View source for PNO-II-88-038, on 880603,outage Exceeded 48 H to Repair Leaking Tubes on Condenser B.Reactor Subsequently Tripped from Unrelated Switch Problem During Surveillance Test.Eddy Current Test Determined 30 Tubes Would Not Pass Probe

Jump to navigation Jump to search

You do not have permission to edit this page, for the following reason:

The action you have requested is limited to users in the group: Users.


You can view and copy the source of this page.

Return to PNO-II-88-038, on 880603,outage Exceeded 48 H to Repair Leaking Tubes on Condenser B.Reactor Subsequently Tripped from Unrelated Switch Problem During Surveillance Test.Eddy Current Test Determined 30 Tubes Would Not Pass Probe.