ML12044A306: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 3: | Line 3: | ||
| issue date = 02/13/2012 | | issue date = 02/13/2012 | ||
| title = Order Denying Unopposed Motion for Leave to Respond to NRC Staff'S Answer to Proposed Contention 4 and Setting Proposed Contention 5's Admissibility for Oral Argument | | title = Order Denying Unopposed Motion for Leave to Respond to NRC Staff'S Answer to Proposed Contention 4 and Setting Proposed Contention 5's Admissibility for Oral Argument | ||
| author name = Froehlich W | | author name = Froehlich W, Kastenberg W, Trikouros N | ||
| author affiliation = NRC/ASLBP | | author affiliation = NRC/ASLBP | ||
| addressee name = | | addressee name = |
Revision as of 03:17, 29 June 2019
ML12044A306 | |
Person / Time | |
---|---|
Site: | Davis Besse |
Issue date: | 02/13/2012 |
From: | William Froehlich, Kastenberg W, Nicholas Trikouros Atomic Safety and Licensing Board Panel |
To: | |
SECY RAS | |
References | |
RAS 21905, 50-346-LR, ASLBP 11-907-01-LR-BD01 | |
Download: ML12044A306 (5) | |
Text
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD Before Administrative Judges:
William J. Froehlich, Chairman Nicholas G. Trikouros Dr. William E. Kastenberg In the Matter of: FirstEnergy NUCLEAR OPERATING COMPANY (Davis-Besse Nuclear Power Station, Unit 1)
Docket No. 50-346-LR ASLBP No. 11-907-01-LR-BD01
February 13, 2012 ORDER DENYING UNOPPOSED MOTION FOR LEAVE TO RESPOND TO NRC STAFF'S ANSWER TO PROPOSED CONTENTION 5 and SETTING PROPOSED CONTENTION 5's ADMISSIBILITY FOR ORAL ARGUMENT
On January 10, 2012, Beyond Nuclear, Citizens Environment Alliance of Southwestern Ontario, Don't Waste Michigan, and the Green Party of Ohio (Joint Intervenors) filed a motion with the Atomic Safety and Licensing Board (Board) to admit a newly-proposed Contention 5 regarding shield building cracking.
1 FirstEnergy Nuclear Operating Company (FENOC) and the Nuclear Regulatory Commission Staff (NRC Staff) filed answers to the proposed Contention 5 on February 6, 2012.2 Proposed Contention 5 reads as follows:
1 Motion for Admission of Contention No. 5 on Shield Building Cracking (Jan. 10, 2012)
("Contention 5").
2 NRC Staff's Answer to Motion to Admit New Contention Regarding the Safety Implications of Newly Discovered Shield Building Cracking (Feb. 6, 2012) ("Staff Answer"); FENOC's Answer Opposing Intervenors' Motion for Admission of Contention No. 5 on Shield Building Cracking (Feb.
6, 2012). Interveners contend that FirstEnergy's recently-discovered, extensive cracking of unknown origin in the Davis-Besse shield building/secondary reactor radiological containment structure is an aging-related feature of the plant, the condition of which precludes safe operation of the atomic reactor beyond 2017 for any period of time, let alone the proposed 20-year license period.
3 On February 9, 2012, FENOC filed an unopposed motion requesting leave from the Board to file a short response to the NRC Staff's Answer.
4 FENOC requested that the Board schedule oral argument on Contention 5 should the Board deny the Motion. FENOC desires to address on the record its concerns related to the new arguments and the following revised contention language advanced in the NRC Staff's Answer: Is the Structures AMP adequate to address any aging effects for the shield building that are related to the cracks identified by FENOC during the October 10, 2011 reactor head replacement and subject to a root cause evaluation to be provided by FENOC on February 28, 2012 such that the shield building would be unable to perform its intended functions of: 1)protecting the steel containment from environmental effects, including wind, tornado, and external missiles, 2) providing biological shielding, 3) providing controlled release of the annulus during an accident, and 4) providing a means for collection and filtration of fission product leakage from the Containment Vessel following a hypothetical accident?
5 Rather than begin a flurry of responsive pleadings, the Board believes that oral argument would be helpful in deciding the admissibility of proposed Contention 5. The Board will therefore set this matter for oral argument at a time and place to be announced. The Board's law clerk will
3 Contention 5 at 11.
4 FENOC's Unopposed Motion for Leave to Respond to the NRC Staff's Answer to Proposed Contention 5 on Shield Building Cracking (Feb. 9, 2012). Counsel for FENOC certified under 10 C.F.R. § 2.323(b) and Initial Scheduling Order Section G.1 that it consulted with the other parties regarding this request. Id. at 2, n.4. Counsel for the NRC Staff indicated that the Staff does not oppose FENOC's request to file a responsive brief. Id. Counsel for Joint Intervenors similarly indicated that Joint Intervenors would not oppose FENOC's request, provided FENOC does not oppose an opportunity for Joint Intervenors to file a rebuttal pleading. Id.
5 Staff Answer at 16.
contact the parties to arrange a mutually convenient time and place to hold said oral argument.
It is so ORDERED.
FOR THE ATOMIC SAFETY AND LICENSING BOARD
__________________________
William J. Froehlich, Chairman ADMINISTRATIVE JUDGE
Rockville, Maryland February 13, 2012
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of ) )
FIRST ENERGY NUCLEAR OPERATING )
COMPANY ) Docket No. 50-346-LR
)
(Davis-Besse Nuclear Power Station, Unit 1) ) ) CERTIFICATE OF SERVICE
I hereby certify that copies of the foregoing ORDER (Denying Unopposed Motion for Leave to Respond to NRC Staff's Answer to Proposed Contention 5 and Setting Proposed Contention 5's Admissibility for Oral Argument) have been served upon the following persons by Electronic
Information Exchange.
Office of Commission Appellate Adjudication Mail Stop O-7H4M U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
E-mail: ocaamail@nrc.gov Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission.
Mail Stop T-3F23 Washington, DC 20555-0001 William J. Froehlich, Chair
Administrative Judge
E-mail: william.froehlich@nrc.gov
Nicholas G. Trikouros Administrative Judge E-mail: nicholas.trikouros@nrc.gov
William E. Kastenberg
Administrative Judge E-mail: wek1@nrc.gov
Hillary Cain, Law Clerk
E-mail: hillary.cain@nrc.gov Matthew Flyntz, Law Clerk
E-mail: matthew.flyntz@nrc.gov
Office of the Secretary of the Commission U.S. Nuclear Regulatory Commission Mail Stop O-16C1 Washington, DC 20555-0001
Hearing Docket
E-mail: hearingdocket@nrc.gov Office of the General Counsel U.S. Nuclear Regulatory Commission
Mail Stop O-15D21 Washington, DC 20555-0001 Edward L. Williamson, Esq.
E-mail: edward.williamson@nrc.gov Lloyd B. Subin, Esq.
E-mail: lloyd.subin@nrc.gov Brian Harris, Esq.
E-mail: brian.harris@nrc.gov Catherine Kanatas, Esq.
E-mail: catherine.kanatas@nrc.gov Brian P. Newell, Paralegal
E-mail: brian.newell@nrc.gov
OGC Mail Center :
OGCMailCenter@nrc.gov FirstEnergy Service Company.
Mailstop: A-GO-15
76 South Main Street Akron, OH 44308 David W. Jenkins, Esq.
E-mail : djenkins@firstenergycorp.com
Docket No. 50-346-LR ORDER (Denying Unopposed Motion for Leave to Respond to NRC Staff's Answer to Proposed Contention 5 and Setting Proposed Contention 5's Admissibility for Oral Argument) 2 Morgan, Lewis & Bockius
1111 Pennsylvania Avenue, NW Washington, D.C. 20004 Stephen Burdick, Esq.
E-mail: sburdick@morganlewis.com Alex Polonsky, Esq.
E-mail: apolonsky@morganlewis.com Kathryn M. Sutton, Esq.
E-mail: ksutton@morganlewis.com Martin O'Neill, Esq.
E-mail: martin.oneill@morganlewis.com Timothy Matthews, Esq.
E-mail: tmatthews@morganlewis.com Brooke Leach, Esq.
E-mail: bleach@morganlewis.com Jane Diecker, Esq.
E-mail: jdiecker@morganlewis.com Mary Freeze, Legal Secretary
E-mail: mfreeze@morganlewis.com Citizens Environmental Alliance (CEA)
of Southwestern Ontario
1950 Ottawa Street
Windsor, Ontario Canada N8Y 197 Green Party of Ohio 2626 Robinwood Avenue
Toledo, Ohio 43610
Don't Waste Michigan 811 Harrison Street Monroe, Michigan 48161
Michael Keegan
E-mail: mkeeganj@comcast.net Terry J. Lodge, Counsel for CEA, Don't Waste Michigan, and Green Party of Ohio
316 N. Michigan Street, Suite 520
Toledo, OH 43604-5627
E-mail: tjlodge50@yahoo.com Beyond Nuclear 6930 Carroll Avenue Suite 400
Takoma Park, Md. 20912 Kevin Kamps E-mail : kevin@beyondnuclear.org Paul Gunter
E-mail : paul@beyondnuclear.org
[Original signed by Christine M. Pierpoint ] Office of the Secretary of the Commission
Dated at Rockville, Maryland
this 13 th day of February 2012