Official Exhibit - ENT000324-00-BD01 - Email Notification from Donald Mayer, Director, IPEC Unit 1, Entergy, to John White, Branch Chief, Radiation Protection, NRC Region 1, Subject: Indian Point 1 (Nov. 5, 2008)
ML12338A688
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 11/05/2008
From: Mayer D
Entergy Nuclear Operations, Indian Point
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 22135, 50-247-LR, 50-286-LR, ASLBP 07-858-03-LR-BD01
Download: ML12338A688 (1)


Text

United States Nuclear Regulatory Commission Official Hearing Exhibit Entergy Nuclear Operations, Inc.

In the Matter of:

(Indian Point Nuclear Generating Units 2 and 3)

"...V-Po. REG(f<.o,,,, ASLBP #: 07-858-03-LR-BD01

.l~'~.

Docket #: 05000247 l 05000286 Exhibit #: ENT000324-00-BD01 Identified: 10/15/2012

~

Admitted: 10/15/2012 Withdrawn:

~ "' i

. . .'". o +s- Rejected: Stricken:

Jf-** ** Other: ENT000324 Submitted: March 29, 2012 From: Mayer, Donald M Sent: Wednesday, November 5, 20084:10 PM To: 'jrw 1@nrc.gov'

Subject:

Indian Point 1 John-I am happy to report that we have completed the draining and de-sludging ofthe Unit 1 fuel pools. The fuel has been safely removed from the west pool (as of 9/19/08), the fuel pools are drained (as of 10/15/08) and de-

---sludge-eper-ati0ns-are-e0mpieted-(-10/-3-l-f08}-As-an-adcled-meaStire-f-t)r-I-()ng~term-SAF-S'feR-maintenanee-the:-e- - - -

most contaminated (west pool) has had a fixative (coating) applied to minimize the potential for future airborne contamination (this was completed today). This ends an important project for IPEC which has terminated the leakage from the Unit 1 spent fuel pools thus stopping the introduction of radiological contaminants to the underlying groundwater from this source. The contamination of ground water as a result of an actively leaking pool complex at Unit 1 has been terminated.

Not insignificantly this was completed with no personnel safety or radiological issues and for dose which was ALARA and below our goal.

Don Don Mayer Director, Unit 1 Entergy Nuclear Indian Point Energy Center (w) 914827 -77 16 (c) 914 582-690 1 Confidential IPEC001287826