ML12338A688: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 11/05/2008
| issue date = 11/05/2008
| title = Official Exhibit - ENT000324-00-BD01 - Email Notification from Donald Mayer, Director, IPEC Unit 1, Entergy, to John White, Branch Chief, Radiation Protection, NRC Region 1, Subject: Indian Point 1 (Nov. 5, 2008)
| title = Official Exhibit - ENT000324-00-BD01 - Email Notification from Donald Mayer, Director, IPEC Unit 1, Entergy, to John White, Branch Chief, Radiation Protection, NRC Region 1, Subject: Indian Point 1 (Nov. 5, 2008)
| author name = Mayer D M
| author name = Mayer D
| author affiliation = Entergy Nuclear Operations, Inc, Indian Point Energy Center
| author affiliation = Entergy Nuclear Operations, Inc, Indian Point Energy Center
| addressee name =  
| addressee name =  

Revision as of 11:47, 22 June 2019

Official Exhibit - ENT000324-00-BD01 - Email Notification from Donald Mayer, Director, IPEC Unit 1, Entergy, to John White, Branch Chief, Radiation Protection, NRC Region 1, Subject: Indian Point 1 (Nov. 5, 2008)
ML12338A688
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 11/05/2008
From: Mayer D
Entergy Nuclear Operations, Indian Point
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 22135, 50-247-LR, 50-286-LR, ASLBP 07-858-03-LR-BD01
Download: ML12338A688 (1)


Text

ENT000324 Submitted: March 29, 2012 United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of

Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3)

ASLBP #:07-858-03-LR-BD01 Docket #:05000247 l 05000286 Exhibit #:

Identified:

Admitted: Withdrawn:

Rejected: Stricken: Other: ENT000324-00-BD01 10/15/2012 10/15/2012" ... V-Po. REG(f<.o,,,, . . . "' i ....... '" s-o + Jf-** ** From: Sent: To:

Subject:

John-Mayer , Donald M Wednesday , November 5 , 20084:10 PM 'jrw 1@nrc.gov' Indian Point 1 I am happy to report that we have completed the draining and de-sludging ofthe Unit 1 fuel pools. The fuel has been safely removed from the west pool (as of 9/19/08), the fuel pools are drained (as of 10/15/08) and de-most contaminated (west pool) has had a fixative (coating) applied to minimize the potential for future airborne contamination (this was completed today). This ends an important project for IPEC which has terminated the leakage from the Unit 1 spent fuel pools thus stopping the introduction of radiological contaminants to the underlying groundwater from this source. The contamination of ground water as a result of an actively leaking pool complex at Unit 1 has been terminated.

Not insignificantly this was completed with no personnel safety or radiological issues and for dose which was ALARA and below our goal. Don D o n Ma ye r Dir e ct o r, U nit 1 E nter gy Nuclear Indian Point Energy Center (w) 9148 27-77 1 6 (c) 9 14 582-690 1 Confidential IPEC001287826