ML17142A216: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 05/19/2017
| issue date = 05/19/2017
| title = Requalification Program Inspection - Vogtle, Units 1 and 2 05000424/2017002 and 05000425/2017002
| title = Requalification Program Inspection - Vogtle, Units 1 and 2 05000424/2017002 and 05000425/2017002
| author name = McCoy G J
| author name = Mccoy G
| author affiliation = NRC/RGN-II/DRS
| author affiliation = NRC/RGN-II/DRS
| addressee name = Taber B K
| addressee name = Taber B
| addressee affiliation = Southern Nuclear Operating Co, Inc
| addressee affiliation = Southern Nuclear Operating Co, Inc
| docket = 05000424, 05000425
| docket = 05000424, 05000425
Line 14: Line 14:
| page count = 3
| page count = 3
}}
}}
See also: [[followed by::IR 05000424/2017002]]
See also: [[see also::IR 05000424/2017002]]


=Text=
=Text=

Revision as of 12:25, 19 June 2019

Requalification Program Inspection - Vogtle, Units 1 and 2 05000424/2017002 and 05000425/2017002
ML17142A216
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 05/19/2017
From: Gerald Mccoy
Division of Reactor Safety II
To: Taber B
Southern Nuclear Operating Co
References
IR 2017002
Download: ML17142A216 (3)


See also: IR 05000424/2017002

Text

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257

May 19, 2017

Mr. B. Keith Taber

Vice President

Southern Nuclear Operating Company, Inc.

Vogtle Electric Generating Plant

7821 River Road

Waynesboro, GA 30830

SUBJECT: REQUALIFICATION PROGRAM INSPECTION - VOGTLE ELECTRIC GENERATING PLANT UNITS 1 AND 2 05000424/2017002 AND

05000425/2017002

Dear Mr. Taber:

In a telephone conversation on May 4, 2017, Mr. David Lanyi, Senior Operations Engineeer and

Mr. Ken Jenkins, Initial Exam Lead made arrangements for the NRC to inspect the licensed operator requalification program at Vogtle Electric Generating Plant Units 1 and 2. The inspection is planned for the week of June 26, 2017, which coincides with your regularly

scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program. It is our understanding that you have committed to maintain your plant-referenced

simulator in accordance with ANSI/ANS-3.5-1985, "American National Standard for Nuclear

Power Plant Simulators for Use in Operator Training and Examination."

In accordance with 10 CFR 55.59, the NRC has requested that you submit June 2, 2017, the

material as specified in paragraph "A" of the Enclosure, in order to support the NRC's inspection

program needs. The NRC has further requested t

hat you have all items as specified in

paragraph "B" of the Enclosure available for review for the inspectors on the first day they arrive on site. Mr. Jenkins has been advised of this request and provided with the name and address

of the NRC lead inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number Part 55 (3150-0018).

The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per

response, including the time for reviewing instructions, gathering and maintaining the data

needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission,

Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov;

and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-

0101), Office of Management and Budget, Washington, DC 20503.

B. Taber 2

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB approval number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice, " a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html. (The Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding this

inspection please contact Mr. Lanyi at (404)

997-4487, (Internet E-mail: david.lanyi@nrc.gov), or me at (404) 997-4551, (Internet E-mail: Gerald.mccoy@nrc.gov).

Sincerely,

/RA/ Gerald J. McCoy, Chief Operations Branch 1 Division of Reactor Safety

Docket Nos.: 50-424, 50-425

License Nos.: NPF-68, NPF-81

Enclosure: Materials Request List

cc: Distribution via Listserv

_________________________ SUNSI REVIEW COMPLETE

FORM 665 ATTACHED OFFICE RII/ OB1 RII/ OB1 SIGNATURE DRL GXM NAME D. Lanyi G. McCoy DATE 5/19/2017 5/19/2017 5/ /2017 5/ /2017 5/ /2017 5/ /2017 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO