W3P85-0402, Monthly Operating Rept for Jan 1985

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jan 1985
ML20106H277
Person / Time
Site: Waterford Entergy icon.png
Issue date: 01/31/1985
From: Cook K, Geoffrey Miller
LOUISIANA POWER & LIGHT CO.
To: Barry L
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
W3P85-0402, W3P85-402, NUDOCS 8502150240
Download: ML20106H277 (7)


Text

_

OPERATING DATA REPORT.

=

q UNIT NAME: WATERFORD 3 CITY / STATE: KILLONA/LA e-DATE: FEBRUARY 1985 OPERATING STATUS

-1. Docket: 50-382 Notes (1) Maximum Dependable t{

a rs

2. Reporting Period: JANUARY 1985 be determined after the

.3. Utility

Contact:

GEORGE MILLER 100% warranty run.

Phone Number:

(504) 467-8211 f.

4. Licensed Thermal Power (Wt): 3390
5. Nameplate-Rating (Gross Mwe): 1153

~

6. Design Electrical Rating (Net We): 1104

- 7. Maximum Dependable Capacity (Gross We): (Note 1)

8. Maximum Dependable Capacity (Net We): (Note 1) 9.-If. Changes occur-in Capacity Ratings (Items-Number 4 Through 8) Since Last Report,

.Give Reasons:

N/A 10.

Power Level To Which Restricted, if Any (Net MWe): ^

11.

Reasons For Restrictions,-If Any:-Operating License limited to 5% Rated Thermal Power 4

This Month Tr.-to-Date Cumulative 1

l

.12.

Hours In Reporting Period-. 13. -Number Of Hours. Reactor Was Critical ~- 14. : Reactor Reserve Shutdown Hours -0 ~

' 15 Hours Generator On-Line

-0 ' 16. -Unit Reserve Shutdown Hours -0 ',

w~e y"*g40850131* *****ni! =

4*

85021

OPERATING DATA REPORT (Continued)

This Month Yr.-to-Date Cumulative 17.

Gross Thermal Energy Generated (MFH) 18.

Gross Electrical Energy Generated (MWH) 19.

Net Electrical Energy Generated (MWH) 20.

Unit Service Factor N/A N/A N/A

21. Unit Availability Factor N/A N/A N/A 22.

Unit Capacity Factor (Using MDC Net)

N/A N/A N/A

23. Unit Capacity Factor (Using DER Net)

N/A N/A N/A

24. Unit Forced Outage Rate 25. Unit Forced Outage Hours 26. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A 27.

If Shut Down At End of Report Period, Estimated Date Of Startup:

28. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 2/85 INITIAL ELECTRICITY 3/85 COMMERCIAL OPERATION 6/85 i

., -~-

.,.. d'..*

J-f AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-382 UNIT WATERFORD 3 DATE FEBRUARY 1985 COMPLETED BY GEORGE MILLER TELEPHONE 504-467-8211 i

4 MONTH JANUARY 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 17 2 18 3 19 4 20 5 21 6 22.7 23 8 24 9 25 10 26 11 27 12 28 13' 29 14' 30 15 31 16 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in'the reporting month. Compute to the nearest whole. megawatt.

(9/77)

~

e UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT FOR JANUARY 1985 DOCKET NO 50-382 UNIT NAME WATERFORD 3 DATE FEBRUARY 1985 COMPLETED BY GEORGE MILLER TELEPHONE 504-467-8211 Hethod of Licensee Cause & Corrective Duration Shutting Event System Component Action to 1

Ns.

.Date Type.

(HOURS)'

REASON 2 Down Reactor 8 Report #

Code 4 Code 5 Prevent Recurrence NONE I

2 3

4 F: Forced Reason:

Hethod IEEE Std. 805-1984 S: Scheduled A-Equipment Failure (Explain) 1-Hanual B-Haintenance of Test 2-Manual Scram.

C-Refueling 3-Automatic Scram.

D-Regulatory Restriction 4-Continuation E-Operator Training &

5-Load Reduction License Examination 9-Other 5

F-Administrative IEEE Std. 803A-1983 G-Operational Error'(Explain)

H-Other (Explain).

LOUISI AN A / 4 o L4ao~o. 7a. r aa.ox.oo.

POWER & LIGHT / NEW OaLEANS LoutSWA 70174-Sooe 9 (504] 36EH2345 NINSYS February 12, 1985 W3P85-0402 3-A1.01.04 A4.05 Mr. Learned W. Barry Director and Controller Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Barry:

Subject:

Waterford 3 SES Docket No. 50-382 MONTHLY OPERATING REPORT Enclosed is the subject monthly report which covers the operating statistics for the month of January 1985. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-26.

Very truly yours,

// Db K.W. Cook Nuclear Support & Licensing Manager KWC:GEW:sms Enclosure cc:

R.D. Martin, NRC Region IV NRC, Director, Office of I&E G.W. Knighton, NRC-NRR D.M. Crutchfield, NRC-NRR NRC Resident Inspectors Office INPO Records Center (D.L. Gillispie)

E.L. Blake W.M. Stevenson

$')&

a

.f W3P85-0402 NRC MONTHLY OPERATING REPORT

SUMMARY

OF OPERATIONS WATERFORD 3 JANUARY 1985 During the month, post core hot functional testing activities were performed as the unit was gradually heated up.

The unit started the month in Mode 5

-(cold shutdown). On January 23 at 0226 the unit entered Mode 4 (hot shutdown).

The following testing was started and/or performed:

control element drive mechanism performance, incore instrumentation baseline data collection, instrument intercomparison, reactor coolant system expansion measurements and

. movable incore instrumentation operation verification.

W s

---w

-w w-,-

a a m w-

,,e--

v.+

--- --= - -

f SPRING-LOADED PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 During t.he month of January 1985, there were no spring-loaded pressurizer safety talva failures or challenges.

9 0

o

,,-