NRC Generic Letter 1990-08: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 14: Line 14:
| page count = 3
| page count = 3
}}
}}
{{#Wiki_filter:.*. *A0 RUNITED STATESi vNUCLEAR REGULATORY COMMISSIONWASHINGTON, D. C. 20555August 10, 1990TO: ALL HOLDERS OF OPERATING LICENSES OR CONSTRUCTION PERMITS FORNUCLEAR POWER REACTORSSUBJECT: SIMULATION FACILITY EXEMPTIONS (GENERIC LETTER 90- O0This Generic Letter is being issued to remind the addressees of the need tomeet the schedule requirements for the use of simulation facilities in theadministration of operating tests established in Section 55.45(b) of Title 10of the Code of Federal Regulations (CFR). This Generic Letter also describesthe review of exemption requests and the potential consequences for failure tomeet the requirements of Section 55.45(b). It is expected that addressees willreview this letter for applicability to their facilities.Section 306 of the Nuclear Waste Policy Act of 1982 (42 USC 10226) requiredthe Nuclear Regulatory Commission (NRC) to establish, among other things,requirements for operating tests at simulators. The NRC accomplished thisobjective by revising 10 CFR Part 55, effective May 26, 1987. Theseregulations, in conjunction with 10 CFR 50.54(1-1), require facility licenseesto use simulation facilities when administering operating tests. Theseregulations further require that a certified or NRC-approved simulationfacility must be used to administer operating tests after May 26, 1991.In accordance with 10 CFR 55.45(b)(1), facility licensees may either apply forCommission approval for use of a simulation facility or they may certify thattheir simulation facility consists solely of a plant-referenced simulator.Section 55.45(b)(2) establishes the required schedule for the initial submittalof either an application or a certification. Sections 55.45(b)(2)(i) and (ii)require facility licensees proposing to apply for NRC approval to submit a planto do so by May 26 1988, and to submit the application by November 26, 1990.Section 55.45(b)(25(iii) requires facility licensees proposing to certifyplant-referenced simulators to submit Form 474, "Simulation FacilityCertification," by March 26, 1991. Section 55.45(b)(2)(iv) requires that,after May 26, 1991, the simulation facility portion of the operating test,which is required to be completed for both initial licensing and requalifi-cation examinations administered by NRC and for annual operating tests forfacility requalification programs, not be administered on other than acertified or approved simulation facility.As stated in the "Supplementary Information" published with the final versionof 10 CFR Part 55 in the Federal Register (52 FR 9453, March 25, 1987), theNRC expected each facility licensee to have a simulation facility availablewithin a reasonable period of time after the effective date of the new rulebut not later than 4 years after the effective date. It was further stated thatany deviations from the time requirements of 10 CFR 55.45(b) would be addressedon a case-specific basis. Therefore, facility licensees who believe they willnot be able to meet the time requirements should request exemptions as soon aspossible so that the request may be reviewed-and, where appropriate, granted sothat the facility licensees will not be in violation of the regulationsdiscus-sed-ahove.900047 Z A)G:  
{{#Wiki_filter:.*. *A0 RUNITED STATES i vNUCLEAR REGULATORY  
-I. --Generic Letter 90- 08 -2 i August 10, 1990The NRC will consider requests for exemptions in accordance with 10 CFR 50.12.'Items that will be considered when reviewing Justifications for exemptionrequests include the licensees' reasons for not meeting the schedule requirementsincluding their actual order dates and estimated completion dates for new orupgraded simulation facilities and the means for conducting operating testsuntil a certified or approved simulation facility is available. Specialcircumstances, as described in 10 CFR 50.12(a)(2), must be present for anyexemption to be granted.An exemption request would be covered by Office of Management and BudgetClearance Number 3150-0011, which expires January 31, 1991. The estimatedaverage burden hours for an exemption request would be approximately fourperson hours. Send comments regarding this burden estimate or any otheraspect of this collection of information, including suggestions for reducingthis burden, to the Information and Records Management Branch (MNBB-7714),Division of Information Support Services, Office of Information ResourcesManagement, U. S. Nuclear Regulatory Commission, Washington, DC 20555; and tothe Paperwork Reduction Project (3150-0011), Office of Management and Budget,Washington, DC 20503.If you have any questions about this letter, please contact the technicalcontact44sted beWow or the-appropriate- NRR-pro-emt anager-Sincerely,Ja s G. Partlow, Associate Directorfor ProjectsOffice of Nuclear Reactor Regulation
COMMISSION
WASHINGTON, D. C. 20555 August 10, 1990 TO: ALL HOLDERS OF OPERATING  
LICENSES OR CONSTRUCTION  
PERMITS FOR NUCLEAR POWER REACTORS SUBJECT: SIMULATION  
FACILITY EXEMPTIONS (GENERIC LETTER 90- O0 This Generic Letter is being issued to remind the addressees of the need to meet the schedule requirements for the use of simulation facilities in the administration of operating tests established in Section 55.45(b) of Title 10 of the Code of Federal Regulations (CFR). This Generic Letter also describes the review of exemption requests and the potential consequences for failure to meet the requirements of Section 55.45(b).  
It is expected that addressees will review this letter for applicability to their facilities.
 
Section 306 of the Nuclear Waste Policy Act of 1982 (42 USC 10226) required the Nuclear Regulatory Commission (NRC) to establish, among other things, requirements for operating tests at simulators.
 
The NRC accomplished this objective by revising 10 CFR Part 55, effective May 26, 1987. These regulations, in conjunction with 10 CFR 50.54(1-1), require facility licensees to use simulation facilities when administering operating tests. These regulations further require that a certified or NRC-approved simulation facility must be used to administer operating tests after May 26, 1991.In accordance with 10 CFR 55.45(b)(1), facility licensees may either apply for Commission approval for use of a simulation facility or they may certify that their simulation facility consists solely of a plant-referenced simulator.
 
Section 55.45(b)(2)  
establishes the required schedule for the initial submittal of either an application or a certification.
 
Sections 55.45(b)(2)(i)  
and (ii)require facility licensees proposing to apply for NRC approval to submit a plan to do so by May 26 1988, and to submit the application by November 26, 1990.Section 55.45(b)(25(iii)  
requires facility licensees proposing to certify plant-referenced simulators to submit Form 474, "Simulation Facility Certification," by March 26, 1991. Section 55.45(b)(2)(iv)  
requires that, after May 26, 1991, the simulation facility portion of the operating test, which is required to be completed for both initial licensing and requalifi- cation examinations administered by NRC and for annual operating tests for facility requalification programs, not be administered on other than a certified or approved simulation facility.As stated in the "Supplementary Information" published with the final version of 10 CFR Part 55 in the Federal Register (52 FR 9453, March 25, 1987), the NRC expected each facility licensee to have a simulation facility available within a reasonable period of time after the effective date of the new rule but not later than 4 years after the effective date. It was further stated that any deviations from the time requirements of 10 CFR 55.45(b) would be addressed on a case-specific basis. Therefore, facility licensees who believe they will not be able to meet the time requirements should request exemptions as soon as possible so that the request may be reviewed-and, where appropriate, granted so that the facility licensees will not be in violation of the regulations discus-sed-ahove.
 
900047 Z A)G:  
-I. --Generic Letter 90- 08 -2 i August 10, 1990 The NRC will consider requests for exemptions in accordance with 10 CFR 50.12.'Items that will be considered when reviewing Justifications for exemption requests include the licensees'  
reasons for not meeting the schedule requirements including their actual order dates and estimated completion dates for new or upgraded simulation facilities and the means for conducting operating tests until a certified or approved simulation facility is available.
 
Special circumstances, as described in 10 CFR 50.12(a)(2), must be present for any exemption to be granted.An exemption request would be covered by Office of Management and Budget Clearance Number 3150-0011, which expires January 31, 1991. The estimated average burden hours for an exemption request would be approximately four person hours. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Information and Records Management Branch (MNBB-7714), Division of Information Support Services, Office of Information Resources Management, U. S. Nuclear Regulatory Commission, Washington, DC 20555; and to the Paperwork Reduction Project (3150-0011), Office of Management and Budget, Washington, DC 20503.If you have any questions about this letter, please contact the technical contact44sted beWow or the-appropriate- NRR-pro-emt anager-Sincerely, Ja s G. Partlow, Associate Director for Projects Office of Nuclear Reactor Regulation  


===Technical Contact:===
===Technical Contact:===
N. Hunemuller, NRR(301) 492-3173Enclosure:List of Recently Issued Generic Letters EnclosureLIST OF RECENTLY ISSUED GENERIC LETTERSGenericLetter No..Date ofIssuanceSubject.-Issued To-- ----90-08SIMULATION FACILITYEXEMPTIONS08/10/90ALL HOLDERS OFOPERATING LICENSESOR CONSTRUCTIONPERMITS FOR NUCLEARPOWER REACTORS90-0789-10SUPP. 2.-OPERATOR LICENSING NATIONALEXAMINATION SCHEDULEAVAILABILITY OF.PROGRAMDESCRIPTIONS08/10/9008/03/90ALL POWER REACTORLICENSEES ANDAPPLICANTS FOR ANOPERATING LICENSEALL LICENSEES OFOPERATING NPPs ANDHOLDERS OF CPs FORNPPs88-20SUPP. 3COMPLETION OF CONTAINMENTPERFORMANCE IMPROVEMENTPROGRAM AND,,FORWARIING OF,INSIGHTS FOR USE IN THEINDIVIDUAL PLANT EXAMINA-TION FOR SEVERE ACCIDENTVULNERABILITIES07/06/90--, !1; I = I- u ..ALL LICENSEES HOLD-ING OLs AND CPs.,FQR 0P.PwEACILITLESI.IEXCEPT LICENSEESFOR BWRs WITH MARK ICONTAINMENTS90-0690-05RESOLUTION OF GI 70, "POWER-OPERATED RELIEF VALVE ANDBLOCK VALVE RELIABILITY,"AND GI 94, 'ADDITIONAL LOW-TEMPERATURE-OVERPRESSUREPROTECTION FOR LIGHT-WATERREACTORS," PURSUANT TO1OCFR50.54(f)GUIDANCE FOR PERFORMINGTEMPORARY NON-CODE REPAIROF ASME CODE CLASS 1,2,&3PIPINGRESULTS OF THE PUBLIC WORK-SHOPRELAXATION OF STAFF POSITIONIN GL 83-28, ITEM 2.2 PART2, "VENDOR INTERFACE FORSAFETY-RELATED COMPONENTS"06/28/9006/15/9006/13/9005/14/90ALL PRESSURIZEDWATER REACTORLICENSEES ANDCONSTRUCTIONPERMIT HOLDERSALL HOLDERS OFOPERATING LICENSESFOR NPPsALL LICENSEES OFOPERATING NPPs ANDHOLDERS OF CPsALL POWER REACTORLICENSEES ANDAPPLICANTS89-10SUPP. 190-03SUPP. 1  
N. Hunemuller, NRR (301) 492-3173 Enclosure:
}}
List of Recently Issued Generic Letters Enclosure LIST OF RECENTLY ISSUED GENERIC LETTERS Generic Letter No..Date of Issuance Subject.-Issued To-- ----90-08 SIMULATION
FACILITY EXEMPTIONS
08/10/90 ALL HOLDERS OF OPERATING
LICENSES OR CONSTRUCTION
PERMITS FOR NUCLEAR POWER REACTORS 90-07 89-10 SUPP. 2.-OPERATOR LICENSING  
NATIONAL EXAMINATION
SCHEDULE AVAILABILITY
OF.PROGRAM
DESCRIPTIONS
08/10/90 08/03/90 ALL POWER REACTOR LICENSEES
AND APPLICANTS
FOR AN OPERATING
LICENSE ALL LICENSEES  
OF OPERATING
NPPs AND HOLDERS OF CPs FOR NPPs 88-20 SUPP. 3 COMPLETION
OF CONTAINMENT
PERFORMANCE
IMPROVEMENT
PROGRAM AND,,FORWARIING  
OF, INSIGHTS FOR USE IN THE INDIVIDUAL
PLANT EXAMINA-TION FOR SEVERE ACCIDENT VULNERABILITIES
07/06/90--, !1; I = I- u ..ALL LICENSEES  
HOLD-ING OLs AND CPs.,FQR 0P.PwEACILITLESI.I
EXCEPT LICENSEES FOR BWRs WITH MARK I CONTAINMENTS
90-06 90-05 RESOLUTION
OF GI 70, "POWER-OPERATED RELIEF VALVE AND BLOCK VALVE RELIABILITY," AND GI 94, 'ADDITIONAL  
LOW-TEMPERATURE-OVERPRESSURE
PROTECTION
FOR LIGHT-WATER
REACTORS," PURSUANT TO 1OCFR50.54(f)
GUIDANCE FOR PERFORMING
TEMPORARY
NON-CODE REPAIR OF ASME CODE CLASS 1,2,&3 PIPING RESULTS OF THE PUBLIC WORK-SHOP RELAXATION
OF STAFF POSITION IN GL 83-28, ITEM 2.2 PART 2, "VENDOR INTERFACE  
FOR SAFETY-RELATED  
COMPONENTS" 06/28/90 06/15/90 06/13/90 05/14/90 ALL PRESSURIZED
WATER REACTOR LICENSEES
AND CONSTRUCTION
PERMIT HOLDERS ALL HOLDERS OF OPERATING
LICENSES FOR NPPs ALL LICENSEES  
OF OPERATING
NPPs AND HOLDERS OF CPs ALL POWER REACTOR LICENSEES
AND APPLICANTS
89-10 SUPP. 1 90-03 SUPP. 1}}


{{GL-Nav}}
{{GL-Nav}}

Revision as of 12:04, 31 August 2018

NRC Generic Letter 1990-008: Simulation Facility Exemptions
ML031210435
Person / Time
Site: Beaver Valley, Millstone, Hatch, Monticello, Calvert Cliffs, Dresden, Davis Besse, Peach Bottom, Browns Ferry, Salem, Oconee, Mcguire, Nine Mile Point, Palisades, Palo Verde, Perry, Indian Point, Fermi, Kewaunee, Catawba, Harris, Wolf Creek, Saint Lucie, Point Beach, Oyster Creek, Watts Bar, Hope Creek, Grand Gulf, Cooper, Sequoyah, Byron, Pilgrim, Arkansas Nuclear, Braidwood, Susquehanna, Summer, Prairie Island, Columbia, Seabrook, Brunswick, Surry, Limerick, North Anna, Turkey Point, River Bend, Vermont Yankee, Crystal River, Haddam Neck, Ginna, Diablo Canyon, Callaway, Vogtle, Waterford, Duane Arnold, Farley, Robinson, Clinton, South Texas, San Onofre, Cook, Comanche Peak, Yankee Rowe, Maine Yankee, Quad Cities, Humboldt Bay, La Crosse, Big Rock Point, Rancho Seco, Zion, Midland, Bellefonte, Fort Calhoun, FitzPatrick, McGuire, LaSalle, Fort Saint Vrain, Washington Public Power Supply System, Shoreham, Satsop, Trojan, Atlantic Nuclear Power Plant, Clinch River, Crane  Entergy icon.png
Issue date: 08/10/1990
From: Partlow J G
Office of Nuclear Reactor Regulation
To:
References
GL-90-008, NUDOCS 9008080047
Download: ML031210435 (3)


.*. *A0 RUNITED STATES i vNUCLEAR REGULATORY

COMMISSION

WASHINGTON, D. C. 20555 August 10, 1990 TO: ALL HOLDERS OF OPERATING

LICENSES OR CONSTRUCTION

PERMITS FOR NUCLEAR POWER REACTORS SUBJECT: SIMULATION

FACILITY EXEMPTIONS (GENERIC LETTER 90- O0 This Generic Letter is being issued to remind the addressees of the need to meet the schedule requirements for the use of simulation facilities in the administration of operating tests established in Section 55.45(b) of Title 10 of the Code of Federal Regulations (CFR). This Generic Letter also describes the review of exemption requests and the potential consequences for failure to meet the requirements of Section 55.45(b).

It is expected that addressees will review this letter for applicability to their facilities.

Section 306 of the Nuclear Waste Policy Act of 1982 (42 USC 10226) required the Nuclear Regulatory Commission (NRC) to establish, among other things, requirements for operating tests at simulators.

The NRC accomplished this objective by revising 10 CFR Part 55, effective May 26, 1987. These regulations, in conjunction with 10 CFR 50.54(1-1), require facility licensees to use simulation facilities when administering operating tests. These regulations further require that a certified or NRC-approved simulation facility must be used to administer operating tests after May 26, 1991.In accordance with 10 CFR 55.45(b)(1), facility licensees may either apply for Commission approval for use of a simulation facility or they may certify that their simulation facility consists solely of a plant-referenced simulator.

Section 55.45(b)(2)

establishes the required schedule for the initial submittal of either an application or a certification.

Sections 55.45(b)(2)(i)

and (ii)require facility licensees proposing to apply for NRC approval to submit a plan to do so by May 26 1988, and to submit the application by November 26, 1990.Section 55.45(b)(25(iii)

requires facility licensees proposing to certify plant-referenced simulators to submit Form 474, "Simulation Facility Certification," by March 26, 1991. Section 55.45(b)(2)(iv)

requires that, after May 26, 1991, the simulation facility portion of the operating test, which is required to be completed for both initial licensing and requalifi- cation examinations administered by NRC and for annual operating tests for facility requalification programs, not be administered on other than a certified or approved simulation facility.As stated in the "Supplementary Information" published with the final version of 10 CFR Part 55 in the Federal Register (52 FR 9453, March 25, 1987), the NRC expected each facility licensee to have a simulation facility available within a reasonable period of time after the effective date of the new rule but not later than 4 years after the effective date. It was further stated that any deviations from the time requirements of 10 CFR 55.45(b) would be addressed on a case-specific basis. Therefore, facility licensees who believe they will not be able to meet the time requirements should request exemptions as soon as possible so that the request may be reviewed-and, where appropriate, granted so that the facility licensees will not be in violation of the regulations discus-sed-ahove.

900047 Z A)G:

-I. --Generic Letter 90- 08 -2 i August 10, 1990 The NRC will consider requests for exemptions in accordance with 10 CFR 50.12.'Items that will be considered when reviewing Justifications for exemption requests include the licensees'

reasons for not meeting the schedule requirements including their actual order dates and estimated completion dates for new or upgraded simulation facilities and the means for conducting operating tests until a certified or approved simulation facility is available.

Special circumstances, as described in 10 CFR 50.12(a)(2), must be present for any exemption to be granted.An exemption request would be covered by Office of Management and Budget Clearance Number 3150-0011, which expires January 31, 1991. The estimated average burden hours for an exemption request would be approximately four person hours. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Information and Records Management Branch (MNBB-7714), Division of Information Support Services, Office of Information Resources Management, U. S. Nuclear Regulatory Commission, Washington, DC 20555; and to the Paperwork Reduction Project (3150-0011), Office of Management and Budget, Washington, DC 20503.If you have any questions about this letter, please contact the technical contact44sted beWow or the-appropriate- NRR-pro-emt anager-Sincerely, Ja s G. Partlow, Associate Director for Projects Office of Nuclear Reactor Regulation

Technical Contact:

N. Hunemuller, NRR (301) 492-3173 Enclosure:

List of Recently Issued Generic Letters Enclosure LIST OF RECENTLY ISSUED GENERIC LETTERS Generic Letter No..Date of Issuance Subject.-Issued To-- ----90-08 SIMULATION

FACILITY EXEMPTIONS

08/10/90 ALL HOLDERS OF OPERATING

LICENSES OR CONSTRUCTION

PERMITS FOR NUCLEAR POWER REACTORS 90-07 89-10 SUPP. 2.-OPERATOR LICENSING

NATIONAL EXAMINATION

SCHEDULE AVAILABILITY

OF.PROGRAM

DESCRIPTIONS

08/10/90 08/03/90 ALL POWER REACTOR LICENSEES

AND APPLICANTS

FOR AN OPERATING

LICENSE ALL LICENSEES

OF OPERATING

NPPs AND HOLDERS OF CPs FOR NPPs 88-20 SUPP. 3 COMPLETION

OF CONTAINMENT

PERFORMANCE

IMPROVEMENT

PROGRAM AND,,FORWARIING

OF, INSIGHTS FOR USE IN THE INDIVIDUAL

PLANT EXAMINA-TION FOR SEVERE ACCIDENT VULNERABILITIES

07/06/90--, !1; I = I- u ..ALL LICENSEES

HOLD-ING OLs AND CPs.,FQR 0P.PwEACILITLESI.I

EXCEPT LICENSEES FOR BWRs WITH MARK I CONTAINMENTS

90-06 90-05 RESOLUTION

OF GI 70, "POWER-OPERATED RELIEF VALVE AND BLOCK VALVE RELIABILITY," AND GI 94, 'ADDITIONAL

LOW-TEMPERATURE-OVERPRESSURE

PROTECTION

FOR LIGHT-WATER

REACTORS," PURSUANT TO 1OCFR50.54(f)

GUIDANCE FOR PERFORMING

TEMPORARY

NON-CODE REPAIR OF ASME CODE CLASS 1,2,&3 PIPING RESULTS OF THE PUBLIC WORK-SHOP RELAXATION

OF STAFF POSITION IN GL 83-28, ITEM 2.2 PART 2, "VENDOR INTERFACE

FOR SAFETY-RELATED

COMPONENTS" 06/28/90 06/15/90 06/13/90 05/14/90 ALL PRESSURIZED

WATER REACTOR LICENSEES

AND CONSTRUCTION

PERMIT HOLDERS ALL HOLDERS OF OPERATING

LICENSES FOR NPPs ALL LICENSEES

OF OPERATING

NPPs AND HOLDERS OF CPs ALL POWER REACTOR LICENSEES

AND APPLICANTS

89-10 SUPP. 1 90-03 SUPP. 1

Template:GL-Nav