ML14056A344: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:ATTACHMENTS OR ENCLOSURES TO THIS LETTER CONTAIN INFORMATION TO BEWITHHELD FROM PUBLIC DISCLOSURE PURSUANT TO 10 CFR 2.390PSEG Nuclear LLCP.O. Box 236, Hancocks Bridge, NJ 08038-0236 0 PSEGNuclear LLC10 CFR 50.54(f)LR-N14-0024 FEB 07 2014U.S. Nuclear Regulatory Commission ATTN: Document Control DeskWashington, DC 20555-0001 Hope Creek Generating StationRenewed Facility Operating License No. NPF-57NRC Docket No. 50-354
{{#Wiki_filter:ATTACHMENTS OR ENCLOSURES TO THIS LETTER CONTAIN INFORMATION TO BE WITHHELD FROM PUBLIC DISCLOSURE PURSUANT TO 10 CFR 2.390 PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, NJ 08038-0236 0 PSEG Nuclear LLC 10 CFR 50.54(f)LR-N14-0024 FEB 07 2014 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Hope Creek Generating Station Renewed Facility Operating License No. NPF-57 NRC Docket No. 50-354  


==Subject:==
==Subject:==
 
Seismic Walkdown Report Update -Hope Creek Generating Station Response to Recommendation 2.3: Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident  
Seismic Walkdown Report Update -Hope Creek Generating StationResponse to Recommendation 2.3: Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident


==References:==
==References:==


(1) US Nuclear Regulatory Commission (NRC) letter, "Request forInformation Pursuant to Title 10 of the Code of Federal Regulations 50.54(f)
(1) US Nuclear Regulatory Commission (NRC) letter, "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," dated March 12, 2012 (2) PSEG letter LR-N12-0371, "Hope Creek Generating Station Response to Recommendation 2.3: Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," dated November 26, 2012 (3) Electric Power Research Institute (EPRI) Report 1025286, "Seismic Walkdown Guidance:
Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident,"
For Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic," dated June 2012 On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued a request for information (Reference  
dated March 12, 2012(2) PSEG letter LR-N12-0371, "Hope Creek Generating Station Response toRecommendation 2.3: Seismic Walkdown of the Near-Term Task ForceReview of Insights from the Fukushima Dai-ichi Accident,"
datedNovember 26, 2012(3) Electric Power Research Institute (EPRI) Report 1025286, "SeismicWalkdown Guidance:
For Resolution of Fukushima Near-Term TaskForce Recommendation 2.3: Seismic,"
dated June 2012On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued a request for information (Reference  
: 1) to PSEG Nuclear LLC (PSEG), including a request to perform seismic walkdowns using NRC-endorsed methodology.
: 1) to PSEG Nuclear LLC (PSEG), including a request to perform seismic walkdowns using NRC-endorsed methodology.
By letter dated November 26, 2012 (Reference 2), PSEGresponded to the information request for Hope Creek Generating Station (HCGS), utilizing theNRC-endorsed walkdown guidance in EPRI Technical Report 1025286 (Reference 3).Reference 2 included a commitment for PSEG to submit an updated seismic walkdown reportfor HCGS. This was due to inaccessibility of areas and components at the time of the originalwalkdowns.
By letter dated November 26, 2012 (Reference 2), PSEG responded to the information request for Hope Creek Generating Station (HCGS), utilizing the NRC-endorsed walkdown guidance in EPRI Technical Report 1025286 (Reference 3).Reference 2 included a commitment for PSEG to submit an updated seismic walkdown report for HCGS. This was due to inaccessibility of areas and components at the time of the original walkdowns.
Enclosure 1 provides the updated HCGS seismic walkdown report which includesP0 IO ATTACHMENTS OR ENCLOSURES TO THIS LETTER CONTAIN INFORMATION TO BEWITHHELD FROM PUBLIC DISCLOSURE PURSUANT TO 10 CFR 2.390FEB 07 2014 10 CFR 50.54(f)Page 2LR-N14-0024 the results of walkdowns performed during HCGS Refueling Outage 18 (H1 R1 8), and completes the regulatory commitment contained in Reference 2.Table 6-1 of Enclosure 1 provides a summary of potentially adverse seismic conditions thatwere identified during the walkdowns and entered into PSEG's Corrective Action Program(CAP). These CAP items have either been corrected or determined to be acceptable "as-is."The walkdowns performed during H1R18 in support of the revised walkdown report did notidentify any new potentially adverse seismic conditions.
Enclosure 1 provides the updated HCGS seismic walkdown report which includes P0 IO ATTACHMENTS OR ENCLOSURES TO THIS LETTER CONTAIN INFORMATION TO BE WITHHELD FROM PUBLIC DISCLOSURE PURSUANT TO 10 CFR 2.390 FEB 07 2014 10 CFR 50.54(f)Page 2 LR-N14-0024 the results of walkdowns performed during HCGS Refueling Outage 18 (H1 R1 8), and completes the regulatory commitment contained in Reference 2.Table 6-1 of Enclosure 1 provides a summary of potentially adverse seismic conditions that were identified during the walkdowns and entered into PSEG's Corrective Action Program (CAP). These CAP items have either been corrected or determined to be acceptable "as-is." The walkdowns performed during H1R18 in support of the revised walkdown report did not identify any new potentially adverse seismic conditions.
Attachments 3 and 6 to Enclosure 1 are considered sensitive, unclassified (non-safeguard) information in accordance with 10 CFR 2.390, "Public inspections, exemptions, requests forwithholding."
Attachments 3 and 6 to Enclosure 1 are considered sensitive, unclassified (non-safeguard) information in accordance with 10 CFR 2.390, "Public inspections, exemptions, requests for withholding." As such, PSEG requests that the information contained in these attachments be withheld from public disclosure.
As such, PSEG requests that the information contained in these attachments bewithheld from public disclosure.
There are no regulatory commitments contained in this letter. If you have any questions or require additional information, please do not hesitate to contact Mrs. Emily Bauer at 856-339-1023.
There are no regulatory commitments contained in this letter. If you have any questions or require additional information, please do not hesitate to contact Mrs. Emily Bauer at856-339-1023.
I declare under penalty of perjury that the foregoing is true and correct.Executed on Da-" 1 0 1 Ot4 (Date)Sincerely, Paul J. Davison Site Vice President Hope Creek Generating Station Enclosure 1: Hope Creek Generating Station Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic cc: Mr. E. Leeds, Director of Office of Nuclear Reactor Regulation Mr. W. Dean, Administrator, Region I, NRC Mr. J. Hughey, Project Manager, NRC NRC Senior Resident Inspector, Hope Creek Mr. P. Mulligan, Manager IV, NJBNE Hope Creek Commitment Tracking Coordinator PSEG Commitment Coordinator  
I declare under penalty of perjury that the foregoing is true and correct.Executed on Da-" 1 0 1 Ot4(Date)Sincerely, Paul J. DavisonSite Vice President Hope Creek Generating StationEnclosure 1: Hope Creek Generating Station Response to the 50.54(f)
-Corporate ATTACHMENTS TO THIS ENCLOSURE CONTAIN INFORMATION TO BE WITHHELD FROM PUBLIC DISCLOSURE PURSUANT TO 10 CFR 2.390 LR-N14-0024 Enclosure 1 PSEG NUCLEAR LLC Hope Creek Generating Station Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic Report SL-011553 Revision 2 The signatures below document PSEG Nuclear LLC review and approval of this report: Reviewed By: PSEG Euishirda Response Engineering PSEG Fukushima Response Licensing Approved By: 2.7-'17 Date Date D te PSEG Fuk(js'hma U o0,1- Manager Attachments 3 and 6 to Enclosure 1 are considered sensitive, unclassified (non-safeguard) information in accordance with 10 CFR 2.390, "Public inspections, exemptions, requests for withholding." As such, PSEG requests that the information contained in the attachments be withheld from public disclosure.}}
Information RequestRegarding Fukushima Near-Term Task Force Recommendation 2.3: Seismiccc: Mr. E. Leeds, Director of Office of Nuclear Reactor Regulation Mr. W. Dean, Administrator, Region I, NRCMr. J. Hughey, Project Manager, NRCNRC Senior Resident Inspector, Hope CreekMr. P. Mulligan, Manager IV, NJBNEHope Creek Commitment Tracking Coordinator PSEG Commitment Coordinator  
-Corporate ATTACHMENTS TO THIS ENCLOSURE CONTAIN INFORMATION TO BEWITHHELD FROM PUBLIC DISCLOSURE PURSUANT TO 10 CFR 2.390LR-N14-0024 Enclosure 1PSEG NUCLEAR LLCHope Creek Generating StationResponse to the 50.54(f)
Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: SeismicReport SL-011553 Revision 2The signatures below document PSEG Nuclear LLC review and approval of this report:Reviewed By:PSEG Euishirda Response Engineering PSEG Fukushima Response Licensing Approved By:2.7-'17DateDateD tePSEG Fuk(js'hma Uo0,1- ManagerAttachments 3 and 6 to Enclosure 1 are considered sensitive, unclassified (non-safeguard) information in accordance with 10 CFR 2.390, "Public inspections, exemptions, requests for withholding."
As such, PSEG requests that theinformation contained in the attachments be withheld from public disclosure.}}

Latest revision as of 15:58, 17 March 2019

Seismic Walkdown Report Update - Hope Creek Generating Station Response to Recommendation 2.3: Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident
ML14056A344
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 02/07/2014
From: Davison P J
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML14056A365 List:
References
LR-N14-0024
Download: ML14056A344 (3)


Text

ATTACHMENTS OR ENCLOSURES TO THIS LETTER CONTAIN INFORMATION TO BE WITHHELD FROM PUBLIC DISCLOSURE PURSUANT TO 10 CFR 2.390 PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, NJ 08038-0236 0 PSEG Nuclear LLC 10 CFR 50.54(f)LR-N14-0024 FEB 07 2014 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Hope Creek Generating Station Renewed Facility Operating License No. NPF-57 NRC Docket No. 50-354

Subject:

Seismic Walkdown Report Update -Hope Creek Generating Station Response to Recommendation 2.3: Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident

References:

(1) US Nuclear Regulatory Commission (NRC) letter, "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," dated March 12, 2012 (2) PSEG letter LR-N12-0371, "Hope Creek Generating Station Response to Recommendation 2.3: Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," dated November 26, 2012 (3) Electric Power Research Institute (EPRI) Report 1025286, "Seismic Walkdown Guidance:

For Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic," dated June 2012 On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued a request for information (Reference

1) to PSEG Nuclear LLC (PSEG), including a request to perform seismic walkdowns using NRC-endorsed methodology.

By letter dated November 26, 2012 (Reference 2), PSEG responded to the information request for Hope Creek Generating Station (HCGS), utilizing the NRC-endorsed walkdown guidance in EPRI Technical Report 1025286 (Reference 3).Reference 2 included a commitment for PSEG to submit an updated seismic walkdown report for HCGS. This was due to inaccessibility of areas and components at the time of the original walkdowns.

Enclosure 1 provides the updated HCGS seismic walkdown report which includes P0 IO ATTACHMENTS OR ENCLOSURES TO THIS LETTER CONTAIN INFORMATION TO BE WITHHELD FROM PUBLIC DISCLOSURE PURSUANT TO 10 CFR 2.390 FEB 07 2014 10 CFR 50.54(f)Page 2 LR-N14-0024 the results of walkdowns performed during HCGS Refueling Outage 18 (H1 R1 8), and completes the regulatory commitment contained in Reference 2.Table 6-1 of Enclosure 1 provides a summary of potentially adverse seismic conditions that were identified during the walkdowns and entered into PSEG's Corrective Action Program (CAP). These CAP items have either been corrected or determined to be acceptable "as-is." The walkdowns performed during H1R18 in support of the revised walkdown report did not identify any new potentially adverse seismic conditions.

Attachments 3 and 6 to Enclosure 1 are considered sensitive, unclassified (non-safeguard) information in accordance with 10 CFR 2.390, "Public inspections, exemptions, requests for withholding." As such, PSEG requests that the information contained in these attachments be withheld from public disclosure.

There are no regulatory commitments contained in this letter. If you have any questions or require additional information, please do not hesitate to contact Mrs. Emily Bauer at 856-339-1023.

I declare under penalty of perjury that the foregoing is true and correct.Executed on Da-" 1 0 1 Ot4 (Date)Sincerely, Paul J. Davison Site Vice President Hope Creek Generating Station Enclosure 1: Hope Creek Generating Station Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic cc: Mr. E. Leeds, Director of Office of Nuclear Reactor Regulation Mr. W. Dean, Administrator, Region I, NRC Mr. J. Hughey, Project Manager, NRC NRC Senior Resident Inspector, Hope Creek Mr. P. Mulligan, Manager IV, NJBNE Hope Creek Commitment Tracking Coordinator PSEG Commitment Coordinator

-Corporate ATTACHMENTS TO THIS ENCLOSURE CONTAIN INFORMATION TO BE WITHHELD FROM PUBLIC DISCLOSURE PURSUANT TO 10 CFR 2.390 LR-N14-0024 Enclosure 1 PSEG NUCLEAR LLC Hope Creek Generating Station Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic Report SL-011553 Revision 2 The signatures below document PSEG Nuclear LLC review and approval of this report: Reviewed By: PSEG Euishirda Response Engineering PSEG Fukushima Response Licensing Approved By: 2.7-'17 Date Date D te PSEG Fuk(js'hma U o0,1- Manager Attachments 3 and 6 to Enclosure 1 are considered sensitive, unclassified (non-safeguard) information in accordance with 10 CFR 2.390, "Public inspections, exemptions, requests for withholding." As such, PSEG requests that the information contained in the attachments be withheld from public disclosure.