Information for "PNO-II-88-038, on 880603,outage Exceeded 48 H to Repair Leaking Tubes on Condenser B.Reactor Subsequently Tripped from Unrelated Switch Problem During Surveillance Test.Eddy Current Test Determined 30 Tubes Would Not Pass Probe"

Jump to navigation Jump to search

Basic information

Display titlePNO-II-88-038, on 880603,outage Exceeded 48 H to Repair Leaking Tubes on Condenser B.Reactor Subsequently Tripped from Unrelated Switch Problem During Surveillance Test.Eddy Current Test Determined 30 Tubes Would Not Pass Probe
Default sort keyPNO-II-88-038, on 880603,outage Exceeded 48 H to Repair Leaking Tubes on Condenser B.Reactor Subsequently Tripped from Unrelated Switch Problem During Surveillance Test.Eddy Current Test Determined 30 Tubes Would Not Pass Probe
Page length (in bytes)765
Page ID1014027
Page content languageen - English
Page content modelwikitext
Indexing by robotsAllowed
Number of redirects to this page2
Counted as a content pageYes

Page protection

EditAllow all users (infinite)
MoveAllow all users (infinite)
View the protection log for this page.

Edit history

Page creatorStriderTol (talk | contribs)
Date of page creation13:44, 14 November 2020
Latest editorStriderTol (talk | contribs)
Date of latest edit06:47, 17 December 2020
Total number of edits2
Total number of distinct authors1
Recent number of edits (within past 90 days)0
Recent number of distinct authors0

Page properties

Transcluded templates (13)

Templates used on this page: