ML072550278: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 09/12/2007
| issue date = 09/12/2007
| title = 2007/09/12-LB Memorandum and Order (Hearing Directives)
| title = 2007/09/12-LB Memorandum and Order (Hearing Directives)
| author name = Abramson P B, Baratta A J, Hawkens E R
| author name = Abramson P, Baratta A, Hawkens E
| author affiliation = NRC/ASLBP
| author affiliation = NRC/ASLBP
| addressee name =  
| addressee name =  

Revision as of 19:47, 12 July 2019

2007/09/12-LB Memorandum and Order (Hearing Directives)
ML072550278
Person / Time
Site: Oyster Creek
Issue date: 09/12/2007
From: Abramson P, Anthony Baratta, Hawkens E
Atomic Safety and Licensing Board Panel
To:
SECY RAS
References
50-219-LR, ASLBP 06-844-01-LR, RAS 14109
Download: ML072550278 (8)


Text

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION DOCKETED 09/12/07 ATOMIC SAFETY AND LICENSING BOARD SERVED 09/12/07 Before Administrative Judges:

E. Roy Hawkens, Chairman Dr. Paul B. Abramson Dr. Anthony J. Baratta In the Matter of AMERGEN ENERGY COMPANY, LLC (License Renewal for Oyster Creek Nuclear Generating Station)

Docket No. 50-0219-LR ASLBP No. 06-844-01-LR

September 12, 2007 MEMORANDUM AND ORDER (Hearing Directives)

On September 5, 2007, the Licensing Board in the above-captioned proceeding convened a prehearing telephonic conference with counsel for the parties to discuss matters

relating to the upcoming evidentiary hearing. This Memorandum and Order sets forth in greater

detail certain items discussed during that call.A.Requiring Citizens To Expunge Certain Material From Prefiled Exhibits On July 27, 2007, AmerGen and the NRC Staff each filed motions in limine seeking to strike from the record certain portions of Citizens' initial written statement of position, and the prefiled direct testimony of Dr. Rudolf H. Haus ler. Subsequently, on August 9, the Board issued a Memorandum and Order indicating that we w ould "refrain from actually expunging [any]

irrelevant material from the record[, r]ather, to the extent we conclude that material is irrelevant or otherwise inadmissible, we will accord it no weight" (Licensing Board Memorandum and

Order (Ruling on Motions in Limine and Motion for Clarification) at 2 (Aug. 9, 2007)

(unpublished) [hereinafter August 9 Order]). Our decision not to expunge the inadmissible material from the administrative record does not mean, however, that it may be admitted into the 1"The reason such material is not purged from the record is that it could become relevant in a subsequent appeal" (Licensing Board Memorandum and Order (Denying AmerGen's Motion for Summary Disposition) at 6 n.9 (June 19, 2007) (unpublished)).

2 Because Citizens' initial written statement of position is not evidence in this proceeding and will not be submitted as an exhibit, to the extent statements made therein are irrelevant or otherwise inadmissible, we will acco rd those statements whatever weight they merit and will not require them to be deleted.

3 The NRC Staff indicated it would not be making an opening or closing statement (Tr. at 132).

evidentiary record.

1 Accordingly, consistent with instructions provided to Citizens by the Board during the prehearing telephonic conference call of September 5 (Tr. at 173-74), and pursuant to the rationale in our August 9 Order, Citizens are hereby directed to redact from the prefiled testimony of Dr. Hausler and his accompanyi ng Attachments 3 and 4 the language indicated in Attachment A to this Order.

2 Citizens must either remove the offending language from the testimony and Attachments, or otherwise black out the language such that it cannot be read. B.Opening And Closing Statements Counsel for AmerGen and Citizens will be allowed fifteen (15) minutes each to make an opening statement. AmerGen will present its opening first, followed by Citizens. Counsel for AmerGen and Citizens will be allowed twenty (20) minutes each to make a closing statement.

Citizens will present their closing first, followed by AmerGen.

3C.Witness Panels The Licensing Board will examine witnesses from all three parties in panels in accordance with the panel topics listed below (which generally track the panel topics proposed by AmerGen in its prefiled direct testimony):

Panel Topic 1: Drywell Physical Structure, History, and Commitments Panel Topic 2: Acceptance Criteria

Panel Topic 3: Available Margin

Panel Topic 4: Sources of Water Panel Topic 5: The Epoxy Coating Panel Topic 6: Future Corrosion Panel Topic 7: Additional Questions

At present, the Board anticipates covering Panel Topics 1 - 3 on Monday, September 24, and Panel Topics 4 - 7 on Tuesday, September 25. The Board intends to reserve the morning

of Wednesday, September 26 to address any remaining questions and to allow for closing

arguments. As the Board previously has adv ised, however, the parties should have their witnesses available for all the panel topics throughout the hearing. D.Submission Of Motions To Strike Sur-Rebuttal Testimony If a party intends to submit a motion in limine regarding the sur-rebuttal testimony due on September 14, such a motion must be filed and received by the Licensing Board and the other parties no later than 12:00 P.M. on Tuesday, September 18. Any response to such a motion must be filed no later than 5:00 P.M. on Wednesday, September 19

.E.Submission Of Corrections To The Transcript At the conclusion of the evidentiary hearing, the Licensing Board will instruct the parties as to the schedule for submission of transcript corrections.

F.Topic Areas To Be Discussed In Greater Detail At Evidentiary Hearing The parties shall be prepared to discuss in depth all of the topics addressed in their testimony and briefs. In addition, the Board intends to explore in greater detail the topics listed below. 1.In Question No. 11 of our August 9 Order, we directed the parties to discuss the use of the term "reasonable assurance" under 10 C.F.R. § 54.29(a). See August 9 Order at 10-11. The Board intends to explore this issue further, particularly with the NRC Staff. The Staff's witnesses shall be prepared to explain, using

specific examples, the "reasonable assurance" standard it has used in matters

involving measurements of parameters that are at issue in license renewal pro-ceedings, as well as in making determinations as to whether a licensee is in

compliance with its Current Licensing Basis. This explanation should include all matters the Staff considers, such as the level of confidence in the data (i.e.

, 95/95), and conservatisms in the threshold for satisfaction of the limit at issue. 4 The Board emphasize that, although we may ask questions about the derivation of the acceptance criteria (or other topics that we previously have ruled are beyond the scope of this proceeding), our inquiries should not be construed as questioning the validity of the accep-tance criteria. Nor should our inquiries about non-litigable topics be construed as rendering The Staff should be prepared to provide a foundation for its method of determination.

To the extent AmerGen or Citizens belie ve they have an expert who can contri-bute relevant information on this matter, they should be prepared to have their expert testify. 2.The Board intends to probe further, with all three parties, the issue of uncertainty in the UT measurements - both systematic and statistical - which was raised in

Question Nos. 4, 7, and 9 of our August 9 Order. See August 9 Order at 10.

Only AmerGen provided an answer to Question Nos. 7 and 9 (AmerGen's Pre-filed Rebuttal Testimony, Part 3, at 7-9, 17 (Aug. 17, 2007); AmerGen Prefiled

Exh. 25), while all three parties provided answers to Question No. 4. See Amer-Gen's Prefiled Rebuttal Testimony, Part 3, at 11-14; NRC Staff Response to

Initial Presentations and Response to Board Questions at 16-18 (Aug. 17, 2007);

Citizens Prefiled Exh. 38, Memorandum from Dr. Rudolf H. Hausler (Aug. 16, 2007). To the extent the NRC Staff or Citizens believe they have an expert who can contribute relevant information on matters raised by Question Nos. 7 and 9, they should be prepared to have their expert testify.3.The parties should be prepared to discuss likely sites for future corrosion - if any

- in light of the corrective actions taken by AmerGen. See , e.g., [AmerGen]

Initial Statement of Position at 6-7 (July 20, 2007) (listing corrective actions taken to "protect[] the exterior of the drywell shell in the sand bed region from further

corrosion"). 4.For the Board to make a determination as to whether AmerGen's proposed frequency for conducting UT measurements will maintain an adequate safety

margin, the Board must have a thorough understanding of the acceptance criteria against which the UT measurements are compared. In that context, AmerGen and the NRC Staff shall be prepared to explain: (a) the manner in which the current general and localized acceptance criteria were derived by General Electric ("GE"); in particular, the distribution of thicknesses assumed in the GE analyses. (b) the extent to which the general and localized acceptance criteria have changed over time and the reasons for those changes.

All parties shall be prepared to discuss how the current state of the drywell shell (i.e., its actual thicknesses distribution function, as measured) is properly considered against the particular geometrical pattern used by GE in its analyses.

4 those topics litigable. Rather, the purpose of such questions is to acquire an understanding of the subject matter sufficient to enable us to accompany our decision with a fully explicated

rationale. Because the Board is acutely aware of the limited scope of this proceeding, and

because this hearing must end no later than noon on September 26 pursuant to the parties'

request, we strongly urge the parties to be circumspect about raising objections to questions by

the Board that seek to enhance the Board's understanding of related topics. See Tr. at 158-59.

5 Copies of this Memorandum and Order were sent this date by Internet e-mail to counsel for: (1) AmerGen; (2) Citizens; (3) the NRC Staff; and (4) New Jersey.5.AmerGen's Commitment 2 states that "[a] strippable coating will be applied to the reactor cavity liner . . . during periods when the reactor cavity is flooded," at the following Implementation Schedule: "

Refueling outages . . .

during the period of extended operation" (AmerGen Prefiled Exh. 10, Letter from Michael Gallagher, AmerGen, to NRC (Feb. 15, 2007), Encl. at 2).

AmerGen and the NRC Staff should be prepared to discuss whether the terms of this commitment extend to non-refueling outages (i.e., "forced" outages) that could arise during the period of extended operation. If yes, are there safety concerns that could arise during those forced outages that would prohibit or

otherwise delay AmerGen's ability to apply the strippable coating.

It is so ORDERED.

THE ATOMIC SAFETY AND LICENSING BOARD 5/RA/

E. Roy Hawkens, Chairman ADMINISTRATIVE JUDGE

/RA by E. Roy Hawkens for:/

Dr. Paul B. Abramson ADMINISTRATIVE JUDGE

/RA/

Dr. Anthony J. BarattaRockville, MarylandADMINISTRATIVE JUDGE September 12, 2007 ATTACHMENT A Document, Page No. (AndAnswer No., Or Location)

Language To Be Deleted Or Otherwise Redacted Prefiled Direct Testimony of Dr.

Rudolf H. Hausler [hereinafter

Direct Testimony] at 6; Answer 15(5) in its entirety "5. The areas thinner than 0.736 inches in Bays 1 and 13 are grooves, not squares. It is unclear how to apply acceptance criteria that assume the corroded areas are squares to such grooves, which could have more effect on

buckling capacity for the same area."

Direct Testimony at 8; Answer 19 (final 3 sentences)

"A possible alternative would be to adapt real-time corrosion monitoring technology to measure corrosion of

the drywell in real time. While I do not know of any

nuclear power plant where this has been done, I do know

of other successful applications of real-time corrosion

measurement. There appears to be no technical reason

why it could not be done."

Direct Testimony at 8;

Answer 20 (final sentence)

"In addition, the exterior measurements are the only

measurements that allow us to estimate the areas that are

corroded beyond acceptance thresholds."

Direct Testimony, Att. 3 (Memorandum from Dr. Hausler (Apr. 25, 2007 - redacted

version July 19, 2007)

[hereinafter Attachment 3])

All redacted material indicated in the margins shall not

appear in Exhibit B.

Att. 3, at 1;

First bullet, second sentence "It is shown that the UT monitoring locations (6 by 6 inch

grids inside the drywell) as defined in 1989 are not

representative of the corrosion, which had occurred in the

sand bed region."

Direct Testimony, Att. 4 (Memorandum from Dr. Hausler (July 18, 2007)) at 12-13;

Final paragraph in its entirety "Finally, the acceptance criteria have been based on

modeling of square areas of corrosion less than 0.736

inches. However, in Bays 1, 15 and 19 the most corroded

areas are actually long grooves. It is likely that such

grooves have more effect on the stability of the drywell

shell than square areas because the stresses cannot

easily distribute around such areas. In the absence of

further modeling of the effect of these shapes on stability, it is prudent to use conservative acceptance criteria to

review these grooves, based on the modeling conducted

to date, especially in Bays 1 and 15 where the average

thickness is, at best, very close to 0.736 inches. Thus, the

area below 0.736 inches should at least be smaller than

one square foot, and thicker than 0.636 inches on average

as it appears AmerGen also decided in 2006, after careful

consideration."

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSIONIn the Matter of )

)AMERGEN ENERGY COMPANY, LLC )Docket No. 50-219-LR

)

)(Oyster Creek Nuclear Generating Station) )

CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing LB MEMORANDUM AND ORDER (HEARING DIRECTIVES) have been served upon the following persons by U.S. mail, first class, or through

NRC internal distribution.

Office of Commission Appellate Adjudication

U.S. Nuclear Regulatory Commission

Washington, DC 20555-0001 Administrative Judge E. Roy Hawkens, Chair

Atomic Safety and Licensing Board Panel

Mail Stop - T-3 F23

U.S. Nuclear Regulatory Commission

Washington, DC 20555-0001 Administrative Judge Paul B. Abramson

Atomic Safety and Licensing Board Panel

Mail Stop - T-3 F23

U.S. Nuclear Regulatory Commission

Washington, DC 20555-0001 Administrative Judge Anthony J. Baratta

Atomic Safety and Licensing Board Panel

Mail Stop - T-3 F23

U.S. Nuclear Regulatory Commission

Washington, DC 20555-0001 Mitzi A. Young, Esq.

Mary C. Baty, Esq.

Office of the General Counsel

Mail Stop - O-15 D21

U.S. Nuclear Regulatory Commission

Washington, DC 20555-0001 Richard Webster, Esq.

Rutgers Environmental Law Clinic

123 Washington Street

Newark, NJ 07102-5695 Paul Gunter, Reactor Oversight Kevin kamps

Beyond Nuclear

Nuclear Policy Research Institute

6930 Carroll Avenue, Suite 400

Takoma Park, MD 20912 Donald J. Silverman, Esq.

Kathryn M. Sutton, Esq.

Alex S. Polonsky, Esq.

Morgan, Lewis & Bockius LLP

1111 Pennsyvlania Ave., NW

Washington, DC 20004 2 Docket No. 50-219-LR LB MEMORANDUM AND ORDER (HEARING DIRECTIVES)

Bradley M. Campbell, Commissioner New Jersey Department of

Environmental Protection

P.O. Box 402

Trenton, NJ 08625-0402 Jill Lipoti, Director New Jersey Department of

Environmental Protection

Division of Environmental Safety and Health

P.O. Box 424

Trenton, NJ 08625-0424 Ron Zak New Jersey Department of

Environmental Protection

Nuclear Engineering

P.O. Box 415

Trenton, NJ 08625-0415 J. Bradley Fewell, Esq.

Exelon Corporation

4300 Warrenville Road

Warrenville, IL 60555 Suzanne Leta NJPIRG 11 N. Willow St.

Trenton, NJ 08608 John A. Covino, Esq.

Ellen Barney Balint, Esq.

Valerie Anne Gray, Esq.

Caroline Stahl, Esq.

Deputy Attorneys General

New Jersey Office of the Attorney General

Environmental Permitting &

Counseling Section

Division of Law

Hughes Justice Complex

P.O. Box 093

Trenton, NJ 08625

[Original signed by Evangeline S. Ngbea]

Office of the Secretary of the Commission Dated at Rockville, Maryland this 12 th day of September 2007