ML15245A739: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 3: | Line 3: | ||
| issue date = 09/03/2015 | | issue date = 09/03/2015 | ||
| title = EN-15-025, Issuance of Final Significance Determination and Notice of Violation, Entergy Operations, Inc., River Bend, (EA-15-043) | | title = EN-15-025, Issuance of Final Significance Determination and Notice of Violation, Entergy Operations, Inc., River Bend, (EA-15-043) | ||
| author name = Hilton N | | author name = Hilton N | ||
| author affiliation = NRC/OE | | author affiliation = NRC/OE | ||
| addressee name = | | addressee name = | ||
Line 9: | Line 9: | ||
| docket = 05000455 | | docket = 05000455 | ||
| license number = | | license number = | ||
| contact person = Wray J | | contact person = Wray J | ||
| case reference number = EA-15-043, EN-15-025 | | case reference number = EA-15-043, EN-15-025 | ||
| document type = Enforcement Notification | | document type = Enforcement Notification |
Revision as of 18:03, 20 June 2019
ML15245A739 | |
Person / Time | |
---|---|
Site: | Byron |
Issue date: | 09/03/2015 |
From: | Nick Hilton NRC/OE |
To: | |
Wray J | |
References | |
EA-15-043, EN-15-025 | |
Download: ML15245A739 (2) | |
Text
September 3, 2015 EN 15-025 OFFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION Licensee: Entergy Operations, Inc. EA-15-043 River Bend Station Docket No.: 50-458
Subject:
ISSUANCE OF FINAL SIGNIFICANCE DETERMINATION AND NOTICE OF VIOLATION This is to inform the Commission that a Notice of Violation will be issued on or about September 10, 2015, to Entergy Operations, Inc. (Entergy) for a violation associated with a White Significance Determination Process finding identified during an inspection of River Bend Station.
This White finding, an issue of low to moderate safety significance, involves the failure to maintain the simulator so it would accurately reproduce the operating characteristics of the facility. Specifically, the River Bend Station simulator failed to accurately model feedwater flow and reactor vessel level response following a scram, failed to provide the correct alarm response for loss of a reactor protection system motor generator set, and failed to correctly model the operation of the startup feedwater regulating valve.
A Notice of Violation is included based on Entergy's failure to meet 10 CFR Part 55.46(c)(1),
"Plant-Referenced Simulators," which requires, in part, that a simulator, "-must demonstrate expected plant response to operator input and to normal, transient, and accident conditions to which the simulator has been designed to respond." In accordance with the NRC Enforcement Policy, the NOV is considered an escalated enforcement action because it is associated with a White finding.
Entergy provided a written response in a letter dated July 30, 2015, and agreed with the finding and the violation. After reviewing the information developed during the inspection, and the information provided by Entergy, the staff concluded that the finding is appropriately characterized as White.
It should be noted that the licensee has not been specifically informed of the enforcement action. The schedule of issuance and notification is: Mailing of Final Significance Determination September 10, 2015 Telephone Notification of Licensee September 10, 2015
The State of Louisiana will be notified.
CONTACTS: Robert Carpenter, OE (301) 415-1330
Nick Hilton, OE (301) 415-2741
Distribution: EN-15-025, September 10, 2015 OWFN Chairman Burns Comm. Svinicki Comm. Ostendorff
Comm. Baran SECY OCA OPA OIP OWFN EDO DEDR DEDMRT OE OGC NRR OI OIG TWFN OCFO OIS RES ACRS NRO NMSS 3WFN NSIR OP Center
Regional Offices RI RII
RIII RIV
Electronic DISTRIBUTION: P. Holahan, OE N. Hilton, OE R. Carpenter, OE OE r/f EN binder
X PUBLIC X NON-SENSITIVE
ADAMS ML15245A739 OFFICE OE:ES OE:BC NAME RCarpenter /RA/ by JWray for NHilton DATE 9/2/2015 9/3/2015 OFFICIAL RECORD COPY