ML102870223: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 3: | Line 3: | ||
| issue date = 09/20/2010 | | issue date = 09/20/2010 | ||
| title = FOIA/PA-2010-0116 - Resp 9 - Partial | | title = FOIA/PA-2010-0116 - Resp 9 - Partial | ||
| author name = Sealing D | | author name = Sealing D | ||
| author affiliation = NRC/OIS/IRSD/RFSB | | author affiliation = NRC/OIS/IRSD/RFSB | ||
| addressee name = Olson M | | addressee name = Olson M |
Revision as of 03:02, 11 July 2019
ML102870223 | |
Person / Time | |
---|---|
Site: | Crystal River |
Issue date: | 09/20/2010 |
From: | Sealing D NRC/OIS/IRSD/RFSB |
To: | Olson M Nuclear Information & Resource Service (NIRS) |
References | |
FOIA/PA-2010-0116 | |
Download: ML102870223 (17) | |
Text
NRC FORM 464 Part I U.S. NUCLEAR REGULATORY COMMISSION FOIA/PA RESPONSE NUMBER (6-1998).,S R 0 2010-0116 9 0 TO FREEDOM OFINFORMATION ACT (FOIA) / PRIVACY RESPONSE D FINAL 1 PARTIAL ACT (PA) REQUEST TYPE REQUESTER DATE Mary Olson SEP 2 0 2010 PART I. -- INFORMATION RELEASED D No additional agency records subject to the request have been located.D- Requested records are available through another public distribution program. See Comments section."] APPENDICES Agency records subject to the request that are identified in the listed appendices are already available for public inspection and copying at the NRC Public Document Room.APPENDICES Agency records subject to the request that are identified in the listed appendices are being made available for P public inspection and copying at the NRC Public Document Room.Enclosed is information on how you may obtain access to and the charges for copying records located at the NRC Public Document Room, 11555 Rockville Pike, Rockville, MD 20852-2738.
] !APPENDICES p t' Agency records subject to the request are enclosed.Dý Records subject to the request that contain information originated by or of interest to another Federal agency have been referred to that agency (see comments section) for a disclosure determination and direct response to you.We are continuing to process your request.D} See Comments.PART I.A -- FEES AMOUNT* You will be billed by NRC for the amount listed. None. Minimum fee threshold not met.$ D You will receive a refund for the amount listed. F- Fees waived.See comments for details PART I.B -- INFORMATION NOT LOCATED OR WITHHELD FROM DISCLOSURE D] No agency records subject to the request have been located.Certain information in the requested records is being withheld from disclosure pursuant to the exemptions described in and for the reasons stated in Part II.FD This determination may be appealed within 30 days by writing to the FOIA/PA Officer, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.
Clearly state on the envelope and-in the letter that it is a "FOIA/PA Appeal." PART I.C COMMENTS (Use attached Comments continuation paqe if reauired)The incoming FOIA/PA-2010-0116 request is located in ADAMS at ML100290385.
SIGNA'JE FREEDOMFIO.IATION ACT AND PRIVACY ACT OFFICER NRC~onL .FD NRC FORM 464 Part 1 (6-1998)PRINTED ON RECYCLED PAPER This form was designed using InForms FOIA-2010-0116 APPENDIX P RECORDS RELEASED IN THEIR ENTIRETY NO. DATE DESCRIPTION/(PAGE COUNT)/EXEMPTIONS 1 Undated Exhibit1 Erlin Hime Petro (3 Pages)2 Undated 5.3 Exhibit 2 ACI 515.1 R (7 Pages)3 Undated 5.3 Exhibit 3 Item #101 (1Page)4 Undated 5.6 Exhibit 4 Surveillance (6 Pages)5 Undated 5.7 Exhibit 1 permeability v w2c (1 Page)6 Undated 5.8 Exhibit 7 Petrographic CTL (4 Pages)7 Undated 6.2 Exhibit 1 Subsection IWL (14 Pages)8 Undated 6.2 Exhibit 2 Wire Material (2 Pages)9 Undated 6.2 Exhibit 3 Strain Along Wire (1 Page)10 Undated Item 136 1992 BS Event Strip Chart (1 Page)11 Undated EC ED 62366RO.doc (5 Pages)12 Undated SP 178 Rev 28 (1 Page)13 Undated SP 178 Rev 28 50.59 (4 Pages)14 Undated SP 178 Rev 28 205 (1 Page)15 Undated Item 108 Purge Fan Event (5 Pages)16 Undated Vacuum Calculation (1 Page)17 Undated 9.1 Ex 1 FSAR Section 052 (6 Pages)18 Undated 9.3 Exhibit 1 Gilbert Study 1.2.11 (11 Pages)19 Undated 9.3 Exhibit 2 FSAR CH 2 Selected Pages (9 Pages)20 Undated 9.3 Exhibit 4 Containment Exterior Surface (4 Pages)21 Undated Request #7 NRC SIT (1 page)22 Undated Containment Opening Tendon Removal Timeline (2 Pages)23 Undated R16 Tendon Detensioning Sequence (1 Page)24 Undated Request #9 NRC SIT (2 Pages)25 Undated Request #22 NRC SIT (1 Page)26 Undated Engineering Change Package 75220, Rv 0; REACTOR BUILDING CONCRETE PLACEMENT (321 Pages)Engineering Change Package 75218, Rev 0; REACTOR BUILDING DELAMINATION REPAIR -PHASE 2 DETENSIONING TENDONS (636 Pages)Information blocked out in the record was received by the NRC with information already removed.Engineering Change Package 75219, Rev 0; REACTOR BUILDING 28 Undated DELAMINATION REPAIR -PHASE 3 CONCRETE REMOVAL (179 Pages)29 Undated CTMT DETAIL COMPARISON.pdf (3 Pages)30 Undated Request 16.docx (1 Page)31 Undated Request 10.docx (1 Page)32 Undated Request 1 l.docx (2 Pages)33 Undated Petrographic Studies of Concrete for Construction Engineering Consultants (5 pages)34 UQuestions pertaining to PGN procedure PT-407T, Reactor Building Concrete Examination and Testin, Revision 2 (2 Pages)35 Undated EC 603016 Attachment Z10R24 (1 Page)36 Undated NCR 358948 -part (Adverse Cond Correct & Trend Form).doc (1 Page)37 Undated NCR 358724 (Orginal NCR).doc (3 Pages)PT0407T (Special Procedure
-Rx Bldg Concrete Examination
&Testing).pdf (37 Pages)39 Undated SP0178.pdf (207 Pages)Crystal River Unit 3 Containment 40 Undated Delamination Investigation Report (20 pages)41 Undated Crystal River 3 SGR Action Plan (2 pages)Page 1 of 16 FOIA-2010-0116 42 Undated Licensee Drawing SC-421-036 (1 page)43 Undated Licensee Drawing SC421-032 (1 page)44 Undated Permeability FM 5.8 Exhibit 6 (1 page)45 Undated Picture of crack on right edge of wall (1 page)46 3/17/10 5.2 Salt Water Related (1 Page)47 3/17/10 5.5 Corrosion Rebar (2 Pages)48 3/17/10 5.7 Physical Attack (2 Pages)49 38.2 Thermal Stresses Containment Spray FSAR Section 5 87 (1 49 3/17/10 Pae Page)50 3/17/10 8.3 Effect of Faster Pressurization (1 Page)51 3/17/10 8.4 Inadequate Concrete Structure (1 Page)52 3/17/10 9.1 Hurricanes or Tornadoes (1 Page)53 3/17/10 9.2 Seismic Events (1 Page)54 3/17110 9.3 Ground Movement (1 Page)55 3/12/10 7.6 Vibration Due to Cutting Tendons (36 Pages)56 3/8/10 Mar 8 PNSC De Tensioning Briefing (33 Pages)57 3/4/10 6.1 Uneven Force Along Tendon (63 Pages)58 3/3/10 Mar 3 PNSC De Tensioning Briefing P1 (53 Pages)59 2/25/10 7.11 Added Stress from Pulling Tendons (30 pages)60 2/23/10 6.3 Thermal Effects of Greasing (71 pages)61 2/19/10 7.9 Inadequate Hydro Blasting Nozzles Rate part 1 (36 pages)62 2/19/10 7.9 Inadequate Hydro Blasting Nozzles Rate part 2 (11 pages)63 2/19/10 7.9 Inadequate Hydro Blasting Nozzles Rate part 3 (55 pages)64 2/19/10 7.10 Hydrodemolition Induced Cracking (80 pages)65 2/18/10 7.8 Excessive Water Jet Pressure part 1 (34 pages)66 2/18/10 7.8 Excessive Water Jet Pressure part 2 (18 pages)67 2/18/10 7.8 Excessive Water Jet Pressure part 3 (53 pages)68 2/7/10 7.2 Vibration Induced by Hydro Blasting Part 1 ( 27 pages)69 2/7/10 7.2 Vibration Induced by Hydro Blasting Part 2 (23 pages)70 10/6/09 Email -
Subject:
October 6 2009 Licensee Pictures (17 Pages)71 2/6/10 6.4 Rigid and Flexible Sleeves (66pages)72 2/3/10 6.6 Original Tensioning T(2) (71 pages)73 2/2/10 6.5 Inadequate RetensioningT1 (75 pages)74 2/1/10 Containment Pressure Testing Method.pdf (1 Page)75 1/30/10 5.7 Exhibit 7 winter 2002-2010 (7 Pages)76 1/29/10 Email -
Subject:
Detensioning sequence spreadsheets (6 Pages)77 11/23/09 2.8 Inadequate Support of Tendons during Pouring (7 pages)Email -From: Dyksterhouse, Don[don.dyksterhouse@pgnmail.com]
to: Lake, Louis dated Wednesday, January 27, 2010 7:57 AM
Subject:
Design Basis Calculations 78 1/27/10 Attachments:
0102-0135-02 concrete strength and elastic modulus rO final.pdf; 0102-0135-03 rO final.pdf; 0102-0135-04 FE Model Description signed.pdf; 0102-0135-05 Conduit Local Stress Analysis signed (2).pdf; 0102-0135-07 concrete moment capacity load rO (2).pdf; 0102-0135-08 seismic wind tornado rO.pdf (159 Pages)79 1/23/10
Subject:
FW: Design Basis Calculations (126 pages)80 1/22/10 Detensioning Sequence -Case 10 (1 page)81 1/22/10 CTL 059169 Final Report.pdf (102 Pages)82 1/20/10 2009 NRC Special Information (94 pages)Page 2 of 16 FOIA-2010-0116 Email -From: Miller, Craig L [Craig.Miller@pgnmail.com]
to Lake, Louis; Thomas, George; Carrion, Robert; 'nausdj@ornl.gov';
Souther, Martin; 'trowe@wje.com' Cc: Williams, Charles R. dated Friday, January 22, 2010 8:53 AM 83 1/21/10
Subject:
FW: Failure Mode 5.3 Ready for Review Attachments:
FM 5.3.Maintenance.pdf; FM 5.3 Exhibit 3 -Item #101-Purity of pressure washing water-l.pdf; FM 5.3 Exhibit 1 -Interviews regarding Maintenance
-1.pdf; FM 5.3 Exhibit 2 -ACI 515.1R deleterious chemicals-i .pdf (11 Pages)84 1/20/10 List of all questions (94 Pages)85 1/21/10
Subject:
FW: CTR Level II Schedule (3 pages)86 1/21/10 5.3 Maintenance (1 Page)From: Williams, Charles R. [Charles.Williams@pgnmail.com]
To: Lake, Louis; Thomas, George dated Wednesday, January 20, 2010 87 1/20/10 5:16PM
Subject:
FW: 01-21-10 Containment Repair Project Level 3 schedule Attachments:
01 10 Level 3 Rev D -11 x1 7.pdf (10 Pages)88 11/23/09 8.1 and 8.5 (3 pages)89 11/23/09 3.1 Inadequate Air Content (2 pages)90 10/5/09 Crystal River 3 Nuclear Condition Report Summary -NCRs Initiated Since Sep 28, 2009 (1 page)10/6/09 Crystal River 3 Nuclear Safety Review Committee Handout Page (1 page)92 1/20/10 5.3 Exhibit 1 Interviews Regarding Maintenance (1 Page)Email -From: Williams, Charles R.[Charles.Williams@pgnmail.com]
to: Lake, Louis; Thomas, George 93 1/18/10 dated Monday, January 18, 2010 4:18 PM
Subject:
FW: 01-19-10 Containment Repair Project Level 3 schedule Attachments:
01-19-10 Level 3 Rev D -1 lx17.pdf (12 Pages)Email -From: Williams, Charles R. To: Lake, Louis; Thomas, George[Charles.Williams@pgnmail.com]
dated Sunday, January 17, 2010 94 1/17/10 9:28 AM
Subject:
FW: 01-18-10 Containment Repair Project Level 3 schedule Attachments:
01-18-10 Level 3 Rev D -1 lx17.pdf (12 Pages)Email -From: Miller, Craig L [Craig.Miller@pgnmail.com]
To: Lake, Louis; Thomas, George; Carrion, Robert; 'trowe@wje.com';
Sealey, Mac Cc: Williams, Charles R. dated Saturday, January 16, 2010 1:24 PM 95 1/16/10
Subject:
RE: Failure Mode 2.6 for Review and Commet Attachments:
FM 2.6 Exhibit 3 Cylinder Tests exterior wall 28 days.pdf; FM 2.6 Exhibit 4c Petrographic Mactec 2009-11-1 .pdf;FM 2.6 Exhibit 4a Petrographic Erlin Hime May 1976.pdf; FM 2.6 Exhibit 4b Petrographic CTL.PDF; FM 2.6 Exhibit 5 -Strength and Modulus of Elasticity-Core Samples.pdf (31 Pages)Email -From: Miller, Craig L [Craig.Miller@pgnmail.com]
To: Lake, Louis; Thomas, George; Carrion, Robert; 'trowe@wje.com';
Sealey, Mac Cc: Williams, Charles R. dated Saturday, January 16, 2010 96 1/16/10 1:19PM
Subject:
Failure Mode 2.6 for Review and Commet Attachments:
FM 2.6.pdf; FM 2.6 Exhibit 1 -Law Engineering mix design tests.pdf; FM 2.6 Exhibit 2 -pour cards from bay RBCN-0015.pdf (52 Pages)Page 3 of 16 FOIA-2010-0116 Email -From: Miller, Craig L [Craig.Miller@pgnmail.com]
To: Miller, Craig L; Lake, Louis; Thomas, George; Carrion, Robert;'trowe@wje.com' 97 1/16/10 Cc: Williams, Charles R. dated Saturday, January 16, 2010 1:15 PM
Subject:
RE: Failure Mode 5.1 for Review and Commet Attachments:
FM 5.1 Exhibit 6a -Petrographic Mactec 2009-12-08.pdf (13 Pages)From: Miller, Craig L [Craig.Miller@pgnmail.com]
to: Miller, Craig L;Lake, Louis; Thomas, George; Carrion, Robert; 'trowe@wje.com' Cc: Williams, Charles R. dated Saturday, January 16, 2010 1:14 PM 98 1/16/10
Subject:
RE: Failure Mode 5.1 for Review and Commet Attachments:
FM 5.1 Exhibit 4 -report on concrete placement-Pour528RBElev103.pdf; FM 5.1 Exhibit 5 -Law Engineering Tests Aggregates only.pdf; FM 5.1 Exhibit 6b -Petrographic Erlin Hime June 1976.pdf (7 Pages)Email -From: Miller, Craig L [Craig.Miller@pgnmail.com]
To: Lake, Louis; Thomas, George; Carrion, Robert; 'trowe@wje.com' Cc: Williams, Charles R. dated Saturday, January 16, 2010 1:10 PM 99 1/16/10
Subject:
RE: Failure Mode 5.1 for Review and Commet Attachments:
FM 5.1.pdf; FM 5.1 Exhibit 1 -SP5618 and JAJ-W5 clean forms.pdf; FM 5.1 Exhibit 2- QC Procedures_PTL-10.pdf; FM 5.1 Exhibit 3 -Pour528RB-NCR213 sand in joints.pdf (12 Pages)Email -From: Miller, Craig L [Craig.Miller@pgnmail.com]
to Portmann, Rick; Lake, Louis; Thomas, George; Ghosal, Partha S.;Carrion, Robert; 'nausdj@ornl.gov' Cc: Williams, Charles R. dated Saturday, January 16, 2010 12:53 PM 100 1/16/10
Subject:
Failure Mode 6.2 for Review and Comment Attachments:
FM 6.2.pdf; FM 6.2 Exhibit 1 Subsection IWL.pdf; FM 6.2 Exhibit 2 Wire Material from DBD1 1-2-1.pdf; FM 6.2 Exhibit 3 Strain along Wire.pdf; FM 6.2 Exhibit 3 Strain along Wire.pdf; FM 6.2 Exhibit 4 Wire Surveillances.pdf; FM 6.2 Exhibit 5 Wire Testing-1.pdf; FM 6.2 Exhibit 6 atlas 947613 0001.pdf (35 Pages)Email -From: Williams, Charles R.[Charles.Williams@pgnmail.com]
to Lake, Louis; Thomas, George 101 1/14/10 dated Thursday, January 14, 2010 3:28 PM
Subject:
FW: 01-15-10 Containment Repair Project Level 3 schedule (11 Pages)Email -From: Williams, Charles R.[Charles.Williams@pgnmail.com]
To: Lake, Louis; Thomas, George 102 1/14/10 dated Thursday, January 14, 2010 7:16 AM
Subject:
FW: 01-14-10 Containment Repair Project Level 3 schedule (13 Pages)103. 1/13/10 5.1 Contamination during construction (2 pages)Email -From: Williams, Charles R. to Lake, Louis; Thomas, George[Charles.Williams@pgnmail.com]
dated Wednesday, January 13, 104 1/13/10 2010 10:46 AM
Subject:
FW: 01-13-10 Containment Repair Project Level 3 schedule (13 Pages)Email -From: Thomas, George To: Naus, Dan J.5 1/12/10 Cc: Lake, Louis dated Tuesday, January 12, 2010 3:59 PM
Subject:
FW: Petrographic Report (17 Pages)Page 4 of 16 FOIA-2010-0116 From: Thomas, George to: Naus, Dan J. Cc: Lake, Louis dated Tuesday, January 12, 2010 3:57 PM
Subject:
FW: Petrographic Report (19 Pages)Email -From Thomas, George to Naus, Dan J.Cc: Lake, Louis dated Tuesday, January 12, 2010 3:56 PM 107 1/12/10
Subject:
FW: Petrographic Report Attachments:
S&ME Modulus Core 16, 40, 63, 65, 66.pdf; S&ME Density Core 16, 40, 60, 63, 65, 66.pdf; S&ME Compressive Core 31 and 45.pdf; S&ME Compressive Core 59.pdf) (22 Pages)108 1/11/10 5.4 Concrete Form Release (1 Page)Email -From: Williams, Charles R.[Charles.Williams@pgnmail.com]
to Lake, Louis; Thomas, George;'nausdj@ornl.gov';
Carrion, Robert; Souther, Martin; 'Archer, John 109 1/11/10 C. (Reading)';
'Wells, Richard P. (Reading)'
Cc: Miller, Craig L dated Monday, January 1--,20-10-&5.53-PM.
..
Subject:
FM 5.8 Ex 5b Draft for Review (8 Pages)Email -From: Williams, Charles R. To: Lake, Louis; Thomas, George; Carrion, Robert; 'nausdj@ornl.gov';
Souther, Martin;'Archer, John C. (Reading)';
'Wells, Richard P. (Reading)'
Cc: Miller, Craig L[Charles.Williams@pgnmail.com]
dated Monday, January 11, 2010 5:49 PM
Subject:
FM 5.8 Draft for Review Attachments:
FM 5.8 Exhibit 3b Petrographic CTL.pdf; FM 5.8 Exhibit 3c Petrographic Mactec 2009-11-1 l.pdf; FM 5.8 Exhibit 4 WC ratio RB-1 5.pdf; FM 5.8 Exhibit 5a Petrographic Mactec 2009-12-23.pdf; FM 5.8 Exhibit 6 permeability v w2c from Mehta.pdf; FM 5.8 Exhibit 7 Petrographic CTL.pdf; FM 5.8 Exhibit 8 -ASR test report -PII.pdf; FM 5.8 Exhibit 9 ASTM C1260.pdf; FM 5.8.pdf; FM 5.8 Exhibit1 ACI 201.2R-01 Durability.pdf; FM 5.8 Exhibit 2 Mix Design- from Dome Repair Report-cgp.pdf; FM 5.8 Exhibit 3a Petrographic Erlin Hime May 1976.pdf (32 Pages)Email -From: Williams, Charles R.[Charles.Williams@pgnmail.com]
to Lake, Louis; Thomas, George;'nausdj@ornl.gov';
Carrion, Robert; Souther, Martin;111 1/11/10 'trowe@wje.com' dated Monday, January 11, 2010 5:42 PM
Subject:
FM 5.4 Draft for Review Attachments:
FM 5.4 Exhibit 2 -QC ProceduresPTL-10.pdf; FM 5.4 Exhibit 3 -Pour7l2RBElev2lO.pdf; FM 5.4.pdf; FM 5.4 Exhibit 1-Forms -SP5618 Placement of Structural Concrete.pdf (7 Pages)Email -From: Williams, Charles R. To: Lake, Louis; Thomas, George; Carrion, Robert; 'nausdj@ornl.gov';
'daniel.fiorello@exeloncorp.com';
Lese, Joseph A.Cc: Miller, Craig L [Charles.Williams@pgnmail.com]
dated Monday, January 11, 2010 5:38 PM 112 1/11/10
Subject:
FM 4.7 Draft for Review Attachments:
FM 4.7 Exhibit 4 -Pour Location Drawing Buttress 6-1 and 3-4 color.pdf; FM 4.7.pdf; FM 4.7 Exhibit 1 -Break Test Summary -core v original table.pdf; FM 4.7 Exhibit 2 Cylinder Tests exterior wall 28 days.pdf; FM 4.7 Exhibit 3 -Concrete .pdf (21 Pages)Email -From: Dyksterhouse, Don [don.dyksterhouse@pgnmail.com]
To: Thomas, George Cc: Dyksterhouse, Don; Lake, Louis dated Friday, January 08, 2010 8:17 AM 113 1/8/10
Subject:
Approved calculations Attachments:
0102-0135-jlh-2 Radial Pressure at Tendons rosigned.pdf; Approved January 6 0102-0135-01 effective elastic modulus rO.pdf (29 Pages)Page 5 of 16 FOIA-2010-0116 Email -
Subject:
Spauling Pictures, Attachments:
Spauling 010.jpg;Spauling 001.jpg to Spauling 009.jpg (21 Pages)Email -From: Chou, Rich To: Powell, Sid Cc: Franke, Mark; Lake, Louis; Sykes, Marvin; Morrissey, Thomas;115 .1/7/10 Reyes, Rogerio dated Thursday, January 07, 2010 11:53 AM
Subject:
FW: Wednesday NCRs (4 Pages)Email -From: Williams, Charles R.[Charles.Williams@pgnmail.com]
To: Lake, Louis; Thomas, George;'nausdj@ornl.gov';
Carrion, Robert; Souther, Martin;'trowe@wje.com' Cc: Miller, Craig L dated Wednesday, January 06, 2010 4:51 PM
Subject:
FM 5.5 -Corrosion of Rebars and Sleeves Attachments:
FM 5.5 -Corrosion Rebars and Sleeves.pptx; FM 5.5 Exhibit 1 Permeability v w2c from Mehta.pdf; FM 5.5 Exhibit 2 Mix Design- from Dome Repair Report-cgp.pdf; FM 5.5 Exhibit 3a Petrographic Erlin Hime May 1976-1.pdf; FM 5.5 Exhibit 3b Petrographic CTL.pdf; FM 5.5 Exhibit 3c Petrographic Mactec 2009-11-11.pdf; FM 5.5 Exhibit 4 WC ratio RB-15.pdf; FM 5.5 Exhibit 5 Cover detail -Plan 421-036-SHOOO.pdf; FM 5.5 Exhibit 6 Cover photos.pdf (20 Pages)Email -From: Williams, Charles R.[Charles.Williams@pgnmail.com]
to Lake, Louis; Thomas, George;'nausdj@ornl.gov';
Carrion, Robert; Worthington, Wayne; 'Archer, John C. (Reading)'
Cc: Miller, Craig L; Edwards, Steven dated Tuesday, January 05, 2010 7:50 AM
Subject:
FW: FM 3.7 -Inadequate Testing Attachments:
FM 3.7.pptx; FM 3.7 Exhbit 1 -field testing from specs 117 1/5/10 -SP5618.pdf; FM 3.7 Exhibit 2 QC sp5569 Furnishing of Structural Concrete.pdf; FM 3.7 Exhibit 3 QC ProceduresPTL-10.pdf; FM 3.7 Exhibit 4 QC in Pour7l2RBElev2lO.pdf; FM 3.7 Exhibit 5 Pour 511 RB-NCR95 Concrete temperature.pdf; FM 3.7 Exhibit 6 Fc in Pour712RBElev210.
pdf; FM 3.7 Exhibit 7 tickets for Pour7l2RBElev2lO.pdf; FM 3.7 Exhibit 8 SOO-0047 Concrete Strength.pdf; FM 3.7 Exhibit 9 Cylinder Tests exterior wall 28 days.pdf; FM 3.7 Exhibit 10 -Slump allowed -Final Dome Report.pdf (63 Pages)118 1/4/10 Email -
Subject:
Schedule (17 Pages)CR3 Outage Containment Repair Project -Level 3 Schedule (16 119 1/4/10 Pgs Pages)120 1/4/10 6.2 Inadequate Tendon (2 Pages)121 1/1/10 5.5 Exhibit 2 Mix Design from Dome Repair (1 Page)122 1/1/10 5.5 Exhibit 3a Petrographic Erlin Hime May 19 (3 Pages)123 1/1/10 5.5 Exhibit 1 Permeability v w2c from Mehta (1 Page)Email -From: Williams, Charles R. Charles.Williams@pgnmail.com]
To: Lake, Louis; Thomas, George; 'nausdj@ornl.gov';
Carrion, Robert; Miller, Craig L dated Thursday, December 31, 2009 5:20 124 12/31/09 PM
Subject:
FM 9.3 Draft and Exhibits for Review Attachments:
FM 9.3 Exhibit 2 FSAR Ch 2 Selected Pages.pdf; FM 9.3 Exhibit 3 Glenn-Craig email.pdf; FM 9.3 Exhibit 4 Containment Exterior Surface Survey Data.pdf; FM 9.3.pptx; FM 9.3 Exhibit 1 Gilbert Study Section 1.2.11 .pdf (27 Pages)Page 6 of 16 FOIA-2010-0116 Email -From: Williams, Charles R. to Lake, Louis; Thomas, George; 'nausdj@ornl.gov';
Carrion, Robert; Pugh, C-Glenn;'daniel.fiorello@exeloncorp.com'
[Charles.Williams@pgnmail.com]
dated Thursday, December 31, 2009 4:43 PM 125 12/31/09
Subject:
Emailing:
FM 1.6 Exhibit 3 FSAR Ch 2 Selected Pages.pdf, FM 1.6.pptx, FM 1.6 Exhibit 1 Gilbert Study Section 1.2.11.pdf, FM 1.6 Exhibit 2 Containment Exterior Surface Survey Data.pdf Attachments:
FM 1.6 Exhibit 3 FSAR Ch 2 Selected Pages.pdf; FM 1.6.pptx; FM 1.6 Exhibit 1 Gilbert Study Section 1.2.1e.pdf; FM 1.6 Exhibit 2 Containment Exterior Surface Survey Data.pdf (27 Pages)Email -From: Williams, Charles R.[Charles.Williams@pgnmail.com]
to: Lake, Louis; Thomas, George;Carrion, Robert; 'nausdj@ornl.gov';
Pugh, C-Glenn;'daniel.fiorello@exeloncorp.com' dated Thursday, December 31, 126 12/31/09 2009 4:37 PM
Subject:
FM 1.5 Draft for Review Attachments:
FM 1.5.pptx; FM 1.5 Exhibit 1 Glenn-Craig email.pdf; FM 1.5 Exhibit 2 Containment Exterior Surface Survey Data.pdf; FM 1.5 Exhibit 3 RB Foundation Settlement discussion per FSAR.pdf (9 Papes)Email -From: Williams, Charles R.[Charles.Williams@pgnmail.com]
to Lake, Louis; Thomas, George;127 12/31/09 Carrion, Robert dated Thursday, December 31, 2009 2:52 PM
Subject:
FW: Fm 5.2 Draft for Review Attachments:
FM 5.2 Exhibit 2 -Mactec PetrographicReport-Final NO PHOTOS.pdf (17 Pages)Email -From: Williams, Charles R.[Charles.Williams@pgnmail.coma to: Lake, Louis; Thomas, George;128 12/31D09 Carrion, Robert dated Thursday, December 31,2009 2:51 PM
Subject:
FW: Fm 5.2 Draft for Review Report.pdf; FM5.2 Exhibit 1 -Erlin Hime Petro report.pdf (16 Pages)129 1229/09 Email -
Subject:
Revised engineering/repair work flow chart (2 Pages)Email -From: Thomas, George To: Lake, Louis Cc: Khanna, Meena; Franke, Mark; Farzam, Farhad; Carrion, Robert; Masters, Anthony; nausdj@ornl.gov dated Monday, December 28, 2009 6:15 PM 130 12/28/09
Subject:
CR-3 Schedule and Root Cause Failure Modes Update as of 12-28-09 Attachments:
12-28-09 Level 3 Rev D -11 x17.pdf; 12-28-09 Root Cause Update.pdf; Failure Modes CR3, Rev.ll 122809.ppt (18 Pages)131 1228n09 12-28-09 Level 3 Rev D -11 x1 7.pdf (16 Pages)132 12/28/09 Engg Repair Work Flow 12-28-09.pdf (1 Page)133 12/23/09 5.8 Exhibit 5a Petrographic (3 Pages)Email -From: Orf, Tracy to Lake, Louis dated Tuesday, December 22, 2009 6:31 AM 134 12/22/09
Subject:
FW: CR3 Updated Root Cause Information Attachments:
2009 Dec 18 -Root Cause Update for NRC.pptx (2 Pages)Email -
Subject:
FW: CR3 Containment Repair Project Level 1 135 12/21/09 Schedule Attachments:
12-16-09 Level 1 Rev C -11 x1 7.pdf (2 page s)Page 7 of 16 FOIA-2010-0116 136 12/18/09 From: Miller, Craig L [Craig.Miller@pgnmail.com]
To: Lake, Louis;Thomas, George; nausdj@ornl.gov; Carrion, Robert Cc: Williams, Charles R. dated Friday, December 18, 2009 4:47 PM
Subject:
Draft FM 3.5 for Review Attachments:
FM 3.5.pptx; FM 3.5 x 1 SP5569 specs admixtures-1.pdf; FM 3.5 x 2 -mix designs -1.pdf; FM 3.5 x 3 -admixtures in pour ticket -1 .pdf; FM 3.5 x 4 -Air graph 1 .pdf; FM 3.5 x 5 -Erlin Hime Petro report.pdf; FM 3.5 x 6 -CTL Petrographic Report.pdf; FM 3.5 x 7 -Mactec Petroaraohic Reoort~odf (19 Paaes'i FM. 3.5 x- .. .. -.....c F--"ra i "e ....d (19 --aces Email -From: Miller, Craig L [Craig.Miller@pgnmail.com]
to Lake, Louis; Thomas, George; nausdj@ornl.gov; Carrion, Robert Cc: Williams, Charles R. dated Friday, December 18, 2009 4:44 PM
Subject:
Draft FM 3.2 for Review 137 12/18/09 Attachments:
FM 3.2.pptx; FM 3.2 x 1 -Break Test Summary -core v original table.pdf; FM 3.2 x 2 -SP5618 grout specs.pdf; FM 3.2 x 3-grout and concrete batching -FPC Procedure W1 12 .pdf; FM 3.2 x4 -Pour data summary CR3.pdf; FM 3.2 x 5 -joint photos.pdf (20 pages)Email -From: Miller, Craig L [Craig.Miller@pgnmail.com]
to: Lake, Louis; Thomas, George; nausdj@ornl.gov; Carrion, Robert 138 12/18/09 Cc: Williams, Charles R. dated Friday, December 18, 2009 4:41 PM
Subject:
Draft FM 2.9 for Review Attachments:
FM 2.9 x 1 -Pour406RB-NCR98.pdf; FM 2.9.pptx (6 Pages)From: Jones, Tai [Brandy.Jones@pgnmail.com]
To: Lake, Louis dated Thursday, December 17, 2009 12:44 PM
Subject:
CR3 Open Requests Attachments:
Open Requests.pdf (65 Pages)Failure Modes of CR-3 Containment Concrete Delamination Issue 140 12/28/09 (6pgs (16 pages)Email -From: Lake, Louis [Louis. Lake@pgnmail.com]
To: Lake, 141 12/17/09 Louis dated Thursday, December 17, 2009 12:05 PM
Subject:
FW: CR3 Containment Repair Project Level 1 Schedule Attachments:
12-16-09 Level 1 Rev C -11x17.pdf (2 Pages)Email -From: Williams, Charles R. to Lake, Louis; Thomas, George; nausdj@ornl.gov; Carrion, Robert Cc: Miller, Craig L[Charles.Williams@pgnmail.com]
dated: Thursday, December 17, 2009 11:19 AM 142 12/17/09
Subject:
Draft FM 2.2 for Review Attachments:
FM 2.2 .pptx; FM2.2 x 1 -pump and bucket -Pour729RB.pdf; FM2.2 x 2 -SP5618.pdf; FM2.2 x 3 -Pour data summary CR3.pdf; FM2.2 x 4 -photos.pdf; FM2.2 x 5 -Pour528RBElev1O3-joints.pdf; FM2.2 x 6 pouring in Pour712RBEIev210.pdf (18 Pages)143 12/28/72 Reactor Equipment Building Access Opening (5 pages)Email -From: Fagan, Paul [Paul.Fagan@pgnmail.com]
to Lake, Louis dated Wednesday, December 16, 2009 6:10 PM 144 12/16/09
Subject:
FW: 12-16-09 Containment Repair Project Level 3 schedule Attachments:
12-16-09 Level 3 Rev B -11x17.pdf (15,Pages)
Email -From: Williams, Charles R.[Charles.Williams@pgnmail.com]
To: Lake, Louis; Thomas, George;nausdj@ornl.gov; Carrion, Robert 145 12/15/09 Cc: Miller, Craig L dated Tuesday, December 15, 2009 11:31 AM
Subject:
Draft Refute 9.2 for Review Attachments:
FM 9.2.ppt; Pages from FSAR Section 05.pdf (2 1 Pages)Page 8 of 16 FOIA-2010-0116 Email -From: Williams, Charles R. to Lake, Louis; Thomas, George;nausdj@ornl.gov; Carrion, Robert Cc: Miller, Craig L[Charles.Williams@pgnmail.com]
dated Tuesday, December 15, 146 12/15/09 2009 11:28 AM
Subject:
FM 9.1 Draft for Review Attachments:
FM 9.1.ppt; Pages from FSAR Section 05_2.pdf (8 Pages)Email -From: Fagan, Paul [Paul.Fagan@pgnmail.com]
To: 'lakelf@bellsouth.net';
Lake, Louis Cc: Miller, Garry dated Monday, 147 12/14/09 December 14, 2009 11:14 AM
Subject:
Emailing:
2009 Dec 11 -Root Cause Update for NRC.pptx Attachments:
2009 Dec 11 -Root Cause Update for NRC.pptx (3 Pages)Email -From: Franke, Mark to: Lake, Louis dated Monday, December 14, 2009 7:42 AM 148 12/14/09
Subject:
FW: CR3 Root Cause Information Attachments:
2009 Dec 11 -Root Cause Update for NRC.pptx (2 Pages)Email -From: Oif, Tracy to: Lake, Louis dated Monday, December 149 12/14/09 14, 2009 7:32 AM
Subject:
FW: CR3 Root Cause Information Attachments:
2009 Dec 11 -Root Cause Update for NRC.pptx (2 Pages)150 1/23/09 2.7 Inadequate Vibration During-Pour (3 pages)Email -From: Williams, Charles R. to Lake, Louis; Thomas, George; nausdj@ornl.gov; Carrion, Robert Cc: Miller, Craig L[Charles.Williams@pgnmail.com]
dated Friday, December 11, 2009 151 12/11/09 4:14 PM
Subject:
FM 2.11 for Review Attachments:
FM 2.11[1].pptx; FM2.11 x 6- core strength.pdf; FM2.11 x4 -Pour data summary CR3.pdf; FM2.11 x 1 -Pour528RBElev103-joints.pdf; FM2.11 x 2 -SP5618 5 01.6.pdf;FM2.1 1 x 3 -SP5618 4 01.2. pdf; FM2.11 x 5 -photos. pdf (19 Pages)152 12/11/09 5.2 Exhibit 2 Mactec Petrographic (16 Pages)153 12/11/09 Email -
Subject:
Information Request #52 (2 Pages)Email -
Subject:
Emailing:
!NRC Request #55 Information.docx Attachments:
!NRC Request #55 Information.docx (2 pages)155 Undated Horizontal Tendons Pages 26-39 (14 pages)156 9/16/09 PSC Field and Quality Control Manual (130 Pages)157 12/10/09 2009 NRC Special Inspection
-RB Concrete Separation (85 pages)Email -
Subject:
mailing: !Request #7_NRC SIT Question#1 Information.docx 158 12/10/09 Attachments:
R16 Tendon Detensiong sequence.pdf; Z23R5 PSC Field and Quality Control Manuall.pdf; Containment Opening -Tendon Removal Timeline.xlsx;
!Request #7 NRC SIT Question#1 Information.docx (134 Pages)Email -
Subject:
Emailing:
!Request #9_NRC SIT Question#3 159 12/10/09 Information.docx Attachments:
!Request #9_NRC SIT Question#3 Information.docx (3 pages)
Subject:
Emailing:
!Request #9_NRC SIT Question#3 Information.docx 160 12/10/09 Attachments:
!Request #24_NRC SIT Question#18 Information.docx;
!Request #9 NRC SIT Question#3 Information.docx (6 pages)Email -
Subject:
Emailing:
NRC Request 12 Response.docx Attachments:
NRC Request 12 Response.docx (2 pages)162 2/4/09 5.6 Exhibit 5 Surveillance Conclusion (2 pages)163 2/4/09 5.6 Exhibit 8 Cap Grease Leakage (1 page)Page 9 of 16 FOIA-2010-0116 Email -
Subject:
Emailing:
Response to NRC Request 23.pdf 164 12/10/09 Attachments:
NCR 0035872410 text.docx; Response to NRC Request 23.pdf (8 pages)Email -
Subject:
Emailing:
!Request #25_NRC SIT Question#19 Information
-Rev 1.docx 165 12/10/09 Attachments:
RO-16 IWL Exam Reports.pdf;
!Request #25_NRC SIT Question#19 Information
-Rev 1.docx (31 pages)Email -
Subject:
Emailing:
Request 29 Question 23 Response 166 12/10/09 (3).docx Attachments:
Request 29 Question 23 Response (3).docx (2 pages)Email from Lake, Louis to Dan Naus, Lake, Louis, Masters, Anthony, Robert Carrion, Thomas, George, dated Thursday, 167 12/10/09 December 10, 2009, 7:43 AM
Subject:
Emailing:
12-3_AII questions.pdf; Attachments:
12-3All questions.pdf (86 pages)Email from Lake, Louis to Thomas, George dated Thursday, 168 12/10/09 December 10, 2009 8:25 AM
Subject:
FW: Emailing:
PresconFieldlnstallationManual.tif Attachements:
PresconFieldlnstallationManual.tif (53 pages)Email -From: Orf, Tracy to Lake, Louis dated Tuesday, December 169 12/8/09 08, 2009 6:29 AM
Subject:
FW: Updated CR3 Root Cause Chart Attachments:
Root Cause Update for NRC.pptx (2 Pages)170 12/8/09 5.1 Exhibit 6A Petrographic Mactec (12 Pages)171 12/8/09 5.8 Exhibit 5b Petrographic (7 Pages)172 9/21/07 5.6 Exhibit 3 Grease Replacement (9 Pages)Email -From: Souther, Martin [martin.souther@pgnmail.com]
to: Lake, Louis Cc: Fagan, Paul dated Friday, December 04, 2009 173 12/4/09 12:25 PM
Subject:
Requested Information Attachments:
Request for Information
-Core #54 Attachments.pdf; Request for Information
-Core #54.docx (14 Pages)174 12/4/09 Email -
Subject:
Requested Information core #54 (14 Pages)Email -
Subject:
FW: Requested Information, Attachments:
Request 175 12/4/09 for'Information
-Core #54 Attachments.pdf; Request for Information
-Core #54.docx (14 Pages)176 12/3/09 Email -Subject Inspection Questions (86 Pages)Email From: Chou, Rich to: Lake, Louis Cc: Franke, Mark; Sykes, Marvin; Ninh, Son; Morrissey, Thomas; Reyes, Rogerio; Chou, Rich;177 12/2/09 Powell, Sid dated Wednesday, December 02, 2009 9:02 AM
Subject:
FW: Monday NCRs Attachments:
0015_insideAverage Moblity.jpg; Nov 21 markup -Containment Unfolded Graphics_IR Mosaic.pdf (4 Pages)Email -From Williams, Charles R.[Charles.Williams@pgnmail.com]
to Lake, Louis; Thomas, George;178. 12/1/09 nausdj@ornl.gov; Carrion, Robert Cc: Miller, Craig L dated Tuesday, December 01, 2009 4:29 PM
Subject:
RE: Draft Refute 8.2 for Review Attachments:
Pages from FSAR Section 05.pdf (3 Pages)Email -From: Williams, Charles R.[Charles.Williams@pgnmail.com]
to: Lake, Louis; Thomas, George;nausdj@ornl.gov; Carrion, Robert dated Tuesday, December 01, 179 12/1/09 20 :1P
Subject:
Draft Refute 8.3 for your Review Attachments:
FM 8.3.pptx; SP-178 Rev 28 (tmp) 205.pdf; Pages from SP-178 Rev 28 (tmp) 1.pdf; SP-178 Rev 28 -50.59 1 Screen. pdf; EC-ED 62366RO.doc (13 Pages)Page 10 of 16 FOIA-2010-0116 Email -From: Williams, Charles R.[Charles.Williams@pgnmail.com]
to Lake, Louis; Thomas, George;nausdj@ornl.gov; Carrion, Robert dated Tuesday, December 01, 180 12/1/09 2009 2:27 PM
Subject:
RE: Draft Refute 8.4 For review Attachments:
FM 8.4.pptx; Selected Pages from S07-0033.pdf; IWL of 10-25-09.pdf (60 Pages)Email -From: Williams, Charles R.[Charles.Williams@pgnmail.com]
To: Lake, Louis; Thomas, George;nausdj@ornl.gov; Carrion, Robert dated Tuesday, December 01, 181 12/1/09 20092:18PM
Subject:
Draft Refute 8.2 for Review Attachments:
FM 8.2.pptx; Item 176 -1992 BS event -RB temperature info.pdf; CR3 FSAR Section 5 87.pdf; CR3 FSAR Section 5 86.pdf (5 Pages)Email -From: Chou, Rich To: Powell, Sid Cc: Franke, Mark; Sykes, Marvin; Morrissey, Thomas; Reyes, Rogerio; Lake, Louis; Chou, Rich; Ninh, Son 182 12/1/09 dated Tuesday, December 01, 2009 9:39 AM
Subject:
FW: Monday NCRs Attachments:
368472.pdf; 368282.pdf; 368351.pdf; 368389.pdf; 368470.pdf (6 Pages)Email -From: Williams, Charles R. To: Lake, Louis; Thomas, George; nausdj@ornl.gov; Carrion, Robert[Charles.Williams@pgnmail.com]
dated Monday, November 30, 2009 2:48 PM
Subject:
RE: Draft Refute 4.2 for Review Attachments:
FM4.2 .ppt; Erlin Hime Petro report 05101976.pdf; Core Bore #5 Final CTL Petrographic Report 059169 C856.1.pdf; 183 11/30/09 Pour743RBElev240-daily concrete curing and form removal.pdf; Pour362RB-concrete curing log.pdf; Pour362RB-daily concrete curing and form removal.pdf; Pour522RBElev98-concrete curing log.pdf; Pour522RBElev98-curing and form removal record.pdf; Pour528RBElev1 03-daily concrete curing and form removal. pdf;Pour642RB-concrete curing log.pdf; Pour642RB-curing and form removal record.pdf; Pour743RBElev240-concrete curing Iog.pdf (28 Pages)Email -From: Williams, Charles R. to Lake, Louis; Thomas, George;nausdj@ornl.gov; Carrion, Robert[Charles.Williams@pgnmail.com]
dated Monday, November 30, 2009 2:02 PM
Subject:
Draft Refute 4.1 for Review Attachments:
FM 4.1 .pptx; Pour743RBElev240-daily concrete curing 184 11/30/09 and form removal.pdf; Pour362RB-concrete curing log.pdf;Pour362RB-daily concrete curing and form removal.pdf; Pour522RBElev98-concrete curing log.pdf; Pour522RBElev98-curing and form removal record.pdf; Pour528RBElevl03-daily concrete curing and form removal.pdf; Pour642RB-concrete curing log.pdf; Pour642RB-curing and form removal record.pdf; Pour743RBElev240-concrete curing log.pdf (11 Pages)Email -From: Williams, Charles R. To: Lake, Louis; Thomas, George; nausdj@ornl.gov; Carrion, Robert[Charles.Williams@pgnmail.com]
dated Monday, November 30, 2009 1:23 PM 185 11/30/09
Subject:
Draft Refute 2.5 for review Attachments:
FM 2.5.pptx; Ambient v concrete temp bay 15 ver 3.pdf; Ambient v concrete temp bay 12 ver 2.pdf; Ice in Pour263RB.pdf; all strength table.pdf; all strength graph.pdf; 7 and 28 day strength.pdf (14 Pages)Page 11 of 16 FOIA-2010-0116 Email -From: Lake, Louis to Dan naus; Lake, Louis; Masters, Anthony; Carrion, Robert; Thomas, George dated Monday, November 30, 2009 1:17 PM 186 11/30/09
Subject:
Emailing:
Failure Modes CR3, Rev.6 111809 NRC pkg no Rs.ppt Attachments:
Failure Modes CR3, Rev.6 111809 NRC pkg no Rs.ppt (17 Pages)Email -From: Williams, Charles R. To: Lake, Louis; Thomas, George; nausdj@ornl.gov; Carrion, Robert -[Charles.Williams@pgnmail.com]
dated Monday, November 30, 2009 1:00 PM
Subject:
Prelim Refute 2.4 Document for Review Attachments:
FM 2.4.pptx; Pour743RBElev240-daily concrete curing and form removal.pdf; Pour362RB-concrete curing log.pdf;187 11/30/09 Pour362RB-daily concrete curing and form removal.pdf; Pour522RBElev98-concrete curing log.pdf; Pour522RBElev98-curing and form removal record.pdf; Pour528RBElevl03-daily concrete curing and form removal.pdf; Pour642RB-concrete curing log.pdf; Pour642RB-curing and form removal record.pdf; Pour743RBElev240-concrete curing log.pdf; Fc over time butt 3-4.pdf; Fc develop butt 1-6.pdf; Fc develop butt 3-4.pdf; Fc over time butt 1-6.pdf (11 Pages)Email -
Subject:
Emailing:
Failure Modes CR3, Rev.6 111809 NRC 188 11/30/09 pkg no Rs.ppt Attachments:
Failure Modes CR3, Rev.6 111809 NRC pkg no Rs.ppt (17 Pages)189 11/27/09 Item 176 1992 BS event RB temperature (4 Pages)Email -From: Souther, Martin [martin.souther@pgnmail.com]
To: Lake, Louis Cc: Fagan, Paul; Miller, Garry dated Tuesday, November 24, 2009 8:06 AM 190 11/24/09
Subject:
2009 Nov 23 -Containment Unfolded Graphics_IR Mosaic.pptx Attachments:
2009 Nov 23 -Containment Unfolded GraphicslR Mosaic.pptx (3 Pages)Email -From: Williams, Charles R. to: Lake, Louis; Thomas, George; nausdj@ornl.gov 191 11/24/09 [Charles.Williams@pgnmail.com]
dated Tuesday, November 24, 2009 7:19 AM
Subject:
Refute 8.5 for Review Attachments:
FM 8.5.ppt; Vacuum Calculation.doc; Item 108 -Purge Fan Event.pdf (7 Pages)Email -From: Williams, Charles R.[Charles.Williams@pgnmail.com]
to: Lake, Louis; Thomas, George;nausdj@ornl.gov dated Tuesday, November 24, 2009 7:17 AM 192 11/24/09
Subject:
Refute 8.1 for Review Attachments:
FM 8.1.ppt; Item 115 -1992 BS event.pdf; Item 136 -1992 BS event -strip chart annotated.pdf; 1992 BS Actuation.pdf (81 Pages)Email -From: Williams, Charles R.[Charles.Williams@pgnmail.com]
to: Lake, Louis; Thomas, George;nausdj@ornl.gov dated Tuesday, November 24, 2009 7:16 AM
Subject:
Refute 3.3 for Review 193 11/24/09 Attachments:
FM 3.3.ppt; PTL Test Cement 04011974.pdf; mill cert 04021974.pdf; all strength table.pdf; 7 and 28 day strength.pdf; all strength graph.pdf; Erlin Hime Petro report 05101976.
pdf; Core Bore #5 Final CTL Petrographic Report 059169 C856 (2).pdf (27 Pages)Page 12 of 16 FOIA-2010-0116 Email -From: Williams, Charles R.[Charles.Williams@pgnmail.com]
to Lake, Louis; Thomas, George;nausdj@ornl.gov Cc: Herrin, Dennis W. dated Tuesday, November 24, 2009 7:12 AM 194 11/24/09
Subject:
Refute 3.1 for Review Attachments:
FM 3.1.ppt; Exhibit 4 -Graph of air from tickets.pdf; Exhibit 1 -Erlin Hime Petro report 05101976.pdf; Exhibit 2 -Core Bore #5 Final CTL Petrographic Report 059169 C856.pdf; Exhibit 3-pour ticket samples -Pour666RBElevl6O.pdf (8 Pages)Email -From: Williams, Charles R. To: Lake, Louis; Thomas, George; nausdj@ornl.gov Cc: Herrin, Dennis W.195 11/24/09 [Charles.Williams@pgnmail.com]
dated Tuesday, November 24, 2009 7:10 AM
Subject:
Refute 2.8 for Review Attachments:
FM 2.8.ppt; Picture 013.jpg; 4 jan 73 emailsize.jpg; 5 april 73.bmp.jpg; DSC04768.JPG; DSC04776.JPG; Picture 006.jpg (8 Pages)Email From: Williams, Charles R. [Charles.Williams@pgnmail.com]
To: Lake, Louis; Thomas, George; nausdj@ornl.gov Cc: Herrin, Dennis W. dated Tuesday, November 24, 2009 7:08 AM
Subject:
Refute 2.7 for Review Attachments:
FM 2.7.ppt; Pour729RB-mechanical vibration.pdf; Pour362RB-mechanical vibration.pdf; Pour528RBElev103-mechanical vibration.pdf; Pour674RB-mechanical vibration.pdf; Pour713RB-mechanical vibration.pdf; Erlin Hime Petro report 05101976.pdf; Core Bore #5 Final CTL Petrographic Report 059169 C856 (2).pdf; Interview Willie Easman.doc (24 Pages)Email -From: Williams, Charles R. to: Lake, Louis; Thomas, George; nausdj@ornl.gov Cc: Herrin, Dennis W.[Charles.Williams@pgnmail.com]
dated Tuesday, November 24, 197 11/24/09 2009 7:02 AM
Subject:
Refute 2.3 for Review Attachments:
FM 2.3.ppt; Slump in Bay 15 v2.pdf; all strength graph.pdf; Original construction Pour Data.pdf; Slump in Bay 12 v2.pdf (12 Pages)Email From: Williams, Charles R. [Charles.Williams@pgnmail.com]
To: Lake, Louis; Thomas, George; nausdj@ornl.gov dated Tuesday, November 24, 2009 6:56 AM
Subject:
Refute document 2.1 and Exhibits Attachments:
FM 2.1.ppt; Pour642RB-curing and form removal 198 11/24/09 record.pdf; Pour743RBElev240-concrete curing log.pdf;Pour743RBElev240-daily concrete curing and form removal.pdf; Pour362RB-concrete curing log.pdf; Pour362RB-daily concrete curing and form removal.pdf; Pour522RBElev98-concrete curing log.pdf; Pour522RBElev98-curing and form removal record.pdf; Pour528RBElev103-daily concrete curing and form removal.pdf; Pour642RB-concrete curing log.pdf (12 Pages)Email -Attachments:
Response to NDT Question from NRR.pdf 059169_N DT Qualification Letter_1 1-11-09. pdf 199 11/24/09 Request 10.docx Request 11 .docx Request 16.docx (20 Pages)Email -
Subject:
FW: 2009 Nov 23 -Containment Unfolded 200 11/24/09 GraphicsIR Mosaic.pptx Attachments:
2009 Nov 23 -Containment Unfolded GraphicslR Mosaic.pptx (3 Pages)Page 13 of 16 FOIA-2010-0116 Email -
Subject:
FW: Refute 3.3 for Review Attachments:
FM 3.3.ppt;PTL Test Cement 04011974.pdf; mill cert 04021974.pdf; 201 11/24/09 all strength table.pdf; 7 and 28 day strength.pdf; all strength graph.pdf; Erlin Hime Petro report 05101976.pdf; Core Bore #5 Final CTL Petrographic Report 059169 C856 (2).pdf (22 pages)202 Undated Appendix Slides (15 pages)Email -
Subject:
FW: Refute 8.5 for Review 203 11/24/09 Attachments:
FM 8.5.ppt;Vacuum Calculation.doc; Item 108 -Purge Fan Event.pdf (7 Pages)Email -
Subject:
FW: Refute 2.8 for Review Attachments:
FM 2.8.ppt;Picture 013.jpg;204 11/24/09 4 jan 73 emailsize.jpg; 5 april 73.bmp.jpg; DSC04768.JPG; DSC04776.JPG; Picture 006.jpg (338 pages)205 11/24/09 Email -
Subject:
Refute 3.1 for Review (20 Pages)Email -
Subject:
FW: Refute 2.7 for Review Attachments:
FM 2.7.ppt;Pour729RB-mechanical vibration.pdf; Pour362RB-mechanical vibration.pdf; 206 11/24/09 Pour528RBElev1 03-mechanical vibration.
pdf;Pour674RB-mechanical vibration.pdf; Pour713RB-mechanical vibration.pdf; Erlin Hime Petro report 05101976.pdf; Core Bore #5 Final CTL Petrographic Report 059169 C856 (2).pdf;Interview Willie Easman.doc (26 pages)207 11/24/09 Email -
Subject:
Containment Graphlic (3 Pages)208 8/15/07 Select pages from S07-0033 (42 Pages)Email -From: Thomas, George To: Carrion, Robert; Masters, Anthony; Farzam, Farhad; Ashar, Hansraj; Sheikh, Abdul 209 11/19/09 Cc: Khanna, Meena; Lake, Louis dated Thursday, November 19, 2009 11:28 AM
Subject:
Presentation made to PNSC (39 Pages)210 3/2/06 2005 ILRT.pdf (303 Pages)211 11/18/09 Email -
Subject:
Information Request #52 and #55 (3 Pages)Email From: Carrion, Robert to: Lake, Louis dated Wednesday, 212 11/18/09 November 18, 2009 3:53 PM
Subject:
Extra Files (19 Pages)Email -From: Franke, Mark to: Kennedy, Kriss Cc: McCree, Victor;Reyes, Luis; Lake, Louis; Carrion, Robert; Khanna, Meena; Saba, 213 11/17/09 Farideh; Sykes, Marvin; Wert, Leonard; Munday, Joel dated Tuesday, November 17, 2009 4:39 PM
Subject:
Crystal River containment repair plan update (38 Pages)214 11/16/09 2009 Nov 16- PNSC -Repair Update FINAL.pdf (37 Pages)215 8/31/98
Subject:
Crystal River IWE/IWL Tendon Layout Drawings (13 Pages)216 11/14/09 Email -
Subject:
Photos of Core #5 (4 Pages)217 11/13/09 Email -
Subject:
MacTec Petrographic Report (46 Pages)218 11/13/09 059169 NDT Qualification Letter 11-11-09.pdf (2 Pages)Page 14 of 16 FOIA-2010-0116 Email -From: Thomas, George to nausdj@ornl.gov Cc: Farzam, 219 11/ 13/09 Farhad; Lake, Louis; Carrion, Robert; Masters, Anthony dated Friday, November 13, 2009 2:16 PM
Subject:
MacTec Petrographic Report (46 Pages)Email -From Thomas, George to nausdj@ornl.gov Cc: Farzam, 220 11/13/09 Farhad; Lake, Louis; Carrion, Robert dated Friday, November 13, 2009 2:06 PM
Subject:
CTL Petrographic Report on one core (12 Pages)221 2/11/97 6.5 Exhibits 5 (646 pages)222 8/10/76 5.1 Exhibit 6b Petrographic Erlin Hime (4 Pages)223 11/12/09 2009 Nov 12 -Containment Unfolded GraphicslR Mosaic.pptx (2 Pages)224 12/10/76 Crystal River Unit 3 -Florida Power Corporation:
Reactor Building Dome Delamination Report (196 pages)225 2/16/73 5.4 Exhibit 3 Pour712RBelev210 (1 Page)Email -From Orf, Tracy To: Lake, Louis dated Thursday, November 12, 2009 7:05 AM
Subject:
FW: CR3 Information Update (4 Pages)227 11/12/09 Email -
Subject:
Information Request #50, #58, and #49 (7 Pages)228 11/11/09 5.5 Exhibit 3c Petrographic (5 Pages)229 11/11/09 5.8 Exhibit 3c Petrographic (5 Pages)230 11/9/09 Email -
Subject:
Additional inspection questions (1 Page)Email -
Subject:
Information Request #44, #45, #46, #47, # 48, #51,#54, #56, and #57 (11 Pages)232 10/xx/72 5.1 Exhibit 2 Pour QC procedures (1 Page)233 11/6/09 Containment Unfolded Buttress 2 to 5 (1 page)234 10/xx/72 5.4 Exhibit 2- QC Procedures (2 pages)235 11/5/09 Email -
Subject:
Additional inspection questions (1 Page)236 11/5/09 2009 Nov 5 -NRC Telecon Briefing.pdf (9 Pages)Crystal River unit #3 Containment Update 237 11/5/09 by Garry Miller (9 pages)238 11/4/09 Email -
Subject:
CR3 Status Meeting (7 Pages)239 7/28/72 5.1 Exhibit 4 report on concrete placement (1 Page)240 11/2/09 5.2 Exhibit 3 CTL Petrographic (11 Pages)241 3/13/72 5.1 Exhibit 3 Pour 528RB (5 Pages)242 10/30/09 2009 Oct 30 -Root Cause Analysis Metrics.pptx (1 Page)2009 Oct 29_NRC CopyContainment Delamination.pptx (18 243 10/29/09 Pgs Pages)244 10/29/09 5.6 Exhibit 7 Grease Photos (3 Pages)Email -
Subject:
Responses to NRC questions database set up (1 245 10/29/09 Pae Page)246 10/29/09 Condition Assessment (290ct09).doc (1 Page)247 10/28/09 Interview Cliff Peters Gary Geotsch (1 Page)248 10/27/09 Summary of Results From Comparison.pdf (3 Pages)Email From Franke, Mark to Saba, Farideh Cc: Carrion, Robert;249 10/26/09 Khanna, Meena; Chan, Terence; Lake, Louis dated Monday, October 26, 2009 2:55 PM,
Subject:
Crystal River NDE plan (38 Pages)250 10/24/09 Interview Gary Geotsch (1 Page)251 3/18/69 5.1 Exhibit 5 Law Engineering Tests (1 page)252 10/23/09 IWL of 10-25-09 (16 Pages)253 10/23/09
Subject:
October 23 2009 Containment Picture (1 Page)254 10/23/09
Subject:
IWL/IWE Program information (601 Pages)255 10/22/09 9.3 Exhibit 3 Glenn Craig (1 Page)256 10/20/09 Email -
Subject:
October 20 2009 containment pictures (8 Pages)257 10/18/09 Email -
Subject:
October 18 2009 Core bore pictures (17 Pages)Page 15 of 16 FOIA-2010-0116 Photos; Picture007.jpg, Pcture008.jpg, 258 10/16/09 Picture009.jpg, Picture010.jpg, Picture014.jpg, Picture021 .jpg, Picture022.jpg, Picture023.jpg (4 pages 259 10/15/09
Subject:
October 15 2009 Containment Pictures (37 Pages)260 10/15/09
Subject:
October 15 2009 Crack pictures (8 Pages)261 1/22/69 5.1 Exhibit 1 SP 56178 and JAJ (3 pages)Photos; Picture021.jpg, Picture022.jpg, Picture023.jpg, Picture024.jpg, Picture025.jpg, Picture026.jpg, Picture027.jpg, Picture028.jpg, Picture029.jpg, Picture03O.jpg, Picture031 .jpg, Picture032.jpg, Picture033.jpg, Picture034.jpg, Picture035.jpg, Picture036.jpg, 262 10/14/09 Picture037.jpg, Picture038.jpg, Picture039.jpg, Picture04O.jpg, Picture041.jpg, Picture042.jpg, Picture043.jpg, Picture044.jpg, Picture046.jpg, Picture048.jpg, Picture05O.jpg, Picture051 .jpg, Picture052.jpg, Picture054.jpg, Picture055.jpg, Picture056.jpg (16 pages)263 1/22/69 5.4 Exhibit 1- Forms -SP5618 (2 pages)Crystal River 3 Nuclear Condition Report Summary -NCRs Initiated Since 264 10/13/09.
Oct 12, 2009 (1 page)Contact: Dennis W. Herrin, Lead Engineer Progress Energy Florida 265 10/8/09 E-Mail from Reyes to Reyes, Briefing Talking Points (2 pages)266 Undated Adverse Condition Investigation Form, CAP-NGGC-0200-3-18 (28 pages)Presentation to PNSC Containment Update & Discussion of Repair Options (7 pages)Cr3 NPC Outage Containment Repair Project -Level 3 Schedule 268 1/18/10 (1pgs (11 pages)269 Undated Photo (2 pages)Page 16 of 16