WBL-19-044, Unit 2 - Forward Emergency Plan Implementing Procedure Revisions
| ML19220A031 | |
| Person / Time | |
|---|---|
| Site: | Watts Bar |
| Issue date: | 08/08/2019 |
| From: | Anthony Williams Tennessee Valley Authority |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19224A670 | List: |
| References | |
| WBL-19-044 | |
| Download: ML19220A031 (2) | |
Text
Watts Bar Nuclear Plant, Post Office Box 2000 Spring City, Tennessee 37381 WBL-19-044 August 8, 2019 10 CFR 50, Appendix E, Section V 10 CFR 50.54(q)(5) 10 CFR 72.44(f)
ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001
Subject:
Watts Bar Nuclear Plant, Unit 1 & Unit 2 Facility Operating License No. NPF-90, NPF-96 NRC Docket No. 50-390, 50-391 Emergency Plan Implementing Procedure Revisions In accordance with the requirements of 1 O CFR Part 50, Appendix E,Section V, 10 CFR 50.54(q)(5), and 10 CFR 72.44(f), the following Emergency Plan Implementing Procedures (EPIP) have been revised with administrative and editorial changes:
EPIP Revision Title Effective Date EPIP-2 0041 Notification of Unusual Event 07/29/19 EPIP-3 0046 Alert 07/29/19 EPIP-4 0044 Site Area Emergency 07/30/19 EPIP-5 0051 General Emergency 07/30/19 EPIP-13 0028 Initial Dose Assessment for Radiological 07/30/19 Emergencies EPIP-14 0028 Radiological Control Response 07/31/19 The above referenced revisions continue to comply with regulations and there is no reduction in effectiveness of the plan. Details of the revisions are included in Enclosure 1.
U.S. Regulatory Commission August 8, 2019 Page 2 There are no regulatory commitments in this letter. Please direct all questions concerning this matter to Mike White, Emergency Preparedness Manager, at (423) 365-3232.
Respectfully, Anthony L. Williams IV Site Vice President Watts Bar Nuclear Plant : Description of Revision/change cc w/
Enclosure:
NRC Regional Administrator - Region II NRC Senior Resident Inspector