| Start date | Site | Title |
---|
IR 05000333/2024011 | 19 September 2024 | FitzPatrick | Follow-up to Inspection Procedure 71153 Report 05000333/2024011 and Preliminary White Finding and Apparent Violation |
IR 05000483/2024002 | 18 July 2024 | Callaway | And Independent Spent Fuel Storage Installation Integrated Inspection Report 05000483/2024002 and 07201045/2024001 |
1CAN032301, License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure | 30 March 2023 | Arkansas Nuclear | License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure |
IR 05000498/2022001 | 9 May 2022 | South Texas | Integrated Inspection Report 05000498/2022001 and 05000499/2022001 |
ML21210A408 | 29 July 2021 | 07109374 | Enclosure 4: HI-2146261, Revision 4, Safety Analysis Report on the HI-STAR 80 Package |
ML21152A270 | 1 June 2021 | 07109325 | Enclosure 4: Holtec International - Safety Analysis Report on the HI-STAR 180 Package |
ML21124A207 | 4 May 2021 | 07109375 | HI-2146312, Revision 3, Safety Analysis Report on the HI-STAR Atb 1T Non-Fuel Waste Transport System |
ML21120A135 | 30 April 2021 | 07109378 | Enclosure 3 - HI-2188080, Revision 5, Safety Analysis Report on the HI-STAR 100MB Package |
IR 05000286/2020004 | 28 January 2021 | Indian Point | Integrated Inspection Report 05000286/2020004 |
ML20258A058 | 11 September 2020 | 07109378 | Enclosure 3: HI-2188080, Revision 4, Safety Analysis Report on the HI-STAR 100MB Package |