ML12053A188: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 3: | Line 3: | ||
| issue date = 05/18/2012 | | issue date = 05/18/2012 | ||
| title = Plants, Units 1, 2, and 3 - Letter - Confirmatory Order (Effective Immediately) (TAC Nos. ME7841, ME7842, and ME7843) | | title = Plants, Units 1, 2, and 3 - Letter - Confirmatory Order (Effective Immediately) (TAC Nos. ME7841, ME7842, and ME7843) | ||
| author name = Zimmerman R | | author name = Zimmerman R | ||
| author affiliation = NRC/OE | | author affiliation = NRC/OE | ||
| addressee name = Swafford P | | addressee name = Swafford P | ||
| addressee affiliation = Tennessee Valley Authority | | addressee affiliation = Tennessee Valley Authority | ||
| docket = 05000259, 05000260, 05000296 | | docket = 05000259, 05000260, 05000296 | ||
Line 25: | Line 25: | ||
==Dear Mr. Swafford:== | ==Dear Mr. Swafford:== | ||
The enclosed Confirmatory Order is being issued to the Tennessee Valley Authority (TVA, the licensee) to revise the date for the submittal of an acceptable license amendment request to transition the Browns Ferry Nuclear Plant (BFN) Units 1, 2, and 3, to the National Fire Protection Association (NFPA) Standard 805, "Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants," in accordance with Section 50.48(c) to Title 10 of the Code of Federal Regulations (10 CFR). In a March 4,2009 letter (Agencywide Documents Access and Management System (ADAMS) Accession No. ML090650597), TVA notified the Nuclear Regulatory Commission (NRC) of its intent to transition the BFN units to NFPA 805, and to submit its license amendment application by March 4, 2012. This Order is being issued as a result of TVA's revised commitment, provided in a letter dated January 13, 2012 (ADAMS Accession No. | The enclosed Confirmatory Order is being issued to the Tennessee Valley Authority (TVA, the licensee) to revise the date for the submittal of an acceptable license amendment request to transition the Browns Ferry Nuclear Plant (BFN) Units 1, 2, and 3, to the National Fire Protection Association (NFPA) Standard 805, "Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants," in accordance with Section 50.48(c) to Title 10 of the Code of Federal Regulations (10 CFR). In a March 4,2009 letter (Agencywide Documents Access and Management System (ADAMS) Accession No. ML090650597), TVA notified the Nuclear Regulatory Commission (NRC) of its intent to transition the BFN units to NFPA 805, and to submit its license amendment application by March 4, 2012. This Order is being issued as a result of TVA's revised commitment, provided in a letter dated January 13, 2012 (ADAMS Accession No. ML12017A186), and supplemental information TVA provided in letters dated February 17, 2012, and March 20,2012 (ADAMS Accession Nos. ML12053A019 and ML12083A198) to submit its license amendment request by March 29, 2013. As a part of its initiative to address longstanding fire protection issues, the NRC has exercised enforcement discretion for most fire protection noncompliances identified during a licensee's transition to NFPA 805, and for certain existing identified noncompliances that reasonably may be resolved at the completion of this transition. | ||
In order to receive enforcement discretion for these noncompliances, the licensee must meet the specific criteria stated in Section 9.1, "Enforcement Discretion for Certain Fire Protection Issues (10 CFR 50.48)," of the NRC Enforcement Policy (ADAMS Accession No. ML093480037), and submit an acceptable license amendment application by the date specified in the licensee's commitment letter. TVA's newly proposed submittal date of March 29, 2013, is beyond the 3-year timeframe and, thus, exceeds its enforcement discretion (Le., until March 4, 2012) that was granted to BFN for certain fire protection noncompliances. | In order to receive enforcement discretion for these noncompliances, the licensee must meet the specific criteria stated in Section 9.1, "Enforcement Discretion for Certain Fire Protection Issues (10 CFR 50.48)," of the NRC Enforcement Policy (ADAMS Accession No. ML093480037), and submit an acceptable license amendment application by the date specified in the licensee's commitment letter. TVA's newly proposed submittal date of March 29, 2013, is beyond the 3-year timeframe and, thus, exceeds its enforcement discretion (Le., until March 4, 2012) that was granted to BFN for certain fire protection noncompliances. | ||
P. Swafford -The NRC may accept a revised date for the submittal of an acceptable license amendment request to transition to NFPA 805, and continue enforcement discretion, if the licensee provides adequate justification. | P. Swafford -The NRC may accept a revised date for the submittal of an acceptable license amendment request to transition to NFPA 805, and continue enforcement discretion, if the licensee provides adequate justification. | ||
Line 88: | Line 88: | ||
Distribution via Listserv Distribution: | Distribution via Listserv Distribution: | ||
Public RidsNrrDorILPL2-2 RidsRgn2MailCenter LPL2-2 R/F RidsNrrDra RidsSecyMailCenter MKotzalas. | Public RidsNrrDorILPL2-2 RidsRgn2MailCenter LPL2-2 R/F RidsNrrDra RidsSecyMailCenter MKotzalas. | ||
EDO RidsNrrDssStsb SBurneli MAshley RidsNrrLABClayton RidsOgcRP RidsAcrsAcnw_MailCTR RidsNrrOd Resource RidsNrrDorl RidsNrrDirs RidsNrrPMBrownsFerry OE R/F ADAM S Accession No. Package | EDO RidsNrrDssStsb SBurneli MAshley RidsNrrLABClayton RidsOgcRP RidsAcrsAcnw_MailCTR RidsNrrOd Resource RidsNrrDorl RidsNrrDirs RidsNrrPMBrownsFerry OE R/F ADAM S Accession No. Package ML120533282 FRN ML12053A190 A L TR ML 1 053A 188 L OFFICE I NAME | ||
* DATE I OFFICE NAME I DATE DORULPL2-2/PM EBrown 04/24112 DORL:D MEvans (AHowe for) 05/03112 DORULPL2-21LA DORULPL2-21BC BClayton DBroaddus 04124112 04125/12 DRA:D DIRS:Enf. | * DATE I OFFICE NAME I DATE DORULPL2-2/PM EBrown 04/24112 DORL:D MEvans (AHowe for) 05/03112 DORULPL2-21LA DORULPL2-21BC BClayton DBroaddus 04124112 04125/12 DRA:D DIRS:Enf. | ||
JGiitter JLubinski 04/26/12 05/03112 TechEd* JDougherty 4119112 OGC* MLemoncelli 05/16/12 RII/RA VMcCree 05101112 OE:D RZimmerman 05/18112 | JGiitter JLubinski 04/26/12 05/03112 TechEd* JDougherty 4119112 OGC* MLemoncelli 05/16/12 RII/RA VMcCree 05101112 OE:D RZimmerman 05/18112 | ||
* Via e-mail OFFICIAL RECORD COpy}} | * Via e-mail OFFICIAL RECORD COpy}} |
Revision as of 02:58, 29 June 2019
ML12053A188 | |
Person / Time | |
---|---|
Site: | Browns Ferry |
Issue date: | 05/18/2012 |
From: | Zimmerman R NRC/OE |
To: | Swafford P Tennessee Valley Authority |
Brown, Eva A. | |
Shared Package | |
ML12053A328 | List: |
References | |
TAC ME7841, TAC ME7842, TAC ME7843, EA-12-071 | |
Download: ML12053A188 (16) | |
Text
UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555"()001 May 18, 2012 EA-12-071 Mr. Preston D.
Chief Nuclear Officer Executive Vice Tennessee Valley 3R Lookout 1101 Market Chattanooga, TN BROWNS FERRY NUCLEAR PLANT, UNITS 1,2, AND 3 -
ORDER (EFFECTIVE
Dear Mr. Swafford:
The enclosed Confirmatory Order is being issued to the Tennessee Valley Authority (TVA, the licensee) to revise the date for the submittal of an acceptable license amendment request to transition the Browns Ferry Nuclear Plant (BFN) Units 1, 2, and 3, to the National Fire Protection Association (NFPA) Standard 805, "Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants," in accordance with Section 50.48(c) to Title 10 of the Code of Federal Regulations (10 CFR). In a March 4,2009 letter (Agencywide Documents Access and Management System (ADAMS) Accession No. ML090650597), TVA notified the Nuclear Regulatory Commission (NRC) of its intent to transition the BFN units to NFPA 805, and to submit its license amendment application by March 4, 2012. This Order is being issued as a result of TVA's revised commitment, provided in a letter dated January 13, 2012 (ADAMS Accession No. ML12017A186), and supplemental information TVA provided in letters dated February 17, 2012, and March 20,2012 (ADAMS Accession Nos. ML12053A019 and ML12083A198) to submit its license amendment request by March 29, 2013. As a part of its initiative to address longstanding fire protection issues, the NRC has exercised enforcement discretion for most fire protection noncompliances identified during a licensee's transition to NFPA 805, and for certain existing identified noncompliances that reasonably may be resolved at the completion of this transition.
In order to receive enforcement discretion for these noncompliances, the licensee must meet the specific criteria stated in Section 9.1, "Enforcement Discretion for Certain Fire Protection Issues (10 CFR 50.48)," of the NRC Enforcement Policy (ADAMS Accession No. ML093480037), and submit an acceptable license amendment application by the date specified in the licensee's commitment letter. TVA's newly proposed submittal date of March 29, 2013, is beyond the 3-year timeframe and, thus, exceeds its enforcement discretion (Le., until March 4, 2012) that was granted to BFN for certain fire protection noncompliances.
P. Swafford -The NRC may accept a revised date for the submittal of an acceptable license amendment request to transition to NFPA 805, and continue enforcement discretion, if the licensee provides adequate justification.
In a public meeting held on December 8,2011, and in its January 13, 2012 letter, TVA explained the NFPA 805 transition strategy implemented at BFN and stated that the development of a high-quality application will require more time than originally anticipated.
The BFN transition strategy includes implementing modifications, described in its February 17, 2012 letter, that address fire protection noncompliances that are not covered under NFPA 805 enforcement discretion, in parallel with the development of its license amendment application.
The NRC recognizes that these additional modifications, among other activities, are intended to improve BFN site fire safety. In its March 20, 2012 letter, the licensee provided justification for the revised submittal date, and a schedule for the remaining key activities and major milestones for completing its NFPA 805 application.
The NRC staff reviewed the licensee's compensatory measures, additional modifications, and submittal schedule.
Based on the maintenance of acceptable compensatory measures, the planned improvements, proposed modifications, and continued progress toward the submittal of a high quality amendment request, the NRC staff finds that TVA has provided adequate justification for a delay in the submittal date for its NFPA 805 amendment request. This Order constitutes the NRC's acceptance of the proposed March 29, 2013 submittal date. With this acceptance, enforcement discretion will continue for certain fire protection noncompliances for BFN Units 1, 2 and 3 until March 29, 2013, if the conditions as stated in this Order are met. The enclosed Order is effective immediately.
It confirms the commitment made in the TVA correspondence cited above. TVA has agreed to this Order to illustrate its continued commitment to transition to NFPA 805. As evidenced by your Signed "Consent and Hearing Waiver Form" (copy enclosed) dated May 16,2012, you agreed to the issuance of this Order and to waive hearing rights. Pursuant to Section 223 of the Atomic Energy Act of 1954, as amended, any person who willfully violates, attempts to violate, or conspires to violate, any provision of this Order shall be subject to criminal prosecution as set forth in that section. Violation of this Order also may subject the person to civil monetary penalty.
o Ice of Enforcement P. Swafford -In accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter and its enclosure(s) will be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (ADAMS), accessible from the NRC website at rm/adams.html.
The NRC also includes significant enforcement actions on its website at http://www.nrc.gov/reading-rm/doc-collections/enforcementlactions
/. Sincerely, Docket Nos.: 50-259, 50-260, and 50-296 License Nos.: DPR-33, DPR-52, and DPR-68
Enclosures:
- 1. Consent and Hearing Waiver Form 2. Confirmatory Order cc wI enclosure:
Distribution via Listserv Enclosure Consent and Hearing Waiver CONSENT AND HEARING WAIVER FORM The Tennessee Valley Authority rrVA). hereby agrees Ie comply with the terms and conditions of the Confirmatory Order arising out of a cDmmitMent made in a i*:tter from TVA dated January 13.2012. The Tennessee Va!iey Autho:!ty unaerstands that the Confirmatory wii! be immediately effective upon its issuance.
By signing below, Tennessee Valley Author!ty, consents to the issuance of the referenced Confirmatory Ortier, effective immediately upon its Issuance and, by doing so, agrees to waive the right 7Q request a hearing on atl or ,my part cf the Confirmatory Order.
Enclosure Confirmatory Order Modifying License (Effective Immediately)
[7590-01-P]
NUCLEAR REGULATORY COMMISSION
[NRC-2012-XXXXJ In the Matter of Tennessee Valley Authority (Browns Ferry Units 1, 2, and 3) ) ) ) ) Docket Nos. 50-259, 50-260, and 50-296 license Nos. DPR-33, DPR-52, and DPR-68 EA-12-071 CONFIRMATORY ORDER MODIFYING LICENSE (EFFECTIVE IMMEDIATELY)
The Tennessee Valley Authority (TVA, the licensee) is the holder of Renewed Facility Operating license Nos. DPR-33, DPR-52, and DPR-68 issued by the U.S. Nuclear Regulatory Commission (NRC or Commission) pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 50, "Domestic licensing of Production and Utilization," on May 4,2006. The licenses authorize the operation of the Browns Ferry Nuclear Plant (BFN), Units 1, 2, and 3 (facility), in accordance with conditions specified therein. The facility is located on the licensee's site in limestone County, Alabama. II On March 4,2009, TVA notified the NRC of its intent to transition the BFN facility to the National Fire Protection Association (NFPA) Standard 805 fire protection program in accordance with 10 CFR 50.48(c).
Under this initiative, the NRC has exercised enforcement discretion for most fire protection noncompliances that are identified during the licensee's transition to NFPA 805, and for certain existing identified noncompliances that reasonably may
-be resolved at the completion of transition.
NFPA 805 was adopted in 10 CFR 50.48(c) as an alternative fire protection rule, which is one path to resolving longstanding fire protection issues. To receive enforcement discretion for these noncompliances, the licensee must meet the specific criteria as stated in Section 9.1, "Enforcement Discretion for Certain Fire Protection Issues (10 CFR 50.48)," of the "NRC Enforcement Policy," dated July 12,2011, and submit an acceptable license amendment application by the date as specified in the licensee's commitment letter. In a public meeting held on December 8, 2011 between the NRC and TVA, the licensee described its strategy for transitioning BFN to NFPA 805, which is intended to address the corrective actions for previously-cited fire protection violations along with other noncompliances identified during the transition period. TVA also notified the NRC that the development of a high-quality application will require more time than originally anticipated. In a letter dated January 13, 2012, TVA reiterated the current transition strategy for BFN, and notified the NRC that TVA will submit its license amendment request (LAR) no later than March 29,2013. The newly proposed submittal date is beyond the 3-yeartimeframe and, thus, exceeds TVA's enforcement discretion (Le., until March 4,2012) that was granted to BFN for certain fire protection noncompliances.
However, if provided with adequate justification, the NRC may revise the submittal date through the use of an order that would continue the enforcement discretion provided in Section 9.1 of the Enforcement Policy. In a letter dated February 17, 2012, TVA provided a list of planned fire risk reduction modifications at BFN and the associated planned implementation schedules.
The NRC held a public teleconference with TVA on February 29,2012, to discuss the planned modifications and their associated fire risk reductions, and TVA's schedule for completing its LAR. During the teleconference, TVA expressed a desire to continue enforcement discretion, and a willingness to commit to the new submittal date. By letter dated March 9, 2012, the NRC requested that TVA provide additional justification for the proposed submittal date. TVA provided the requested information in a letter dated March 20, 2012. Based on the licensee maintaining acceptable compensatory measures and the NRC's review of the licensee's transition status, planned key activities to complete its NFPA 805 LAR, and planned fire risk reduction modifications, the NRC staff has determined that the licensee has provided adequate justification for revising the LAR submittal date. Therefore, the NRC has determined that the date for submitting an acceptable NFPA 805 LAR should be extended.
This Order is being issued to revise the original TVA LAR submittal date of March 4,2012, until March 29,2013. The new submittal date supports TVA's continued progress in activities related to the transition to NFPA 805 and the correction of other previously-identified fire protection noncompliances consistent with regulatory commitments provided in letters dated January 13 and February 17, 2012, and the activities described in the letter dated March 20, 2012. TVA may, at any time, cease its transition to NFPA 805 and comply with the regulations set forth in 10 CFR Part 50, Appendix R. As indicated in the Enforcement Policy, if TVA decides not to complete the transition to 10 CFR 50.48(c), it must submit a letter stating its intent to retain its existing licensing basis and withdrawing its letter of intent to comply with 10 CFR 50.48(c).
If TVA fails to meet the new LAR submittal date and fails to comply with its existing licensing basis, the NRC will take appropriate enforcement action consistent with its Enforcement Policy.
On May 16, 2012, TVA consented to issuing this Order, as described in Section V below. TVA further agreed that this Order will be effective upon issuance and that it has waived its rights to a hearing. IV Based on the licensee maintaining acceptable compensatory measures, and a review of the licensee's status and planned key activities, including the intended NFPA 805 modifications, the NRC has determined that the licensee has provided adequate justification for its commitment given in Section V, and, thus, for the extension of enforcement discretion.
Because the licensee will perform modifications, with associated procedure updates, to reduce current fire risk in parallel with the development of their NFPA 805 LAR, the staff finds this acceptable to ensure public health and safety. Based on the above and TVA's consent, this Order is immediately effective upon issuance.
V Accordingly, pursuant to Sections 103, 161b, 161i, 1610, 182, and 186 of the Atomic Energy Act of 1954, as amended, and the Commission's regulations in 10 CFR 2.202, "Orders," IT IS HEREBY ORDERED, EFFECTIVE IMMEDIATELY, THAT LICENSE NOS. DPR-33, DPR-52, AND DPR-68 ARE MODIFIED AS FOLLOWS: TVA will submit an acceptable license amendment request for Browns Ferry Nuclear Plant, Units 1, 2, and 3, to adopt NFPA Standard 805 by no later than March 29, 2013.
-TVA will continue to receive enforcement discretion until March 29, 2013. If the NRC finds that the LAR is not acceptable, the NRC will take steps consistent with the Enforcement Policy. The Director of the Office of Enforcement, in consultation with the Director of the Office of Nuclear Reactor Regulation, may, in writing, relax or rescind any of the above conditions upon demonstration by the licensee of good cause. VI In accordance with 10 CFR 2.202, the licensee must, and any other person adversely affected by this Order may, submit an answer to this Order within 20 days of its publication in the Federal Register.
In addition, any other person adversely affected by this Order may request a hearing on this Order within 20 days of its publication in the Federal Register.
Where good cause is shown, consideration will be given to extending the time to answer or request a hearing. A request for extension of time must be directed to the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, and include a statement of good cause for the extension.
If a hearing is requested by a person whose interest is adversely affected, the Commission will issue an Order designating the time and place of any hearings.
If a hearing is held, the issue to be considered at such hearing shall be whether this Order should be sustained.
All documents filed in NRC adjudicatory proceedings, including a request for hearing, a petition for leave to intervene, any motion or other document filed in the proceeding prior to the submission of a request for hearing or petition to intervene, and documents filed by interested governmental entities participating under 10 CFR 2.315(c), must be filed in accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007). The E-Filing process requires participants to submit and serve all adjudicatory documents over the internet, or in some cases to mail copies on electronic storage media. Participants may not submit paper copies of their filings unless they seek an exemption in accordance with the procedures described below. To comply with the procedural requirements of E-Filing, at least 10 days prior to the filing deadline, the participant should contact the Office of the Secretary bye-mail at hearing.docket@nrc.gov , or by telephone at (301) 415-1677, to request (1) a digitallD certificate, which allows the participants (or its counselor representative) to digitally sign documents and access the E-Submittal server for any proceeding in which it is participating; and (2) advise the Secretary that the participant will be submitting a request or petition for hearing (even in instances in which the participant, or its counselor representative, already holds an NRC-issued digitallD certificate).
Based upon this information, the Secretary will establish an electronic docket for the hearing in this proceeding if the Secretary has not already established an electronic docket. Information about applying for a digitallD certificate is available on NRC's public Web site at http://www.nrc.gov/sife-helple-submittalslapplv-cerfificates.html. System requirements for accessing the E-Submittal server are detailed in NRC's "Guidance for Electronic Submission," which is available on the agency's public Web site at http://www.nrc.gov/sitehelple-submittals.html.
Participants may attempt to use other software not listed on the web site, but should note that the NRC's E-Filing system does not support unlisted software, and the NRC Meta System Help Desk will not be able to offer assistance in using unlisted software.
If a participant is electronically submitting a document to the NRC in accordance with the E-Filing rule, the participant must file the document using the NRC's online, web-based submission form. In order to serve documents through the Electronic Information Exchange,
-7 users will be required to install a web browser plug-in from the NRC web site. Further information on the web-based submission form, including the installation of the Web browser plug-in, is available on the NRC's public web site at submittals.
html. Once a participant has obtained a digitallD certificate and a docket has been created, the participant can then submit a request for hearing or petition for leave to intervene.
Submissions should be in Portable Document Format (pdf) in accordance with NRC guidance available on the NRC public Web site at htte:llwww.nrc.govlsite-helP/e-submittals.htmI.Afiling is considered complete at the time the documents are submitted through the NRC's E-Filing system. To be timely, an electronic filing must be submitted to the E-Filing system no later than 11 :59 p.m. Eastern Time on the due date. Upon receipt of a transmission, the E-Filing system time-stamps the document and sends the submitter an e-mail notice confirming receipt of the document.
The E-Filing system also distributes an e-mail notice that provides access to the document to the NRC Office of the General Counsel and any others who have advised the Office of the Secretary that they wish to participate in the proceeding, so that the filer need not serve the documents on those participants separately.
Therefore, applicants and other participants (or their counselor representative) must apply for and receive a digitallD certificate before a hearing request/petition to intervene is filed so that they can obtain access to the document via the E-Filing system. A person filing electronically using the agency's adjudicatory E-Filing system may seek assistance by contacting the NRC Meta System Help Desk through the "Contact Us" link located on the NRC web site at htte:11www.nrc.gov/site-heJP/e-submittals.htmJ.by e-mail at MSHD.Resource@nrc.gov , or by a toll-free call at (866) 672-7640.
The NRC Meta System Help
-Desk is available between 8 a.m. and 8 p.m., Eastern Time, Monday through Friday, excluding government holidays.
Participants who believe that they have a good cause for not submitting documents electronically must file an exemption request, in accordance with 10 CFR 2.302(g), with their initial paper filing requesting authorization to continue to submit documents in paper format. Such filings must be submitted by: (1) first class mail addressed to the Office of the Secretary of the Commission, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention:
Rulemaking and Adjudications Staff; or (2) courier, express mail, or expedited delivery service to the Office of the Secretary, Sixteenth Floor, One White Flint North, 11555 Rockville Pike, Rockville, Maryland, 20852, Attention:
Rulemaking and Adjudications Staff. Participants filing a document in this manner are responsible for serving the document on all other participants.
Filing is considered complete by first-class mail as of the time of deposit in the mail, or by courier, express mail, or expedited delivery service upon depositing the document with the provider of the service. A presiding officer, having granted an exemption request from using E-Filing, may require a participant or party to use E-Filing if the presiding officer subsequently determines that the reason for granting the exemption from use of E-Filing no longer exists. Documents submitted in adjudicatory proceedings will appear in NRC's electronic hearing docket, which is available to the public at http://ehd.nrc.gov/EHD Proceeding( home. asp, unless excluded pursuant to an order of the Commission, or the presiding officer. Participants are requested not to include personal privacy information, such as social security numbers, home addresses, or home phone numbers in their filings, unless an NRC regulation or other law requires submission of such information.
With respect to copyrighted works, except for limited excerpts that serve the purpose of the adjudicatory filings and would constitute a Fair
-Use application, participants are requested not to include copyrighted materials in their submission.
If a person other than the licensee requests a hearing, that person shall set forth with particularity the manner in which his interest is adversely affected by this Order and shall address the criteria set forth in 10 CFR 2.309(d) and (t). In the absence of any request for hearing, or written approval of an extension of time in which to request a hearing, the provisions specified in Section V above shall be final 20 days from the date of this Order without further order or proceedings.
If an extension of time for requesting a hearing has been approved, the provisions specified in Section V shall be final when the extension expires if a hearing request has not been received.
AN ANSWER OR A REQUEST FOR HEARING SHALL NOT STAY THE IMMEDIATE EFFECTIVENESS OF THIS ORDER. For The Nuclear Regulatory Dated at Rockville, Maryland this 18 th of May Director Enforcement P. Swafford -In accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter and its enclosure(s) will be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (ADAMS), accessible from the NRC website at rm/adams.html.
The NRC also includes significant enforcement actions on its website at http://www.nrc.gov/reading-rm/doc-collections/enforcementiac tions/. Sincerely, IRA! Roy P. Zimmerman, Director Office of Enforcement Docket Nos.: 50-259, 50-260, and 50-296 License Nos.: DPR-33, DPR-52, and DPR-68
Enclosures:
- 1. Consent and Hearing Waiver Form 2. Confirmatory Order cc wi enclosure:
Distribution via Listserv Distribution:
Public RidsNrrDorILPL2-2 RidsRgn2MailCenter LPL2-2 R/F RidsNrrDra RidsSecyMailCenter MKotzalas.
EDO RidsNrrDssStsb SBurneli MAshley RidsNrrLABClayton RidsOgcRP RidsAcrsAcnw_MailCTR RidsNrrOd Resource RidsNrrDorl RidsNrrDirs RidsNrrPMBrownsFerry OE R/F ADAM S Accession No. Package ML120533282 FRN ML12053A190 A L TR ML 1 053A 188 L OFFICE I NAME
- DATE I OFFICE NAME I DATE DORULPL2-2/PM EBrown 04/24112 DORL:D MEvans (AHowe for) 05/03112 DORULPL2-21LA DORULPL2-21BC BClayton DBroaddus 04124112 04125/12 DRA:D DIRS:Enf.
JGiitter JLubinski 04/26/12 05/03112 TechEd* JDougherty 4119112 OGC* MLemoncelli 05/16/12 RII/RA VMcCree 05101112 OE:D RZimmerman 05/18112
- Via e-mail OFFICIAL RECORD COpy