There is currently no text in this page. You can search for this page title in other pages, or search the related logs, but you do not have permission to create this page.
Category:Letter type:NEI
Jump to navigation
Jump to search
Pages in category "Letter type:NEI"
The following 39 pages are in this category, out of 39 total.
N
- NEI 03-01, Supplemental Information for Submittal of Revision 4 to the Security Plan, Training & Qualification Plan and Safeguards Contingency Plan Updating NEI 03-01 Compliance from Revision 1 to Revision 2 - Cover Letter
- NEI 03-08, Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program (MRP) 2019-008, Materials Reliability Program: Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants .
- NEI 03-08, Prairie Island, Units 1 and 2, Notification of Deviation from Eprl Steam Generator Management Program Pressurized Water Reactor Steam Generator Examination Guidelines, Revision 7, Section 6.3.3.2
- NEI 04-07, Response to Request No. 2 in NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors.
- NEI 07-07, Groundwater Protection Initiative (GPI) - Voluntary Special Report for Tritium Discovered On-Site
- NEI 07-07, Oyster Creek, Submittal of Revised Annual Radiological Groundwater Protection Program Report for 2009
- NEI 07-07, Peach Bottom, Units 2 and 3 - Groundwater Protection Initiative (GPI) - Voluntary Special Report for Tritium Discovered On-Site
- NEI 08-09, Re-Submittal of the Exelon Cyber Security Plan
- NEI 12-01, Oyster Creek - Response to March 12, 2012, Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendations of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, Enclosure 5, Recommendation 9.3,
- NEI 12-01, Response to March 12, 2012, Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendations of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, Enclosure 5, Recommendation 9.3, Emergency..
- NEI 12-06, NEI 12-06, Appendix H, Revision 4, H.4.5 Path 5: GMRS ≫ 2 X SSE, Mitigating Strategies Assessment (MSA) Report for the New Seismic Hazard Information
- NEI 94-01, License Amendment Request Supplement Pursuant to 10 CFR 50.90: Adoption of NEI 94-01, Revision 2-A, and Extension of Primary Containment Integrated Leakage Rate Test Interval to Fifteen (15) Years..
- NEI 97-06, Steam Generator Conditioning Monitoring Report
- NEI 98-03, Submittal of Revision No. 19 to Updated Safety Analysis Report for Monticello
- NEI 98-04, Submittal of Revision No. 19 to Updated Safety Analysis Report for Monticello
- NEI 99-01, Arkansas Nuclear One Units 1 & 2, Proposed Emergency Action Levels Using NEI 99-01 Revision 5 Scheme
- NEI 99-01, Revision to Nine Mile Point Units 1 and 2 Emergency Action Levels in Accordance with NEI 99-01, Methodology for Development of Emergency Action Levels, Revision 5
- NEI 99-01, Seabrook Station, Unit No. 1, Request for Approval of Change of Emergency Action Levels Basis to NEI 99-01, Rev. 4
- NEI 99-04, (Pbaps), Units 1, 2, and 3 - Annual Commitment Revision Report for the Period 01/01/23 Through 12/31/23
- NEI 99-04, Catawba, Units 1 & 2, Submittal of Commitment Change Evaluation Report for 2010
- NEI 99-04, Dresden, Units 2 & 3 - 2007 Regulatory Commitment Change Summary Report
- NEI 99-04, Hope Creek Generating Station, 2010 Summary of Revised Regulatory Commitments
- NEI 99-04, McGuire Nuclear Station, Units 1 and 2 - Annual Commitment Change Report
- NEI 99-04, McGuire Units 1 & 2, Annual Commitment Change Report
- NEI 99-04, McGuire, Units 1 & 2 - Annual Commitment Change Report
- NEI 99-04, Nine Mile Point Nuclear Station, Units 1 & 2 - 2009 Summary of Regulatory Commitment Changes
- NEI 99-04, Oyster Creek - Commitment Change Summary Report - 2007
- NEI 99-04, Oyster Creek - Submittal of Commitment Change Summary Report - 2010
- NEI 99-04, Oyster Creek Nuclear Generating Station - Commitment Change Summary Report - 2008
- NEI 99-04, Oyster Creek Nuclear Generating Station - Commitment Change Summary Report - 2017
- NEI 99-04, Oyster Creek, Commitment Change Summary Report - 2011
- NEI 99-04, Oyster Creek, Commitment Change Summary Report - 2013
- NEI 99-04, Oyster Creek, Submittal of Commitment Change Summary Report - 2009
- NEI 99-04, Peach Bottom Atomic Power Station, Units 2 and 3 - Submittal of Commitment Revision Report for 2009
- NEI 99-04, Peach Bottom, Units 1, 2 and 3 and Independent Spent Fuel Storage Installation - Biennial 10CFR 50.59 and 10CFR 72.48 Reports for the Period 1/1/2011 Through 12/31/2012 and Annual Commitment Revision Report for the Period 1/1/12 Through 12
- NEI 99-04, Peach Bottom, Units 1, 2, and 3 - Annual Commitment Revision Report for the Period 01/01/15 Through 12/31/15
- NEI 99-04, San Onofre Nuclear Generating Station (Songs), Units 1, 2 and 3, and the Independent Spent Fuel Storage Installation - Summary Report of Commitment Changes Implemented During the Period from March 2, 2013, Through March 1, 2014
- NEI 99-04, Sequoyah Units 1 & 2, Commitment Summary Report
- NEI 99-04, Virgil C. Summer, Unit 1 - Annual Commitment Change Summary Report