ENS 47060: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 3: | Line 3: | ||
| facility = Nuclear Fuel Services Inc. | | facility = Nuclear Fuel Services Inc. | ||
| Organization = | | Organization = | ||
| license number = | | license number = SNM-124 | ||
| region = 2 | | region = 2 | ||
| state = Tennessee | | state = Tennessee | ||
Line 16: | Line 16: | ||
| event date = 07/14/2011 17:04 EDT | | event date = 07/14/2011 17:04 EDT | ||
| last update date = 07/15/2011 | | last update date = 07/15/2011 | ||
| title = Initiation | | title = Initiation of Material Control and Accounting Resolution Procedure | ||
| event text = 10CFR74.57(f)(2) requires notification within 24 hours that an MC&A [Material Control and Accounting] alarm resolution procedure has been initiated. In the solvent extraction area of Building 333, the input minus output value exceeded the MC&A limit. Because the alarm investigation procedure has been initiated, this notification is being made. There is no indication that a material loss has occurred. | | event text = 10CFR74.57(f)(2) requires notification within 24 hours that an MC&A [Material Control and Accounting] alarm resolution procedure has been initiated. In the solvent extraction area of Building 333, the input minus output value exceeded the MC&A limit. Because the alarm investigation procedure has been initiated, this notification is being made. There is no indication that a material loss has occurred. | ||
MC&A process monitoring tests for material balance were run as specified by applicable procedures and requirements. Based on the test results for the Building 333 solvent extraction area, the test limit was exceeded. An investigation is currently underway to resolve the issue. | MC&A process monitoring tests for material balance were run as specified by applicable procedures and requirements. Based on the test results for the Building 333 solvent extraction area, the test limit was exceeded. An investigation is currently underway to resolve the issue. |
Latest revision as of 18:19, 24 November 2018
Where | |
---|---|
Nuclear Fuel Services Inc. Erwin, Tennessee (NRC Region 2) | |
License number: | SNM-124 |
Reporting | |
10 CFR 74.57 | |
Time - Person (Reporting Time:+18.95 h0.79 days <br />0.113 weeks <br />0.026 months <br />) | |
Opened: | Rick Droke 16:01 Jul 15, 2011 |
NRC Officer: | Donald Norwood |
Last Updated: | Jul 15, 2011 |
47060 - NRC Website | |