PLA-6884, Withdrawal of Proposed Relief Request No. 3RR-19 to the Third 10-Year Inservice Inspection Program: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 08/03/2012
| issue date = 08/03/2012
| title = Withdrawal of Proposed Relief Request No. 3RR-19 to the Third 10-Year Inservice Inspection Program
| title = Withdrawal of Proposed Relief Request No. 3RR-19 to the Third 10-Year Inservice Inspection Program
| author name = Helsel J M
| author name = Helsel J
| author affiliation = PPL Susquehanna, LLC
| author affiliation = PPL Susquehanna, LLC
| addressee name =  
| addressee name =  

Revision as of 16:48, 23 June 2019

Withdrawal of Proposed Relief Request No. 3RR-19 to the Third 10-Year Inservice Inspection Program
ML12216A095
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 08/03/2012
From: Helsel J
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PLA-6884
Download: ML12216A095 (2)


Text

\ I I Jeffrey M. Helsel Nuclear Plant Manager PPL Susquehanna, LLC 7 69 Salem Boulevard Berwick , P A 18603 Tel. 5 7 0.542.3510 Fax 5 7 0.542.1504 \ ' I I I ' \ t I I I .I .. , Pp .l==: ...... TM U.S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-P1-17 Washington, DC 20555 SUSQUEHANNA STEAM ELECTRIC STATION WITHDRAWAL OF PROPOSED RELIEF REQUEST NO. 3RR-19 TO THE THIRD 10-YEAR INSERVICE INSPECTION PROGRAM FOR SUSQUEHANNA UNITS 1AND2 PLA-6884 Docket Nos. 50-387 and 50-388

Reference:

Letter (PLA-6847)from J. M. Helsel (PPL) to USNRC (Document Control Desk) Titled "Proposed Relief Request No. JRR-19 to the Third 10-Year lnservice Inspection Program for Susquehanna SES Units 1 and 2," dated April24, 2012. In the above referenced letter, PPL Susquehanna, LLC (PPL) requested the approval of Relief Request No. 3RR-19 to the Third 10-Year Inservice Inspection Program for Susquehanna SES Units 1 and 2. This Relief Request proposed the approval of ASME Code Case N-702 for use at Susquehanna SES. BWRVIP-108 is the technical basis used to implement the Code Case. Recent operating experience pointed out that not all design assumptions required for the use of BWRVIP-108 have been taken into consideration by the industry.

Most of these assumptions are called out under the Assumptions section of the BWRVIP document.

One assumption, however, was found in a later section of the BWRVIP-108 document and was not validated prior to submittal of the Relief Request. The assumption that was missed is that the number of thermal cycles (start-up and shut down) is assumed to be 40 or less over a 40-year plant life. This assumption is too conservative for most of the BWR fleet and Susquehanna exceeded this number well before its 40-year plant life. The problem of over-conservatism regarding the number of thermal cycles has been discussed with EPRI. EPRI/BWRVIP is working to correct/revise the BWRVIP-108 document so that it reflects a more realistic plant thermal cycle. At this time, there is no timeframe established for revision and publication of a revised BWRVIP-108 document.

Since design assumption on the number of thermal cycles has been exceeded, PPL requests that proposed Relief Request No. 3RR-19 be withdrawn. Document Control Desk PLA-6884 If you have any questions or require additional information, please contact Mr. John L. Tripoli, Nuclear Regulatory Affairs Manager, at (570) 542-3100.

Copy: NRC Region I Mr. P. W. Finney, NRC Sr. Resident Inspector Ms. C. J. Sanders, RC Project Manager Mr. L. J. Winker, DEP/BRP