of license, construction permit, or early site permit, an application to amend the license (including the technical specifications) must fully describe the changes desired and follow, as far as applicable, the form prescribed for original applications. The requirements in 10 CFR 50.34, Contents of applications; technical information, cover the technical information to be included in the application and stipulate that it address design and operating characteristics, unusual or novel design features, and principal safety considerations.
The license amendment request (LAR) proposes to change the possession limits for special nuclear material to include 1 gram of uranium-235 and 1 gram of uranium-233 in any form for use in experiments associated with the operation of the PSBR. Consistent with Title 10 of the Code of Federal Regulatio ns (10 CFR) Section 50.90, "Application for amendment of license, construction permit, or early site permit," an application to amend the license (including the technical specifications) must fully describe the changes desired and follow, as far as applicable, the form prescribed for original applications. The requirements in 10 CFR 50.34, "Contents of applications; technical information," cover the technical information to be included in the application and stipulate that it address design and operating characteristics, unusual or novel design features, and principal safety considerations.
The U.S. Nuclear Regulatory Commission (NRC) staff performed an acceptance review of the LAR and concluded that it includes sufficient information for the NRC staff to begin its detailed technical review. Notwithstanding the acceptance review, the NRC staff may require additional information to complete the detailed technical review. If needed, the NRC staff will request this information by separate correspondence within approximately 45 days.
The U.S. Nuclear Regulatory Commission (NRC) staff performed an acceptance review of the LAR and concluded that it includes sufficient information for the NRC staff to begin its detailed technical review. Notwithstanding the acceptance review, the NRC staff may require additional information to complete the detailed technical review. If needed, the NRC staff will request this information by separate correspondence within approximately 45 days.
Based on the acceptance review, the NRC staff expects to complete its review and make a final determination on the LAR by October 15, 2019. This date could change due to several factors, including requests for additional information, unanticipated changes to the scope of the review, unsolicited supplements to the LAR, and others. If the forecasted date changes, the NRC staff will notify you in writing of the new date and an explanation of the reason for the change.
Based on the acceptance review, the NRC staff expects to complete its review and make a final determination on the LAR by October 15, 2019. This date could change due to several factors, including requests for additional information, unanticipated changes to the scope of the review, unsolicited supplements to the LAR, and others. If the forecasted date changes, the NRC staff will notify you in writing of the new date and an explanation of the reason for the change.


If you have any questions, please contact me at (301) 415
K. Unlu                                  If you have any questions, please contact me at (301) 415-2856, or by electronic mail at Michael.Balazik@nrc.gov.
-2856, or by electronic mail at Michael.Balazik@nrc.gov
Sincerely,
. Sincerely, /RA William B. Kennedy for/
                                              /RA William B. Kennedy for/
Michael Balazik, Project Manager Research and Test Reactors Licensing Branch Division of Licensing Projects Office of Nuclear Reactor Regulation Docket No. 50
Michael Balazik, Project Manager Research and Test Reactors Licensing Branch Division of Licensing Projects Office of Nuclear Reactor Regulation Docket No. 50-005 License No. R-2 cc: See next page
-005 License No. R
-2 cc: See next page


Pennsylvania State University Docket No. 50
Pennsylvania State University             Docket No. 50-005 cc:
-005 cc: Yuanqing Guo Manager of Radiation Protection The Pennsylvania State University 0201 Academic Project Bldg University Park, PA 16802 Dr. Neil A. Sharkey Vice President for Research The Pennsylvania State University 304 Old Main University Park, PA 16802 Director, Bureau of Radiation Protection Department of Environmental Protection P.O. Box 8469 Harrisburg, PA 17105 Test, Research and Training Reactor Newsletter Attention: Amber Johnson Dept of Materials Science and Engineering University of Maryland 4418 Stadium Drive College Park, MD 20742-2115 Dr. Jeffrey Geuther Associate Director for Operations Radiation Science & Engineering Center Breazeale Nuclear Reactor Building University Park, PA 16802-1504
Yuanqing Guo Manager of Radiation Protection The Pennsylvania State University 0201 Academic Project Bldg University Park, PA 16802 Dr. Neil A. Sharkey Vice President for Research The Pennsylvania State University 304 Old Main University Park, PA 16802 Director, Bureau of Radiation Protection Department of Environmental Protection P.O. Box 8469 Harrisburg, PA 17105 Test, Research and Training Reactor Newsletter Attention: Amber Johnson Dept of Materials Science and Engineering University of Maryland 4418 Stadium Drive College Park, MD 20742-2115 Dr. Jeffrey Geuther Associate Director for Operations Radiation Science & Engineering Center Breazeale Nuclear Reactor Building University Park, PA 16802-1504


. ML19126A029
ML19126A029                 *concurred via e-mail             NRR-106 OFFICE NRR/DLP/PRLB/PM* NRR/DLP/PRLB/LA* NRR/DLP/PRLB/PM   NRR/DLP/PRLB/ABC*   NRR/DLP/PRLB/PM NAME   MBalazik         NParker           XYin             WKennedy             MBalazik WKennedy(for)
  *concurre d via e-mail         NRR-106 OFFICE NRR/DLP/PRLB/PM
DATE   5/21/19         5/8/19           5/15/19           5/22/19             6/3/19}}
* NRR/DLP/PRLB/LA*
NRR/DLP/PRLB/PM NRR/DLP/PRLB/ABC
* NRR/DLP/PRLB/PM NAME MBalazik NParker XYin WKennedy MBalazik WKennedy(for) DATE 5/21/19 5/8/19 5/15/19 5/22/19 6/3/19}}

Latest revision as of 20:26, 19 October 2019

Pennsylvania State University Possession Limit License Amendment Request Acceptance May 2019
ML19126A029
Person / Time
Site: Pennsylvania State University
Issue date: 06/03/2019
From: Michael Balazik
Research and Test Reactors Licensing Projects Branch
To: Unlu K
Pennsylvania State Univ
Balazik M, NRR/DLP/PRLB, 415-2856
References
EPID L-2019-LLA-0090
Download: ML19126A029 (4)


Text

June 3, 2019 Dr. Kenan Unlu, Director The Pennsylvania State University Breazeale Nuclear Reactor Radiation Science and Engineering Center University Park, PA 16802-2301

SUBJECT:

PENNSYLVANIA STATE UNIVERSITY ACCEPTANCE OF THE APPLICATION FOR A LICENSE AMENDMENT RE: AN INCREASE IN THE POSSESSION LIMIT FOR SPECIAL NUCLEAR MATERIAL (EPID NO.

L-2019-LLA-0090)

Dear Dr. Unlu:

By letter dated March 26, 2019 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML19094A260), Pennsylvania State University (PSU) applied for an amendment to Facility License No. R-2 for the Penn State Breazeale Reactor (PSBR). The license amendment request (LAR) proposes to change the possession limits for special nuclear material to include 1 gram of uranium-235 and 1 gram of uranium-233 in any form for use in experiments associated with the operation of the PSBR. Consistent with Title 10 of the Code of Federal Regulations (10 CFR) Section 50.90, Application for amendment of license, construction permit, or early site permit, an application to amend the license (including the technical specifications) must fully describe the changes desired and follow, as far as applicable, the form prescribed for original applications. The requirements in 10 CFR 50.34, Contents of applications; technical information, cover the technical information to be included in the application and stipulate that it address design and operating characteristics, unusual or novel design features, and principal safety considerations.

The U.S. Nuclear Regulatory Commission (NRC) staff performed an acceptance review of the LAR and concluded that it includes sufficient information for the NRC staff to begin its detailed technical review. Notwithstanding the acceptance review, the NRC staff may require additional information to complete the detailed technical review. If needed, the NRC staff will request this information by separate correspondence within approximately 45 days.

Based on the acceptance review, the NRC staff expects to complete its review and make a final determination on the LAR by October 15, 2019. This date could change due to several factors, including requests for additional information, unanticipated changes to the scope of the review, unsolicited supplements to the LAR, and others. If the forecasted date changes, the NRC staff will notify you in writing of the new date and an explanation of the reason for the change.

K. Unlu If you have any questions, please contact me at (301) 415-2856, or by electronic mail at Michael.Balazik@nrc.gov.

Sincerely,

/RA William B. Kennedy for/

Michael Balazik, Project Manager Research and Test Reactors Licensing Branch Division of Licensing Projects Office of Nuclear Reactor Regulation Docket No.50-005 License No. R-2 cc: See next page

Pennsylvania State University Docket No.50-005 cc:

Yuanqing Guo Manager of Radiation Protection The Pennsylvania State University 0201 Academic Project Bldg University Park, PA 16802 Dr. Neil A. Sharkey Vice President for Research The Pennsylvania State University 304 Old Main University Park, PA 16802 Director, Bureau of Radiation Protection Department of Environmental Protection P.O. Box 8469 Harrisburg, PA 17105 Test, Research and Training Reactor Newsletter Attention: Amber Johnson Dept of Materials Science and Engineering University of Maryland 4418 Stadium Drive College Park, MD 20742-2115 Dr. Jeffrey Geuther Associate Director for Operations Radiation Science & Engineering Center Breazeale Nuclear Reactor Building University Park, PA 16802-1504

ML19126A029 *concurred via e-mail NRR-106 OFFICE NRR/DLP/PRLB/PM* NRR/DLP/PRLB/LA* NRR/DLP/PRLB/PM NRR/DLP/PRLB/ABC* NRR/DLP/PRLB/PM NAME MBalazik NParker XYin WKennedy MBalazik WKennedy(for)

DATE 5/21/19 5/8/19 5/15/19 5/22/19 6/3/19