EN-15-025, Issuance of Final Significance Determination and Notice of Violation, Entergy Operations, Inc., River Bend, (EA-15-043)
ML15245A739
Person / Time
Site: Byron Constellation icon.png
Issue date: 09/03/2015
From: Nick Hilton
NRC/OE
To:
Wray J
References
EA-15-043, EN-15-025
Download: ML15245A739 (2)


Text

September 3, 2015 EN 15-025 OFFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION Licensee: Entergy Operations, Inc. EA-15-043 River Bend Station Docket No.: 50-458

Subject:

ISSUANCE OF FINAL SIGNIFICANCE DETERMINATION AND NOTICE OF VIOLATION This is to inform the Commission that a Notice of Violation will be issued on or about September 10, 2015, to Entergy Operations, Inc. (Entergy) for a violation associated with a White Significance Determination Process finding identified during an inspection of River Bend Station.

This White finding, an issue of low to moderate safety significance, involves the failure to maintain the simulator so it would accurately reproduce the operating characteristics of the facility. Specifically, the River Bend Station simulator failed to accurately model feedwater flow and reactor vessel level response following a scram, failed to provide the correct alarm response for loss of a reactor protection system motor generator set, and failed to correctly model the operation of the startup feedwater regulating valve.

A Notice of Violation is included based on Entergys failure to meet 10 CFR Part 55.46(c)(1),

Plant-Referenced Simulators, which requires, in part, that a simulator, must demonstrate expected plant response to operator input and to normal, transient, and accident conditions to which the simulator has been designed to respond. In accordance with the NRC Enforcement Policy, the NOV is considered an escalated enforcement action because it is associated with a White finding.

Entergy provided a written response in a letter dated July 30, 2015, and agreed with the finding and the violation. After reviewing the information developed during the inspection, and the information provided by Entergy, the staff concluded that the finding is appropriately characterized as White.

It should be noted that the licensee has not been specifically informed of the enforcement action. The schedule of issuance and notification is:

Mailing of Final Significance Determination September 10, 2015 Telephone Notification of Licensee September 10, 2015 The State of Louisiana will be notified.

CONTACTS: Robert Carpenter, OE (301) 415-1330 Nick Hilton, OE (301) 415-2741

Distribution: EN-15-025, September 10, 2015 OWFN OWFN TWFN 3WFN Regional Offices Chairman Burns EDO OCFO NSIR RI RII Comm. Svinicki DEDR OIS OP Center RIII RIV Comm. Ostendorff DEDMRT RES Comm. Baran OE ACRS MAIL SECY OGC NRO ADAMS OCA NRR NMSS OE staff OPA OI OIP OIG Electronic DISTRIBUTION:

P. Holahan, OE N. Hilton, OE R. Carpenter, OE OE r/f EN binder X PUBLIC X NON-SENSITIVE ADAMS ML15245A739 OFFICE OE:ES OE:BC NAME RCarpenter /RA/ by JWray for NHilton DATE 9/2/2015 9/3/2015 OFFICIAL RECORD COPY