ML16207A675: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 2: Line 2:
| number = ML16207A675
| number = ML16207A675
| issue date = 04/28/2016
| issue date = 04/28/2016
| title = South Texas, Units 1 and 2, Revision 18 to Updated Final Safety Analysis Report, Section 4.3, Figure 4.3-1 to Figure 4.3-45
| title = Revision 18 to Updated Final Safety Analysis Report, Section 4.3, Figure 4.3-1 to Figure 4.3-45
| author name =  
| author name =  
| author affiliation = South Texas Project Nuclear Operating Co
| author affiliation = South Texas Project Nuclear Operating Co

Latest revision as of 04:13, 2 February 2019

Revision 18 to Updated Final Safety Analysis Report, Section 4.3, Figure 4.3-1 to Figure 4.3-45
ML16207A675
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 04/28/2016
From:
South Texas
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16207A547 List: ... further results
References
NOC-AE-16003371
Download: ML16207A675 (65)


Text

Revision18

  • The Unit 1 Cycle 20 core contains 56 RCCAs with no RCCA installed at

core location D-6. Unit 1 has seven

(7) rods for shutdown bank SA. The

total number of rods for Unit 1 is

twenty-seven (27) for the shutdown

banks.***