W3F1-2018-0027, Preparation and Scheduling of Operator Licensing Examinations
| ML18136B010 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 05/16/2018 |
| From: | Simpson R Entergy Operations |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| W3F 1-2018-0027 | |
| Download: ML18136B010 (4) | |
Text
- ~Entergy W3F 1-2018-0027 May 16, 2018 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Entergy Operations, Inc.
17265 River Road Killona, LA 70057 -3093 Tel 504 739 6001 Fax 504-739-6007 rsimpso@entergy.com Robert E. Simpson Manager, Training Waterford 3 10CFR 55
Subject:
RIS 2018-02, Preparation and Scheduling of Operator Licensing Examinations Waterford Steam Electric Station, Unit 3 (Waterford 3)
Docket No. 50-382 License No. NPF-38
Dear Sir or Madam:
In response to NRC Regulatory Issue Summary (RIS) 2018-02, Entergy is hereby submitting the requested information. Attached, on NRC Form 536, is updated information on projected site-specific operator licensing examination schedules and estimated numbers of applicants planning to take operator licensing examinations.
There are no new commitments contained in this submittal.
If you have any questions pertaining to the contents of the attachment, please contact Mr.
Robert Simpson, Training Manager, at (504) 739-6001. For any questions or concerns pertaining to regulatory compliance, please contact Mr. John Jarrell, Regulatory Assurance Manager, at (504) 739-6685.
J-
Attachment:
- 1. Operator Licensing Examination Data
W3F1-2018-0027 Page 2 cc:
Regional Administrator U. S. Nuclear Regulatory Commission Region IV RidsRgn4MailCenter@nrc.gov NRC/NRR Project Manager for Waterford 3 April.Pulvirenti@nrc.gov NRC Senior Resident Inspector Waterford Steam Electric Station Unit 3 Frances.Ramirez@nrc.gov Chris.Speer@nrc.gov W3F1-2018-0027 Operator Licensing Examination Data
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 11/30/2020 (1 1-2017)
,:P"v,.P. REC"<.,>
~
0 OPERA TOR LICENSING Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This
~ '!...
information collection is used to plan budgets and resources for operator examinations. Send
~
~
0 comments regarding burden estimate to the lnf01mation Services Branch (T-2 F43), U.S. Nuclear tr.
- ~: :
EXAMINATION DATA
~
~
Regulatory Commission, Washington, DC20555-0001, or by e-mail to lnfocollects.Resource@nrc.gov,
..... ~...,
~of!'
and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget Washington, DC 20503.
If a means used 1o impose an information collection does not display a currently valid OMB control number, the NRG may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION lwaterf ord 3 SES I l1v I
A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2020 CY 2021 CY 2022 cy 2023 ESTIMATED NUMBER OF LICENSEE-PREPARED 1
0 I
I EXAM I NATIONS ESTIMATED NUMBER OF NRG-PREPARED 0
0 0
0 EXAMINATIONS
- 8. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2020 CY 2021 CY 2022 CY 2023 NUMBER OF REACTOR 5
0 6
6 OPERATORS NUMBER OF SENIOR REACTOR 9
0 2
3 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 5
0 4
5 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0
0 0
0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DA TE 08/1 7/2020 04/15/2022 09/11/2023 ALTERNATE DATE 08/24/2020 04/22/2022 09/18/2023 NRC FORM 536 (11-2017)