Search results
Jump to navigation
Jump to search
- NEI 99-04, (Pbaps), Units 1, 2, and 3 - Annual Commitment Revision Report for the Period 01/01/23 Through 12/31/23 (category Letter type:NEI)Rule Implementation RAI Response NRC Letter 10/23/1992 Constellation Tracking Nos.: T04082 (02701330-15) - Letter to NRC Concerning Station Blackout -11 KB (1,704 words) - 01:17, 6 February 2024
- NEI 07-07, Groundwater Protection Initiative (GPI) - Voluntary Special Report for Tritium Discovered On-Site (category Letter type:NEI)Steinhauer, PSE&G, Financial Controls and Co-owner Affairs R. Anderson, NEI (GW Notice@nei-org) S. Focht, American Nuclear Insurer's CCN: 15-52 IR 24864603 KB (375 words) - 12:58, 19 March 2020
- NEI 98-03, Submittal of Revision No. 19 to Updated Safety Analysis Report for Monticello (category Letter type:NEI)in accordance with guidance provided in NEI 99-04, "Guidelines for Managing NRC Commitment Changes." This letter contains no new NRC commitments. Exhibit8 KB (1,230 words) - 05:16, 24 November 2019
- NEI 94-01, License Amendment Request Supplement Pursuant to 10 CFR 50.90: Adoption of NEI 94-01, Revision 2-A, and Extension of Primary Containment Integrated Leakage Rate Test Interval to Fifteen (15) Years.. (category Letter type:NEI)ILRT surveillance interval was very small. By letter dated August 31, 2007, the NEI submitted Revision 2 of NEI 94-01 and EPRI TR-1009325, Revision 2, "Risk167 KB (25,986 words) - 10:50, 12 March 2020
- NEI 04-07, Response to Request No. 2 in NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors. (category Letter type:NEI)Response to Request No. 2 in NRC Generic Letter 2004-02 3. List of Regulatory Commitments Attachment 1: Deviations to NEI 04-07 and WCAP-16406-P cc: B. S. Mallett100 KB (15,594 words) - 16:05, 14 March 2020
- provides the NEI 12-01 Phase 2 Staffing Assessment, as requested by the §50.54(f) letter, conducted using the guidance in NEI 12-01 and material from NEI 10-05123 KB (18,230 words) - 16:52, 4 December 2019
- NEI 99-04, Oyster Creek, Submittal of Commitment Change Summary Report - 2009 (category Letter type:NEI)Containment Inspection Program (Commitment 27), as described in AmerGen letter 2130-07-20464, and the NRC SER. Updating the description of this commitment8 KB (1,203 words) - 07:44, 19 September 2018
- NEI 99-04, Catawba, Units 1 & 2, Submittal of Commitment Change Evaluation Report for 2010 (category Letter type:NEI)subsequent commitment changes were made based on the guidance defined in NEI 99-04, Guidelines for Managing NRC Commitments, and have no adverse effect3 KB (422 words) - 21:23, 18 September 2018
- NEI 99-04, McGuire, Units 1 & 2 - Annual Commitment Change Report (category Letter type:NEI)NUMBER SOURCE ORIGINAL COMMITMENT MODIFIED COMMITMENT DOCUMENT 2009-M-001 Letter dated August August 3, 2004 -Run maximum Run the maximum number of 3, 20043 KB (468 words) - 14:25, 19 September 2018
- NEI 99-04, McGuire Nuclear Station, Units 1 and 2 - Annual Commitment Change Report (category Letter type:NEI)DOCUMENT ORIGINAL COMMITMENT MODIFIED COMMITMENT 2011 -M-001 Duke Energy letter to Portable emergency lights -For Areas 1, 3, 4, and NRC dated January 313 KB (405 words) - 05:58, 18 September 2018
- NEI 99-04, San Onofre Nuclear Generating Station (Songs), Units 1, 2 and 3, and the Independent Spent Fuel Storage Installation - Summary Report of Commitment Changes Implemented During the Period from March 2, 2013, Through March 1, 2014 (category Letter type:NEI)1988-05-001, 002, 003, & 004 NN 202376533 SCE letter to NRC dated May 31, 1985, Response to Generic Letter 88-05.001: "As identified in the enclosure, SCE20 KB (3,130 words) - 17:58, 12 October 2018
- NEI 99-04, McGuire Units 1 & 2, Annual Commitment Change Report (category Letter type:NEI)coolant system level has been lowered below 84 inches.2007-M-003 Duke Letter Duke's letter commits to ANSI The Occupational Physical dated July B30.2-1976 for3 KB (479 words) - 16:51, 20 September 2018
- NEI 99-04, Sequoyah Units 1 & 2, Commitment Summary Report (category Letter type:NEI)Docket Nos. 50-327 and 50-328 Commitment Summary Report The purpose of this letter is to provide the Sequoyah Nuclear Plant Commitment Summary Report for the4 KB (613 words) - 11:25, 19 September 2018
- REPORT JANUARY 1, 2012 THROUGH DECEMBER 31, 2012 CHANGE SUMMARIES Letter Source: Letter to NRC dated 4/24/91 Commitments Regarding Station Blackout Exelon37 KB (5,995 words) - 21:29, 17 September 2018
- NEI 07-07, Oyster Creek, Submittal of Revised Annual Radiological Groundwater Protection Program Report for 2009 (category Letter type:NEI)this cover letter is a revised copy of the 2009 Annual Radiological Groundwater Protection Program Report that was submitted under cover letter RA-10-003124 KB (32,692 words) - 04:38, 19 September 2018
- NEI 99-01, Revision to Nine Mile Point Units 1 and 2 Emergency Action Levels in Accordance with NEI 99-01, Methodology for Development of Emergency Action Levels, Revision 5 (category Letter type:NEI)and are in agreement with the proposed EAL changes.The Attachments to this letter provide the documents which support the NMP 1 and NMP2 proposed EAL scheme4 KB (512 words) - 19:52, 18 September 2018
- NEI 99-04, Oyster Creek, Commitment Change Summary Report - 2013 (category Letter type:NEI)v t e Similar Documents at Oyster Creek Category:Letter type:NEI MONTHYEARNEI 99-04929 bytes (81 words) - 05:47, 11 October 2018
- NEI 99-04, Oyster Creek - Commitment Change Summary Report - 2007 (category Letter type:NEI)completion is contained in letter 6730-96-2112 to the NRC dated April 18, 1996.Justification -OCNGS's response to Generic Letter 96-01 provided a docketed4 KB (469 words) - 11:08, 20 September 2018
- NEI 07-07, Peach Bottom, Units 2 and 3 - Groundwater Protection Initiative (GPI) - Voluntary Special Report for Tritium Discovered On-Site (category Letter type:NEI)Maryland P. Steinhauer, PSE&G, Financial Controls and Co-owner Affairs NEI (GW Notice@nei-orQ) Peach Bottom Township Delta Borough Lower Chanceford Township3 KB (395 words) - 22:53, 19 September 2018
- NEI 99-04, Oyster Creek Nuclear Generating Station - Commitment Change Summary Report - 2017 (category Letter type:NEI)License No. DPR-16 NRG Docket No. 50-219 Commitment Change Summary Report -2017 NEI 99-04 Enclosed is the Oyster Creek Nuclear Generating Station Commitment Change6 KB (814 words) - 22:37, 21 September 2018