| #REDIRECT [[NL-14-0050, Clarification to Proposed Inservice Inspection Alternatives, VEGP-ISI-ALT-05, Version 1 and VEGP-ISI-ALT-06, Version 1]] | | {{Adams |
| | | number = ML14031A429 |
| | | issue date = 01/31/2014 |
| | | title = Clarification to Proposed Inservice Inspection Alternatives, VEGP-ISI-ALT-05, Version 1 and VEGP-ISI-ALT-06, Version 1 |
| | | author name = Pierce C R |
| | | author affiliation = Southern Co, Southern Nuclear Operating Co, Inc |
| | | addressee name = |
| | | addressee affiliation = NRC/Document Control Desk, NRC/NRR |
| | | docket = 05000424, 05000425 |
| | | license number = |
| | | contact person = |
| | | case reference number = NL-14-0050 |
| | | document type = Letter |
| | | page count = 2 |
| | }} |
| | |
| | =Text= |
| | {{#Wiki_filter:Charles R. Pierce Regulatory Affairs Director January 31, 2014 Docket Nos.: 50-424 50-425 Southern Nuclear Operating Company, Inc. 40 Inverness Center Parkway Post Office Box 1295 Birmingham, Alabama 35201 Tel 205.992.7872 Fax 205.992.7601 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 SOUTHERN<<\ |
| | COMPANY NL-14-0050 Vogtle Electric Generating Plant-Units 1 & 2 Clarification to Proposed lnservice Inspection Alternatives VEGP-ISI-ALT-05 Version 1 and VEGP-ISI-ALT-06 Version 1 Ladies and Gentlemen: |
| | By letter dated August 29, 2012, and as supplemented by letter dated November 25, 2013, Southern Nuclear Operating Company (SNC) requested Nuclear Regulatory Commission (NRC) approval of proposed inservice inspection (lSI) Alternatives VEGP-ISI-ALT-05, Version 1 and VEGP-ISI-ALT-06, Version 1. These alternatives propose one-time extensions of reactor vessel examinations from a ten-year examination period to a twenty-year examination period for their respective unit. Specifically, these alternatives request one-time extensions to selected ASME Examination Category B-A reactor vessel welds and selected ASME Examination Category B-D reactor vessel nozzle welds and reactor vessel inside radius sections. |
| | Based on discussion with the NRC, further clarification is needed regarding the Interval Date for the Alternatives. |
| | SNC requested approval for exam exemption during the 3rd lSI Interval, which is from May 31, 2007 through May 30, 2017. Rather than requesting an exam extension, SNC should have requested an extension of the 3rd lSI Interval, in which the exams would be performed during an extended 3rd lSI Interval. |
| | This is approach is in line with the wording in WCAP-16168-NP-A. |
| | The approval of VEGP-ISI-ALT-05, Version 1 and VEGP-ISI-ALT-06, Version 1 will allow examinations identified in VEGP-ISI-ALT-05, Version 1 and VEGP-ISI-ALT-06, Version 1 that are currently scheduled for the 3rd lSI interval to be delayed until the end of the extended 3rd lSI interval. |
| | U. S. Nuclear Regulatory Commission NL-14-0050 Page 2 In addition, SNC had listed the Duration of Proposed Alternative on the August 29, 2012 letter as the 3rd and 4th intervals, since the inspections would be delayed until the 4th lSI interval. |
| | However, the requested Duration of Proposed Alternative should only state the 3rd interval. |
| | The Alternatives will not affect the proposed examination dates of the 4th interval that were indicated in the letter dated August 29, 2012, as supplemented by the letter dated November 25, 2013. This letter contains no NRC commitments. |
| | If you have any questions, please contact Ken McElroy at (205) 992-7369. |
| | Respectfully submitted, C. R. Pierce Regulatory Affairs Director CRP/RMJ cc: Southern Nuclear Operating Company Mr. S. E. Kuczynski, Chairman, President |
| | & CEO Mr. D. G. Bost, Executive Vice President |
| | & Chief Nuclear Officer Mr. T. E. Tynan, Vice President-Vogtle Mr. B. L. lvey, Vice President-Regulatory Affairs Mr. B. J. Adams, Vice President-Fleet Operations RType: CVC7000 U.S. Nuclear Regulatory Commission Mr. V. M. McCree, Regional Administrator Mr. R. E. Martin, NRR Senior Project Manager-Vogtle Mr. L. M. Cain, Senior Resident Inspector-Vogtle}} |
|
---|
Category:Letter
MONTHYEARNL-24-0385, Request for Action Matrix Deviation Due to Recent Events Impacting the Unplanned Scram with Complications Performance Indicator2024-10-31031 October 2024 Request for Action Matrix Deviation Due to Recent Events Impacting the Unplanned Scram with Complications Performance Indicator IR 05000424/20240032024-10-30030 October 2024 – Integrated Inspection Report 05000424/2024003 and 05000425/2024003 NL-24-0392, Response to Requests for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-0022024-10-28028 October 2024 Response to Requests for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-002 NL-24-0386, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks Response to Request for Additional Information2024-10-28028 October 2024 License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks Response to Request for Additional Information NL-24-0366, Core Operating Limits Report, Cycle 26, Version 12024-10-25025 October 2024 Core Operating Limits Report, Cycle 26, Version 1 ML24297A6482024-10-23023 October 2024 5 to the Updated Final Safety Analysis Report, Technical Specification Bases Changes, Technical Requirements Manual Changes, Summary Report and Revised NRC Commitments Report ML24269A2502024-09-26026 September 2024 Acknowledgement of the Withdrawal of the Requested Exemption and License Amendment Request to Remove Tier 1 and Tier 2* Requirements NL-24-0369, Withdrawal of License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2 Requirements2024-09-25025 September 2024 Withdrawal of License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2 Requirements NL-24-0350, Core Operating Limits Report, Cycle 24, Version 22024-09-25025 September 2024 Core Operating Limits Report, Cycle 24, Version 2 ML24243A0072024-09-10010 September 2024 – Correction of Amendment Nos. 223 and 206 Regarding Revision to Technical Specifications to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-14483 ML24102A2642024-09-0909 September 2024 – Exemption Request Regarding Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0013) - Letter NL-24-0337, Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program2024-09-0909 September 2024 Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program ML24249A2942024-09-0606 September 2024 Correction of Amendment Nos. 218 and 201 Regarding Revision to Technical Specifications to Use Online Monitoring Methodology 05200025/LER-2024-002, Manual Reactor Protection System and Automatic Safeguards Actuation Due to an Unexpected Change in Position of a Main Feedwater Pump Minimum Flow Control Valve2024-09-0505 September 2024 Manual Reactor Protection System and Automatic Safeguards Actuation Due to an Unexpected Change in Position of a Main Feedwater Pump Minimum Flow Control Valve IR 05000424/20240052024-08-26026 August 2024 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 and 2 - Report 05000424/2024005 and 05000425/2024005 ML24235A1952024-08-22022 August 2024 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 3 and 4 - Report 05200025/2024005 and 05200026/2024005 IR 05000424/20244012024-08-15015 August 2024 4 - Security Baseline Inspection Report 05000424-2024401, 05000425-2024401, 05200025-2024402, and 05200026-2024403 - Cover Letter NL-24-0299, Exemption Request: Final Safety Analysis Report Update Schedule, Response to Request for Additional Information2024-08-14014 August 2024 Exemption Request: Final Safety Analysis Report Update Schedule, Response to Request for Additional Information 05000425/LER-2024-001, Manual Actuation of the Reactor Protection System Due to a Rod Control Fuse Opening Causing a Misaligned Shutdown Rod2024-08-0909 August 2024 Manual Actuation of the Reactor Protection System Due to a Rod Control Fuse Opening Causing a Misaligned Shutdown Rod ML24218A1842024-08-0707 August 2024 Examination Report and Cover Letter 05200026/LER-2024-001, Manual Reactor Protection System Actuation Due to Procedure Not Optimally Sequenced to Reset the Rapid Power Reduction Signal2024-08-0606 August 2024 Manual Reactor Protection System Actuation Due to Procedure Not Optimally Sequenced to Reset the Rapid Power Reduction Signal ML24212A1442024-08-0101 August 2024 Integrated Inspection Report 05200025/2024002 and 05200026/2024002 IR 05000424/20240022024-07-29029 July 2024 Integrated Inspection Report 05000424/2024002 and 05000425/2024002 IR 05000424/20244042024-07-26026 July 2024 Material Control and Accounting Program Inspection Report 05000424/2024404 and 05000425/2024404 (Cover Letter) NL-24-0282, License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements2024-07-25025 July 2024 License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements NL-24-0126, – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.62024-07-25025 July 2024 – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.6 ML24204A0722024-07-23023 July 2024 Issuance of Amendment No. 225, Regarding LAR to Revise TS 3.7.9 for a one-time Change to Support Nuclear Service Cooling Water Transfer Pump Repairs - Emergency Circumstances NL-24-0286, Emergency Request to Revise Technical Specification 3.7.9 for a One-Time Change to Support a Unit 1 Nuclear Service Cooling Water Transfer Pump Repair2024-07-20020 July 2024 Emergency Request to Revise Technical Specification 3.7.9 for a One-Time Change to Support a Unit 1 Nuclear Service Cooling Water Transfer Pump Repair NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 ML24191A4562024-07-19019 July 2024 Request for Relief and Alternative Requirements for Squib (Explosively Actuated) Valves First Test Interval ML24194A0342024-07-12012 July 2024 Review of the Refueling Outage 1R24 Steam Generator Tube Inspection Report ML24191A3792024-07-10010 July 2024 – Initial Test Program and Operational Programs Inspection Report 05200026/2024011 NL-24-0227, Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2024-07-0303 July 2024 Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0234, Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown2024-06-28028 June 2024 Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in NL-24-0087, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks2024-06-21021 June 2024 License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks NL-24-0201, Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2024-06-18018 June 2024 Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0243, Registration of Spent Fuel Cask Use2024-06-18018 June 2024 Registration of Spent Fuel Cask Use ML24163A0632024-06-12012 June 2024 2024 Licensed Operator Re-qualification Inspection Notification Letter Vogtle, Units 3 & 4 ML24155A1772024-06-0505 June 2024 Regulatory Audit in Support of Review of the LAR to Revise Emergency Diesel Generator Frequency and Voltage Ranges for Technical Specification 3.8.1, Surveillance Requirements NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24094A1402024-05-16016 May 2024 Staff Response to Request for Revision to NRC Staff Assessment of Updated Seismic Hazard Information and Latest Understanding of Seismic Hazards at the Vogtle Plant Site Following the NRC Process for the Ongoing Assessment of Natural Hazard ML24130A2412024-05-13013 May 2024 Integrated Inspection Report 05200025/2024001 and 05200026/2024001 ML24120A1812024-05-13013 May 2024 Request for Withholding Information from Public Disclosure Responses to NRC Request for Additional Information for Refueling Outage IR24 Steam Generator Tube Inspection Report – Enclosure 2 ML24101A2112024-05-11011 May 2024 Expedited Issuance of Amendment No. 198 Change to Technical Specification 5.5.13, Ventilation Filter Testing Program (VFTP) NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 ML24127A2372024-05-0909 May 2024 Initial Test Program and Operational Programs Inspection Report 05200026/2024010 NL-24-0194, Revised Request for Relief and Alternative Requirements for Squib Valves First Test Interval (V34-IST-ALT-03-R1)2024-05-0707 May 2024 Revised Request for Relief and Alternative Requirements for Squib Valves First Test Interval (V34-IST-ALT-03-R1) ML24120A2832024-04-30030 April 2024 Project Manager Reassignment 2024-09-09
[Table view] |
Text
Charles R. Pierce Regulatory Affairs Director January 31, 2014 Docket Nos.: 50-424 50-425 Southern Nuclear Operating Company, Inc. 40 Inverness Center Parkway Post Office Box 1295 Birmingham, Alabama 35201 Tel 205.992.7872 Fax 205.992.7601 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 SOUTHERN<<\
COMPANY NL-14-0050 Vogtle Electric Generating Plant-Units 1 & 2 Clarification to Proposed lnservice Inspection Alternatives VEGP-ISI-ALT-05 Version 1 and VEGP-ISI-ALT-06 Version 1 Ladies and Gentlemen:
By letter dated August 29, 2012, and as supplemented by letter dated November 25, 2013, Southern Nuclear Operating Company (SNC) requested Nuclear Regulatory Commission (NRC) approval of proposed inservice inspection (lSI) Alternatives VEGP-ISI-ALT-05, Version 1 and VEGP-ISI-ALT-06, Version 1. These alternatives propose one-time extensions of reactor vessel examinations from a ten-year examination period to a twenty-year examination period for their respective unit. Specifically, these alternatives request one-time extensions to selected ASME Examination Category B-A reactor vessel welds and selected ASME Examination Category B-D reactor vessel nozzle welds and reactor vessel inside radius sections.
Based on discussion with the NRC, further clarification is needed regarding the Interval Date for the Alternatives.
SNC requested approval for exam exemption during the 3rd lSI Interval, which is from May 31, 2007 through May 30, 2017. Rather than requesting an exam extension, SNC should have requested an extension of the 3rd lSI Interval, in which the exams would be performed during an extended 3rd lSI Interval.
This is approach is in line with the wording in WCAP-16168-NP-A.
The approval of VEGP-ISI-ALT-05, Version 1 and VEGP-ISI-ALT-06, Version 1 will allow examinations identified in VEGP-ISI-ALT-05, Version 1 and VEGP-ISI-ALT-06, Version 1 that are currently scheduled for the 3rd lSI interval to be delayed until the end of the extended 3rd lSI interval.
U. S. Nuclear Regulatory Commission NL-14-0050 Page 2 In addition, SNC had listed the Duration of Proposed Alternative on the August 29, 2012 letter as the 3rd and 4th intervals, since the inspections would be delayed until the 4th lSI interval.
However, the requested Duration of Proposed Alternative should only state the 3rd interval.
The Alternatives will not affect the proposed examination dates of the 4th interval that were indicated in the letter dated August 29, 2012, as supplemented by the letter dated November 25, 2013. This letter contains no NRC commitments.
If you have any questions, please contact Ken McElroy at (205) 992-7369.
Respectfully submitted, C. R. Pierce Regulatory Affairs Director CRP/RMJ cc: Southern Nuclear Operating Company Mr. S. E. Kuczynski, Chairman, President
& CEO Mr. D. G. Bost, Executive Vice President
& Chief Nuclear Officer Mr. T. E. Tynan, Vice President-Vogtle Mr. B. L. lvey, Vice President-Regulatory Affairs Mr. B. J. Adams, Vice President-Fleet Operations RType: CVC7000 U.S. Nuclear Regulatory Commission Mr. V. M. McCree, Regional Administrator Mr. R. E. Martin, NRR Senior Project Manager-Vogtle Mr. L. M. Cain, Senior Resident Inspector-Vogtle