ML16207A675: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML16207A675
| number = ML16207A675
| issue date = 04/28/2016
| issue date = 04/28/2016
| title = South Texas, Units 1 and 2, Revision 18 to Updated Final Safety Analysis Report, Section 4.3, Figure 4.3-1 to Figure 4.3-45
| title = Revision 18 to Updated Final Safety Analysis Report, Section 4.3, Figure 4.3-1 to Figure 4.3-45
| author name =  
| author name =  
| author affiliation = South Texas Project Nuclear Operating Co
| author affiliation = South Texas Project Nuclear Operating Co
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:  
{{#Wiki_filter:Revision18
* The Unit 1 Cycle 20 core contains 56 RCCAs with no RCCA installed at


Revision18* The Unit 1 Cycle 20 core contains 56 RCCAs with no RCCA installed at core location D-6. Unit 1 has seven (7) rods for shutdown bank SA. The total number of rods for Unit 1 is twenty-seven (27) for the shutdown banks.***
core location D-6. Unit 1 has seven  


}}
(7) rods for shutdown bank SA. The
 
total number of rods for Unit 1 is
 
twenty-seven (27) for the shutdown
 
banks.***}}

Latest revision as of 04:13, 2 February 2019

Revision 18 to Updated Final Safety Analysis Report, Section 4.3, Figure 4.3-1 to Figure 4.3-45
ML16207A675
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 04/28/2016
From:
South Texas
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16207A547 List: ... further results
References
NOC-AE-16003371
Download: ML16207A675 (65)


Text

Revision18

  • The Unit 1 Cycle 20 core contains 56 RCCAs with no RCCA installed at

core location D-6. Unit 1 has seven

(7) rods for shutdown bank SA. The

total number of rods for Unit 1 is

twenty-seven (27) for the shutdown

banks.***