Information for "05000265/LER-1997-004, Forwards LER 97-004-00,IAW 10CFR50.73(a)(2)(ii)(B).Unit 1 DWEDS & DWFDS Will Be Examined to Verify Video Tape Determination During Next Refueling Shutdown to Ensure Covers on Unit Installed Per Applicable Design Drawings"

Jump to navigation Jump to search

Basic information

Display title05000265/LER-1997-004, Forwards LER 97-004-00,IAW 10CFR50.73(a)(2)(ii)(B).Unit 1 DWEDS & DWFDS Will Be Examined to Verify Video Tape Determination During Next Refueling Shutdown to Ensure Covers on Unit Installed Per Applicable Design Drawings
Default sort key05000265/LER-1997-004, Forwards LER 97-004-00,IAW 10CFR50.73(a)(2)(ii)(B).Unit 1 DWEDS & DWFDS Will Be Examined to Verify Video Tape Determination During Next Refueling Shutdown to Ensure Covers on Unit Installed Per Applicable Design Drawings
Page length (in bytes)4,001
Page ID1421320
Page content languageen - English
Page content modelwikitext
Indexing by robotsAllowed
Number of redirects to this page3
Counted as a content pageYes

Page protection

EditAllow all users (infinite)
MoveAllow all users (infinite)
View the protection log for this page.

Edit history

Page creatorStriderTol (talk | contribs)
Date of page creation02:17, 20 October 2023
Latest editorStriderTol (talk | contribs)
Date of latest edit02:17, 20 October 2023
Total number of edits1
Total number of distinct authors1
Recent number of edits (within past 90 days)0
Recent number of distinct authors0

Page properties

Transcluded templates (15)

Templates used on this page: